{{#Wiki_filter:Code of Federal Regulations
{{#Wiki_filter:March 22, 2019 Gregory Piefer, Ph.D.
Chief Executive Officer SHINE Medical Technologies, Inc.
101 E. Milwaukee Street, Suite 600 Janesville, WI 53545


/RA/}}
==SUBJECT:==
SHINE MEDICAL TECHNOLOGIES, INC. - ACKNOWLEDGMENT OF RECEIPT OF PERIODIC REPORT ON CONSTRUCTION PERMIT CONDITIONS (EPID NO. L-2017-PMP-0014)
 
==Dear Dr. Piefer:==
 
In order to verify certain design developments related to nuclear criticality safety (NCS) and radiation protection in the SHINE Medical Technologies, Inc. (SHINE) radioisotope production facility (RPF), the U.S. Nuclear Regulatory Commission (NRC) collects periodic reports containing the information set forth in Section 3.D.(1) of SHINE Construction Permit No. CPMIF-001.
By letter dated February 22, 2019 (Agencywide Documents Access and Management System Accession No. ML19053A278), SHINE submitted to the NRC its sixth periodic report on NCS and radiation protection consistent with Section 3.D.(1) of its construction permit, CPMIF-001.
As described in its sixth periodic report, SHINE has performed work on the five license conditions described in Section 3.D.(1) of its construction permit. In support of developing the technical basis for the design of the criticality accident alarm system in License Condition (LC) 3.D.(1)(a), SHINE has completed a preliminary analysis using detector response functions in similar facilities to determine detector placement to meet the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 70.24, Criticality accident requirements, paragraph (a).
With respect to the criticality safety considerations described in LCs 3.D.(1)(b) - (d), SHINE indicated that it has used criteria for determining that criticality events are not credible for RPF processes even though fissile materials may be present; completed preliminary NCS evaluations for various systems; and continues to evaluate reactivity contributions from all fissile isotopes to demonstrate that all RPF processes remain subcritical under all normal and credible abnormal conditions.
According to its sixth periodic report, SHINE continues to develop additional design information for the RPF supercells, tank vaults containing the liquid waste storage tanks, evaporation hot cells, and liquid waste solidification hot cells. SHINE indicated that it has determined expected direct dose rates throughout the proposed facility using conservative assumptions. SHINE has created dose maps for multiple analyzed operational scenarios using an as low as is reasonably achievable goal for dose rates in normally occupied locations during normal operation of 0.25 millirem per hour at 30 centimeters from the surface of the shielding. Additionally, administrative controls, such as occupancy times, will be used to ensure doses remain as low
 
G. Piefer                                        as reasonably achievable (ALARA). This information will be presented as part of the SHINE operating license application to demonstrate that shielding and occupancy times within the RPF are consistent with ALARA practices and dose requirements of 10 CFR Part 20, Standards for Protection against Radiation, as described in LC 3.D.(1)(e).
As of the writing of this letter, SHINE has neither initiated construction of its proposed facility nor submitted any additional design information as part of an operating license application or amendment to its construction permit for NRC review under Docket No. 50-608.
Based upon the information provided in SHINEs periodic reports, the status of activities authorized under Construction Permit No. CPMIF-001, and the status of applications submitted under Docket No. 50-608, no NRC action is necessary on SHINEs periodic reports at this time.
The NRC may request that SHINE provide clarifying or more detailed information in order to verify certain design developments as set forth in Section 3.D.(1) of SHINEs construction permit if the NRC considers this information necessary prior to the completion of construction. This may include requests that SHINE make reference material available through an electronic reading room or meet with NRC staff to support the planning and conduct of NRC inspections during construction.
If you have any questions, please contact me at 301-415-1524, or by electronic mail at Steven.Lynch@nrc.gov.
Sincerely,
                                                  /RA/
Steven T. Lynch, Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-608 cc: See next page
 
SHINE Medical Technologies, Inc.          Docket No. 50-608 cc:
Jeff Bartelme Licensing Manager SHINE Medical Technologies, Inc.
101 E. Milwaukee Street, Suite 600 Janesville, WI 53545 Jeff Chamberlin National Nuclear Security Administration, NA-231 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585 Mark Paulson Supervisor Radiation Protection Section Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Dr.
College Park, MD 20742-2115 Mark Freitag City Manager P.O. Box 5005 Janesville, WI 53547-5005 Bill McCoy 1326 Putnam Avenue Janesville, WI 53546 Alfred Lembrich 541 Miller Avenue Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546
 
ML19071A264;            *concurred via email          NRR-002 OFFICE NRR/DLP/PRLB/PM            NRR/DLP/PROB/LA*          NRR/DLP/PRLB/ABC NAME    SLynch                  NParker                  WKennedy DATE    03/12/2019              03/13/2019                03/21/2019 OFFICE NRR/DLP/PRLB/PM NAME    SLynch DATE    03/22/2019}}

Latest revision as of 00:12, 20 October 2019

Shine Medical Technologies, Inc. - Acknowledgement of Receipt of Periodic Report on Construction Permit Conditions
ML19071A264
Person / Time
Site: SHINE Medical Technologies
Issue date: 03/22/2019
From: Steven Lynch
Research and Test Reactors Licensing Projects Branch
To: Piefer G
SHINE Medical Technologies
Lynch S, NRR/DLP, 415-1524
References
Download: ML19071A264 (4)


Text

March 22, 2019 Gregory Piefer, Ph.D.

Chief Executive Officer SHINE Medical Technologies, Inc.

101 E. Milwaukee Street, Suite 600 Janesville, WI 53545

SUBJECT:

SHINE MEDICAL TECHNOLOGIES, INC. - ACKNOWLEDGMENT OF RECEIPT OF PERIODIC REPORT ON CONSTRUCTION PERMIT CONDITIONS (EPID NO. L-2017-PMP-0014)

Dear Dr. Piefer:

In order to verify certain design developments related to nuclear criticality safety (NCS) and radiation protection in the SHINE Medical Technologies, Inc. (SHINE) radioisotope production facility (RPF), the U.S. Nuclear Regulatory Commission (NRC) collects periodic reports containing the information set forth in Section 3.D.(1) of SHINE Construction Permit No. CPMIF-001.

By letter dated February 22, 2019 (Agencywide Documents Access and Management System Accession No. ML19053A278), SHINE submitted to the NRC its sixth periodic report on NCS and radiation protection consistent with Section 3.D.(1) of its construction permit, CPMIF-001.

As described in its sixth periodic report, SHINE has performed work on the five license conditions described in Section 3.D.(1) of its construction permit. In support of developing the technical basis for the design of the criticality accident alarm system in License Condition (LC) 3.D.(1)(a), SHINE has completed a preliminary analysis using detector response functions in similar facilities to determine detector placement to meet the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 70.24, Criticality accident requirements, paragraph (a).

With respect to the criticality safety considerations described in LCs 3.D.(1)(b) - (d), SHINE indicated that it has used criteria for determining that criticality events are not credible for RPF processes even though fissile materials may be present; completed preliminary NCS evaluations for various systems; and continues to evaluate reactivity contributions from all fissile isotopes to demonstrate that all RPF processes remain subcritical under all normal and credible abnormal conditions.

According to its sixth periodic report, SHINE continues to develop additional design information for the RPF supercells, tank vaults containing the liquid waste storage tanks, evaporation hot cells, and liquid waste solidification hot cells. SHINE indicated that it has determined expected direct dose rates throughout the proposed facility using conservative assumptions. SHINE has created dose maps for multiple analyzed operational scenarios using an as low as is reasonably achievable goal for dose rates in normally occupied locations during normal operation of 0.25 millirem per hour at 30 centimeters from the surface of the shielding. Additionally, administrative controls, such as occupancy times, will be used to ensure doses remain as low

G. Piefer as reasonably achievable (ALARA). This information will be presented as part of the SHINE operating license application to demonstrate that shielding and occupancy times within the RPF are consistent with ALARA practices and dose requirements of 10 CFR Part 20, Standards for Protection against Radiation, as described in LC 3.D.(1)(e).

As of the writing of this letter, SHINE has neither initiated construction of its proposed facility nor submitted any additional design information as part of an operating license application or amendment to its construction permit for NRC review under Docket No. 50-608.

Based upon the information provided in SHINEs periodic reports, the status of activities authorized under Construction Permit No. CPMIF-001, and the status of applications submitted under Docket No. 50-608, no NRC action is necessary on SHINEs periodic reports at this time.

The NRC may request that SHINE provide clarifying or more detailed information in order to verify certain design developments as set forth in Section 3.D.(1) of SHINEs construction permit if the NRC considers this information necessary prior to the completion of construction. This may include requests that SHINE make reference material available through an electronic reading room or meet with NRC staff to support the planning and conduct of NRC inspections during construction.

If you have any questions, please contact me at 301-415-1524, or by electronic mail at Steven.Lynch@nrc.gov.

Sincerely,

/RA/

Steven T. Lynch, Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-608 cc: See next page

SHINE Medical Technologies, Inc. Docket No. 50-608 cc:

Jeff Bartelme Licensing Manager SHINE Medical Technologies, Inc.

101 E. Milwaukee Street, Suite 600 Janesville, WI 53545 Jeff Chamberlin National Nuclear Security Administration, NA-231 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585 Mark Paulson Supervisor Radiation Protection Section Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Dr.

College Park, MD 20742-2115 Mark Freitag City Manager P.O. Box 5005 Janesville, WI 53547-5005 Bill McCoy 1326 Putnam Avenue Janesville, WI 53546 Alfred Lembrich 541 Miller Avenue Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546

ML19071A264; *concurred via email NRR-002 OFFICE NRR/DLP/PRLB/PM NRR/DLP/PROB/LA* NRR/DLP/PRLB/ABC NAME SLynch NParker WKennedy DATE 03/12/2019 03/13/2019 03/21/2019 OFFICE NRR/DLP/PRLB/PM NAME SLynch DATE 03/22/2019