Similar Documents at Surry |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML18152B6571999-04-28028 April 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs Re Refueling Water Chemical Addition Tank Min Vol ML18152B5431999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TS Re Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B5501999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,proposing Administrative Change That Will Consolidate AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B6131998-11-0404 November 1998 Application for Amends to Licenses DPR-32 & DPR-37,revising EDG Start & Load Time Testing Requirements in TS 4.6.A.1.b ML18153A3291998-09-24024 September 1998 Application for Amends to Licenses DPR-32 & DPR-37,modifying Testing Requirements for Reactor Trip Bypass Breaker ML18151A6801998-06-19019 June 1998 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers.Application Revised 971105 Submittal ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML18153A3451997-12-18018 December 1997 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Terminology Used for Describing Equipment Surveillances Conducted in Refueling Interval Frequency. Amend Consistent W/Info Provided in Rev 1 of NUREG-1431 ML18151A9791997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Respectively.Amends Will Revise TS to Increase Maximum Allowable Fuel Enrichment from 4.1 to 4.3 Weight Percent U-235.Description of Change Encl ML18152A0761997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML18153A6881996-04-15015 April 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Applicability of Quadrant Power Tilt Ratio Requirements ML18153A5371996-03-21021 March 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Requirements for Testing Charcoal Adsorbent in Auxiliary Ventilation & Control Room Air Filtration Sys as Outlined in Tech Specs 4.12 & 4.20,respectively ML18153A5781996-01-30030 January 1996 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Surveillance Requirement for Certain Reactor Coolant Liquid Samples ML18153A6741995-11-20020 November 1995 Application for Amends to Licenses DPR-32 & DPR-37,permiting Use of 10CFR50 App J,Option B Performance-Based Containment Leakage Rate Testing. ML18153A7121995-07-20020 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to Ts,By Establishing New Setpoint Limit for Steam Generator high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6971995-07-14014 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing Su Accumulators in Lieu of Isolation ML18152A1841995-02-14014 February 1995 Application for Amends to Licenses DPR-32 & DPR-37,revising TS 4.4.D to Permit Approved Exemptions to ILRT Frequency Requirements,Including one-time Exemption Request from Section III.D.1(a) of 10CFR50,App J for Surry Unit 2 ML18153B2111995-01-24024 January 1995 Application for Amends to Licenses DPR-32 & DPR-37,modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1601994-11-29029 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs to Implement Zirlo Fuel Cladding ML18153B1561994-11-22022 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1481994-11-10010 November 1994 Application for Amends to Licenses DPR-32 & DPR-37 to TS Re Changes to TS to Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0921994-10-11011 October 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying Surveillance Frequencies of Hydrogen Analyzers in Accordance W/Generic Ltr 93-05 ML18153B0491994-08-30030 August 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Accomodate Core Uprating,In Accordance w/WCAP-10263, Review Plan for Uprating Licensed Power of PWR Power Plant. ML18153B0041994-07-14014 July 1994 Application for Amends to Licenses DPR-32 & DPR-37, Requesting Amendments in Form of Changes to TS to Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18153A9651994-06-0909 June 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying in Part,Chemical & Vol Control Sys Specs & Safety Injection Sys Specs in Accordance w/NUREG-0452,Rev 4,NUREG-1431 & Generic Ltr 93-05 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B3481993-10-19019 October 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding Operability & Action Statements for RSHX Service Water Outlet Radiation Monitors to TS Table 3.7-6 & SRs for Monitors to TS Table 4.1-2 ML18153B3301993-09-29029 September 1993 Application for Amends to Licenses DPR-32 & DPR-37,modifying TS to Require Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Perform Concurrent W/Disk & Hub Insp ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3901993-07-16016 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to TS to Permit Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML18153D3791993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,updating Augmented Insp Program for Sensitized Stainless Steel to Incorporate Newer Code Requirements While Maintaining Increased Insp Philosophy of ASLB ML18153D3781993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37 Modifying TS to Include COLR Which Presents reload-specific Limits for Key Core Operating Parameters ML18152A4471993-05-0606 May 1993 Application for Amend to License DPR-37,modifying TS to Support Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12,per Enforcement Discretion Granted by NRC on 930504 ML18153D3141993-04-21021 April 1993 Application for Amends to Licenses DPR-32 & DPR-37,providing Clarification of Design Response Time of Containment Hydrogen Analyzers & Deleting Unnecessary Channel Check for Analyzers ML18153D3111993-04-21021 April 1993 Suppl to 930315 Application for Amends to Licenses DPR-32 & DPR-37,modifying LCO & Action Statements for Main Control Room & Emergency Switchgear Room Air Conditioning Sys ML18153D2771993-03-19019 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Address Operation W/Control Rod Urgent Failure Condition ML18153D2691993-03-15015 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Permit Use of Two New Main Control Room & Emergency Switchgear Room Air Conditioning Sys Chillers,When Fully Operational,To Meet LCO ML18153D2281993-01-26026 January 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding NRC Std Fire Protection License Condition to Each OL & Relocating Fire Protection Requirements from TS to Updated Fsar,Per GL 86-10 & GL 88-12 ML18153D1971992-12-11011 December 1992 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Operability Requirements for RCS Loop Stop Interlocks & Establishing Requirements for Operation of Loop Stop Valves ML18153D1681992-11-10010 November 1992 Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C ML18153D1611992-10-26026 October 1992 Application for Amends to Licenses DPR-32 & DPR-37 to Increase Limit for Intermediate Range High Flux Reactor Trip Setpoint & to Eliminate Redundant Stipulation That Predicted Critical Rod Position Be Above Zero Power Insertion Limit ML18153D1171992-09-0404 September 1992 Suppl to 911230 Amend Applications 165 & 164 to Licenses DPR-32 & DPR-37,respectively,reinstating Allowed Outage Time for Surveillance Testing of Nonessential Svc Water Isolation Actuation Logic & Reformatting Logic ML18153D1141992-09-0404 September 1992 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Modify Acceptance Criteria for Functional Testing of Anchor/Darling Mechanical Snubbers to Reflect Replacement of Pacific Scientific Snubbers W/Anchor/Darling Snubbers ML18153D0871992-08-0707 August 1992 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Operating Requirements for Recirculation Mode Transfer (Rmt) Function,Including LCO Action Statement & SR for Rmt & Deleting RWST Max Vol Requirements ML18153D0861992-08-0404 August 1992 Suppl to 911008 Application for Amends to Licenses DPR-32 & DPR-37,upgrading Portions of Section 3.0 & 4.0,per Generic Ltr 87-09 to Restrict Changes of Operational Conditions While in LCO & Delaying Entry Into Action Statement ML18153D0701992-07-28028 July 1992 Application for Amends to Licenses DPR-32 & DPR-37,deleting Operability & SRs of Hydrogen Monitor from Explosive Gas Monitoring Instrumentation Requirements for Waste Gas Holdup Sys & Including Requirements to Submit Special Rept to NRC ML18153D0301992-06-0101 June 1992 Application for Amends to Licenses DPR-32 & DPR-37,modifying Definition of Containment Integrity & Establishing LCOs & Operation & Action Statements for Containment Isolation Sys, Per Generic Ltr 91-08 & NUREG-0452 1999-04-28
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18152B6571999-04-28028 April 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs Re Refueling Water Chemical Addition Tank Min Vol ML18152B5431999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TS Re Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B5501999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,proposing Administrative Change That Will Consolidate AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B6131998-11-0404 November 1998 Application for Amends to Licenses DPR-32 & DPR-37,revising EDG Start & Load Time Testing Requirements in TS 4.6.A.1.b ML18153A3291998-09-24024 September 1998 Application for Amends to Licenses DPR-32 & DPR-37,modifying Testing Requirements for Reactor Trip Bypass Breaker ML18151A6801998-06-19019 June 1998 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers.Application Revised 971105 Submittal ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML18153A3451997-12-18018 December 1997 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Terminology Used for Describing Equipment Surveillances Conducted in Refueling Interval Frequency. Amend Consistent W/Info Provided in Rev 1 of NUREG-1431 ML18151A9791997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Respectively.Amends Will Revise TS to Increase Maximum Allowable Fuel Enrichment from 4.1 to 4.3 Weight Percent U-235.Description of Change Encl ML18152A0761997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML18153A6881996-04-15015 April 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Applicability of Quadrant Power Tilt Ratio Requirements ML18153A5371996-03-21021 March 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Requirements for Testing Charcoal Adsorbent in Auxiliary Ventilation & Control Room Air Filtration Sys as Outlined in Tech Specs 4.12 & 4.20,respectively ML18153A5781996-01-30030 January 1996 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Surveillance Requirement for Certain Reactor Coolant Liquid Samples ML18153A6741995-11-20020 November 1995 Application for Amends to Licenses DPR-32 & DPR-37,permiting Use of 10CFR50 App J,Option B Performance-Based Containment Leakage Rate Testing. ML18153A7121995-07-20020 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to Ts,By Establishing New Setpoint Limit for Steam Generator high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6971995-07-14014 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing Su Accumulators in Lieu of Isolation ML18152A1841995-02-14014 February 1995 Application for Amends to Licenses DPR-32 & DPR-37,revising TS 4.4.D to Permit Approved Exemptions to ILRT Frequency Requirements,Including one-time Exemption Request from Section III.D.1(a) of 10CFR50,App J for Surry Unit 2 ML18153B2111995-01-24024 January 1995 Application for Amends to Licenses DPR-32 & DPR-37,modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1601994-11-29029 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs to Implement Zirlo Fuel Cladding ML18153B1561994-11-22022 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1481994-11-10010 November 1994 Application for Amends to Licenses DPR-32 & DPR-37 to TS Re Changes to TS to Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0921994-10-11011 October 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying Surveillance Frequencies of Hydrogen Analyzers in Accordance W/Generic Ltr 93-05 ML18153B0491994-08-30030 August 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Accomodate Core Uprating,In Accordance w/WCAP-10263, Review Plan for Uprating Licensed Power of PWR Power Plant. ML18153B0041994-07-14014 July 1994 Application for Amends to Licenses DPR-32 & DPR-37, Requesting Amendments in Form of Changes to TS to Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18153A9651994-06-0909 June 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying in Part,Chemical & Vol Control Sys Specs & Safety Injection Sys Specs in Accordance w/NUREG-0452,Rev 4,NUREG-1431 & Generic Ltr 93-05 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B3481993-10-19019 October 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding Operability & Action Statements for RSHX Service Water Outlet Radiation Monitors to TS Table 3.7-6 & SRs for Monitors to TS Table 4.1-2 ML18153B3301993-09-29029 September 1993 Application for Amends to Licenses DPR-32 & DPR-37,modifying TS to Require Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Perform Concurrent W/Disk & Hub Insp ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3901993-07-16016 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to TS to Permit Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML18153D3791993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,updating Augmented Insp Program for Sensitized Stainless Steel to Incorporate Newer Code Requirements While Maintaining Increased Insp Philosophy of ASLB ML18153D3781993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37 Modifying TS to Include COLR Which Presents reload-specific Limits for Key Core Operating Parameters ML18152A4471993-05-0606 May 1993 Application for Amend to License DPR-37,modifying TS to Support Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12,per Enforcement Discretion Granted by NRC on 930504 ML18153D3141993-04-21021 April 1993 Application for Amends to Licenses DPR-32 & DPR-37,providing Clarification of Design Response Time of Containment Hydrogen Analyzers & Deleting Unnecessary Channel Check for Analyzers ML18153D3111993-04-21021 April 1993 Suppl to 930315 Application for Amends to Licenses DPR-32 & DPR-37,modifying LCO & Action Statements for Main Control Room & Emergency Switchgear Room Air Conditioning Sys ML18153D2771993-03-19019 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Address Operation W/Control Rod Urgent Failure Condition ML18153D2691993-03-15015 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Permit Use of Two New Main Control Room & Emergency Switchgear Room Air Conditioning Sys Chillers,When Fully Operational,To Meet LCO ML18153D2281993-01-26026 January 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding NRC Std Fire Protection License Condition to Each OL & Relocating Fire Protection Requirements from TS to Updated Fsar,Per GL 86-10 & GL 88-12 ML20128A5221993-01-22022 January 1993 Amends 173 & 172 to Licenses DPR-32 & DPR-37,respectively, Revising TS to Modify Acceptance Criteria for Functional Testing of Anchor Darling Mechanical Snubbers ML18153D1971992-12-11011 December 1992 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Operability Requirements for RCS Loop Stop Interlocks & Establishing Requirements for Operation of Loop Stop Valves ML18153D1681992-11-10010 November 1992 Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C ML18153D1611992-10-26026 October 1992 Application for Amends to Licenses DPR-32 & DPR-37 to Increase Limit for Intermediate Range High Flux Reactor Trip Setpoint & to Eliminate Redundant Stipulation That Predicted Critical Rod Position Be Above Zero Power Insertion Limit ML18153D1171992-09-0404 September 1992 Suppl to 911230 Amend Applications 165 & 164 to Licenses DPR-32 & DPR-37,respectively,reinstating Allowed Outage Time for Surveillance Testing of Nonessential Svc Water Isolation Actuation Logic & Reformatting Logic ML18153D1141992-09-0404 September 1992 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Modify Acceptance Criteria for Functional Testing of Anchor/Darling Mechanical Snubbers to Reflect Replacement of Pacific Scientific Snubbers W/Anchor/Darling Snubbers ML18153D0871992-08-0707 August 1992 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Operating Requirements for Recirculation Mode Transfer (Rmt) Function,Including LCO Action Statement & SR for Rmt & Deleting RWST Max Vol Requirements ML18153D0861992-08-0404 August 1992 Suppl to 911008 Application for Amends to Licenses DPR-32 & DPR-37,upgrading Portions of Section 3.0 & 4.0,per Generic Ltr 87-09 to Restrict Changes of Operational Conditions While in LCO & Delaying Entry Into Action Statement ML18153D0701992-07-28028 July 1992 Application for Amends to Licenses DPR-32 & DPR-37,deleting Operability & SRs of Hydrogen Monitor from Explosive Gas Monitoring Instrumentation Requirements for Waste Gas Holdup Sys & Including Requirements to Submit Special Rept to NRC 1999-04-28
[Table view] |
Text
e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 21, 1993 United States Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES Serial No. NL&P/ETS:
Docket Nos. License Nos. MAIN CONTROL ROOM AND EMERGENCY SWITCHGEAR ROOM AIR CONDITIONING SYSTEM 93-122A R1 50-280 50-281 DPR-32 DPR-37 On March 15, 1993 Virginia Electric and Power Company requested changes to the Technical Specifications for Surry Power Station Units 1 and 2. The proposed changes modified the Limiting Conditions for Operation and Action Statements for the Main Control Room and Emergency Switchgear Room Air Conditioning System. Subsequently, an administrative error was identified in the submitted change request. A portion of both the discussion of changes and the significant hazards consideration had been inadvertantly omitted during reproduction of the change package. As a consequence, the change request is being resubmitted in its entirety.
The complete discussion of changes and significant hazards consideration are included in Attachment
- 1. The proposed Technical Specifications changes are included as Attachment
- 2. Should you have any questions or require additional information, please contact us. Very truly yours, ;N_/2~ M. L. Bowling, Manager Nuclear Licensing and Programs Attachments 260056 r 9304260190 930421 t. . PDR ADOCK 05000280. . P . PDR cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W. Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219 Attachment 1 Discussion of Changes Significant Hazards Consideration e e Discussion of Changes Introduction Surry Power Station initiated a Main Control Room and Emergency Switchgear Room (MCR & ESGR) Air Conditioning System Upgrade Program in 1988. The program includes installing larger capacity Air Handling Units (AHU) and installing additional chiller capacity.
After the additional chiller capacity is installed, electrical power modifications are required to the three existing chillers (1-VS-E-4A, 48, and 4C) to complete the upgrade program. To complete these final modifications, the existing Technical Specifications must be revised to permit credit being taken for the new chillers in satisfying Technical Specification operability requirements.
Background The original plant design included two redundant 100% capacity trains of air conditioning with an installed 100% capacity chiller for maintenance.
Since initial operation, incremental heat loads have been added to the MCR & ESGR envelope.
The net effect of the increased heat loads has been to reduce the capacity of each train of the air conditioning system to less than 100%. Therefore, it became necessary to increase the capacity of the AHUs and the chillers to return the system to the original design capability.
To support continued operation, interim modifications were completed on the AHUs and chillers and operating restrictions (Technical Specification requirements) were placed on both the AHUs and the chillers.
In addition, a fire watch was required in the ESGRs and Mechanical Equipment Room No. 3 (MER-3) for Appendix R consideration.
These interim modifications and operating restrictions ensured adequate heat removal during both normal and accident conditions.
To date, the AHUs have been replaced with larger capacity units which return the air handling capacity of the two trains to 100% capacity.
Consequently, the interim operating restrictions on the AHUs have been removed. Returning the air handling capacity to 100% also eliminates the need for a fire watch in the ESGRs. Work on the additional chiller capacity is underway.
Thus, the interim operating restrictions and the MER-3 firewatch are still necessary for the chillers.
The three existing chillers (1-VS-E-4A, 48, and 4C) are required to be operable to provide 100% air conditioning capacity.
To ensure that 100% air conditioning capacity will be available during any accident scenario with a Loss of Offsite Power and a Page 1 of 3 e e single failure, one of the three chillers has a manual transfer switch that permits the chiller to be powered from an alternate emergency power supply. Additionally, operator action is necessary to align the AHUs to the available chillers and to align the swing chiller to the operable power supply in the event of a total Loss of Offsite Power to the station with a single failure to an emergency bus or a chiller. After the two additional chillers are installed and electrical power modifications are completed to the existing chillers, the MCR and ESGR Air Conditioning System can be operated to eliminate the necessity for manual realignment of the AHUs and the swing chiller. To complete the MCR & ESGR Air Conditioning System Upgrade Program the existing interim operating restrictions in Technical Specifications must be revised to permit use of the two new safety-related chillers (1-VS-E-4D and 4E) to meet the operability requirements and complete the final plant modifications.
Eliminating specific chiller identification from the Technical Specifications provides the flexibility necessary to use the two new safety-related chillers to support plant operation and remove an existing chiller from service for modification while maintaining the required chiller capacity and equipment redundancy.
Specific Changes Technical Specification
.3.23.C.1.a requires chillers 1-VS-E-4A, '4s, and 4C to be operable whenever either unit is above Cold Shutdown.
The proposed Technical Specification changes will require:
- three main control and emergency switchgear room chillers be operable whenever either unit is above Cold Shutdown,
- the three operable chillers be powered from three of the four emergency buses, and
- one of the three operable chillers be capable of being powered from the fourth emergency bus. An action statement is being added to allow one hour to restore one of two inoperable chillers to operable, when two of the three required chillers become inoperable, prior to shutting down both units. This action statement will eliminate immediate entry into TS 3.0.1. In order to complete chilled water connections in the existing loops for the new chillers, I a Technical Specification change was necessary to allow planned entries into the Page 2 of 3 e e seven day action statements (AmendmenJs Nos. 168 and 167). The connections have been completed.
Thus, the footnote alluding to the planned entries into the action statement is being deleted. The AHUs have been replaced with larger capacity units which return the AHU trains to 100% capacity, and the interim operating restrictions on the AH Us have been removed. With the AH Us returned to 100% capacity the associated fire watch is no . . longer necessary in the ESGRs. Therefore, the Basis Section is being revised to delete the required fire watch in the ESGRs. The Basis Section is being changed to discuss the configuration and operation of the MCR and ESGR air conditioning system with the two new safety-related chillers.
The Basis Section of Technical Specification 3.16 is being changed to reflect the new power scheme of the five control room chillers and associated chilled water pumps. Each emergency bus will be capable of powering two chillers and the associated chilled water pumps. Defined words are being capitalized throughout Section 3.23. In addition, system names are being capitalized and acronyms are being spelled out for consistency.
Safety Significance These Technical Specifications changes will eliminate the specific chiller identification from the operability requirement of Technical Specification 3.23.C.1.a.
These changes will continue to provide 100% air conditioning system capacity to support plant operations.
The revised Technical Specifications will continue to require three operable chillers, powered from three of the four emergency buses with one of the chillers capable of being powered from the fourth emergency bus, whenever either unit is above Cold Shutdown.
This requirement meets the single failure requirements and provides adequate heat removal capacity during both normal and accident conditions.
Operation of the MCR and ESGR Air Conditioning System following these modifications continues to ensure adequate cooling capacity for normal and accident conditions.
Equipment redundancy prevents a total loss of air conditioning during any single failure. Page 3 of 3 e Significant Hazards Consideration Virginia Electric and Power Company has reviewed the proposed changes against the criteria of 1 O CFR 50.92 and has concluded that the changes as proposed do not pose a significant hazards consideration.
Specifically, operation of the Surry Power Station in accordance with the proposed Technical Specification changes will not: 1. Involve a significant increase in the probability of occurrence or consequences of an accident previously evaluated.
The Main Control Room and Emergency Switchgear Room Air Conditioning System is not involved in the initiation of any previously evaluated accidents.
Therefore, the probability of such accidents is not affected.
The requirement to have three chillers operable whenever either unit is above Cold Shutdown is being maintained.
Any three operable chillers, powered from three of the four emergency buses with one of the chillers capable of being powered from the fourth emergency bus, will continue to provide equivalent capacity and redundancy to remove the heat load during normal and accident conditions.
Providing one hour to restore a second chiller to operable status when there is only one operable chiller does not change air conditioning system or equipment operation.
Therefore, the probability of occurrence and the consequence of an accident previously evaluated is not increased.
Elimination of the fire watch in the emergency switchgear rooms does not affect the probability or consequences of any previously analyzed accident.
The firewatch was an interim measure pending completion of the AHU upgrade restoring air handling capacity to original design. The AHU modifications are complete and the interim firewatch is no longer necessary.
Therefore, the fire watch has no impact on the probability of occurrence or consequences of an accident.
The administrative changes do not impact plant operation or system design. Thus, the consequences of an accident are not being affected by this change. 2. Create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed changes do not introduce any new failure modes or accident!
precursors.
Eliminating the specific chiller identification from the operability Page 1 of 2 e e requirements does n*ot create any new or different kind of accident scenarios.
Operation of the Main Control Room and Emergency Switchgear Room Air Conditioning System does not change. Providing one hour to restore a second chiller to operable status when there is only one operable chiller does not change air conditioning system or equipment operation.
Elimination of the fire watch in the Emergency Switchgear Rooms does not create any new or different kind of accident scenario.
The air handling capacity in the Main Control and Emergency Switchgear Rooms has been restored to original design capacity.
Therefore, the interim firewatch is unnecess~ry for Appendix R considerations.
The administrative changes do not impact plant operation or system design. Therefore, no new or different kind of accident is being created. 3. Involve a significant reduction in a n:,argin of safety. The revised Technical Specification maintains the required capacity and redundancy in the Main Control Room and Emergency Switchgear Room Air Conditioning System to ensure sufficient heat removal during normal and accident conditions.
Providing one hour to restore a second chiller to operable status when there is only one operable chiller does not significantly reduce the margin of safety. The air handling capacity in the Main Control Room and Emergency Switchgear Room has been restored to original design capacity.
Therefore, the* interim firewatch is unnecessary for Appendix R considerations.
The administrative changes do not impact plant operation or system design. Therefore, the margin of safety as defined in any Technical Specification is not reduced. Page 2 of 2