ML18139B774: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-*------------------------------8203050235 820224 PDR p . --*----25. 26. 27. 28. 29. 30. 31. 32. 33. 34. ADQCI,( 05000280 PDR CHANNEL DESCRIPTION Turbine First Stage Pressure Emergency Plan Radiati~n Instr._ Environmental Radiation Monitors Logic Channel Testing Turbine Overspeed Protection Trip Chann_el (Electrical)
{{#Wiki_filter:-*-------     ------ --------- ---- ----
Turbine Tr:l.p Setpoint Seismic Instrumentation Reactor Trip Breaker Reactor Coolant Pressure (Low) Auxiliary Feedwater
8203050235 820224 PDR ADQCI,( 05000280 p                         PDR
: a. Steam Generator Water Level Low-Low b. RCP Undervoltage TABLE 4.1-1 CHECK CALIBRATE TEST s R M *M R M *M N.A. N.A. N.A. N.A. M N.A. R R ~.A. R R M R M N.A. N.A. M N.A. R N.A. s R M s R M c. S.I. -(All Safety Injection surveillance requirements)
. - -*-- --                                                           TABLE 4.1-1 CHANNEL DESCRIPTION                                   CHECK              CALIBRATE          TEST            REMARKS
: d. Station Blackout N.A. N.A. R N.A. e. Main Feedwater Pump Trip S -Each shift D -Daily W .-Weekly NA -Not applicable SA -Semiannually M -Monthly* P -Prior to each startup if not done previous week R -Each Refueling Shutdown BW -Every two weeks AP -After each startup if not done previous week Q -Every 90 effective full power days -. 1
: 25. Turbine First Stage Pressure                 s                  R                  M
* See Specification 4.lD N.A. R REMARKS TLD Dosimeters Stop valve closure or low EH fluid pressure -*i -,}}
: 26. Emergency Plan Radiati~n Instr._             *M                 R                 M
: 27. Environmental Radiation Monitors              *M                 N.A.               N.A. TLD Dosimeters
: 28. Logic Channel Testing                        N.A.               N.A.               M
: 29. Turbine Overspeed Protection                  N.A.               R                 R Trip Chann_el (Electrical)
: 30. Turbine Tr:l.p Setpoint                      ~.A.               R                 R     Stop valve closure or low EH fluid pressure
                                                                                                                                  *i
                                                                                                                                  -,
: 31. Seismic Instrumentation                      M                   R                 M
: 32. Reactor Trip Breaker                          N.A.               N.A.               M
: 33. Reactor Coolant Pressure (Low)                N.A.               R                   N.A.
: 34. Auxiliary Feedwater
: a.      Steam Generator Water                s                   R                 M Level Low-Low s
                                                                                                                                -
: b.      RCP Undervoltage                                          R                 M
: c.     S.I.                           - (All Safety Injection surveillance requirements)
: d.     Station Blackout                     N.A.               R                   N.A.
: e. Main Feedwater Pump Trip               N.A.                N.A.                R S - Each shift                     M - Monthly*
D - Daily                          P - Prior to each startup if not done previous week W.- Weekly                        R - Each Refueling Shutdown NA - Not applicable                BW - Every two weeks SA - Semiannually                  AP - After each startup if not done previous week Q - Every 90 effective full power days                 -   . 1
* See Specification 4.lD}}

Revision as of 03:05, 21 October 2019

Proposed Revision to Tech Spec Table 4.1-1,Item 31,changing Channel Calibr for Seismic Instrumentation from Semiannual to Refueling Frequency
ML18139B774
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/24/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B773 List:
References
NUDOCS 8203050235
Download: ML18139B774 (1)


Text

-*------- ------ --------- ---- ----

8203050235 820224 PDR ADQCI,( 05000280 p PDR

. - -*-- -- TABLE 4.1-1 CHANNEL DESCRIPTION CHECK CALIBRATE TEST REMARKS

25. Turbine First Stage Pressure s R M
26. Emergency Plan Radiati~n Instr._ *M R M
27. Environmental Radiation Monitors *M N.A. N.A. TLD Dosimeters
28. Logic Channel Testing N.A. N.A. M
29. Turbine Overspeed Protection N.A. R R Trip Chann_el (Electrical)
30. Turbine Tr:l.p Setpoint ~.A. R R Stop valve closure or low EH fluid pressure
  • i

-,

31. Seismic Instrumentation M R M
32. Reactor Trip Breaker N.A. N.A. M
33. Reactor Coolant Pressure (Low) N.A. R N.A.
34. Auxiliary Feedwater
a. Steam Generator Water s R M Level Low-Low s

-

b. RCP Undervoltage R M
c. S.I. - (All Safety Injection surveillance requirements)
d. Station Blackout N.A. R N.A.
e. Main Feedwater Pump Trip N.A. N.A. R S - Each shift M - Monthly*

D - Daily P - Prior to each startup if not done previous week W.- Weekly R - Each Refueling Shutdown NA - Not applicable BW - Every two weeks SA - Semiannually AP - After each startup if not done previous week Q - Every 90 effective full power days - . 1

  • See Specification 4.lD