| issue date = 09/12/2017
| issue date = 09/12/2017
| title = Requalification Program Inspection: Calvert Cliff Nuclear Power Plant
| title = Requalification Program Inspection: Calvert Cliff Nuclear Power Plant
| author name = Jackson D E
| author name = Jackson D
| author affiliation = NRC/RGN-I
| author affiliation = NRC/RGN-I
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000317, 05000318
| docket = 05000317, 05000318

Revision as of 03:46, 19 June 2019

Requalification Program Inspection: Calvert Cliff Nuclear Power Plant
ML17256A039
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/12/2017
From: Diane Jackson
NRC Region 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
Download: ML17256A039 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406

-2713 September 12, 2017

Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

- CALVERT CLIFF NUCLEAR POWER PLANT

Dear Mr. Hanson:

In a telephone conversation on September 7, 2017, Mr. David Silk , Senior Operations Engineer , and Mr. Scott Stillings , Licensed Operator Requalification Program Lead , made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Calvert Cliffs Nuclear Power Plant. The inspection is planned for the week of November 27, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC

-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish:

1) an index or summary of condition reports written in the past 2 years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of conditio n reports written in the past 2 years on simulator performance problems; 3) an index or summary of simulator performance test results in the past 2 years; and 4) the examination schedule, sample plan, written examinations

, and operating test scheduled for the week of the inspection to the NRC by the week of November 6, 2017. Mr. Stillings has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

These information collections were approved by the Office of Management and Budget, approval number 3150

-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T

-5 F52), U.S.

B. Hanson 2 Nuclear Regulatory Commission, Washington, DC 20555

-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB

-10202, (3150

-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC

's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. David Silk at (610) 337

-53 7 2. Sincerely,

/RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No s. 50-317 and 50-318 License No

s. DPR-53 and DPR 6 9 cc: Distribution via ListServ

B. Hanson 3

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

- CALVERT CLIFFS NUCLEAR POWER PLANT DATED SEPTEMBER 12, 2017 DISTRIBUTION

(via email)

DDorman, RA (R1ORAMAIL RESOURCE)

DLew, DRA (R1ORAMAIL RESOURCE)

RLorson, DRP (R1DRPMAIL RESOURCE)

DPelton, DRP (R1DRPMAIL RESOURCE)

JYerokun, DRS (R1DRSMAIL RESOURCE)

BWelling, DRS (R1DRSMAIL RESOURCE)

ADimitriadis, DRP ARosebrook, DRP JBream, DRP MHardgrove, DRP, RI RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA JBowen, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource ROPReports Resource

DOCUMENT NAME:

G:\DRS\Operations Branch

\SILK\CC2017CorpNotifLtrRQL.docx ADAMS Accession N o. ML17256A039 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME DSilk DEJackson DATE 0 9/8/17 0 9/12/17 OFFICIAL RECORD COPY