ML072210977: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/09/2007
| issue date = 08/09/2007
| title = Document Request for NRC Inspection Procedures 71111.02 and 71111.17
| title = Document Request for NRC Inspection Procedures 71111.02 and 71111.17
| author name = Powers D A
| author name = Powers D
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Jacobs D
| addressee name = Jacobs D

Revision as of 20:54, 12 July 2019

Document Request for NRC Inspection Procedures 71111.02 and 71111.17
ML072210977
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/09/2007
From: Powers D
Division of Reactor Safety IV
To: Jacobs D
Pacific Gas & Electric Co
References
IR-07-004
Download: ML072210977 (5)


Text

August 9, 2007Donna Jacobs, Vice President Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424

SUBJECT:

DIABLO CANYON POWER PLANT DOCUMENT REQUEST FOR NRCINSPECTION PROCEDURES 71111.02 AND 71111.17

Dear Ms. Jacobs:

From September 10-14, 2007, reactor inspectors from Engineering Branch 1 of the Division ofReactor Safety will be performing an onsite inspection of your 10 CFR 50.59 and permanent plant modification programs. The inspectors will perform the inspection using guidance of NRC Inspection Procedures 71111.02, "Evaluations of Changes, Tests, and Experiments", and 71111.17B, "Permanent Plant Modifications." Please provide the following documents requested, electronically or ims.certrec.com, to the lead inspector in the week prior to the onsite portion of the inspection. If you have any questions, please contact the lead inspector.Inspection:Inspection Procedure 71111.02, "Changes, Tests, and Experiments"Inspection Procedure 71111.17B, "Permanent Plant Modifications"Site:Diablo Canyon Power Plant Inspectors:Gerond A. George, 817-276-6562, GAG@nrc.gov *Shiattin T. Makor, STM@nrc.gov Inspection Duration:September 4-21, 2007 Onsite Inspection Dates:September 10-14, 2007 Inspection Report:05000275/2007004, 05000323/2007004 Diablo Canyon POC:Charles A. Dougherty*Lead Inspector Diablo Canyon Power Plant2Document Request List 1. 71111.02 - Evaluation of Changes, Tests, or Experimentsa.A list of all 10 CFR 50.59 screens performed from September 2005 throughSeptember 2007, which did not result in an evaluation.b.A list of all 10 CFR 50.59 evaluations performed which did not result inapplication for license amendment to NRC from September 2005 through September 2007.Note:Description of items to be screened and evaluated should be brief, but ofsufficient detail so that inspectors can determine the significance of the

issue.c.Diablo Canyon procedure for conducting 10 CFR 50.59 screens and evaluations.

d.A list of all condition reports (i.e., corrective action reports) relatedto 10 CFR 50.59 activities, including screens and evaluations from September 2004 through September 2007.2. 71111.17B - Permanent Plant Modificationsa.A list of all permanent plant modifications dating from September 2005, withsufficient detail to enable the inspector to determine the significance of each modification.b.Diablo Canyon procedure for implementing and controlling permanent plantmodifications.c.A list of all condition reports (i.e., corrective action reports) related to yourpermanent plant modification program and its implementation since September

2005.Sincerely,/RA/Dale A. Powers, Senior Technical Analyst and Chief Engineering Branch 1 Division of Reactor Safety Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Diablo Canyon Power Plant3 cc:James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424Stan Ketelsen, Manager Regulatory Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424Sierra Club San Lucia ChapterATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406Jane SwansonSan Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448ChairmanSan Luis Obispo County Board of Supervisors County Government Building 1055 Monterey Street, Suite D430 San Luis Obispo, California 93408Truman Burns\Mr. Robert KinosianCalifornia Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102-3298Diablo Canyon Independent Safety CommitteeRobert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, California 93940Director, Radiological Health BranchState Department of Health Services P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Diablo Canyon Power Plant4Antonio Fernandez, Esq.Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120City EditorThe Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, California 93406-0112James D. Boyd, CommissionerCalifornia Energy Commission 1516 Ninth Street (MS 34)

Sacramento, California 95814Jennifer TangField Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111Chief, Radiological Emergency Preparedness Section Oakland Field Office Chemical and Nuclear Preparedness and Protection Division Department of Homeland Security 1111 Broadway, Suite 1200 Oakland, CA 94607-4052 Diablo Canyon Power Plant5Electronic distribution by RIV:Regional Administrator (BSM1)DRS Director (DDC)DRS Deputy Director (RJC1)DRS STA (DAP)Branch Chief, DRS (WBJ)Branch Chief, DRP/B (VGG)Senior Resident Inspector(MAB10)DC Site Secretary (AWC1)W. A. Maier, RSLO (WAM)V. Dricks, PAO (VLD)D. Pelton, OEDO RIV Coordinator (DLP1)SUNSI Review Completed: _Yes_ ADAMS: Yes No Initials: _GAG_____

Publicly Available G Non-Publicly Available G Sensitive Non-SensitiveC:\FileNet\ML072210977.wpd MLRIV:RI:DRS/EB1BC/EB1 GAGeorgeDAPowers/RA//RA/08/ 8 /0708/ 9 /07OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax