ML080700342: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 02/29/2008 | | issue date = 02/29/2008 | ||
| title = AN2-2008-02 - Draft Operating Exam | | title = AN2-2008-02 - Draft Operating Exam | ||
| author name = Garchow S | | author name = Garchow S | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = | | addressee name = | ||
Line 213: | Line 213: | ||
START TIME: | START TIME: | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Reviewed procedure OP 2107.001 section 11.0 and Attachment 'P' for errors. | PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Reviewed procedure OP 2107.001 section 11.0 and Attachment 'P' for errors. | ||
Identified 4 of the following 5 errors: | Identified 4 of the following 5 errors: | ||
: 1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service. | : 1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service. | ||
: 2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service. | : 2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service. | ||
: 3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop. | : 3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop. | ||
: 4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running. 5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment 'P is correct) | : 4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running. 5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment 'P is correct) | ||
N/A SAT UNSAT (C) 2. Determined that SU#2 availability. | N/A SAT UNSAT (C) 2. Determined that SU#2 availability. | ||
Line 232: | Line 232: | ||
The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions. | The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions. | ||
List the errors identified below: | List the errors identified below: | ||
: 1) | : 1) | ||
: 2) | : 2) | ||
: 3) | : 3) | ||
: 4) | : 4) | ||
Line 250: | Line 250: | ||
The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions. | The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions. | ||
List the errors identified below: | List the errors identified below: | ||
: 1) | : 1) | ||
: 2) | : 2) | ||
: 3) | : 3) | ||
: 4) | : 4) | ||
Line 275: | Line 275: | ||
Time after shutdown = 35 hours; one (1) PZR code safety valve is removed; PZR manway is installed; ECCS vent valves are de-energized OPEN; NO RCP seal work inprogress; NO RCS cold or hot leg openings; RCS Temperature is 105°F. | Time after shutdown = 35 hours; one (1) PZR code safety valve is removed; PZR manway is installed; ECCS vent valves are de-energized OPEN; NO RCP seal work inprogress; NO RCS cold or hot leg openings; RCS Temperature is 105°F. | ||
TASK STANDARD: | TASK STANDARD: | ||
Identify Three (3) of the following four (4) errors in the original Time to boil calculation : | Identify Three (3) of the following four (4) errors in the original Time to boil calculation : | ||
: 1) 2 code safety valves were recorded as remo ved and only one was removed in initial conditions. | : 1) 2 code safety valves were recorded as remo ved and only one was removed in initial conditions. | ||
: 2) Initial RCS water level was recorded as 42" above the bottom of the hot leg instead of the correct 24". | : 2) Initial RCS water level was recorded as 42" above the bottom of the hot leg instead of the correct 24". | ||
: 3) Current RCS temperature was recorded as 80°F in stead of 105°F as stated in the initial conditions. | : 3) Current RCS temperature was recorded as 80°F in stead of 105°F as stated in the initial conditions. | ||
: 4) Time after shutdown was recorded as 3 days 5 hour s instead of the correct 1 day and 11 hours (35 hours). | : 4) Time after shutdown was recorded as 3 days 5 hour s instead of the correct 1 day and 11 hours (35 hours). | ||
AND Identify that the RCS cannot be drained to reduc ed inventory due to TTTCU is less than 2 hours. | AND Identify that the RCS cannot be drained to reduc ed inventory due to TTTCU is less than 2 hours. | ||
Line 292: | Line 292: | ||
program. | program. | ||
Computer program independently run and calculations compared to N/A SAT UNSAT (C) 2. Identified 3 of the 4 errors | Computer program independently run and calculations compared to N/A SAT UNSAT (C) 2. Identified 3 of the 4 errors | ||
: 1) 2 code safety valves were recorded as removed instead of | : 1) 2 code safety valves were recorded as removed instead of | ||
Line 300: | Line 300: | ||
bottom of the hot leg instead of | bottom of the hot leg instead of | ||
the correct 24". | the correct 24". | ||
: 3) Current RCS temperature was recorded as 80°F instead of the | : 3) Current RCS temperature was recorded as 80°F instead of the | ||
correct 105°F. | correct 105°F. | ||
: 4) Time after shutdown was recorded as 3 days 5 hours | : 4) Time after shutdown was recorded as 3 days 5 hours | ||
Line 320: | Line 320: | ||
Do not print data or save LOSCD2 file. | Do not print data or save LOSCD2 file. | ||
List the errors identified below: | List the errors identified below: | ||
: 1) | : 1) | ||
: 2) | : 2) | ||
: 3) | : 3) | ||
Line 333: | Line 333: | ||
Do not print data or save LOSCD2 file. | Do not print data or save LOSCD2 file. | ||
List the errors identified below: | List the errors identified below: | ||
: 1) | : 1) | ||
: 2) | : 2) | ||
: 3) | : 3) | ||
Line 357: | Line 357: | ||
: 2. The clearance has been removed. There are currently no Equipm ent Status Log (ESL) entries. | : 2. The clearance has been removed. There are currently no Equipm ent Status Log (ESL) entries. | ||
TASK STANDARD: | TASK STANDARD: | ||
Identified 3 of the following 4 errors. | Identified 3 of the following 4 errors. | ||
: 1) 2SW-1514A 'As Found' and 'Restoration' positions are listed as CLOSED when required to be OPEN. | : 1) 2SW-1514A 'As Found' and 'Restoration' positions are listed as CLOSED when required to be OPEN. | ||
: 2) 2SW-1514C 'Restoration' position is lis ted as OPEN when required to be CLOSED. | : 2) 2SW-1514C 'Restoration' position is lis ted as OPEN when required to be CLOSED. | ||
: 3) 2SW-1514L 'Restoration' position is list ed as OPEN when required to be CLOSED. | : 3) 2SW-1514L 'Restoration' position is list ed as OPEN when required to be CLOSED. | ||
: 4) 2SW-1514L Restorer and Verifier initials are the same. | : 4) 2SW-1514L Restorer and Verifier initials are the same. | ||
TASK PERFORMANCE AIDS: | TASK PERFORMANCE AIDS: | ||
Line 388: | Line 388: | ||
be OPEN. 2) 2SW-1514C 'Restoration' position is listed as OPEN when | be OPEN. 2) 2SW-1514C 'Restoration' position is listed as OPEN when | ||
required to be CLOSED. | required to be CLOSED. | ||
: 3) 2SW-1514L 'Restoration' position is listed as OPEN when | : 3) 2SW-1514L 'Restoration' position is listed as OPEN when | ||
required to be CLOSED. | required to be CLOSED. | ||
: 4) 2SW-1514L Restorer and Verifier initials are the same. | : 4) 2SW-1514L Restorer and Verifier initials are the same. | ||
N/A SAT UNSAT END ANO-2-JPM-NRC-MAINTSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS: | N/A SAT UNSAT END ANO-2-JPM-NRC-MAINTSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS: | ||
Line 399: | Line 399: | ||
CRS/SM directs: "Perform an Operations ve rification of the given 1025.003C form, Maintenance Configuration Tracking Log follo wing maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors." | CRS/SM directs: "Perform an Operations ve rification of the given 1025.003C form, Maintenance Configuration Tracking Log follo wing maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors." | ||
List the errors identified below: | List the errors identified below: | ||
: 1) | : 1) | ||
: 2) | : 2) | ||
: 3) | : 3) | ||
Line 409: | Line 409: | ||
CRS/SM directs: "Perform an Operations ve rification of the given 1025.003C form, Maintenance Configuration Tracking Log follo wing maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors." | CRS/SM directs: "Perform an Operations ve rification of the given 1025.003C form, Maintenance Configuration Tracking Log follo wing maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors." | ||
List the errors identified below: | List the errors identified below: | ||
: 1) | : 1) | ||
: 2) | : 2) | ||
: 3) | : 3) | ||
Line 418: | Line 418: | ||
==REFERENCE:== | ==REFERENCE:== | ||
2.3.9 APPROVED FOR ADMINISTRATION TO: | |||
FOR ADMINISTRATION TO: | |||
RO: SRO: X TASK LOCATION: | RO: SRO: X TASK LOCATION: | ||
INSIDE CR: | INSIDE CR: | ||
Line 471: | Line 470: | ||
START TIME: | START TIME: | ||
PERFORMANCECHECKLIST STANDARD CIRCLE ONE EXAMINER'S NOTE: Provide a marked-up copy of OP 2104.033 Supplement 1. | PERFORMANCECHECKLIST STANDARD CIRCLE ONE EXAMINER'S NOTE: Provide a marked-up copy of OP 2104.033 Supplement 1. | ||
: 1. Perform supervisor review for approval of the Containment purge gaseous release permit and determine errors. Reviews the containment purge gaseous release permit. | : 1. Perform supervisor review for approval of the Containment purge gaseous release permit and determine errors. Reviews the containment purge gaseous release permit. | ||
N/A EXAMINER'S NOTE: The following list identify errors in the supplement 1 provided. The acceptance criterion is given in the task standard. Examinee must identify 4 of the 5 errors. | N/A EXAMINER'S NOTE: The following list identify errors in the supplement 1 provided. The acceptance criterion is given in the task standard. Examinee must identify 4 of the 5 errors. | ||
(C) 2. Data recorded in section 1.4.5 was incorrect the filter run-time should have been given to Engineering programs for evaluation. | |||
Step 4.3 calculated count rate limits are wrong. | Step 4.3 calculated count rate limits are wrong. | ||
Line 494: | Line 493: | ||
The Shift Manager directs "Review and approv e OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the complet ed supplement and chemis try report. Identify at least 4 errors in the supplement." | The Shift Manager directs "Review and approv e OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the complet ed supplement and chemis try report. Identify at least 4 errors in the supplement." | ||
List the errors identified below: | List the errors identified below: | ||
: 1) | : 1) | ||
: 2) | : 2) | ||
: 3) | : 3) | ||
: 4) | : 4) | ||
Can this release permit be approved given the initial condition information? _____________ | Can this release permit be approved given the initial condition information? _____________ | ||
Line 505: | Line 504: | ||
List the errors identified below: | List the errors identified below: | ||
: 1) | : 1) | ||
: 2) | : 2) | ||
: 3) | : 3) | ||
: 4) | : 4) | ||
Can this release permit be approved given the initial condition information? _____________ | Can this release permit be approved given the initial condition information? _____________ | ||
Line 885: | Line 884: | ||
Observed green lights ON above handswitches. | Observed green lights ON above handswitches. | ||
Enter TS 3.0.3. | Enter TS 3.0.3. | ||
N/A SAT UNSAT (C) 3. Step 2.6.1 2.6.2 2.6.3 | N/A SAT UNSAT (C) 3. Step 2.6.1 2.6.2 2.6.3 2.6.4 Reset CSAS on 2C23. | ||
CSAS on 2C23. | |||
Examiner's Note: | Examiner's Note: | ||
Line 914: | Line 910: | ||
There is only one channel available on the simulator. | There is only one channel available on the simulator. | ||
Resetting 2C40 actuation path will reset all the other channels also. | Resetting 2C40 actuation path will reset all the other channels also. | ||
ANO-2-JPM-NRC-EOP01 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 3. Step 2.6.6 | ANO-2-JPM-NRC-EOP01 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 3. Step 2.6.6 2.6.7 Reset CSAS on 2C40 | ||
CSAS on 2C40 | |||
On 2C40, depressed CSAS lockout reset pushbutton. | On 2C40, depressed CSAS lockout reset pushbutton. | ||
Line 1,156: | Line 1,149: | ||
N/A SAT UNSAT EXAMINER's NOTE: | N/A SAT UNSAT EXAMINER's NOTE: | ||
This JPM does not examine the examinee's use of Tech Specs, JPM can be ended at this step. | This JPM does not examine the examinee's use of Tech Specs, JPM can be ended at this step. | ||
: 10. step 7.1.5 Initiate condition report and determine tech spec | : 10. step 7.1.5 Initiate condition report and determine tech spec | ||
Line 1,268: | Line 1,261: | ||
on 2PIS-3013 for results of | on 2PIS-3013 for results of | ||
actions. N/A SAT UNSAT ANO-2-JPM-NRC-IA02 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4 Step 4.A Close Instrument Air header cross-connect valve with Unit | actions. N/A SAT UNSAT ANO-2-JPM-NRC-IA02 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4 Step 4.A Close Instrument Air header cross-connect valve with Unit | ||
: 1. | : 1. | ||
On panel 2C14, placed handswitches for 2CV-3004 and | On panel 2C14, placed handswitches for 2CV-3004 and | ||
Line 1,738: | Line 1,731: | ||
Informed CRS that 2CV-5015-1 failed to close. | Informed CRS that 2CV-5015-1 failed to close. | ||
N/A SAT UNSAT 8. Step 8.4.3.B Close SIT (2T2A) Drain Valve. | N/A SAT UNSAT 8. Step 8.4.3.B Close SIT (2T2A) Drain Valve. | ||
(if not closed previously.) | (if not closed previously.) | ||
Line 1,748: | Line 1,741: | ||
handswitch. | handswitch. | ||
N/A SAT UNSAT 9. Step 8.4.3.C Close SIT (2T2A) Check Valve Bypass. | N/A SAT UNSAT 9. Step 8.4.3.C Close SIT (2T2A) Check Valve Bypass. | ||
(if not closed previously.) | (if not closed previously.) | ||
Line 1,951: | Line 1,944: | ||
This is an alternate success path JPM. | This is an alternate success path JPM. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
The following conditions exist: | The following conditions exist: | ||
: 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators ar e tied to their respective buses. 3. An attempt to start the AACDG from the Control R oom to energize 4160v Non-vital bus 2A1 was unsuccessful. | : 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators ar e tied to their respective buses. 3. An attempt to start the AACDG from the Control R oom to energize 4160v Non-vital bus 2A1 was unsuccessful. | ||
: 4. The PC on 2C14 AND 2C435 have both failed TASK STANDARD: | : 4. The PC on 2C14 AND 2C435 have both failed TASK STANDARD: | ||
The AAC Diesel has been started and is at 4160 V and 900 rp m with the output breaker (2A-1001) closed. The 480V bus 2B16 has been powered from the AAC diesel generator. | The AAC Diesel has been started and is at 4160 V and 900 rp m with the output breaker (2A-1001) closed. The 480V bus 2B16 has been powered from the AAC diesel generator. | ||
Line 1,959: | Line 1,952: | ||
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 3 of 7 INITIATING CUE: | JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 3 of 7 INITIATING CUE: | ||
The CRS provides the following direction: | The CRS provides the following direction: | ||
: 1. Start the AAC Diesel Generat or using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads. | : 1. Start the AAC Diesel Generat or using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads. | ||
START TIME: | START TIME: | ||
Line 1,971: | Line 1,964: | ||
(2HS-7118) | (2HS-7118) | ||
N/A SAT UNSAT EXAMINER'S NOTE: | N/A SAT UNSAT EXAMINER'S NOTE: | ||
The failure of the AAC diesel to start by the local handswitch will cause the examinee to start the AAC diesel by an alternate means. There will be no change in AAC diesel generator frequency or noise level when the local start switch is taken to START. Provide the following cue after 35 seconds when the local start switch is taken to START. (35 seconds is the delay time to allow for the lube oil pressure to build up on the EDG) | The failure of the AAC diesel to start by the local handswitch will cause the examinee to start the AAC diesel by an alternate means. There will be no change in AAC diesel generator frequency or noise level when the local start switch is taken to START. Provide the following cue after 35 seconds when the local start switch is taken to START. (35 seconds is the delay time to allow for the lube oil pressure to build up on the EDG) | ||
: 2. (Step 1.2) Start the AAC Diesel using the local start switch. (2HS-7117) | : 2. (Step 1.2) Start the AAC Diesel using the local start switch. (2HS-7117) | ||
EXAMINER'S CUE: | EXAMINER'S CUE: | ||
Line 2,034: | Line 2,027: | ||
When the examinee inspects the condition of 2A-1001, provide the NEGATIVE CUE first to indicate that the breaker has not automatically closed. Once the action has been taken to close the breaker, provide | When the examinee inspects the condition of 2A-1001, provide the NEGATIVE CUE first to indicate that the breaker has not automatically closed. Once the action has been taken to close the breaker, provide | ||
the POSITIVE CUE. | the POSITIVE CUE. | ||
(C) 8. (Step 4.1) Verify the AAC Generator Output Breaker (2A-1001) is | |||
CLOSED EXAMINER'S CUE: | CLOSED EXAMINER'S CUE: | ||
Line 2,080: | Line 2,073: | ||
N/A SAT UNSAT END STOP TIME: | N/A SAT UNSAT END STOP TIME: | ||
________________ | ________________ | ||
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 6 of 7 Examiner's Copy JPM INITIAL TASK CONDITIONS The following conditions exist: | JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 6 of 7 Examiner's Copy JPM INITIAL TASK CONDITIONS The following conditions exist: | ||
: 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators are tied to their respective buses. 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful. | : 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators are tied to their respective buses. 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful. | ||
: 4. The PC on 2C14 AND 2C435 have both failed. | : 4. The PC on 2C14 AND 2C435 have both failed. | ||
INITIATING CUE: | INITIATING CUE: | ||
The CRS provides the following direction: | The CRS provides the following direction: | ||
: 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads. | : 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads. | ||
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 7 of 7 Examinee's Copy JPM INITIAL TASK CONDITIONS The following conditions exist: | JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 7 of 7 Examinee's Copy JPM INITIAL TASK CONDITIONS The following conditions exist: | ||
: 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators are tied to their respective buses. 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful. | : 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators are tied to their respective buses. 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful. | ||
: 4. The PC on 2C14 AND 2C435 have both failed. | : 4. The PC on 2C14 AND 2C435 have both failed. | ||
INITIATING CUE: | INITIATING CUE: | ||
The CRS provides the following direction: | The CRS provides the following direction: | ||
: 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads. | : 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads. | ||
Line 2,136: | Line 2,129: | ||
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
The following conditions exist: | The following conditions exist: | ||
: 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running. | : 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running. | ||
TASK STANDARD: | TASK STANDARD: | ||
Line 2,157: | Line 2,150: | ||
Observed green light ON, red light OFF. N/A SAT UNSAT TRANSITION NOTE: | Observed green light ON, red light OFF. N/A SAT UNSAT TRANSITION NOTE: | ||
Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery. | Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery. | ||
(C) 2. Step 14.2.2 Verify Borated MU or RWT to 2P-66 (2FP-32) closed. | |||
Examiner's Cue: | Examiner's Cue: | ||
2FP-32 stem is fully inserted and resistance is felt. | 2FP-32 stem is fully inserted and resistance is felt. | ||
Line 2,167: | Line 2,160: | ||
N/A SAT UNSAT TRANSITION NOTE: | N/A SAT UNSAT TRANSITION NOTE: | ||
Go to elevation 335' RAB just off elevator (if local verification is performed) | Go to elevation 335' RAB just off elevator (if local verification is performed) | ||
(C) 3. Step 14.2.2 Verify RWT Recirculation Isolation (2CV-5637-1) closed. | |||
Examiner's Cue: | Examiner's Cue: | ||
When Control Room is contacted, then Control room | When Control Room is contacted, then Control room | ||
Line 2,222: | Line 2,215: | ||
N/A SAT UNSAT TRANSITION NOTE: | N/A SAT UNSAT TRANSITION NOTE: | ||
Go to elevation 335' RAB just off elevator. | Go to elevation 335' RAB just off elevator. | ||
(C) 7. Step 14.2.5 Close SW Header 1 Telltale Drain (2SW-8401). | |||
Examiner's Cue: | Examiner's Cue: | ||
2SW-8401 has stem inserted into handwheel. | 2SW-8401 has stem inserted into handwheel. | ||
Line 2,259: | Line 2,252: | ||
Isolation to SF Pool (2SW-138) | Isolation to SF Pool (2SW-138) | ||
N/A SAT UNSAT EXAMINERS NOTE: | N/A SAT UNSAT EXAMINERS NOTE: | ||
- Final valve position is at discretion of examinee to ensure level is raised / maintained. - Operator stationed to monitor SFP level in accordance with initial conditions. | - Final valve position is at discretion of examinee to ensure level is raised / maintained. - Operator stationed to monitor SFP level in accordance with initial conditions. | ||
(C) 11. Step 14.2.9 Throttle open SW Header 1 Emergency Feed Isolation to | |||
SF Pool (2SW-138). | SF Pool (2SW-138). | ||
Line 2,270: | Line 2,263: | ||
N/A SAT UNSAT END STOP TIME: | N/A SAT UNSAT END STOP TIME: | ||
ANO-2-JPM-NRC-FPEM1 PAGE 6 of 7 JOB PERFORMANCE MEASURE Examiner's Copy JPM INITIAL TASK CONDITIONS The following conditions exist: | ANO-2-JPM-NRC-FPEM1 PAGE 6 of 7 JOB PERFORMANCE MEASURE Examiner's Copy JPM INITIAL TASK CONDITIONS The following conditions exist: | ||
: 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level. 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running. | : 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level. 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running. | ||
INITIATING CUE: | INITIATING CUE: | ||
Line 2,276: | Line 2,269: | ||
"Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2." | "Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2." | ||
ANO-2-JPM-NRC-FPEM1 PAGE 7 of 7 JOB PERFORMANCE MEASURE Examinee's Copy JPM INITIAL TASK CONDITIONS The following conditions exist: | ANO-2-JPM-NRC-FPEM1 PAGE 7 of 7 JOB PERFORMANCE MEASURE Examinee's Copy JPM INITIAL TASK CONDITIONS The following conditions exist: | ||
: 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level. 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running. | : 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level. 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running. | ||
INITIATING CUE: | INITIATING CUE: | ||
Line 2,326: | Line 2,319: | ||
JPM INITIAL TASK CONDITIONS: | JPM INITIAL TASK CONDITIONS: | ||
: 1. Equipment Out OF Service: 2P-7A for Outboard Pump Bearing Replacement. 2. The plant has tripped from 100% power due to an inadvertent CSAS. | : 1. Equipment Out OF Service: 2P-7A for Outboard Pump Bearing Replacement. 2. The plant has tripped from 100% power due to an inadvertent CSAS. | ||
: 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309). | : 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309). | ||
Line 2,493: | Line 2,486: | ||
The Control Room Supervisor directs "R espond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J." | The Control Room Supervisor directs "R espond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J." | ||
PERFORMANCE CHECKLIST STANDARDS (Circle One) Examiner note: Valves may be opened in any order and either alarm window may be mitigated first. | PERFORMANCE CHECKLIST STANDARDS (Circle One) Examiner note: Valves may be opened in any order and either alarm window may be mitigated first. | ||
: 1. (Step 2.1) Determined misalignment not directed by a procedure step. | : 1. (Step 2.1) Determined misalignment not directed by a procedure step. | ||
Examiner's cue: | Examiner's cue: |
Revision as of 13:56, 12 July 2019
ML080700342 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 02/29/2008 |
From: | Garchow S Operations Branch IV |
To: | Entergy Operations |
References | |
50-313/08-301, 50-368/08-301, ES-D-1 50-313/08-301, 50-368/08-301 | |
Download: ML080700342 (126) | |
Text
Appendix D Scenario 1Form ES-D-1Page 1 of 20Facility: ANO-2Scenario No.: 1 (Modified)Op-Test No.: 2008-1Examiners:Operators:Initial Conditions:100% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motortagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.Turnover:100%. 250 EFPD. EOOS indicates 'Minimal Risk.' MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED TrainMaintenance Week.EventNo.Malf. No.EventType*EventDescription 1N (CBOT)Start 'B' Component Cooling Water pump 'B' andsecure 'C' Component Cooling Water pump.
2XRCCHAPCNTI (ATC)Pressurizer control channel pressure fails high.
32CV4652C (ATC)'B' normal spray valve sticks open 4XSG2PT10411I (CBOT)'A' Steam Generator pressure safety channel fails low.Tech Spec for CRS.
5SGATUBEN (CBOT)R (ATC)5 gpm tube leak on 'A' Steam Generator. Tech Spec for CRS 6SGATUBEM (ALL)'A' Steam Generator tube leakage ramps up to 300 gpmover 10 minutes. Manual reactor trip criteria whengreater than 44 gpm.
7 2K11_C2 2K11_C4C (ATC)Reverse rotation alarm for the reactor coolant pumpattempted to stop.
8XMSHDRPRSI (CBOT)Steam Dump and Bypass Control System fails toautomatically open bypass and dump valves to controlSteam Generator pressure.
9 2SI10A HPI2P89BC (CBOT) 2P89A, 'A' High Pressure Safety Injection pumpcoupling failure (no discharge pressure).2P89B, 'B' High Pressure Safety Injection pump fails tostart automatically.* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D Scenario 1Form ES-D-1Page 2 of 20Scenario #1 Objectives 1)Evaluate individual ability to operate safety related equipment.
2)Evaluate individual response to a failure of a pressurizer pressure control channel failure.
3)Evaluate individual response to a failure of a pressurizer spray valve to automatically close.
4)Evaluate individual response to a small Pri-Sec leak.
5)Evaluate individual ability to perform a reduction in plant power.
6)Evaluate individual ability to mitigate a SGTR.
7)Evaluate individual response to a failure of a reactor coolant pump reverse rotation device.
8)Evaluate individual response to a failure of the steam dump and bypass control system.
9)Evaluate individual ability to monitor operation of emergency core cooling equipment.
SCENARIO #1 NARRATIVESimulator session begins with the plant at 100% power steady state. Main turbine generator turninggear is tagged out. Gland seal regulator, 2PCV0231 is jacked closed.When the crew has completed their control room walk down and brief, the CBOT will start 'B'Component Cooling Water (CCW) Pump and secure 'C' Component Cooling Water Pump (CCW)using OP 2104.028 section 18.2.After the 'B' CCW pump is placed in serve and 'C' CCW is secured and cued by lead examiner, the'A' channel Pressurizer (PZR) control channel will fail high. This will result in both main sprayvalves to automatically open and both proportional heater banks to go to minimum fire. Actual PZRpressure will drop and will result in an automatic reactor trip, if actions are not taken to mitigate theevent. The Control Room Supervisor (CRS) will enter Abnormal operating procedure OP 2203.028,PZR systems malfunctions will be entered. The CRS will direct selecting the opposite controlchannel. The ATC will report that one of the spray valves, 2CV4652 did not close. The CRS willdirect the failed spray valve to be isolated.After the 'B' PZR control channel is placed in service and 2CV 4652 is isolated and cued by leadexaminer, 'A' Steam Generator safety channel pressure instrument, 2PT1041-1, will fail low. Thiswill trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSISpre-trip, RPS channel trip/pre-trip, and channel 'A' operator insert (2C03) trip and pre-trip lightswill be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1, 3.3.3.5 and3.3.3.6 for guidance. The CBOT will place Channel 'A' PPS in bypass for point 11, SG pressurelow, point 19, 'A' SG delta-P for EFAS 1, and point 20, 'B' SG delta-P for EFAS 2 formaintenance and trouble shooting. The crew will have one hour to place these points in bypassbefore exceeding the tech spec LCO.After the 'A' PPS channel is placed in bypass and cued by lead examiner, a 5.0 gpm primary tosecondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038.CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec3.4.6.2. The CRS will direct the NLO's to control secondary contamination using standardattachment 19 and direct the chemists to sample the SG's for activity. The CRS will isolate steamto 'A' EFW pump from 'A' SG and enter TS 3.7.1.2. The crew will perform a plant shutdown. CRSwill declare and NUE EAL based on criteria 3.2, S/G Tube Leak greater than Tech. Spec. Limits.
Appendix D Scenario 1Form ES-D-1Page 3 of 20SCENARIO #1 NARRATIVE (continued)After the CBOR has completed the required reactivity manipulation and cued by lead examiner, a300 gpm SGTR on 'A' SG will start with a ramp of 10 minutes. Secondary System Radiation Hi,SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators willalarm. The CBOR/ATC recognizes that the SGTR is greater than 44gpm. The CRS will direct theCBOR will manually trip the reactor.Post trip, when PZR pressure drops less than 1400psia, the ATC should secure 'B' and 'D' RCP'sand receive a reverse rotation alarm on 'B' RCP. The CRS will direct all RCP's to be secured. Thiswill result in natural circulation conditions in the Reactor Coolant System.Also post trip, the steam dump and bypass control system (SDBCS) main steam pressure instrumentwill fail low. This will result in SDBCS not automatically controlling main steam header pressurecausing the main steam safety valves to lift on both Steam Generators. The CRS will direct theCBOT to manually control one of the bypass valves to the condenser to stop the offsite release fromthe ruptured steam generator.The Crew will implement Standard Post Trip Actions (SPTA), OP 2202.001.The CRS will diagnose a steam Generator tube rupture greater than charging pump capacity andenter EOP 2202.004, Steam Generator Tube Rupture (SGTR).The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to thecondenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the 'A' SGusing standard attachment 10 when RCS Thot is less than 535°F. CRS will declare an ALERT EALbased on 2.2, RCS leakage greater than 44 gpm.Post SIAS, the 'B' High Pressure Safety Injection (HPSI) pump Breaker will fail to startautomatically (green train) and the 'A' high pressure safety injection pump will experience a failedcoupling so it will not develop any discharge pressure. The CBOT will place the 'A' HPSI pumphandswitch in Pull-to-Lock (PTL) and manually start the 'B' HPSI pump and/or manually start the'C' HPSI pump on the Red train to satisfy the required HSPI flow requirements.
Appendix D Scenario 1Form ES-D-1Page 4 of 20Simulator Instructions for Scenario 1Reset simulator to MOL 100% power IC stead state.Ensure that AACG is secured and annunciators clear.Ensure hotwell level is ~80%.Place MINIMAL RISK and RED Train Maintenance Week signs on 2C11.Swing ESF equipment aligned to the RED train.'B' CCP lead charging pump.2PCV0231, Gland sealing steam pressure control valve failed closed.T1, T2, T3 set to false.T5 set to Reactor trip.T6 set to SIAS1.EventNo.Malf. No.Value/RampTimeEventDescription 1 0.0Place 'B' CCW pump in service, secure 'C' CCW pump.
2XRCCHAPCNTTrigger = T12500 'A' PZR control channel fails HIGH.
3CV4652Trigger = T1 1.0Ramp =10 secs'B' spray valve fails open; 4XSG2PT10411Trigger = T2 0'A' Steam generator safety channel pressure transmitterfails low.
5SGATUBETrigger = T35.0 'A' SG primary-secondary leak.
6SGATUBE CUED 300RAMP=10 MIN'A' Steam Generator Tube Rupture (300 gpm rampedover 10 Minutes).
7RCP2P32AREVRCP2P32BREVTrigger = T5TRUEWhen 'A' or 'B' RCP secured, reverse rotationannunciator will alarm.
8XMSHDRPRSTrigger = T5 650SDBCS main steam header pressure fails low.
9 2SI10 A HPI2P89BTrigger = T6 0.0TRUE'A' HPSI pump coupling failure.'B' HPSI pump fails to automatically start on SIAS.
Appendix D Scenario 1Form ES-D-1Page 5 of 20Simulator Operator CUEsAt T=0CBOT will place 'B' CCW pump inservice and secure 'C' CCWpump.CUE: Report as AO that 'B' CCW pump has been vented at 2CCW-1029 and a solid stream ofwater was observed.Cued byleadexaminerTrigger T1'A' PZR pressure control channel fails High.Cue: Report that I & C planner will begin planning work on failed pressure instrument.Trigger T1PZR 'B' main spray valve fails to close when openedCued byleadexaminerTrigger T2'A' Steam Generator Pressure safety channel fails low.Cue: Report that I & C planner will begin planning work on failed pressure instrument.Cued byleadexaminerTrigger T3'A' Steam Generator 5 gpm tube leak.Cue: As Auxiliary Operator, report thatstandard attachment 19, control of secondarycontamination is in progress.Cue: When notified of requirement to sample SG's as Chemist, after 15 minutes reportthat the sample analysis is in progress and that when frisking sample 'A' SG countrate washigher than 'B' SG.The CRS will direct the NLO's to and direct the chemists to sample the SG's for activity.Cued byleadexaminerRaise 'A' SG tube leak to 500 gpm ramped over 10 minutes. This willresult in a manual reactor trip.Cue: As Auxiliary operator, report that actions for standard attachment 10 for 'A' steam generatorisolation outside the control room actions have been completed.Tripping 'A'or 'B'ReactorCoolantPumpTrigger T5Reverse rotation alarm when pump is secured. This will result insecuring all reactor coolant pumps.Reactor Trip Trigger T5 Steam dump and bypass control system pressure input will fail low.This results in no automatic response to control main steam pressurepost reactor trip.SIAS1Trigger T62SI10 is closed. This will result in 'A' HPSI pump not developingdischarge pressure.'B' HPSI pump will not start automatically must be manually started.Cue: As waste control operator report that the coupling on 'A' HPSI pump is damaged andseparated from the motor.
Appendix D Scenario 1Form ES-D-1Page 6 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 1Event
Description:
CBOT places 'B' component cooling water pump in service and secures 'C'component cooling water pump.TimePositionApplicant's Actions or Behavior CRSDirect the CBOT to secure 'B' CCW pump and secure 'C' CCW pump.
CBOTReview OP 2104.028 section 8.2.
CBOTWill perform the following:Verify open 2P-33C/B Suction Crossover (2CV-5221).Verify open 2P-33C/B Discharge Crossover (2CV-5232).Direct AO to throttle open 2P-33B Casing Vent (2CCW-1029).Place 2P-33B handswitch (2HS-5228) to START.Observe the following:
oNormal flow 1000 to 3000 gpm (2FIS-5202) o2P-33B discharge pressure 100 to 120 psig (2PI-5234)Place 2P-33C handswitch (2HS-5234) in Pull To Lock.Termination criteria: When 'B' CCW pump is secured and 'C' CCW is secured or at leadexaminer's descretion.
Appendix D Scenario 1Form ES-D-1Page 7 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 2Event
Description:
Channel '1' Pressurizer Pressure instrument will fail High.TimePositionApplicant's Actions or BehaviorATCAnnounce annunciator 2K10-E6 Pressurizer Pressure Control Channel 1Pressure HI / LO alarm is due to High pressure.
CRSRefer to PZR Systems Malfunctions AOP 2203.028 and direct boardoperators actions.Refer toTS 3.2.8 if pressure not 2025 to 2275 psia.Could direct placing SDBCS valves in manual closedATCCompare channels and determine Channel 1 failed High.Place PZR Pressure Channel Select switch (2HS-4626) toChannel 2.Restore heaters to automatic control, if secured.Verify that PZR heaters respond as designed.Verify that 'B' PZR spray valve closed.Announce that 'A' PZR spray valve did not close as expected.
CBOTPlace SDBCS Master controller in AUTO local and adjust set-point to1000 psia. Termination Criteria: PZR pressure control selected to channel 2 in auto control or at leadexaminer's discretion.
Appendix D Scenario 1Form ES-D-1Page 8 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 3Event
Description:
2CV4652, 'B' spray valve sticks OPEN.TimePositionApplicant's Actions or BehaviorATCAnnounce 2CV4652 did not close.
CRSRefer to PZR Systems Malfunctions AOP 2203.028 and direct boardoperators actions.Direct ATC to close 2CV4652 per the AOP.Direct the ATC to close 2CV4652 isolation valve.ATCAttempt to close 2CV4652 by placing the control switch to MAN androtating the hand switch to the OPEN direction for 1 second then afterwaiting 5 seconds rotating the hand switch to the CLOSE position.Report that 2CV4652 did not close.ATCClose 2CV4652 isolation valves by rotation hand switch to CLOSE.Report that Pressurizer Pressure is restoring to set point. Termination Criteria: When 2CV4652 is isolated or at lead examiner's discretion.
Appendix D Scenario 1Form ES-D-1Page 9 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 4Event
Description:
'A' Steam Generator pressure transmitter, 2PT1041-1, on Channel 'A' fails low.TimePositionApplicant's Actions or BehaviorATCAnnounce annunciators:2K04-A4 CH A RPS/ESF/PRETRIP/TRIP2K04-B3 PPS Channel TRIP2K04-E4 MSIS PRETRIPCompare all safety channels four channels and report 2PI-1041-1 hasfailed low.
CRSImplement Annunciator Corrective Action AOP 2203.012D.ATCReport A SG low pressure pretrip/trip on PPS insert.
CBOTCompare all four channels and report 2PI-1041-1 indicates zero.
CRSEnter Tech Spec3.3.1.1 and 3.3.2.1, 3.3.3.5 and 3.3.3.6.
CBOTPlace the following channels in bypass on Channel A:A SG PRESS low (Bistable 11)A SGP - EFAS 1 (Bistable 19)A SGP - EFAS 2 (Bistable 20)ATCVerify annunciator 2K04-C3 PPS CHANNEL BYPASSEDVerify correct channels in bypass.
CRSContact maintenance/PS liaison. Termination Criteria: Affected channel points placed in bypassor at lead examiner'sdiscretion.
Appendix D Scenario 1Form ES-D-1Page 10 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 5Event
Description:
5.0 GPM primary to secondary leak on 'A' SG.The CRS will enter the primaryto secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdownTimePositionApplicant's Actions or BehaviorATCAnnounce annunciators:2K11-A10Sec Sys Radiation Hi 2K11-J8SG Tube Leak Detection Rate of Change Hi2K11-K8SG Tube Leak Detection Trouble/LKRT Hi CRSImplement AOP 2203.038, PRI-SEC leakage and perform the following:Direct CBO's to perform RCS leak ratesEnter TS 3.4.6.2Direct AO to perform standardattachment 19, control of secondarycontaminationDirect the chemists to sample the SG's for activityDirect CBOT to isolate steam to 'A' EFW pump from 'A' SG andenter Tech Spec 3.7.1.2Determine Action level 3 of AOP 2203.038 is applicable and a shutdownto less than 50% in one hour and to be in mode 3 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> isapplicable.Direct CBOR to perform a plant shutdown using normal boration method.Declare and NUE EAL based on criteria 3.2, S/G Tube Leak greaterthan Tech. Spec. Limits.
CBOTClose 2CV 1000-1, steam from 'A' SG to 'A' EFW pump.Announce 2K04-F2 annunciator as expected due to INOP of 2P7A.
Appendix D Scenario 1Form ES-D-1Page 11 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 5Event
Description:
5.0 GPM primary to secondary leak on 'A' SG.The CRS will enter the primaryto secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdownATCPerform a plant shutdownUse reactivity plans to determine the amount of boron required.Adjust turbine load to maintain Tave within 2°F of Tref.Insert CEA's as directed by reactivity plan.AOP requires a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> shutdown to Mode 3.The CRS may determine a rapid plant shutdown of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to be in Mode 3is more conservative and this decision is acceptable.Termination criteria: When reactivity manipulations are satisfied or at the discretion of the leadexaminer.
Appendix D Scenario 1Form ES-D-1Page 12 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 6Event
Description:
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a natural circulationcool down of the RCS and manually Isolate 'A' SG.TimePositionApplicant's Actions or BehaviorATCReport that PZR level is loweringStart all back up CCP's or report that they are running.Isolate Letdown as required.
CRSRecognize SGTR is greater than 44 gpm and meets the AOP trip criteria.Direct the CBOR to manually trip the reactorATCManually trip the reactor.
CRSImplement Standard Post Trip Actions, track safety functions, and directboard operators actions.ATCCheck reactivity control:Reactor power decreasing.All CEAs inserted.
CBOTCheck maintenance of vital auxiliaries:Main turbine tripped.Generator output and exciter breakers open.All 4160v and 6900 v Non-Vital busses energized.All 4160v and 480v vital AC bus energized.All 125v vital DC bus energized.
Appendix D Scenario 1Form ES-D-1Page 13 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 6Event
Description:
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.TimePositionApplicant's Actions or Behavior CBORCheck inventory control:PZR level 10 to 80%.Trending from set point.Report SIAS actuated or manually actuate and verify all PZR heaters offwhen PZR level less than 29%.
CBORCheck RCS pressure control:RCS pressure 1800 to 2250 psia.Trend from set pointSecure Two RCP's when RCS pressure is less than 1400 psia.Place spray valve for secured RCPs in manual closed.Verify SIAS when pressure less than 1650 psia.(See event 7 for actions on reverse rotation alarm.)
CBORCheck core heat removal by forced circulation:RCP 's runningLoop T less than 10 F.RCS MTS 30 F or greater.Service water pump suction aligned to Lake.Component cooling water aligned to RCPs.
CBOTRestore SW to ACW per Exhibit 5. (NOTE: This action requires severalminutes)Check SIAS actuated.Maintain SW pressure greater than 85 psig.
Appendix D Scenario 1Form ES-D-1Page 14 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 6Event
Description:
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.TimePositionApplicant's Actions or Behavior CBOTCheck RCS Heat Removal:Report SG levels and main feed water is in RTO.Report feed water line intact.Report SG pressures. Report that SG pressure is high and SDBCS isnot responding in AUTO.(See event 8 for actions due to SDBCS failure)
CBORCheck CNTMT parameters:Temperature less than 140 F.Pressure less than 16 psia.Status of radiation alarms: CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOTWill open 2CV0233, bypass around 2PCV0231 which is simulated closedto match condition of valve at plant. This is in response to low gland sealpressure.CRSNotify SM to perform the following:SE report to control room.Announce reactor trip on plant page.Refer to Tech Specs and EALs.
Appendix D Scenario 1Form ES-D-1Page 15 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 6Event
Description:
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.
CRSDirect CBOs to acknowledge all control room annunciators and announceall significant alarms.Diagnose Steam Generator Tube Rupture CRSImplement Steam Generator Tube Rupture procedure and open placekeeping page.ALLPerform crew brief and review floating steps.
CRSDetermine applicable floating steps:Commence natural circulation using bypass valves to thecondenser cool down to less than 535 F Thot.HPSI Override Criteria.
CRSDirect the following actions:Commence cool down to less than 535 F Thot.Inform SM to contact Chemistry to sample both SG for activity.Determine ruptured SGPerform post-SIAS actions:Verify Safety Injection flow to RCS:Isolate 'A' SG when RCS Thot is less than 535°FVerify HPSI override criteria met:RCS MTS 30°F or greater.PZR level greater than 29% and controlled.RVLMS LVL 03 or higher elevation indicates WET.At least ONE intact SG available for Heat RemovalLevel 10 to 90% with FW available.Declare an ALERT EAL based on 2.2, RCS leakage greater than 44gpm.
Appendix D Scenario 1Form ES-D-1Page 16 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 6Event
Description:
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.TimePositionApplicant's Actions or BehaviorCriticalStep ATCRCS cool down to less than 535°F T-hot : (floating step)ATCReset low SG set points.Commence RCS depressurization to maintain RCS MTS 30 to 45 (WhenHPSI overridden)Take manual control of SDBCS bypass valves to condenser(2CV0302/2CV0303)Place ALL ADV Permissive switches in OFF.Verify EFW feeding SGs.Secure running MFW pump.Close ALL MFW Block valves.Record and plot cool down on Attachments 1 and 8.ATC /CBOT Verify Safety Injection flow to RCS:Check HPSI flow using Exhibit 2.(SEE event 9 on actions due to HPSI failures)Check LPSI flow using Exhibit 3.
Appendix D Scenario 1Form ES-D-1Page 17 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 6Event
Description:
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.TimePositionApplicant's Actions or Behavior CBOTPerform post-SIAS actions:SW pumps running on each loop.EDG SW outlet valves open.SW pump suction aligned to Lake.Report all non-vital buses energized.Verify SG sample valves open.CriticalStep CBOTUse Attachment 10 to isolate Ruptured SGATC /CBOTOVERRIDE HPSI:Throttle HPSI flow OR place HPSI pumps in PTL as needed to controlRCS pressure, inventory, and heat removal.Termination criteria: RCS Cool down to less than 535°F and 'A' SG isolated or at examinersdiscretion.
Appendix D Scenario 1Form ES-D-1Page 18 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 7Event
Description:
Reverse rotation alarm when Reactor Coolant Pump 'A' or 'B' secured whichresults in securing all reactor coolant pumps.TimePositionApplicant's Actions or BehaviorATCAnnounces 2K11-C2 or 2K11-C4 annunciator for reverse rotation ofassociated reactor coolant pump.
CRSRefers to annunciator corrective actions OP 2203.012K and directs ATC tosecure ALL Reactor Coolant Pumps.ATCSecures remaining reactor coolant pumps and places associated sprayvalves to Manual.Verifies pumps secured (amperages, delta 'P' and Green light forassociated breaker lit).Termination criteria: When ALL RCP's are secured or at discretion of lead examiner.
Appendix D Scenario 1Form ES-D-1Page 19 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 8Event
Description:
Steam Dump and Bypass Control System fails to automatically open bypass anddump valves to control Steam Generator pressure.TimePositionApplicant's Actions or Behavior CBOTRecognize and announce that SDBCS is NOT maintaining steamGenerator pressure.
CRSDirect CBOT to manually control Steam Generator pressure by eithertaking manual control of a SDBCS bypass valve or place the SDBCSmaster controller in manual and adjust output to open SDBCS bypassvalve(s) to maintain Steam Generator pressure 950 to 1000 psia.
CBOTManually control SDBCS valves to control Steam Generator pressure.Termination criteria: SDBCS is controlled manually or at the discretion of the lead examiner.
Appendix D Scenario 1Form ES-D-1Page 20 of 20Op-Test No.: 1 Scenario No.: 1 Event No.: 9Event
Description:
2P89B, 'B' High Pressure Safety Injection pump (HPSI) fails to auto-start and 'A'High Pressure Safety Injection Pump fails to develop discharge pressure.TimePositionApplicant's Actions or Behavior CBOTRecognizes and announces failure of 'B' HPSI pump to automaticallystart.Announces failure of 'A' HPSI CRSDirect CBOT start 'C' HPSI pump (2P89C) and/or start 'B' HPSI pump(2P89B).Direct WCO to investigate 'A' HPSI pump operation.CriticalStepCriticalPart is toeitherstart2P89Bor Start2P89C.CBOTOn 2C17, took hand switch for 'A' HPSI pump (2P89A) to pull-to-lock and took hand switch for 'C' HPSI pump (2P89C) to start andverified discharge pressure (if pressure < 1450psia, verified flow toRCS).AND/OROn 2C16, took hand switch for 'B' HPSI pump (2P89B) to start andverified discharge pressure (if pressure < 1450psia, verified flow toRCS).Termination criteria: When 'B' HPSI pump is started or when 'C' HPSI pump is started or atthe discretion of the lead examiner.
Appendix D Scenario 2 Form ES-D-1 Facility: ANO-2 Scenario No.: 2 (Modified) Op-Test No.: 2008-1 Page 1 Examiners: Operators:
Initial Conditions: 85% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. 'A' MFP offline to repair Electro-Hydraulic leak. RED Train Maintenance Week.
Turnover:
85%. 250 EFPD. EOOS indicates 'Acceptable Risk (9.3)'. MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. 'A' Main feed pump Electro-Hydraulic leak repaired and ready to be placed in service. OP 2106.007 is complete up to section 10.0 for placing 'A' MFP in service. RED Train Maintenance Week.
Event No. Malf. No. Event Type* Event Description 1 N (CBOT)
Place 'A' Main Feed Pump in service. 2 XFW2TE0361 I (CBOT) Temperature indicator to Main Feed Pump oil cooler fails low.
3 CVC2P36BFAL C (ATC) 'B' Coolant Charging Pump motor fault. TRM for CRS.
4 BKR1205 BKR1218 Startup transformer #2 lockout. Tech Spec for CRS.
5 CEA24DROP N (CBOT)
R (ATC) Control Element Assembly #24 drops to bottom of core.
Tech Spec for CRS.
6 500LOSE500 500LOSE161 M (ALL) Loss of Off-Site Power.
7 MTGTRPLOCKO RPSRXMAN RPSRXAUTO C (ATC) Main turbine lockout. Failure of the reactor protection system to automatically or manually trip the reactor. Tech Spec for CRS. 8 EDGDG1OIL CV0332 C (CBOT) Loss of both Emergency Feed Water pumps resulting in loss of all Feed water to steam generators.
9 Loss of instrument air C (ATC) Loss of instrument air results in using upstream atmospheric dump valve isolation valves to control steaming rate. * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario 3 Form ES-D-1 Facility: ANO-2 Scenario No.: 3 Op-Test No.: 2008-1 Examiners: Operators:
Initial Conditions: 100 % MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.
Turnover:
100%. 250 EFPD. EOOS indicates 'Minimal Risk.' MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week.
Event No. Malf. No. Event Type* Event Description 1 XRCCHAPLVL I (ATC)
'A' Pressurizer level channel fails High. 2 2SV8263-2 C (CBOT) Containment Isolation Valve for containment air monitoring system 2RITS8271, fails closed. Tech Spec for CRS. 3 NIBLINEPWR I (CBOT) 'B' channel nuclear instrument fails low. Tech Spec for CRS. 4 FWPMPATRP N (CBOT)
R (ATC) 'A' main feed water pump trips due to thrust bearing wear. 5 FWAFT5A M (ALL)
Unisolable main feed water rupture inside containment.
6 BUHTRS CHV2P36LOLVL C (ATC) Backup heaters fail to deenergize when pressurizer level drops below 29%. Backup CCPs fail to auto start on low PZR level. 7 Containment cooling fails C (CBOT) 'B' containment cooling fails to actuate. * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: A1a Conduct of Operations
TASK: Perform Transferring Unit Auxiliaries from SU3 or Unit Aux to SU2 JTA#: ANOROELECDNORM-026 KA VALUE RO: 3.4 SRO: 3.8 KA
REFERENCE:
2.1.32 APPROVED FOR ADMINISTRATION TO:
RO: SRO: X TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Perform SIMULATOR:
Perform LAB: POSITION EVALUATED:
RO: SRO: ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE:
PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2107.001 Attachment P EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLIC ABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
Mode 4; 250 EFPD. All ESF systems are in normal alignment.
Startup Transformer #3 is supplying all AC electrical busses.
'A', 'C' and 'B' Condensate Pump are running for post maintenance testing and 'D' Condensate Pump is in pull to lock.
'B' Circulating Water Pump is running and 'A' Circulating Water Pump is in pull to lock.
'B' and 'D' Reactor Coolant Pumps are running and 'A' and 'C' Reactor Coolant Pumps are secured.
Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
Unit 1 SU#2 feeder to A1(A111) is in normal after stop.
2H2 loading is 4MVA, 2H1 loading is 5 MVA
Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps TASK STANDARD: Identify at least 4 of the following 5 errors in OP 2107.001 section 11.0:
- 1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service.
- 2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
- 3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lo ck but in normal after stop.
- 4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running.
- 5) Procedure step 11.8.5 was marked as complete when the load ing of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment 'P is correct)
And Identified the error that SU#2 can not be placed in service in current configuration.
TASK PERFORMANCE AIDS: OP 2107.001 limits and precautions (section 5), completed section 11.0, and completed Attachment 'P'.
SIMULATOR SETUP:
N/A.
JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions.
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Reviewed procedure OP 2107.001 section 11.0 and Attachment 'P' for errors.
Identified 4 of the following 5 errors:
- 1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service.
- 2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
- 3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop.
- 4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running. 5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment 'P is correct)
N/A SAT UNSAT (C) 2. Determined that SU#2 availability.
Determined that and that SU#2 could not be placed in service in current configuration.
N/A SAT UNSAT END STOP TIME:
JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS Mode 4; 250 EFPD. All ESF systems are in normal alignment.
Startup Transformer #3 is supplying all AC electrical busses.
'A', 'C' and 'B' Condensate Pump are running for post maintenance testing and 'D' Condensate Pump is in pull to lock.
'B' Circulating Water Pump is running and 'A' Circulating Water Pump is in pull to lock.
'B' and 'D' Reactor Coolant Pumps are running and 'A' and 'C' Reactor Coolant Pumps are secured.
Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
2H2 loading is 4MVA, 2H1 loading is 5 MVA Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:
The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions.
List the errors identified below:
- 1)
- 2)
- 3)
- 4)
Can Startup Transformer #2 be placed in service given the initial condition information? _____________
JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS Mode 4; 250 EFPD. All ESF systems are in normal alignment.
Startup Transformer #3 is supplying all AC electrical busses.
'A', 'C' and 'B' Condensate Pump are running for post maintenance testing and 'D' Condensate Pump is in pull to lock.
'B' Circulating Water Pump is running and 'A' Circulating Water Pump is in pull to lock.
'B' and 'D' Reactor Coolant Pumps are running and 'A' and 'C' Reactor Coolant Pumps are secured.
Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
2H2 loading is 4MVA, 2H1 loading is 5 MVA Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:
The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions.
List the errors identified below:
- 1)
- 2)
- 3)
- 4)
Can Startup Transformer #2 be placed in service given the initial condition information? _____________
ANO-2-JPM-NRC-TTBCSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:
SYSTEM/DUTY AREA: Conduct of Operations (A.1) TASK: Calculate Time to Boil using computer program JTA#: ANO2RONORM4 KA VALUE RO: 3.9 SRO: 4.0 KA
REFERENCE:
2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR: Perform Classroom: Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: Classroom:
TESTING METHOD: SIMULATE: PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1015.008 Attachment E EXAMINEE'S NAME: SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-TTBCSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Plant shutdown for repair of Steam Generator Tube Leak. Making preparations for draining the RCS to 24 inches above the bottom of the hotleg to install nozzle dams. PZR level is 40%.
Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />; one (1) PZR code safety valve is removed; PZR manway is installed; ECCS vent valves are de-energized OPEN; NO RCP seal work inprogress; NO RCS cold or hot leg openings; RCS Temperature is 105°F.
TASK STANDARD:
Identify Three (3) of the following four (4) errors in the original Time to boil calculation :
- 1) 2 code safety valves were recorded as remo ved and only one was removed in initial conditions.
- 2) Initial RCS water level was recorded as 42" above the bottom of the hot leg instead of the correct 24".
- 3) Current RCS temperature was recorded as 80°F in stead of 105°F as stated in the initial conditions.
- 4) Time after shutdown was recorded as 3 days 5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> s instead of the correct 1 day and 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> (35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />).
AND Identify that the RCS cannot be drained to reduc ed inventory due to TTTCU is less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
TASK PERFORMANCE AIDS:
1015.008 attachment E, Computer operational with the current revision of LOSDC2 installed. (SP-94-C-0001-01, Rev. 13), set up s hortcut to program on the desktop.
SIMULATOR SETUP:
NA EXAMINER'S NOTES:
ANO-2-JPM-NRC-TTBCSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
CRS/SM directs: "Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory."
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. Compare time to boil (TTB) calculation using LOSDC2
program.
Computer program independently run and calculations compared to N/A SAT UNSAT (C) 2. Identified 3 of the 4 errors
- 1) 2 code safety valves were recorded as removed instead of
1 code safety valve removed.
- 2) Initial RCS water level was recorded as 42" above the
bottom of the hot leg instead of
the correct 24".
- 3) Current RCS temperature was recorded as 80°F instead of the
correct 105°F.
- 4) Time after shutdown was recorded as 3 days 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />
instead of the correct 1 day 11
hours (35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />).
N/A SAT UNSAT (C) 3. Determined that the actual Time until core uncovery:
is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 50 min 36 sec Determined that the RCS cannot be drained to reduced inventory.
N/A SAT UNSAT EXAMINER'S NOTE:
Prompt the Examinee that the file should not be printed or saved.
END ANO-2-JPM-NRC-TTBCSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions: Plant shutdown for repair of Steam Generator Tube Leak. Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams. PZR level is 40%. Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />; One (1) PZR code safety valve is removed; PZR manway is installed; ECCS vent valves are de-energized OPEN; NO RCP seal work in progress; NO RCS cold or hot leg openings; RCS Temperature is 105°F.
INITIATING CUE:
CRS/SM directs: "CRS/SM directs: "Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory."
Do not print data or save LOSCD2 file.
List the errors identified below:
- 1)
- 2)
- 3)
Answer the following question Yes or No:
Can the RCS be drained to reduced inventory gi ven the initial condition information?
ANO-2-JPM-NRC-TTBCSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions: Plant shutdown for repair of Steam Generator Tube Leak. Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams. PZR level is 40%. Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />; One (1) PZR code safety valve is removed; PZR manway is installed; ECCS vent valves are de-energized OPEN; NO RCP seal work in progress; NO RCS cold or hot leg openings; RCS Temperature is 105°F.
CRS/SM directs: "CRS/SM directs: "Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory."
Do not print data or save LOSCD2 file.
List the errors identified below:
- 1)
- 2)
- 3)
Can the RCS be drained to reduced inventory given the initial condition information? _____________
ANO-2-JPM-NRC-MAINTSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:
SYSTEM/DUTY AREA: Conduct of Operations (A.2) TASK: Supervisory review of maintenance activities JTA#: ANO-SRO-ADMIN-NORM-48 KA VALUE RO: 2.1 SRO: 3.1 KA
REFERENCE:
2.2.19 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR: Perform Classroom: Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: Classroom:
TESTING METHOD: SIMULATE: PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1025.003, Conduct of Maintenance EXAMINEE'S NAME: SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-MAINTSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-
- 2. The clearance has been removed. There are currently no Equipm ent Status Log (ESL) entries.
TASK STANDARD:
Identified 3 of the following 4 errors.
- 1) 2SW-1514A 'As Found' and 'Restoration' positions are listed as CLOSED when required to be OPEN.
- 2) 2SW-1514C 'Restoration' position is lis ted as OPEN when required to be CLOSED.
- 3) 2SW-1514L 'Restoration' position is list ed as OPEN when required to be CLOSED.
- 4) 2SW-1514L Restorer and Verifier initials are the same.
TASK PERFORMANCE AIDS:
Marked up copy of form 1025.003C, Main tenance Configuration Tracking Log Copy of OP 2104.019 Attachment D.
SIMULATOR SETUP:
NA EXAMINER'S NOTES:
ANO-2-JPM-NRC-MAINTSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
CRS/SM directs: "Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors."
PERFORMANCE CHECKLIST STANDARDS (Circle One)
Evaluator's Note: Provide examinee with a copy of 1025.003, Maintenance Configuration Tracking Log Sheet. 1. Review the Maintenance Configuration Tracking Log
Sheet Examinee reviewed the Maintenance Configuration
Tracking Log Sheet and
compared it to the normal lineup
in 2104.029, Attachment D.
N/A SAT UNSAT (C) 2. Identified 3 of the 4 errors.
Identified 3 of the following 4 errors. 1) 2SW-1514A 'As Found' and
'Restoration' positions are listed
as CLOSED when required to
be OPEN. 2) 2SW-1514C 'Restoration' position is listed as OPEN when
required to be CLOSED.
- 3) 2SW-1514L 'Restoration' position is listed as OPEN when
required to be CLOSED.
- 4) 2SW-1514L Restorer and Verifier initials are the same.
N/A SAT UNSAT END ANO-2-JPM-NRC-MAINTSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions: Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2. The clearance has been removed. There are currently no Equipm ent Status Log (ESL) entries.
INITIATING CUE:
CRS/SM directs: "Perform an Operations ve rification of the given 1025.003C form, Maintenance Configuration Tracking Log follo wing maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors."
List the errors identified below:
- 1)
- 2)
- 3)
ANO-2-JPM-NRC-MAINTSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions: Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2. The clearance has been removed. There are currently no Equipm ent Status Log (ESL) entries.
INITIATING CUE:
CRS/SM directs: "Perform an Operations ve rification of the given 1025.003C form, Maintenance Configuration Tracking Log follo wing maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors."
List the errors identified below:
- 1)
- 2)
- 3)
JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:
SYSTEM/DUTY AREA: A.3: Radiation Control TASK: Review and approve Containment Purge Gaseous Release JTA#: ANOSROADMINNORM189 KA VALUE RO: 2.5 SRO: 3.4 KA
REFERENCE:
2.3.9 APPROVED FOR ADMINISTRATION TO:
RO: SRO: X TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform CLASSROOM:
Perform POSITION EVALUATED:
RO: SRO: ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE:
PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2104.033 EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS
Plant is in Mode 5. Today's date is 03/10/2005.
Chemistry has completed Containment atmosphere radioactivity analysis. Purge Exhaust Filter Unit doors have been verified closed and dogged.
Initial flow from 2RITS-8233, Containment Purge, is 8.5 SCFM. Initial count rate on 2RITS-8233, Containment Purge, is 60 cpm. Initial CAM's Particulate reading is 1084 CPM and Gaseous is 928 CPM. Current four hour average CAM's Particulate reading is 2452 CPM and Gaseous is 1921 CPM. Last test reading run-time from engineering programs group is 7532.5 hrs. Current run-time reading from 2B85-C7 is 8284.9 hrs.
A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.
TASK STANDARD:
Four of the following Five errors must be identified:
Since data recorded in step 1.4.5 was incorrect the filter run-time should have been given to Engineering programs for evaluation.
Step 4.3 calculated count rate limits are wrong.
Step 4.4 since current CAMS radiation readings exceed the calculated limits, the permit should have been resubmitted to chemistry.
Step 4.8 2RITS-8233 set point is recorded incorrectly.
Potentiometer dial set point circled is incorrect due to recording the set point incorrectly; this results in a non-conservative trip value for 2RITS-8233.
AND The release permit must not be approved, but returned to chemistry for reanalysis.
TASK PERFORMANCE AIDS: A marked-up copy of Supplement 1 Containment Purge Gaseous Release Permit through section 4 and chemistry release data.
SIMULATOR SETUP:
NA
JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
The Shift Manager directs "Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement."
START TIME:
PERFORMANCECHECKLIST STANDARD CIRCLE ONE EXAMINER'S NOTE: Provide a marked-up copy of OP 2104.033 Supplement 1.
- 1. Perform supervisor review for approval of the Containment purge gaseous release permit and determine errors. Reviews the containment purge gaseous release permit.
N/A EXAMINER'S NOTE: The following list identify errors in the supplement 1 provided. The acceptance criterion is given in the task standard. Examinee must identify 4 of the 5 errors.
(C) 2. Data recorded in section 1.4.5 was incorrect the filter run-time should have been given to Engineering programs for evaluation.
Step 4.3 calculated count rate limits are wrong.
Step 4.4 since current CAMS radiation readings exceed the allowable limits, the permit should have been resubmitted to chemistry.
Step 4.8 2RITS-8233 set point is recorded incorrectly.
Potentiometer dial set point circled is incorrect due to recording the set point incorrectly; this results in a non-conservative trip value for 2RITS-8233. Filter run-time is beyond 720 hrs; this should be evaluated by engineering programs before proceeding with release.
Calculated count rate limits were given to be particulate 542 CPM and gaseous 464 CPM but should have been Particulate2168 CPM and gaseous 1856 CPM.
The Purge permit should be resubmitted to chemistry but the steps were marked as NA due current radiation readings exceeding calculated limits.
Set point for 2RITS-8233 is recorded as 15000 CPM not 150 CPM as specified in Chemistry report. Potentiometer dial set point should be 3.84, but 5.68 is circled.
N/A SAT UNSAT
EXAMINER'S NOTE: The Examinee should discuss that the release will be resubmitted to chemistry and Engineering programs should evaluate the runtime on the exhaust filter. (C) 3. The release should not be approved and should be resubmitted to chemistry. Would not approve the release to begin. N/A SAT UNSAT END STOP TIME:
JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS Plant is in Mode 5. Today's date is 03/10/2005. Chemistry has completed Containment atmosphere radioactivity analysis. Purge Exhaust Filter Unit door s have been verified closed and dogged. Initial flow from 2RITS-8233, Co ntainment Purge, is 8.5 SCFM. Initial count rate on 2RITS-8233, Containment Purge, is 60cpm. Initial CAM's Particulate reading is 1084 CPM and Gaseous is 928 CPM. Current four hour average CAM's Partic ulate reading is 2452 CPM and Gaseous is 1921 CPM. Last test reading run-time from en gineering programs gr oup is 7532.5 hrs. Current run-time reading from 2B85-C7 is 8284.9 hrs. A reactor Operator has completed the request and containment purge verification section of OP 2104.
033 Supplement 1.
Initiating CUE:
The Shift Manager directs "Review and approv e OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the complet ed supplement and chemis try report. Identify at least 4 errors in the supplement."
List the errors identified below:
- 1)
- 2)
- 3)
- 4)
Can this release permit be approved given the initial condition information? _____________
JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS Plant is in Mode 5. Today's date is 03/10/2005. Chemistry has completed Containment atmosphere radioactivity analysis. Purge Exhaust Filter Unit door s have been verified closed and dogged. Initial flow from 2RITS-8233, Co ntainment Purge, is 8.5 SCFM. Initial count rate on 2RITS-8233, Containment Purge, is 60cpm. Initial CAM's Particulate reading is 1084 CPM and Gaseous is 928 CPM. Current four hour average CAM's Partic ulate reading is 2452 CPM and Gaseous is 1921 CPM. Last test reading run-time from en gineering programs gr oup is 7532.5 hrs. Current run-time reading from 2B85-C7 is 8284.9 hrs. A reactor Operator has completed the r equest and containment purge verification section of OP 2104.
033 Supplement 1.
Initiating CUE:
The Shift Manager directs "Review and approv e OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the complet ed supplement and chemistry report. Identify at least 4 errors in the supplement."
List the errors identified below:
- 1)
- 2)
- 3)
- 4)
Can this release permit be approved given the initial condition information? _____________
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:
SYSTEM/DUTY AREA: A4 Emergency Plan TASK: Determine Emergency Action Level JTA#: ANO-SM-EOPAOP-EMERG-301 KA VALUE RO: 2.3 SRO: 4.1 KA
REFERENCE:
2.4.41 APPROVED FOR ADMINISTRATION TO:
RO: SRO: X TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform LAB: POSITION EVALUATED:
RO: SRO: X ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE:
PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 1903.010 EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater. Feedwater flow can not be rest ored to either Steam Generator. Steam Generator levels are:
o "A" S/G = 47" wide range o "B" S/G = 52" wide range. The crew has initiated Once Thru Cooling using t he ECCS Vents. RCS leakage is estimated to be 875 gpm. Containment temperature, pressure and sump level are rapidly rising. SIAS, CCAS and CIAS have actuated. Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.
TASK STANDARD:
Declared a Site Area Emergency based on EAL 6.9, Loss of Both S/Gs as a Heat Removal Method
TASK PERFORMANCE AIDS: OP 1903.010
SIMULATOR SETUP:
N/A.
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. Review E-Plan procedure 1903.010 to determine classification. Review 1903.010 index and EAL classification tabs.
N/A SAT UNSAT (C) 4. Reviewed EAL 6.9., Site Area Emergency based Loss of Both S/Gs as a Heat Removal
Method Site Area Emergency declared based Loss of Both S/Gs as a Heat Removal Method N/A SAT UNSAT END JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater. Feedwater flow can not be restor ed to either Steam Generator. Steam Generator levels are:
o "A" S/G = 47" wide range o "B" S/G = 52" wide range. The crew has initiated Once Thru Cooling using t he ECCS Vents. RCS leakage is estimated to be 875 gpm. Containment temperature, pressure and sump level are rapidly rising. SIAS, CCAS and CIAS have actuated. Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater. Feedwater flow can not be rest ored to either Steam Generator. Steam Generator levels are:
o "A" S/G = 47" wide range o "B" S/G = 52" wide range. The crew has initiated Once Thru Cooling using t he ECCS Vents. RCS leakage is estimated to be 875 gpm. Containment temperature, pressure and sump level are rapidly rising. SIAS, CCAS and CIAS have actuated. Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
ANO-2-JPM-NRC-CVCS2 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 004 DATE: SYSTEM/DUTY AREA:
Chemical and Volume Control System TASK: Perform Emergency Boration (Alternate Success Path)
JTA#: ANO2-RO-EOPAOP-OFFNORM-193 KA VALUE RO: 3.9 SRO: 3.7 KA
REFERENCE:
004 A4.07 APPROVED FOR ADMINISTRATION TO:
RO: X SRO: X TASK LOCATION:
INSIDE CR:
X OUTSIDE CR:
BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform LAB: POSITION EVALUATED:
RO: SRO: ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE:
PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE (S):
OP 2203.032, OP 2103.015 EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAI NST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLIC ABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-CVCS2 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL R EVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Mode 3, A Shutdown Margin is calculated following a reactor trip.
TASK STANDARD:
Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using
BAM Pumps via Emergency Borate Valve (2CV-4916-2). This is an alternate success path JPM.
TASK PERFORMANCE AIDS:
AOP 2203.032 Steps 2 through 6. Copy of RHOBAL Shutdown margin, OP 2103.015 Worksheet 4, showing SDM not met.
SIMULATOR SETUP:
A Mode 3 IC will be set up for this JPM. Use CASE file JPM01.
The elements of this file are:
Trigger 5 = 2CV-4873-1a = 75%. 2CV-4873-1a (VCT Outlet) malfunction set to 75%; Then overrides 2HS-4873-2 are set to false and 2HS-4873-3 set to false to turn lights off.
This case file will simulate the VCT Outlet valve tri pping its output breaker due to a motor fault as it tries to shut.
ANO-2-JPM-NRC-CVCS2 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."
PERFORMANCE CHECKLIST STANDARD (Circle One) (C) 1. Review SDM calculation and recognize SDM is not met for
current conditions.
Recognize that SDM is not met and that emergency boration is
required.
N/A SAT UNSAT EXAMINERS NOTE: Examinee may review the instruction section of OP 2103.015 and then ask what method of emergency boration the CRS/SM recommends.
EXAMINERS CUE:
When the examinee determines emergency boration is required, provide the following information, even if the examinee does not ask for direction: "Borate using the BAM Tank Gravity Feed valves per AOP 2203.032 starting with step 2." 2. Step 2 Verify at least one Charging Pump (CCP) running with flow greater
than 40 GPM.
POSITIVE CUE:
Red light(s) ON.
Flow is greater than 40 gpm.
On Panel 2C09, verified CCP(s) running.
Observed red light ON; green light
OFF above at least one of the
following handswitch(es):
2HS-4832-1, "A" CCP
2HS-4852-1, "C" CCP (red)
2HS-4853-2, "C" CCP (green)
2HS-4842-2, "B" CCP
Observed flow greater than 40
gpm on Charging Header Flow
(2FIS-4863).
N/A SAT UNSAT 3. Step 3.A Align Boric Acid Supply To CCP Suction.
POSITIVE CUE:
Red light(s) ON.
NEGATIVE CUE:
Green light(s) ON.
On Panel 2C09, opened BAMT Gravity Feed Valves 2CV-4920-1
and/or 2CV-4921-1
Observed red light ON and green
light OFF above handswitch(es):
2HS-4920-1 for 2CV-4920-1 2HS-4921-1 for 2CV-4921-1 N/A SAT UNSAT EXAMINER'S NOTE: In the following step the VCT Outlet Valve will NOT close requiring an alternate success path.
ANO-2-JPM-NRC-CVCS2 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One) 4. Step 4 Close Volume Control Tank (VCT)
Outlet Valve (2CV-4873-1).
POSITIVE CUE:
Green light OFF.
Red light OFF.
NEGATIVE CUE:
Red light ON.
On Panel 2C09, observed that 2CV-4873-1 did NOT go closed.
Observed green light OFF; red
light OFF above VCT Outlet Valve
handswitch (2HS-4873-1).
N/A SAT UNSAT (C) 5. Step 4.A Start at least ONE BAM Pump.
POSITIVE CUE:
Red light ON.
NEGATIVE CUE:
Green light ON.
On Panel 2C09, start 2P39A and/or 2P39B.
Observed RED light ON above the BAM pump started, 2HS-4919-2
(2P39A) or 2HS-4910-2 (2P39B).
N/A SAT UNSAT (C) 6. Step 4.B Open Emergency Borate From BAM Pumps Valve (2CV-4916-2).
POSITIVE CUE:
Red light ON.
NEGATIVE CUE:
Green light ON.
On Panel 2C09, opened 2CV-4916-2.
Observed red light ON; green light OFF above Emergency Borate
Valve, 2CV-4916-2.
N/A SAT UNSAT 7. Step 4.C Verify Boric Acid Makeup Flow Control Valve (2CV-4926) closed.
POSITIVE CUE:
Green light ON.
NEGATIVE CUE:
Red light ON.
On Panel 2C09, verified 2CV-4926 closed.
Observed green light ON; red light
OFF above Boric Acid Makeup
Flow Controller (2FIC-4926).
N/A SAT UNSAT 8. Step 5 Check Reactor Makeup Water Flow Control Valve (2CV-4927) or VCT
Makeup Isol valve (2CV-4941)
closed.
POSITIVE CUE:
Green light ON.
NEGATIVE CUE:
Red light ON.
On Panel 2C09, verified 2CV-4927 or 2CV-4941 closed.
Observed green light ON; red light
OFF above Reactor Makeup
Water Flow Controller (2FIC-4927)
or above 2CV-4941 handswitch.
N/A SAT UNSAT 9. Step 6 Check Charging Header Flow (2FIS-4863) greater than 40 gpm.
POSITIVE CUE:
Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)
On Panel 2C09 (upright portion), observed flow greater than 40
gpm on Charging Header Flow
indicator (2FIS-4863).
N/A SAT UNSAT END ANO-2-JPM-NRC-CVCS2 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINER COPY JPM INITIAL TASK CONDITIONS:
Mode 3. A Shutdown Margin has been calculated following a reactor trip.
INITIATING CUE:
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."
ANO-2-JPM-NRC-CVCS2 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE COPY JPM INITIAL TASK CONDITIONS:
Mode 3. A Shutdown Margin has been calculated following a reactor trip.
INITIATING CUE:
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."
PROC./WORK PLAN NO.
2103.015 PROCEDURE/WORK PLAN TITLE:
REACTIVITY BALANCE CALCULATION PAGE: 2 of 21 CHANGE: 035-04-0 ANO-2-JPM-NRC-EOP01 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 09 DATE: SYSTEM/DUTY AREA:
Abnormal/Emergency Operations
TASK: Secure Containment Spray
JTA#: ANO2-RO-EOPAOP-EMERG-13
REFERENCE:
026 A2.03
APPROVED FOR ADMINISTRATION TO:
RO: X SRO: X TASK LOCATION:
INSIDE CR:
X OUTSIDE CR:
BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform LAB: POSITION EVALUATED:
RO: SRO: ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE:
PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2202.003
EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-EOP01 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Containment spray actuation signal has actuated inadvertently and
2K04 D-1, CSAS ACT, is in Alarm. I&C has corrected the problem. No testing is currently in progress.
TASK STANDARD:
CSAS is reset and CSAS actuated components ar e secured.
TASK PERFORMANCE AIDS:
EOP 2203.012D Annunciator 2K04 D1, CSAS ACT
SIMULATOR SETUP:
Inadvertent containment spray actuated.
Containment Temperature. < 140 ° F, Pressure < 22.5 psia.
ANO-2-JPM-NRC-EOP01 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator 2D1, CSAS ACT.
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. Step 2.1 Verify CSAS NOT valid.
Determined that Containment pressure less than 22.5 PSIA (PMS, SPDS or control board
indication).
Determined that Containment
temperature less than 140°.
N/A SAT UNSAT EXAMINERS NOTE:
There is only one channel available on the simulator. Rese tting 'B' trip path will reset all the other channels also. 2. Step 2.3 Place Spray Pumps in PTL.
Examiner's CUE:
CRS acknowledges TS entry into 3.0.3.
On panels' 2C16/17, placed handswitches for Containment
Spray Pumps (2P35A and
2P35B) in Pull To Lock (PTL).
Observed green lights ON above handswitches.
Enter TS 3.0.3.
N/A SAT UNSAT (C) 3. Step 2.6.1 2.6.2 2.6.3 2.6.4 Reset CSAS on 2C23.
Examiner's Note:
Give examinee Key #15 when
asked.
On panel 2C23B, obtained key and placed it in trip path to be reset.
Placed trip path key switch to
UNLK.
Depressed CSAS pushbutton for
trip path.
Verified Trip Path lights reset (on
2C03) (Not a critical item)
Placed trip path key switch to LK.
N/A SAT UNSAT EXAMINERS NOTE:
There is only one channel available on the simulator.
Resetting 2C40 actuation path will reset all the other channels also.
ANO-2-JPM-NRC-EOP01 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 3. Step 2.6.6 2.6.7 Reset CSAS on 2C40
On 2C40, depressed CSAS lockout reset pushbutton.
On 2C40 verify reset lights are
ON.
N/A SAT UNSAT (C) 4. Step 2.6.8 Close Containment Spray Header Isolation Valves.
On panels' 2C16/17, placed handswitches for Containment
Spray Header Isolation valves
(2CV-5612-1 and 2CV-5613-2) in
CLOSE.
Observed green lights ON above
handswitches.
N/A SAT UNSAT (C) 5. Step 2.6.9 Stop Containment Spray Pumps.
On panels' 2C16/17, removed handswitches for Containment
Spray Pumps (2P35A and
2P35B) from PTL and placed in
normal after stop.
Observed green lights ON above
handswitches.
N/A SAT UNSAT 6. Step 2.6.10 Exit Tech Spec 3.0.3.
EXAMINER's CUE: Exiting Tech Spec 3.0.3 has been
entered into the station log.
Notify CRS to exit tech spec 3.0.3 when both spray pumps are
taken out of PTL.
N/A SAT UNSAT END STOP TIME:
ANO-2-JPM-NRC-EOP01 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Containment spray actuation si gnal has actuated inadvertently.
2K04 D-1, CSAS ACT, is in alarm.
I&C has corrected the problem.
No Testing is currently in progress.
INITIATING CUE:
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.
ANO-2-JPM-NRC-EOP01 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Containment spray actuation si gnal has actuated inadvertently.
2K04 D-1, CSAS ACT, is in alarm.
I&C has corrected the problem.
No Testing is currently in progress.
INITIATING CUE:
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.
ANO-2-JPM-NRC-CREV01 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 00 DATE: SYSTEM/DUTY AREA:
Abnormal/Emergency Operations
TASK: Manually actuate Control Room Vent ilation ALTERNATE SUCCESS PATH JTA#: ANO2-RO-EOPAOP-EMERG-13
REFERENCE:
073 A301
APPROVED FOR ADMINISTRATION TO:
RO: X SRO: X TASK LOCATION:
INSIDE CR:
X OUTSIDE CR:
BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform LAB: POSITION EVALUATED:
RO: SRO: ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE:
PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE(S):
OP 2104.007
EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-CREV01 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and
Annunciator 2K08 A-4 are in. A valid 2RITS-8750-1A is in alarm. ALTERNATE SUCCESS PATH JPM
TASK STANDARD:
All Control room ventilation com ponents have been actuated and 2VSF 9 secured and
outside air damper has been closed and air reserve aligned.
TASK PERFORMANCE AIDS:
Marked up copy of OP 2104.007 section 7.0, Radiation and Chlorine detector alarm response actions. Steps 7.1 and 7.2 are complete.
SIMULATOR SETUP:
Alarm 2K11 D10 in alarm. Control room vent ilation radiation monitor above alarm setpoint.
Insert the following malfunctions:
XRI2RITS8750-1; value = 2000 (Control room radiation monitor in alarm)
X_RM8750; value = TRUE (Control room v entilation components will not actuate)
Insert the following overrides for 2C33:
DO_CI_8603_A; value = OFF DO_CI_8603_R; value = OFF ANO-2-JPM-NRC-CREV01 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm.
Perform actions in OP 2104.007 starting with step 7.1.
2, Radiation and Chlorine alarm response actions."
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
EXAMINERS NOTE:
Do not allow examinee to go to unit 1. Provide cue when determining unit 1 control room component
status. 1. step 7.1.2 Verify Unit 1 control room is isolated.
Examiner's CUE:
Unit 1 control room supply
damper CV7905 and Unit 1
control room return damper CV7907 have been closed.
On C141 on unit 1, verify CV7905 and CV7907 dampers
are closed.
N/A SAT UNSAT (C) 2. step 7.1.2 Verify unit 2 control room is isolated.
On 2C33, verify 2UCD 8683, unit 2 supply damper is closed by
taking handswitch to the closed
position and verifying green light
is ON above handswitch.
On 2C33, verify 2UCD 8685, unit
2 return damper is closed by
taking handswitch to the closed
position and verifying green light
is ON above handswitch.
N/A SAT UNSAT 3. step 7.1.3 Verify Unit 1 control room supply fans are stopped.
Examiner's CUE:
Unit 1 control room supply
fans VSF8A and VSF8B handswitches are in stop and
green lights ON.
At breaker B1544 on Unit 1, verify VSF-8A handswitch in stop
and green light ON.
At breaker B4161 on Unit 1, verify VSF-8B handswitch in stop
and green light ON.
N/A SAT UNSAT Examiner's note:
Transition to back of control room to panel 2C22.
ANO-2-JPM-NRC-CREV01 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4. step 7.1.3 Verify Unit 2 control room supply fans are stopped.
On panel 2C22, took handswitch for 2VSF8A and 2VSF8B to stop
and verified Green light ON
above handswitch.
N/A SAT UNSAT (C) 5. step 7.1.3 Verify Unit 2 control room exhaust fans are stopped.
On panel 2C22, took handswitch for 2VSF43A and 2VSF43B to
stop and verified Green light ON
above handswitch.
N/A SAT UNSAT 6. step 7.1.3 Verify Unit 1 control room smoke exhaust fan is stopped.
Examiner's CUE:
Unit 1 control room smoke
exhauster fan VEF43 handswitch is in stop and
green light ON.
On unit 1 panel C19, verified VEF 43 fan in stop and green light ON.
N/A SAT UNSAT Examiner's note:
Transition to front of control room to panel 2C33.
Examiner's Note: The following is the alternate success path step. 7. step 7.1.4 Verify 2VSF9 running with insufficient air flow.
On panel 2C33 rotated handswitch for 2VSF9 to start.
On panel 2C33 verified RED light ON above handswitch for 2VSF9.
On panel 2C33 verified PCD-8607B red light ON.
On panel 2C33 recognized low air flow by Amber light ON and
Red light OFF above 2VSF9
handswitch.
N/A SAT UNSAT ANO-2-JPM-NRC-CREV01 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 8. step 7.1.5 Close 2VSF9 outside Air damper 2PCD8607B.
EXAMINER's CUE: When asked, report 2 nd person verification of handswitch
2PCD8607B is complete.
EXAMINER's CUE: When asked to go to Unit 1 and
start VSF9, report that VSF 9 is running with proper discharge flow.
On panel 2C33 placed handswitch for 2PCD8607B to
RESERVE.
On panel 2C33, secured 2VSF 9 by taking handswitch to STOP.
Contacts unit 1 to start VSF 9.
N/A SAT UNSAT EXAMINER's NOTE:
This JPM does not examine the examinee's use of Tech Specs, JPM can be ended at this step.
- 10. step 7.1.5 Initiate condition report and determine tech spec
applicability due to 2VSF 9
inoperability.
Discuss writing a condition report and entry into Tech Spec due to
2VSF9 inoperability. Attempt to
access OP 2104.007 attachment
B component/tech spec cross-
reference, to determine tech spec
applicability.
N/A SAT UNSAT END STOP TIME:
ANO-2-JPM-NRC-CREV01 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Annunciator 2K11 D-10, Process Gas Radiati on HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation al arm, 2RITS-8750-1A, is in alarm and not bypassed.
INITIATING CUE:
The CRS directs, "Verify proper system actuat ion following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.
1.2, Radiation and Chlorine alarm response actions."
ANO-2-JPM-NRC-CREV01 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Annunciator 2K11 D-10, Process Gas Radiati on HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation al arm, 2RITS-8750-1A, is in alarm and not bypassed.
INITIATING CUE:
The CRS directs, "Verify proper system actuat ion following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions."
ANO-2-JPM-NRC-IA02 PAGE 1 OF 5 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE: SYSTEM/DUTY AREA: Instrument Air System TASK: Perform actions required by low Instrument Air Header Pressure JTA#: ANO2-RO-EOPAOP-EMER-157 KA VALUE RO:
3.1 SRO: 3.2 KA
REFERENCE:
078 A3.01 APPROVED FOR ADMINISTRATION TO: RO:
X SRO: X TASK LOCATION: INSIDE CR:
X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR:
Perform LAB: POSITION EVALUATED: RO: SRO: ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM:
X APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
AOP 2203.021 EXAMINEE'S NAME: SSN: EVALUATOR'S NAME: THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-IA02 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist -
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.
TASK STANDARD:
Unit 2 fully isolated from Unit 1 instrument air.
TASK PERFORMANCE AIDS:
SIMULATOR SETUP:
T1= IAINSTAIR, value = 13, Ramp = 1:00 minute.
Set trigger T2 to qh3c315 (closed position indication for 2CV3015)
T2=IAINSTAIR, value = 7.
Full power IC, Trigger T1 when candidate ready to start JPM
ANO-2-JPM-NRC-IA02 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Perform the ac tions for Loss of Instrument Air us ing AOP 2203.021 starting with step 2."
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) EXAMINER'S NOTE:
AO and WCO duties are already in progress. (C) 1. Step 2.a Open Instrument Air header cross-connect valves with
Unit 1.
On panel 2C14, placed handswitches for 2CV-3004 and
2CV-3015 to OPEN.
Observed red lights ON and
green lights OFF above
handswitches for 2CV-3004 and
N/A SAT UNSAT 2. Step 2.b Notify Unit-1 of intent to cross-connect instrument air.
Examiner's CUE:
Unit-1 personnel acknowledge
cross-connecting
instrument air.
Notified Unit-1 of intent to cross-connect instrument air.
N/A SAT UNSAT EXAMINER's NOTE: Provide the CUE below after the examinee identifies IA header pressure is less than 60 psig from indication on 2C14.
- 3. Step 4 Monitor Instrument Air header pressure.
Examiner's CUE:
Unit 1 SM reports that Unit 1
IA pressure is 55 psig and going down.
On panel 2C14, monitored Instrument Air header pressure
on 2PIS-3013 for results of
actions. N/A SAT UNSAT ANO-2-JPM-NRC-IA02 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4 Step 4.A Close Instrument Air header cross-connect valve with Unit
- 1.
On panel 2C14, placed handswitches for 2CV-3004 and
2CV-3015 to CLOSED.
Observed green lights ON and red lights OFF above
handswitches for 2CV-3004 and
N/A SAT UNSAT Examiner's Note: When Unit 2 instrument air header is isolated from Unit 1 provide the following cue:
"A large IA leak exists on the instrument air piping and can be isolated by closing 2IA-99."
5 Step 4.B Direct Auxiliary Operator to CLOSE manual Instrument Air
header cross-connect valves. NOTE: candidate may elect to close 2IA99 before
closing manual valves.
Direct Auxiliary Operator to CLOSE manual Instrument Air
header cross-connect valves
N/A SAT UNSAT 6 Step 5 Check IA header pressure greater than 35 psig.
Monitors IA header pressure on 2C14 to verify pressure stays
above 25 psig.
N/A SAT UNSAT 6. Step 6 Direct AO to check IA header pressure and air receivers'
pressure.
Examiner's Cue:
AO reports IA header pressure as indicated on
2C14.
Examiner's note:
AO reports that the IA 'A' air receiver pressure is as
indicated on 2C14 and the
'B' IA receiver pressure is
+5 # as indicated on 2C14.
Direct AO to check IA header pressure locally.
Direct AO to check IA air receivers.
N/A SAT UNSAT ANO-2-JPM-NRC-IA02 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 7. Step 8 Check IA header flow locally.
Examiner's Cue:
IA Header Flow is 700 SCFM. Direct AO to report IA header flow locally.
N/A SAT UNSAT (C) 8. Step 8 Direct AO to close 2 IA-99.
Examiner's Cue:
AO has been directed to close 2IA-99.
Examiner's note:
Notify simulator operator to take IA leak to 0.
Direct AO to close 2IA-99 or inform CRS to direct AO to
close 2IA-99. Refer to OP
2203.021 Attachment E to
determine that 2CV-0427 and
2CV-0437 will fail OPEN when
IA is isolated to them.
N/A SAT UNSAT Simulator operator: When direction given to close 2IA-99, take IA leak malfunction to 0.
END STOP TIME:
ANO-2-JPM-NRC-IA02 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Normal full power operation. Alarm 2K12-A8 "I NSTR AIR PRESS HI/LO" is in alarm.
INITIATING CUE:
The SM/CRS directs, "Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2."
ANO-2-JPM-NRC-IA02 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Normal full power operation. Alarm 2K12-A8 "I NSTR AIR PRESS HI/LO" is in alarm.
INITIATING CUE:
The SM/CRS directs, "Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2."
ANO-2-JPM-NRC-MTG05 PAGE 1 of 8 Job Performance Measure UNIT: 2 REV #: 007 DATE:
SYSTEM/DUTY AREA:
Main Turbine Generator System
TASK: Perform a Manual Synchronization of the Main Turbine Generator to the System (Alternate Success Path) JTA#: ANO2-RO-TURBC-NORM-12 KA VALUE RO: 2.9 SRO: 3.2 KA
REFERENCE:
045 K3.01 APPROVED FOR ADMINISTRATION TO: RO:
X SRO: X TASK LOCATION: INSIDE CR:
X OUTSIDE CR:
BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform LAB: POSITION EVALUATED: RO: SRO: ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S): OP 2106.009 EXAMINEE'S NAME: SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE ANO-2-JPM-NRC-MTG05 PAGE 2 of 8 Job Performance Measure BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS
- Plant startup is in progress. OP 2106.009 is completed through step
16.2.
TASK STANDARD:
Turbine Generator tripped. Uncontrolled MTG load increase stopped.
TASK PERFORMANCE AIDS
- OP 2106.009 Step 16.0
SIMULATOR SETUP:
Startup in progress. Reactor power
~ 5%. Main transformer Cooling Group Breaker
Lineup is complete (ATT. E). Turbine first stage pressure feedback is in auto.
Trigger 1 to component malfunction 2CV0242 value =
1.00 ramp = 2:00 delay 10 sec; Trigger 2 to
component malfunction 2CV208 value = 1.00 ramp = 2:00 del ay 10 sec; T1 set to ce4r9728 (BKR 5130) and T2
set to ce4r9731 (BKR 5134).
ANO-2-JPM-NRC-MTG05 PAGE 3 of 8 Job Performance Measure INITIATING CUE:
The CRS directs, "Synchronize the Main Turbine Generator to the grid and load to about 50 Mwe using OP 2106.009 beginning with step 16.3."
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. step 16.3.1 Notify Pine Bluff Dispatcher of intent to sync to system.
POSITIVE CUE:
Pine Bluff dispatcher
notified.
Using dedicated dispatcher telephone, notified Pine Bluff dispatcher of intent to sync to system. N/A SAT UNSAT (C) 2. step 16.3.2 Place synchronizing hand switch for EITHER Breaker 5130 OR Breaker 5134 to MANUAL.
POSITIVE CUE:
Hand switch 2HS-9727 OR 2HS-9730 in MANUAL.
On panel 2C01, placed synchronizing hand switch for
EITHER Breaker 5130 (2HS-9727) OR Breaker 5134 (2HS-9730) in MANUAL.
Observed EITHER hand switch 2HS-9727 OR 2HS-9730 in MANUAL.
N/A SAT UNSAT (C) 3. step 16.3.3 Verify Synchroscope rotating slowly in the
CLOCKWISE direction.
POSITIVE CUE:
Synchroscope rotating slowly in CLOCKWISE
direction.
On panel 2C01, pressed INCREASE or DECREASE
pushbutton on Load Selector until synchroscope is rotating slowly in CLOCKWISE
direction.
On panel 2C10, observed synchroscope rotating slowly
in CLOCKWISE direction.
N/A SAT UNSAT ANO-2-JPM-NRC-MTG05 PAGE 4 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4. step 16.3.4 16.3.5 Verify Generator Voltage slightly higher than System
Voltage AND check Generator Voltage phase to
phase.
POSITIVE CUE:
Voltage slightly higher than system voltage.
On panel 2C10, verified generator voltage slightly higher than system voltage.
AND On panel 2C01, checked generator voltage phase to
phase using installed indications and handswitch
On panel 2C10, observed voltages on Incoming slightly
higher than Running voltmeters.
N/A SAT UNSAT 5. step 16.3.6 Announce to the control room the intention to synchronize to system.
POSITIVE CUE:
Control room personnel
notified.
Announced to the control room the intention to synchronize to system.
N/A SAT UNSAT (C) 6. step 16.3.7 16.3.8 Close Generator Output Breaker and check turbine picked up load.
POSITIVE CUE:
Red light ON.
Load increase indicated.
On panel 2C01, closed Generator Output Breaker
selected so that Breaker CLOSES with synchroscope in
the 12 O'CLOCK position.
Observed load increase
indicated on Load (2JI-9625)
On panel 2C01, observed
breaker closed indication (red
light ON, green light OFF) for
operated breaker.
OR On panel 2C10 mimic, observed red light ON and
green light OFF for breaker
just closed (5130 or 5134).
N/A SAT UNSAT ANO-2-JPM-NRC-MTG05 PAGE 5 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 7. step 16.3.9 Adjust load to ~ 10 Mwe.
POSITIVE CUE:
Load ~ 10 Mwe.
On panel 2C01, adjusted load to ~ 10 Mwe by pressing
INCREASE OR DECREASE pushbutton on Load Select.
Observed load at ~ 10 Mwe as
indicated on LOAD (2JI-9625)
N/A SAT UNSAT 8. step 16.3.10 Verify SDBCS response
POSITIVE CUE:
SDBCS valves are closing.
On panel 2C04, Verify 2CV0303 is responding to load increase by closing (HIC demand signal lowering).
N/A SAT UNSAT 9. step 16.4 Select Load Rate Limit of 1/2 % per minute.
POSITIVE CUE:
1/2 % per minute illuminated.
On panel 2C01, Verify Load Rate Limit of 1/2 % per minute
light illuminated
N/A SAT UNSAT EXAMINER'S AND SIMULATOR OPERATOR NOTE:
Trigger T-1, #1 control valve opening if BRK5130 closed or Trigger T-2, #2 control valve opening if BRK5134 closed with 10 sec delay. (C) 10. Recognize that turbine load is still increasing.
NEGATIVE CUE:
Turbine load is increasing uncontrollably.
On panel 2C01, observed turbine load still increasing on
SPDS Computers.
N/A SAT UNSAT ANO-2-JPM-NRC-MTG05 PAGE 6 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 11. Attempts to lower load using decrease pushbutton
AND/OR Manually trips Main Turbine
Generator using trip
pushbutton
POSITIVE CUE:
Main Turbine Generator is
tripped.
NOTE: Attempting to decrease load
using the decrease
pushbutton is not critical and
does not need to be
performed. Tripping the
turbine is critical. On panel 2C01, attempted to reduce turbine load using the
decrease pushbutton
AND/OR Manually tripped Main Turbine Generator by depressing the
trip pushbutton.
Verified MTG tripped, Generator Output Breakers
open, Exciter Field Breaker open, all valves closed, and
electrical loads shifted to SU
- 3. N/A SAT UNSAT END STOP TIME:
ANO-2-JPM-NRC-MTG05 PAGE 7 of 8 Job Performance Measure EXAMINER 'S COPY JPM INITIAL TASK CONDITIONS:
Plant startup is in progress. OP 2106.009 is completed through step 16.2.
The CRS directs:
"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."
ANO-2-JPM-NRC-MTG05 PAGE 8 of 8 Job Performance Measure EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Plant startup is in progress. OP 2106.009 is completed through step 16.2.
The CRS directs:
"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."
ANO-2-JPM-NRC-SIT01 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 010 DATE:
SYSTEM/DUTY AREA: Safety Injection System TASK: Perform a high pressure fill of a SI T (SIT "A") (Alternate Success Path)
JTA#: ANO2ROECCSNORM2 KA VALUE RO: 3.3 SRO: 3.7 KA
REFERENCE:
006 A2.03 APPROVED FOR ADMINISTRATION TO: RO:
X SRO: X TASK LOCATION: INSIDE CR:
X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform LAB: POSITION EVALUATED: RO: SRO: ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE(S): OP-2104.001 EXAMINEE'S NAME: SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-SIT01 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
HPSI pump (2P89A) is running on minimum recirculation
TASK STANDARD:
Safety Injection Tank (2T2A) level has been increased ~0.3% and fill is secured prior to
2T2A pressure exceeding 624psig (Hi Hi pressure) or level exceeding 89.5% (Hi Hi level)
THIS IS AN ALTERNATE SUCCESS PATH JPM
TASK PERFORMANCE AIDS:
OP 2104.001 Section 8.0
SIMULATOR SETUP: SIT 'A' level low enough to accept a 0.3% water addition and Safety Injection Tank (2T2A) pressure is <608 psig.
Setup overrides to deenergize the red and gr een lights for 2CV 5015-1 when the handswitch is is taken to the open position and have the valve open 1%. HPSI pump (2P89A) is running on minimum recirculation. RCS PRESSURE > 1500psia.
Set trigger T4= 'of4r0151' (triggered w hen 2HS5015-1 red light is energized).
T4 - CV50151 = 0.1; fail HPSI injection MOV partially open.
T4 - DO_HS_5015_G = OFF Time delay = 2 sec; HPSI injection MOV green light off.
T4 - DO_HS_5015_R = OFF Time delay =2 sec; HPSI injection MOV red light off.
ANO-2-JPM-NRC-SIT01 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS directs, "Raise Safety Injection Tank (2T2 A) level 0.3% using OP 2104.001, beginning with step 8.3." START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Step 8.4.1 Open SIT (2T2A) Drain Valve (2SV-5001-1).
On panel 2C17, placed handswitch for 2SV-5001-1 to
OPEN.
Observed red light ON above
handswitch.
N/A SAT UNSAT (C) 2. Step 8.4.1 Open SIT (2T2A) Check Valve Bypass (2SV-5004).
On panel 2C33, placed handswitch for 2SV-5004 to
OPEN.
Observed red light ON above
handswitch.
N/A SAT UNSAT 3. Step 8.3 Monitor SIT level and pressure during fill.
While filling SIT A, monitored level to ensure level maintained
< 87.9%.
While filling SIT A, monitored SIT
pressure closely to ensure
pressure maintained < 624 psig.
N/A SAT UNSAT (C) 4. Step 8.4.2 Throttle open HPSI Header 1 Injection to RCP A Discharge
(2CV-5015-1).
On panel 2C17, throttled 2CV-5015-1 OPEN by placing
handswitch to OPEN
momentarily as required to
establish an SIT fill rate.
Observed red and green lights
ON above handswitch.
Observed SIT (2T2A) control
board level instrument(s):
2LIS-5008 (2C17)
2LI-5010 (2C17)
2LIS-5009 (2C16)
OR Observed SIT (2T2A) level on PMS, or SPDS computer
point/trend display.
N/A SAT UNSAT ANO-2-JPM-NRC-SIT01 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 5. Step 8.4.3.A Attempts to close HPSI Header 1 Injection to RCP A
Discharge valve.
On panel 2C17, placed handswitch for 2CV-5015-1 to
CLOSE.
Recognized that 2CV-5015-1
would NOT close and both red
and green lights are deenergized.
N/A SAT UNSAT (C) 6.
Step 8.4.3.B Step 8.4.3.C Stop the level increase in 2T2A SIT.
On panel 2C17, placed handswitch for A HPSI pump
(2P-89A) in stop Observed 2P89A stopped.
OR On panel 2C17 placed handswitch for SIT A Drain Valve
(2SV-5001-1) to CLOSED.
Observed green light ON above
handswitch.
OR On panel 2C33, placed handswitch for SIT A Check
Valve Bypass (2SV-5004) to
CLOSED.
Observed green light ON above
handswitch.
N/A SAT UNSAT 7. Inform CRS of failure of 2CV-5015-1 to close.
Examiner's Cue:
Acknowledge communication as CRS.
Direct Examinee to secure
from filling A SIT.
Informed CRS that 2CV-5015-1 failed to close.
N/A SAT UNSAT 8. Step 8.4.3.B Close SIT (2T2A) Drain Valve.
(if not closed previously.)
On panel 2C17, placed handswitch for SIT A Drain Valve
(2SV-5001-1) to CLOSE.
Observed green light ON above
handswitch.
N/A SAT UNSAT 9. Step 8.4.3.C Close SIT (2T2A) Check Valve Bypass.
(if not closed previously.)
On panel 2C33, placed handswitch for SIT A Check
Valve Bypass (2SV-5004) to
CLOSE.
Observed green light ON above
handswitch.
N/A SAT UNSAT ANO-2-JPM-NRC-SIT01 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 10. On panel 2K07, Alarms C3, SIT Press Hi Hi or C4 Level Hi Hi NOT received.
2T2A SIT High High Pressure alarm NOT received (SIT
pressure > 624 psig) or High
High level alarm NOT received
(87.5%). N/A SAT UNSAT END STOP TIME:
ANO-2-JPM-NRC-SIT01 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
HPSI pump (2P89A) is running on minimum recirculation.
INITIATING CUE:
The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."
ANO-2-JPM-NRC-SIT01 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
HPSI pump (2P89A) is running on minimum recirculat ion.
INITIATING CUE:
The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."
ANO-2-JPM-NRC-ELEC001 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 008 DATE: SYSTEM/DUTY AREA: AC Electrical Distribution System TASK: Perform backfeed of a non-vital bus (2A1 from 2A3) , Respond to a Loss of Offsite Power JTA#: ANO2-RO-EOPAOP-EMER-32
KA VALUE RO:
3.7 SRO: 4.1 KA
REFERENCE:
062 A2.11 APPROVED FOR ADMINISTRATION TO: RO:
X SRO: X TASK LOCATION: INSIDE CR:
X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR:
Perform LAB: POSITION EVALUATED: RO: SRO: ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM:
X APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
EOP 2202.007 EXAMINEE'S NAME: SSN: EVALUATOR'S NAME: THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-ELEC001 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL R EVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.
EOP 2202.007 steps have been completed through step 30.
TASK STANDARD:
Non-vital bus 2A1 has been powered fr om vital bus 2A3.
TASK PERFORMANCE AIDS:
EOP 2202.007 steps 28 through 34.
SIMULATOR SETUP:
IC with loss of offsite power. Open feeder breaker s for 2B 1, 2, 7. Close 2CV 0400 & 2CV0460.
Verify Remote function 4162A1strip value = T RUE is triggered. Complete SPTA's and EOP 2202.007 through step 31.
ANO-2-JPM-NRC-ELEC001 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31." START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1 Step 31.A Check 2A1 lockout relay reset.
On annunciator panel 2K01, verified 2K01-B7 "L.O. RELAY TRIP" for 2A1 in "slow flash" OR NOT illuminated.
N/A SAT UNSAT 2 Step 31.B Place "SU 2 to 2A1" (2A111) in PTL and verify breaker open.
On panel 2C10, placed 2A111 in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT 3 Step 31.B Place "Unit Aux to 2A1" (2A112) in PTL and verify breaker open.
On panel 2C10, placed 2A112 in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT 4 Step 31.B Place "SU 3 to 2A1" (2A113) in PTL and verify breaker open.
On panel 2C10, placed 2A113 in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT (C) 5 Step 31.B Place "2A1 to 2B3" (2A103) in PTL and verify breaker open.
On panel 2C10, placed 2A103 in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT (C) 6 Step 31.B Place "2A1 to 2B9" (2A109) in PTL and verify breaker open.
On panel 2C10, placed 2A109 in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT 7 Step 31.C Place condensate pump (2P2A) in PTL and verify breaker open.
On panel 2C02, placed 2P2A in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT 8 Step 31.C Place condensate pump (2P2C) in PTL and verify breaker open.
On panel 2C02, placed 2P2C in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT ANO-2-JPM-NRC-ELEC001 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 9 Step 31.C Place heater drain pump (2P8A) in PTL and verify breaker open.
On panel 2C02, placed 2P8A in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT 10 Step 31.C Place auxiliary feed pump (2P75) in PTL and verify breaker open.
On panel 2C02, placed 2P75 in PTL.
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT Examiner's note: Transition to back of control room to panel 2C22 11 Step 31.D Place main chiller (2VCH-1A) handswitch (2HS-3810) in PTL and verify breaker open.
On panel 2C22, placed 2HS-3810 for 2VCH-1A in PTL.
Observed green lights ON; red lights OFF over hand switch.
N/A SAT UNSAT EXAMINER'S NOTE:
Transition to front of control room panel 2C10 Provide the following cue when the n eed for local actions is identified: CUE: Local actions for EOP 2202.007 step 30.E using Attachment 24 have been completed. (C) 12 Step 33 Energize non-vital bus (2A1).
On panel 2C33, installed the synchronizer selector switch for
2A309 and placed switch in ON.
Placed 2A3 supply breaker (2A309) to CLOSE.
Observed red light ON; green light OFF over 2A309 hand switch.
N/A SAT UNSAT (C) 13 Step 34 Check diesel generator load.
On panel 2C33, verified 2DG1 load < 2850 KW, whenever load is
changed.
Observed 2DG1 load on Wattmeter W2DG1 and verified or was aware
of 2DG1 load change after energizing 2A1.
N/A SAT UNSAT 14 Step 35 Energize non-vital 480v bus 2B1.
On panel 2C10, placed 2A1 to 2B1 Feeder (2A102) in CLOSE.
Observed red light ON; green light OFF above hand switch.
N/A SAT UNSAT ANO-2-JPM-NRC-ELEC001 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 15 Step 35 Energize non-vital 480v bus 2B7.
On panel 2C10, placed 2A1 to 2B7 Feeder (2A104) in CLOSE.
Observed red light ON; green light OFF above hand switch.
N/A SAT UNSAT Examiner's note: When 480VAC busses 2B1 and 2B7 are energized the JPM can be ended.
END STOP TIME:
ANO-2-JPM-NRC-ELEC001 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY:
JPM INITIAL TASK CONDITIONS:
A loss of offsite power has occurred. Both EDG' s are operating supplying their respective busses.
EOP 2202.007 steps have been completed through step 30.
INITIATING CUE:
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."
ANO-2-JPM-NRC-ELEC001 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY:
JPM INITIAL TASK CONDITIONS:
A loss of offsite power has occurred. Both EDG' s are operating supplying their respective busses.
EOP 2202.007 steps have been completed through step 30.
INITIATING CUE:
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 1 of 7 SYSTEM/DUTY AREA:
Diesel Generator System (Alternate Success Path)
TASK: Start up the AAC diesel generator manually locally during a Loss of Offsite Power JTA # : ANO2-AO-AACDG-OFFNORM-18 KA VALUE RO: 3.9 SRO: 4.0 KA
REFERENCE:
2.1.23 APPROVED FOR ADMINISTRATION TO: RO:
X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR:
X BOTH: SUGGESTED TESTING ENVIRONMENT AND ME THOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate SIMULATOR:
LAB: POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR:
PLANT SITE:
X LAB: TESTING METHOD: SIMULATE:
X PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
20 minutes REFERENCE(S)
OP 2104.037, Exhibit 1 EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
DATE: THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time: Stop Time: Total Time:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
SIGNED: DATE:
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 2 of 7 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
This is an alternate success path JPM.
JPM INITIAL TASK CONDITIONS:
The following conditions exist:
- 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators ar e tied to their respective buses. 3. An attempt to start the AACDG from the Control R oom to energize 4160v Non-vital bus 2A1 was unsuccessful.
- 4. The PC on 2C14 AND 2C435 have both failed TASK STANDARD:
The AAC Diesel has been started and is at 4160 V and 900 rp m with the output breaker (2A-1001) closed. The 480V bus 2B16 has been powered from the AAC diesel generator.
TASK PERFORMANCE AIDS:
- 1. OP 2104.037 Exhibit 1
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 3 of 7 INITIATING CUE:
The CRS provides the following direction:
- 1. Start the AAC Diesel Generat or using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads.
START TIME:
EXAMINER'S NOTE:
Provide examinee with copy of 2104.037, Exhibit 1 If asked if 125 VDC is available, tell them that the indications for bus availability are as seen.
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. (Step 1.1) Place "Local/Remote" switch in LOCAL. (2HS-7118)
EXAMINER'S CUE:
"Local/Remote" switch indicates LOCAL.
On panel 2C-440, placed the "Local/Remote" switch in LOCAL.
(2HS-7118)
N/A SAT UNSAT EXAMINER'S NOTE:
The failure of the AAC diesel to start by the local handswitch will cause the examinee to start the AAC diesel by an alternate means. There will be no change in AAC diesel generator frequency or noise level when the local start switch is taken to START. Provide the following cue after 35 seconds when the local start switch is taken to START. (35 seconds is the delay time to allow for the lube oil pressure to build up on the EDG)
- 2. (Step 1.2) Start the AAC Diesel using the local start switch. (2HS-7117)
EXAMINER'S CUE:
The local start switch is in start, but the engine does not
start. On panel 2C-440 turned the local control switch CW to start.
N/A SAT UNSAT TRANSITION NOTE:
Go to the AAC diesel engine room.
- 3. (Step 2.1) Open the pre-lube pump solenoid (2SV-7224) for >10
seconds. EXAMINER'S CUE:
2SV-7224 manual operating stem has been rotated and air
noise is heard.
On the south side of the engine at the generator end, rotated the
manual operator of 2SV-7224
CW to open for >10 seconds.
N/A SAT UNSAT JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 4 of 7 (C) 4. (Step 2.2) Open EITHER of the air start solenoid valves: - 2SV-7222 OR
- 2SV-7223
EXAMINER'S CUE:
2SV-7222 (2SV-7223) manual operating stem has been
rotated and engine speed and noise level increases.
On the south side of the engine at the generator end, rotated the
manual operator of one of the air
start solenoid valves CW to open.
Looked for an increase in engine noise and/or discharge of oil and
air from the air start motors.
N/A SAT UNSAT 5. (Step 2.3) Close the air start solenoid valve that was opened.
EXAMINER'S CUE:
Manual operator rotated CCW to its original position.
On the south side of the engine at the generator end, rotated the
manual operator for the air start
solenoid valve CCW to close.
N/A SAT UNSAT 6. (Step 2.3) Close the pre-lube solenoid (2SV-7224).
EXAMINER'S CUE:
No more air noise is heard.
After > 10 seconds on the south side of the engine at the
generator end, rotated the
manual operator of 2SV-7224 CCW to close.
N/A SAT UNSAT 7. (Step 3.0) Verify the AAC Diesel Generator is at rated speed and
voltage. EXAMINER'S CUE:
Frequency indicates 60 Hz and voltage indicates 4160V.
On panel 2C-440, observed generator frequency at 60 Hz and
voltage at 4160V.
N/A SAT UNSAT JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 5 of 7 EXAMINER'S NOTE:
When the examinee inspects the condition of 2A-1001, provide the NEGATIVE CUE first to indicate that the breaker has not automatically closed. Once the action has been taken to close the breaker, provide
the POSITIVE CUE.
(C) 8. (Step 4.1) Verify the AAC Generator Output Breaker (2A-1001) is
CLOSED EXAMINER'S CUE:
The green breaker OPEN light is lit. AND The white breaker spring charging light is lit.
EXAMINER'S CUE:
The Red breaker CLOSED light is lit.
Observed breaker position indication on the door of 2A-1001.
Rotated breaker local control switch for 2A-1001 to the CLOSE
position.
N/A SAT UNSAT TRANSITION NOTE:
Go to the upstairs area of the switchgear room.
OPEN. EXAMINER'S CUE:
Green OPEN light is lit on 2B16-A1 and mechanical position indicator showing
green open Verifies 2B16-A1 is Open.
Observes the mechanical position indicator breaker for
2B16-A1 to show green open and
the green breaker position
indication light is lit.
N/A SAT UNSAT 10. (Step 4.3) Verify Load Center 2B16 Supply from the AAC diesel (2B16-B1) is CLOSED.
EXAMINER'S CUE:
Red CLOSED light is lit on 2B16-B1 and mechanical
position indicator showing red
closed. Verifies 2B16-B1 is Open.
Observes the mechanical position indicator breaker for
2B16-B1 to show red closed and
the red breaker position indication
light is lit.
N/A SAT UNSAT END STOP TIME:
________________
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 6 of 7 Examiner's Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
- 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators are tied to their respective buses. 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
- 4. The PC on 2C14 AND 2C435 have both failed.
INITIATING CUE:
The CRS provides the following direction:
- 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads.
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 7 of 7 Examinee's Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
- 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators are tied to their respective buses. 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
- 4. The PC on 2C14 AND 2C435 have both failed.
INITIATING CUE:
The CRS provides the following direction:
- 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads.
ANO-2-JPM-NRC-FPEM1 PAGE 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 009 DATE:
SYSTEM/DUTY AREA: Spent Fuel Pool Cooling System TASK: Perform service water emergency makeup to the SFP (with Loop 1 service water)
JTA#: ANO2-WCO-SFP-EMER1
REFERENCE:
033 A2.03
APPROVED FOR ADMINISTRATION TO:
RO: X SRO: X TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
X BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate SIMULATOR:
LAB: POSITION EVALUATED:
RO: SRO: ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE:
PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE (S):
OP 2104.006
EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-FPEM1 PAGE 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
The following conditions exist:
- 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running.
TASK STANDARD:
- 1. Emergency SFP makeup from Loop 1 service water has been initiated.
TASK PERFORMANCE AIDS:
- 1. OP 2104.006 Section 14.2
ANO-2-JPM-NRC-FPEM1 PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS provides the following direction:
"Align Loop 1 service water to provide emergency makeup to the spent fuel pool usi ng OP 2104.006, Section 14.2."
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
TRANSITION NOTE:
Go to elevation 335' RAB, north end of hallway.
- 1. Step 14.2.1 Secure Spent Fuel Pool Purification Pump (2P66).
Examiner's Cue:
Green light ON, red light OFF.
Locally rotated 2P66 handswitch (2HS-5411) to STOP and released.
Observed green light ON, red light OFF. N/A SAT UNSAT TRANSITION NOTE:
Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery.
(C) 2. Step 14.2.2 Verify Borated MU or RWT to 2P-66 (2FP-32) closed.
Examiner's Cue:
2FP-32 stem is fully inserted and resistance is felt.
Closed 2FP-32 by turning handwheel clockwise and
observing valve stem insertion
until resistance felt.
N/A SAT UNSAT TRANSITION NOTE:
Go to elevation 335' RAB just off elevator (if local verification is performed)
(C) 3. Step 14.2.2 Verify RWT Recirculation Isolation (2CV-5637-1) closed.
Examiner's Cue:
When Control Room is contacted, then Control room
reports 2CV-5637-1 has been
taken to Closed.
Or After the Control Room Closes 2CV-5637-1, then 2CV-
5637-1 is Closed (if local verification is performed)
Contacted Control Room to close 2CV-5637-1.
And Locally at 2CV-5637-1, verify that valve stem is in the down (closed)
position and closed limit switch is
actuated after the valve is closed
by the Control Room. (if local
verification performed)
N/A SAT UNSAT ANO-2-JPM-NRC-FPEM1 PAGE 4 of 7 JOB PERFORMANCE MEASURE (C) 4. Step 14.2.2 Verify RWT Recirculation Isolation (2CV-5638-2) closed.
Examiner's Cue:
When Control Room is contacted, then Control room
reports 2CV-5638-2 has been
taken to Closed.
Or After the Control Room Closes 2CV-5638-2, then 2CV-
5638-2 is Closed (if local verification is performed)
Contacted Control Room to close 2CV-5638-2.
And Locally at 2CV-5638-2, verify that valve stem is in the down (closed)
position and closed limit switch is
actuated after the valve is closed
by the Control Room. (if local
verification performed)
N/A SAT UNSAT TRANSITION NOTE:
Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery. (C) 5. Step 14.2.3 Open Borated MU, RWT, SW to Fuel Pool (2FP-31).
Examiner's Cue:
2FP-31 stem is fully extended.
Opened 2FP-31 by turning handwheel CCW.
Observed valve stem fully withdrawn out of the valve.
N/A SAT UNSAT (C) 6. Step 14.2.4 Open RWT to Fuel Pool Isolation (2FP-46).
Examiner's Cue:
2FP-46 stem is fully extended.
Opened 2FP-46 by turning handwheel CCW.
Observed valve stem fully withdrawn out of the valve.
N/A SAT UNSAT TRANSITION NOTE:
Go to elevation 335' RAB just off elevator.
(C) 7. Step 14.2.5 Close SW Header 1 Telltale Drain (2SW-8401).
Examiner's Cue:
2SW-8401 has stem inserted into handwheel.
Closed 2SW-8401 by turning handwheel CW.
Observed valve stem fully inserted into the valve.
N/A SAT UNSAT 8. Step 14.2.6 Ensure position of 2SW-57 is logged in Category "E" Log.
Examiner's Cue:
Valve position is logged.
Logged position of 2SW-57 by:
Using a plant telephone, Gaitronics, OR radio; contacted Control Room
and directed entry in Category "E" Log. OR Ensured Category "E" log entry made upon completion of
evolution.
N/A SAT UNSAT ANO-2-JPM-NRC-FPEM1 PAGE 5 of 7 JOB PERFORMANCE MEASURE (C) 9. Step 14.2.6 Open SW Header 1 Emergency Feed Isolation (2SW-57).
Examiner's Cue:
2SW-57 valve stem is fully extended.
Unlocked locking device on 2SW-57 using category "E" valve key. Opened 2SW-57 by turning handwheel CCW.
Observed valve stem fully withdrawn out of the valve.
N/A SAT UNSAT 10. Step 14.2.7 Station an Operator to monitor SFP level in communication
Emergency Feed Isolation to
SF Pool (2SW-138)
Examiner's Cue:
Operator responds to radio communications.
Verified that an Operator was stationed to monitor SFP level in
communication with Operator at
Isolation to SF Pool (2SW-138)
N/A SAT UNSAT EXAMINERS NOTE:
- Final valve position is at discretion of examinee to ensure level is raised / maintained. - Operator stationed to monitor SFP level in accordance with initial conditions.
(C) 11. Step 14.2.9 Throttle open SW Header 1 Emergency Feed Isolation to
SF Pool (2SW-138).
Examiner's Cue:
Operator stationed at SFP reports level rising slowly.
Throttled open 2SW-138 by turning handwheel CCW.
Observed valve stem withdrawn out of the valve commensurate with valves throttling.
N/A SAT UNSAT END STOP TIME:
ANO-2-JPM-NRC-FPEM1 PAGE 6 of 7 JOB PERFORMANCE MEASURE Examiner's Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
- 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level. 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running.
INITIATING CUE:
The CRS provides the following direction:
"Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2."
ANO-2-JPM-NRC-FPEM1 PAGE 7 of 7 JOB PERFORMANCE MEASURE Examinee's Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
- 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level. 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running.
INITIATING CUE:
The CRS provides the following direction:
"Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2."
ANO-2-JPM-NRC-LOF01 PAGE 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 003 DATE:
SYSTEM/DUTY AREA: Condensate and Feed Water System TASK: Align Condensate pump for start during a loss of all Feed Water event
JTA#: ANO2-RO-EOPAOP-EMER-28
REFERENCE:
CE E06 EA1.1
APPROVED FOR ADMINISTRATION TO:
RO: X SRO: X TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
X BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate SIMULATOR:
LAB: POSITION EVALUATED:
RO: SRO: ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE:
PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE (S):
OP 2202.006
EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ANO-2-JPM-NRC-LOF01 PAGE 2 of 7 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
- 1. Equipment Out OF Service: 2P-7A for Outboard Pump Bearing Replacement. 2. The plant has tripped from 100% power due to an inadvertent CSAS.
- 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).
TASK STANDARD:
"D" Condensate Pump has been prepared for restart and the actions of 2202.006, Loss of
Feedwater EOP through Step 16F has been completed.
TASK PERFORMANCE AIDS: OP 2202.006 Step 16
ANO-2-JPM-NRC-LOF01 PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Prepare "D" Condensate Pump fo r start using OP 2202.006 Step 16 contingency actions."
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
Transition Note:
Go to elevation 370' Turbine Building, east of the elevator, to the 2A-1 / 2 Bus area.
Examiner's Note:
When in front of breaker, give picture of inside breaker cubicle (DC control power breaker). The candidate may want to read MIS placard on the DC breaker. If so, show the candidate the close up picture of the DC Breaker. (C) 1. Step 16.A Locally open "DC CONTROL POWER" breakers in breaker
cubicles 2A106.
Examiner's Cue:
Once the candidate has located the breaker cubicle, Show the picture of the inside
of the 2A106 breaker cubicle Positive Cue:
Molded Case DC Control Power breaker for 2A106 switch positioned down. Points to the DC Control Power Molded Case Circuit Breaker.
Positions the DC Control Power Breaker located in 2A106 in the
down (open) position.
N/A SAT UNSAT (C) 2. Step 16.A Locally open "DC CONTROL POWER" breakers in breaker
cubicle 2A205.
Examiner's Cue:
Once the candidate has located the breaker cubicle, Show the picture of the inside
of the 2A205 breaker cubicle Positive CUE:
Molded Case DC Control Power breaker for 2A205 switch positioned down. Points to the DC Control Power Molded Case Circuit Breaker.
Positions the DC Control Power Breaker located in 2A205 in the
down (open) position.
N/A SAT UNSAT (C) 3. Step 16.B Verify Hotwell level greater than 38%. Examiner's Cue: Hotwell level is greater than 38%. Hotwell is checked > 38% by observing the remote Hotwell
level instrument above Breaker
Cubicle 2A205.
OR By Contacting the Control Room N/A SAT UNSAT ANO-2-JPM-NRC-LOF01 PAGE 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Transition Note:
Go to elevation 335' Turbine Building, south of the Main Condenser on platform. (C) 4. Step 16.C Verify both Condensate Pump Recirc valves closed.
Examiner's Cue:
Both Condensate Pump Recirc Valves indicate closed.
Both Condensate Pump Recirc Valves, 2CV0662 and 2CV-0663, are checked closed by observing
valve position indication on valve
stem. Indicator should be down
and in contact with switch for both valves. OR By Contacting the Control Room N/A SAT UNSAT TRANSITION NOTE:
Go to elevation 330' Turbine Building, west side walkway to check valve position locally. 5. Step 16.D Verify both Main Feedwater Pump Recirc valves closed.
Examiner's Cue:
Both Main Feedwater Pump Recirc Valves indicate closed.
Both Main Feed water Pump Recirc Valves, 2CV-0741 and
2CV-0749, are checked closed by
checking valve position locally.
OR By Contacting the Control Room N/A SAT UNSAT Transition Note Go to elevation 330' Turbine Building, near southwest stairwell and west of the Condensate Pumps in the Turbine Building Basement to check valve position locally.
Examiner's Note:
The procedure being used does not specify which valves to use to isolate the SU/BD DI Pressure Regulating Control Valve. The Candida te could close 2CS-12 (throttled isolation upstream and this one valve would isolate the DI flow OR a combination of the inlet (2CS-57) and bypass (2CS-59) OR outlet (2CS-58) and bypass (2CS-59) 6. Step 16.E Locally verify condensate to SU/BD DI isolated.
Examiner's Cue:
2CS-12 is closed (if used)
2CS-58 is closed (if used)
2CS-57 is closed. (if used)
2CS-59 is closed. (if used)
The SU/BD DI is verified isolated locally by checking the manual
isolation valves, 2CS-57 Inlet to
pressure regulator, 2PCV4505, or 2CS-58 Outlet from pressure
regulator 2PCV4505 and 2CS-
59, regulator bypass, by rotating
handwheel(s) in CW direction
until resistance is felt.
OR Close Combined Isolation 2CS-12 by rotating handwheel in
CW direction until resistance is
felt. N/A SAT UNSAT Transition Note Go to elevation 335' Turbine Building, southwest corner to check valve position locally. Candidate will need climb to platform for valve operation.
ANO-2-JPM-NRC-LOF01 PAGE 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 7. Step 16.F Locally open 'D' Condensate Pump Discharge Valve 10 turns.
Examiner's Cue:
'D' Condensate Pump Discharge Valve is opened 10
turns. The 'D' Condensate Pump Discharge Valve is rotated in CW
direction until resistance is felt
and then rotated in the CCW
direction until valve is 10 turns
open. N/A SAT UNSAT END STOP TIME:
ANO-2-JPM-NRC-LOF01 PAGE 6 of 7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
- 1. Equipment Out OF Service: 2P-7A for Outboard Pump Bearing Replacement. 2. The plant has tripped from 100% pow er due to an inadvertent CSAS. 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).
INITIATING CUE:
The SM/CRS directs, "Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions."
ANO-2-JPM-NRC-LOF01 PAGE 7 of 7 JOB PERFORMANCE MEASURE CANDIDATE'S COPY JPM INITIAL TASK CONDITIONS:
- 1. Equipment Out OF Service: 2P-7A for Outboard Pump Bearing Replacement. 2. The plant has tripped from 100% pow er due to an inadvertent CSAS. 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).
INITIATING CUE:
The SM/CRS directs, "Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions."
ANO-2-JPM-NRC-LOF01 PAGE 8 of 7 JOB PERFORMANCE MEASURE 2A205 CONDENSATE PUMP 2P-2CB 152-205CS ANO-2-JPM-NRC-LOF01 PAGE 9 of 7 JOB PERFORMANCE MEASURE 2A106 CONDENSATE PUMP 2P-2C 152-106 CS ANO-2-JPM-NRC-LOF01 PAGE 10 of 7 JOB PERFORMANCE MEASURE
ANO-2-JPM-NRC-LTOP PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE: SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Respond to Annunciator for LTOP valve misalignment JTA#: ANO2-RO-PZR-OFFNORM-11 KA VALUE RO:
3.8 SRO: 4.1 KA
REFERENCE:
010 K4.03 APPROVED FOR ADMINISTRATION TO: RO:
X SRO: X TASK LOCATION: INSIDE CR:
X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR:
Perform LAB: POSITION EVALUATED: RO: SRO: ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM:
X APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE(S):
OP 2203.012J EXAMINEE'S NAME: SSN: EVALUATOR'S NAME: THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-LTOP PAGE 2 OF 6 JOB PERFORMANCE MEASURE
THE EXAMINER SHALL R EVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
A loss of off site power has occurred.
A Natural Circulation Reactor Coolant System cool down is in progress.
2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
TASK STANDARD:
Placed both loop 1 and loop 2 LTOP's in service.
TASK PERFORMANCE AIDS:
OP 2203.012J, Annunciator 2K10 Corrective Action
SIMULATOR SETUP:
RCS and PZR cool down in progress.
RCS pressure less than 400 psia.
Power available to LTOP Isolation valves.
RCS Thot (both 2TIS4614-1 and 2TIS4714-2) indicate < 280°F Annunciators 2K10 C4 and C5 are in alarm.
ANO-2-JPM-NRC-LTOP PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The Control Room Supervisor directs "R espond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J."
PERFORMANCE CHECKLIST STANDARDS (Circle One) Examiner note: Valves may be opened in any order and either alarm window may be mitigated first.
- 1. (Step 2.1) Determined misalignment not directed by a procedure step.
Examiner's cue:
CRS reports that RCS cool down is controlled by Natural Circulation cool down AOP.
Determined that the LTOP's should be in service for given
conditions.
N/A SAT UNSAT 2. (Step 2.2) Determine RCS T-Hot temperature is less than 280°F. Using PMS, SPDS or 2C04 control board indications
determined that 2TIS-4614-1 is
less than 280°F and N/A'd step to
isolate LTOP's.
N/A SAT UNSAT 3. (Step 2.3) Determine RCS T-Hot temperature is less than 270°F. Using PMS, SPDS or 2C04 control board indications
determined that 2TIS-4614-1 is
less than 270°F and implemented
step. N/A SAT UNSAT (C) 4. (Step 2.3) Opened 2CV-4730-1, LTOP isolation valve.
On 2C09, took hand switch for 2CV-4730-1 to clockwise direction
and observed that Green light
OFF and Red light ON.
N/A SAT UNSAT (C) 5. (Step 2.3) Opened 2CV-4741-1, LTOP isolation valve.
On 2C09, took hand switch for 2CV-4741-1 to clockwise direction
and observed that Green light
OFF and Red light ON.
N/A SAT UNSAT (C) 6. (Step 2.3) Opened 2CV-4731-2, LTOP isolation valve.
On 2C09, took hand switch for 2CV-4731-2 to clockwise direction
and observed that Green light
OFF and Red light ON.
N/A SAT UNSAT (C) 7. (Step 2.3) Opened 2CV-4740-2, LTOP isolation valve.
On 2C09, took hand switch for 2CV-4741-1 to clockwise direction
and observed that Green light
OFF and Red light ON.
N/A SAT UNSAT ANO-2-JPM-NRC-LTOP PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 8. (Step 3.1) Verified Alarms 2K10-C4 and 2K10-C5 alarms cleared.
On 2K10, verified that alarm window C4 and C5 light are in
'slow flash' and acknowledged
alarm lights to verify that alarm
windows clear.
N/A SAT UNSAT END ANO-2-JPM-NRC-LTOP PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY:
INITIAL CONDITIONS:
A loss of off site power has occurred.
A Natural Circulation Reactor Coolant System cool down is in progress. 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
INITIATING CUE:
The Control Room Supervisor directs "R espond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J."
ANO-2-JPM-NRC-LTOP PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY:
INITIAL CONDITIONS:
A loss of off site power has occurred.
A Natural Circulation Reactor Coolant System cool down is in progress. 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
INITIATING CUE:
The Control Room Supervisor directs "R espond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J."