ML080700342

From kanterella
Jump to navigation Jump to search
AN2-2008-02 - Draft Operating Exam
ML080700342
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/29/2008
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-313/08-301, 50-368/08-301, ES-D-1 50-313/08-301, 50-368/08-301
Download: ML080700342 (126)


Text

Appendix D Scenario 1 Form ES-D-1 Facility: ANO-2 Scenario No.: 1 (Modified) Op-Test No.: 2008-1 Examiners: Operators:

Initial Conditions:

100% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.

Turnover:

100%. 250 EFPD. EOOS indicates Minimal Risk. MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 N (CBOT) Start B Component Cooling Water pump B and secure C Component Cooling Water pump.

2 XRCCHAPCNT I (ATC) Pressurizer control channel pressure fails high.

3 2CV4652 C (ATC) B normal spray valve sticks open 4 XSG2PT10411 I (CBOT) A Steam Generator pressure safety channel fails low.

Tech Spec for CRS.

5 SGATUBE N (CBOT) 5 gpm tube leak on A Steam Generator. Tech Spec for R (ATC) CRS 6 SGATUBE M (ALL) A Steam Generator tube leakage ramps up to 300 gpm over 10 minutes. Manual reactor trip criteria when greater than 44 gpm.

7 2K11_C2 C (ATC) Reverse rotation alarm for the reactor coolant pump 2K11_C4 attempted to stop.

8 XMSHDRPRS I (CBOT) Steam Dump and Bypass Control System fails to automatically open bypass and dump valves to control Steam Generator pressure.

9 2SI10A C (CBOT) 2P89A, A High Pressure Safety Injection pump HPI2P89B coupling failure (no discharge pressure).

2P89B, B High Pressure Safety Injection pump fails to start automatically.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 20

Appendix D Scenario 1 Form ES-D-1 Scenario #1 Objectives

1) Evaluate individual ability to operate safety related equipment.
2) Evaluate individual response to a failure of a pressurizer pressure control channel failure.
3) Evaluate individual response to a failure of a pressurizer spray valve to automatically close.
4) Evaluate individual response to a small Pri-Sec leak.
5) Evaluate individual ability to perform a reduction in plant power.
6) Evaluate individual ability to mitigate a SGTR.
7) Evaluate individual response to a failure of a reactor coolant pump reverse rotation device.
8) Evaluate individual response to a failure of the steam dump and bypass control system.
9) Evaluate individual ability to monitor operation of emergency core cooling equipment.

SCENARIO #1 NARRATIVE Simulator session begins with the plant at 100% power steady state. Main turbine generator turning gear is tagged out. Gland seal regulator, 2PCV0231 is jacked closed.

When the crew has completed their control room walk down and brief, the CBOT will start B Component Cooling Water (CCW) Pump and secure C Component Cooling Water Pump (CCW) using OP 2104.028 section 18.2.

After the B CCW pump is placed in serve and C CCW is secured and cued by lead examiner, the A channel Pressurizer (PZR) control channel will fail high. This will result in both main spray valves to automatically open and both proportional heater banks to go to minimum fire. Actual PZR pressure will drop and will result in an automatic reactor trip, if actions are not taken to mitigate the event. The Control Room Supervisor (CRS) will enter Abnormal operating procedure OP 2203.028, PZR systems malfunctions will be entered. The CRS will direct selecting the opposite control channel. The ATC will report that one of the spray valves, 2CV4652 did not close. The CRS will direct the failed spray valve to be isolated.

After the B PZR control channel is placed in service and 2CV 4652 is isolated and cued by lead examiner, A Steam Generator safety channel pressure instrument, 2PT1041-1, will fail low. This will trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSIS pre-trip, RPS channel trip/pre-trip, and channel A operator insert (2C03) trip and pre-trip lights will be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1, 3.3.3.5 and 3.3.3.6 for guidance. The CBOT will place Channel A PPS in bypass for point 11, SG pressure low, point 19, A SG delta-P for EFAS 1, and point 20, B SG delta-P for EFAS 2 for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the tech spec LCO.

After the A PPS channel is placed in bypass and cued by lead examiner, a 5.0 gpm primary to secondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038.

CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec 3.4.6.2. The CRS will direct the NLOs to control secondary contamination using standard attachment 19 and direct the chemists to sample the SGs for activity. The CRS will isolate steam to A EFW pump from A SG and enter TS 3.7.1.2. The crew will perform a plant shutdown. CRS will declare and NUE EAL based on criteria 3.2, S/G Tube Leak greater than Tech. Spec. Limits.

Page 2 of 20

Appendix D Scenario 1 Form ES-D-1 SCENARIO #1 NARRATIVE (continued)

After the CBOR has completed the required reactivity manipulation and cued by lead examiner, a 300 gpm SGTR on A SG will start with a ramp of 10 minutes. Secondary System Radiation Hi, SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators will alarm. The CBOR/ATC recognizes that the SGTR is greater than 44gpm. The CRS will direct the CBOR will manually trip the reactor.

Post trip, when PZR pressure drops less than 1400psia, the ATC should secure B and D RCPs and receive a reverse rotation alarm on B RCP. The CRS will direct all RCPs to be secured. This will result in natural circulation conditions in the Reactor Coolant System.

Also post trip, the steam dump and bypass control system (SDBCS) main steam pressure instrument will fail low. This will result in SDBCS not automatically controlling main steam header pressure causing the main steam safety valves to lift on both Steam Generators. The CRS will direct the CBOT to manually control one of the bypass valves to the condenser to stop the offsite release from the ruptured steam generator.

The Crew will implement Standard Post Trip Actions (SPTA), OP 2202.001.

The CRS will diagnose a steam Generator tube rupture greater than charging pump capacity and enter EOP 2202.004, Steam Generator Tube Rupture (SGTR).

The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to the condenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the A SG using standard attachment 10 when RCS Thot is less than 535°F. CRS will declare an ALERT EAL based on 2.2, RCS leakage greater than 44 gpm.

Post SIAS, the B High Pressure Safety Injection (HPSI) pump Breaker will fail to start automatically (green train) and the A high pressure safety injection pump will experience a failed coupling so it will not develop any discharge pressure. The CBOT will place the A HPSI pump handswitch in Pull-to-Lock (PTL) and manually start the B HPSI pump and/or manually start the C HPSI pump on the Red train to satisfy the required HSPI flow requirements.

Page 3 of 20

Appendix D Scenario 1 Form ES-D-1 Simulator Instructions for Scenario 1 Reset simulator to MOL 100% power IC stead state.

Ensure that AACG is secured and annunciators clear.

Ensure hotwell level is ~80%.

Place MINIMAL RISK and RED Train Maintenance Week signs on 2C11.

Swing ESF equipment aligned to the RED train.

B CCP lead charging pump.

2PCV0231, Gland sealing steam pressure control valve failed closed.

T1, T2, T3 set to false.

T5 set to Reactor trip.

T6 set to SIAS1.

Event Malf. No. Value/ Event No. Ramp Description Time 1 0.0 Place B CCW pump in service, secure C CCW pump.

2 XRCCHAPCNT 2500 A PZR control channel fails HIGH.

Trigger = T1 3 CV4652 1.0 B spray valve fails open; Trigger = T1 Ramp =

10 secs 4 XSG2PT10411 0 A Steam generator safety channel pressure transmitter Trigger = T2 fails low.

5 SGATUBE 5.0 A SG primary-secondary leak.

Trigger = T3 6 SGATUBE 300 A Steam Generator Tube Rupture (300 gpm ramped CUED RAMP= over 10 Minutes).

10 MIN 7 RCP2P32AREV TRUE When A or B RCP secured, reverse rotation RCP2P32BREV annunciator will alarm.

Trigger = T5 8 XMSHDRPRS 650 SDBCS main steam header pressure fails low.

Trigger = T5 9 2SI10 A 0.0 A HPSI pump coupling failure.

HPI2P89B TRUE B HPSI pump fails to automatically start on SIAS.

Trigger = T6 Page 4 of 20

Appendix D Scenario 1 Form ES-D-1 Simulator Operator CUEs At T=0 CBOT will place B CCW pump inservice and secure C CCW pump.

CUE: Report as AO that B CCW pump has been vented at 2CCW-1029 and a solid stream of water was observed.

Cued by Trigger T1 A PZR pressure control channel fails High.

lead examiner Cue: Report that I & C planner will begin planning work on failed pressure instrument.

Trigger T1 PZR B main spray valve fails to close when opened Cued by Trigger T2 A Steam Generator Pressure safety channel fails low.

lead examiner Cue: Report that I & C planner will begin planning work on failed pressure instrument.

Cued by Trigger T3 A Steam Generator 5 gpm tube leak.

lead examiner Cue: As Auxiliary Operator, report that standard attachment 19, control of secondary contamination is in progress.

Cue: When notified of requirement to sample SGs as Chemist, after 15 minutes report that the sample analysis is in progress and that when frisking sample A SG countrate was higher than B SG.

The CRS will direct the NLOs to and direct the chemists to sample the SGs for activity.

Cued by Raise A SG tube leak to 500 gpm ramped over 10 minutes. This will lead result in a manual reactor trip.

examiner Cue: As Auxiliary operator, report that actions for standard attachment 10 for A steam generator isolation outside the control room actions have been completed.

Tripping A Trigger T5 Reverse rotation alarm when pump is secured. This will result in or B securing all reactor coolant pumps.

Reactor Coolant Pump Reactor Trip Trigger T5 Steam dump and bypass control system pressure input will fail low.

This results in no automatic response to control main steam pressure post reactor trip.

SIAS1 Trigger T6 2SI10 is closed. This will result in A HPSI pump not developing discharge pressure.

B HPSI pump will not start automatically must be manually started.

Cue: As waste control operator report that the coupling on A HPSI pump is damaged and separated from the motor.

Page 5 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Event

Description:

CBOT places B component cooling water pump in service and secures C component cooling water pump.

Time Position Applicant's Actions or Behavior CRS Direct the CBOT to secure B CCW pump and secure C CCW pump.

CBOT Review OP 2104.028 section 8.2.

CBOT Will perform the following:

Verify open 2P-33C/B Suction Crossover (2CV-5221).

Verify open 2P-33C/B Discharge Crossover (2CV-5232).

Direct AO to throttle open 2P-33B Casing Vent (2CCW-1029).

Place 2P-33B handswitch (2HS-5228) to START.

Observe the following:

o Normal flow 1000 to 3000 gpm (2FIS-5202) o 2P-33B discharge pressure 100 to 120 psig (2PI-5234)

Place 2P-33C handswitch (2HS-5234) in Pull To Lock.

Termination criteria: When B CCW pump is secured and C CCW is secured or at lead examiners descretion.

Page 6 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 2 Event

Description:

Channel 1 Pressurizer Pressure instrument will fail High.

Time Position Applicant's Actions or Behavior ATC Announce annunciator 2K10-E6 Pressurizer Pressure Control Channel 1 Pressure HI / LO alarm is due to High pressure.

CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.

Refer to TS 3.2.8 if pressure not 2025 to 2275 psia.

Could direct placing SDBCS valves in manual closed ATC Compare channels and determine Channel 1 failed High.

Place PZR Pressure Channel Select switch (2HS-4626) to Channel 2.

Restore heaters to automatic control, if secured.

Verify that PZR heaters respond as designed.

Verify that B PZR spray valve closed.

Announce that A PZR spray valve did not close as expected.

CBOT Place SDBCS Master controller in AUTO local and adjust set-point to 1000 psia.

Termination Criteria: PZR pressure control selected to channel 2 in auto control or at lead examiner's discretion.

Page 7 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Event

Description:

2CV4652, B spray valve sticks OPEN.

Time Position Applicant's Actions or Behavior ATC Announce 2CV4652 did not close.

CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.

Direct ATC to close 2CV4652 per the AOP.

Direct the ATC to close 2CV4652 isolation valve.

ATC Attempt to close 2CV4652 by placing the control switch to MAN and rotating the hand switch to the OPEN direction for 1 second then after waiting 5 seconds rotating the hand switch to the CLOSE position.

Report that 2CV4652 did not close.

ATC Close 2CV4652 isolation valves by rotation hand switch to CLOSE.

Report that Pressurizer Pressure is restoring to set point.

Termination Criteria: When 2CV4652 is isolated or at lead examiners discretion.

Page 8 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event

Description:

A Steam Generator pressure transmitter, 2PT1041-1, on Channel A fails low.

Time Position Applicant's Actions or Behavior ATC Announce annunciators:

2K04-A4 CH A RPS/ESF/PRETRIP/TRIP 2K04-B3 PPS Channel TRIP 2K04-E4 MSIS PRETRIP Compare all safety channels four channels and report 2PI-1041-1 has failed low.

CRS Implement Annunciator Corrective Action AOP 2203.012D.

ATC Report A SG low pressure pretrip/trip on PPS insert.

CBOT Compare all four channels and report 2PI-1041-1 indicates zero.

CRS Enter Tech Spec 3.3.1.1 and 3.3.2.1, 3.3.3.5 and 3.3.3.6.

CBOT Place the following channels in bypass on Channel A:

A SG PRESS low (Bistable 11)

A SG P - EFAS 1 (Bistable 19)

A SG P - EFAS 2 (Bistable 20)

ATC Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass.

CRS Contact maintenance/PS liaison.

Termination Criteria: Affected channel points placed in bypass or at lead examiner's discretion.

Page 9 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Event

Description:

5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown Time Position Applicant's Actions or Behavior ATC Announce annunciators:

2K11-A10 Sec Sys Radiation Hi 2K11-J8 SG Tube Leak Detection Rate of Change Hi 2K11-K8 SG Tube Leak Detection Trouble/LKRT Hi CRS Implement AOP 2203.038, PRI-SEC leakage and perform the following:

Direct CBOs to perform RCS leak rates Enter TS 3.4.6.2 Direct AO to perform standard attachment 19, control of secondary contamination Direct the chemists to sample the SGs for activity Direct CBOT to isolate steam to A EFW pump from A SG and enter Tech Spec 3.7.1.2 Determine Action level 3 of AOP 2203.038 is applicable and a shutdown to less than 50% in one hour and to be in mode 3 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is applicable.

Direct CBOR to perform a plant shutdown using normal boration method.

Declare and NUE EAL based on criteria 3.2, S/G Tube Leak greater than Tech. Spec. Limits.

CBOT Close 2CV 1000-1, steam from A SG to A EFW pump.

Announce 2K04-F2 annunciator as expected due to INOP of 2P7A.

Page 10 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Event

Description:

5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown ATC Perform a plant shutdown Use reactivity plans to determine the amount of boron required.

Adjust turbine load to maintain Tave within 2°F of Tref.

Insert CEAs as directed by reactivity plan.

AOP requires a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> shutdown to Mode 3.

The CRS may determine a rapid plant shutdown of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to be in Mode 3 is more conservative and this decision is acceptable.

Termination criteria: When reactivity manipulations are satisfied or at the discretion of the lead examiner.

Page 11 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a natural circulation cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior ATC Report that PZR level is lowering Start all back up CCPs or report that they are running.

Isolate Letdown as required.

CRS Recognize SGTR is greater than 44 gpm and meets the AOP trip criteria.

Direct the CBOR to manually trip the reactor ATC Manually trip the reactor.

CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.

ATC Check reactivity control:

Reactor power decreasing.

All CEAs inserted.

CBOT Check maintenance of vital auxiliaries:

Main turbine tripped.

Generator output and exciter breakers open.

All 4160v and 6900 v Non-Vital busses energized.

All 4160v and 480v vital AC bus energized.

All 125v vital DC bus energized.

Page 12 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOR Check inventory control:

PZR level 10 to 80%.

Trending from set point.

Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.

CBOR Check RCS pressure control:

RCS pressure 1800 to 2250 psia.

Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.

Place spray valve for secured RCPs in manual closed.

Verify SIAS when pressure less than 1650 psia.

(See event 7 for actions on reverse rotation alarm.)

CBOR Check core heat removal by forced circulation:

RCP s running Loop T less than 10 F.

RCS MTS 30 F or greater.

Service water pump suction aligned to Lake.

Component cooling water aligned to RCPs.

CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)

Check SIAS actuated.

Maintain SW pressure greater than 85 psig.

Page 13 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal:

Report SG levels and main feed water is in RTO.

Report feed water line intact.

Report SG pressures. Report that SG pressure is high and SDBCS is not responding in AUTO.

(See event 8 for actions due to SDBCS failure)

CBOR Check CNTMT parameters:

Temperature less than 140 F.

Pressure less than 16 psia.

Status of radiation alarms:

CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOT Will open 2CV0233, bypass around 2PCV0231 which is simulated closed to match condition of valve at plant. This is in response to low gland seal pressure.

CRS Notify SM to perform the following:

SE report to control room.

Announce reactor trip on plant page.

Refer to Tech Specs and EALs.

Page 14 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.

Diagnose Steam Generator Tube Rupture CRS Implement Steam Generator Tube Rupture procedure and open place keeping page.

ALL Perform crew brief and review floating steps.

CRS Determine applicable floating steps:

Commence natural circulation using bypass valves to the condenser cool down to less than 535 F Thot.

HPSI Override Criteria.

CRS Direct the following actions:

Commence cool down to less than 535 F Thot.

Inform SM to contact Chemistry to sample both SG for activity.

Determine ruptured SG Perform post-SIAS actions:

Verify Safety Injection flow to RCS:

Isolate A SG when RCS Thot is less than 535°F Verify HPSI override criteria met:

RCS MTS 30°F or greater.

PZR level greater than 29% and controlled.

RVLMS LVL 03 or higher elevation indicates WET.

At least ONE intact SG available for Heat Removal Level 10 to 90% with FW available.

Declare an ALERT EAL based on 2.2, RCS leakage greater than 44 gpm.

Page 15 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior Critical ATC RCS cool down to less than 535°F T-hot : (floating step)

Step ATC Reset low SG set points.

Commence RCS depressurization to maintain RCS MTS 30 to 45 (When HPSI overridden)

Take manual control of SDBCS bypass valves to condenser (2CV0302/2CV0303)

Place ALL ADV Permissive switches in OFF.

Verify EFW feeding SGs.

Secure running MFW pump.

Close ALL MFW Block valves.

Record and plot cool down on Attachments 1 and 8.

ATC /CBOT Verify Safety Injection flow to RCS:

Check HPSI flow using Exhibit 2.

(SEE event 9 on actions due to HPSI failures)

Check LPSI flow using Exhibit 3.

Page 16 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOT Perform post-SIAS actions:

SW pumps running on each loop.

EDG SW outlet valves open.

SW pump suction aligned to Lake.

Report all non-vital buses energized.

Verify SG sample valves open.

Critical CBOT Use Attachment 10 to isolate Ruptured SG Step ATC / OVERRIDE HPSI:

CBOT Throttle HPSI flow OR place HPSI pumps in PTL as needed to control RCS pressure, inventory, and heat removal.

Termination criteria: RCS Cool down to less than 535°F and A SG isolated or at examiners discretion.

Page 17 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 7 Event

Description:

Reverse rotation alarm when Reactor Coolant Pump A or B secured which results in securing all reactor coolant pumps.

Time Position Applicant's Actions or Behavior ATC Announces 2K11-C2 or 2K11-C4 annunciator for reverse rotation of associated reactor coolant pump.

CRS Refers to annunciator corrective actions OP 2203.012K and directs ATC to secure ALL Reactor Coolant Pumps.

ATC Secures remaining reactor coolant pumps and places associated spray valves to Manual.

Verifies pumps secured (amperages, delta P and Green light for associated breaker lit).

Termination criteria: When ALL RCPs are secured or at discretion of lead examiner.

Page 18 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 8 Event

Description:

Steam Dump and Bypass Control System fails to automatically open bypass and dump valves to control Steam Generator pressure.

Time Position Applicant's Actions or Behavior CBOT Recognize and announce that SDBCS is NOT maintaining steam Generator pressure.

CRS Direct CBOT to manually control Steam Generator pressure by either taking manual control of a SDBCS bypass valve or place the SDBCS master controller in manual and adjust output to open SDBCS bypass valve(s) to maintain Steam Generator pressure 950 to 1000 psia.

CBOT Manually control SDBCS valves to control Steam Generator pressure.

Termination criteria: SDBCS is controlled manually or at the discretion of the lead examiner.

Page 19 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 9 Event

Description:

2P89B, B High Pressure Safety Injection pump (HPSI) fails to auto-start and A High Pressure Safety Injection Pump fails to develop discharge pressure.

Time Position Applicant's Actions or Behavior CBOT Recognizes and announces failure of B HPSI pump to automatically start.

Announces failure of A HPSI CRS Direct CBOT start C HPSI pump (2P89C) and/or start B HPSI pump (2P89B).

Direct WCO to investigate A HPSI pump operation.

Critical CBOT On 2C17, took hand switch for A HPSI pump (2P89A) to pull-to-Step lock and took hand switch for C HPSI pump (2P89C) to start and verified discharge pressure (if pressure < 1450psia, verified flow to Critical RCS).

Part is to AND/OR either start On 2C16, took hand switch for B HPSI pump (2P89B) to start and 2P89B verified discharge pressure (if pressure < 1450psia, verified flow to or Start RCS).

2P89C.

Termination criteria: When B HPSI pump is started or when C HPSI pump is started or at the discretion of the lead examiner.

Page 20 of 20

Appendix D Scenario 2 Form ES-D-1 Facility: ANO-2 Scenario No.: 2 (Modified) Op-Test No.: 2008-1 Page 1 Examiners: Operators:

Initial Conditions: 85% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. A MFP offline to repair Electro-Hydraulic leak. RED Train Maintenance Week.

Turnover:

85%. 250 EFPD. EOOS indicates Acceptable Risk (9.3). MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. A Main feed pump Electro-Hydraulic leak repaired and ready to be placed in service. OP 2106.007 is complete up to section 10.0 for placing A MFP in service. RED Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 N (CBOT) Place A Main Feed Pump in service.

2 XFW2TE0361 I (CBOT) Temperature indicator to Main Feed Pump oil cooler fails low.

3 CVC2P36BFAL C (ATC) B Coolant Charging Pump motor fault. TRM for CRS.

4 BKR1205 Startup transformer #2 lockout. Tech Spec for CRS.

BKR1218 5 CEA24DROP N (CBOT) Control Element Assembly #24 drops to bottom of core.

R (ATC) Tech Spec for CRS.

6 500LOSE500 M (ALL) Loss of Off-Site Power.

500LOSE161 7 MTGTRPLOCKO C (ATC) Main turbine lockout.

RPSRXMAN Failure of the reactor protection system to automatically RPSRXAUTO or manually trip the reactor. Tech Spec for CRS.

8 EDGDG1OIL C (CBOT) Loss of both Emergency Feed Water pumps resulting in CV0332 loss of all Feed water to steam generators.

9 Loss of instrument C (ATC) Loss of instrument air results in using upstream air atmospheric dump valve isolation valves to control steaming rate.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario 3 Form ES-D-1 Facility: ANO-2 Scenario No.: 3 Op-Test No.: 2008-1 Examiners: Operators:

Initial Conditions: 100 % MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.

Turnover:

100%. 250 EFPD. EOOS indicates Minimal Risk. MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 XRCCHAPLVL I (ATC) A Pressurizer level channel fails High.

2 2SV8263-2 C (CBOT) Containment Isolation Valve for containment air monitoring system 2RITS8271, fails closed. Tech Spec for CRS.

3 NIBLINEPWR I (CBOT) B channel nuclear instrument fails low. Tech Spec for CRS.

4 FWPMPATRP N (CBOT) A main feed water pump trips due to thrust bearing R (ATC) wear.

5 FWAFT5A M (ALL) Unisolable main feed water rupture inside containment.

6 BUHTRS C (ATC) Backup heaters fail to deenergize when pressurizer level CHV2P36LOLVL drops below 29%.

Backup CCPs fail to auto start on low PZR level.

7 Containment C (CBOT) B containment cooling fails to actuate.

cooling fails

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Perform Transferring Unit Auxiliaries from SU3 or Unit Aux to SU2 JTA#: ANOROELECDNORM-026 KA VALUE RO: 3.4 SRO: 3.8 KA

REFERENCE:

2.1.32 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Perform SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2107.001 Attachment P EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

Mode 4; 250 EFPD. All ESF systems are in normal alignment.

Startup Transformer #3 is supplying all AC electrical busses.

A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.

B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.

B and D Reactor Coolant Pumps are running and A and C Reactor Coolant Pumps are secured.

Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.

Unit 1 SU#2 feeder to A1(A111) is in normal after stop.

2H2 loading is 4MVA, 2H1 loading is 5 MVA Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps TASK STANDARD: Identify at least 4 of the following 5 errors in OP 2107.001 section 11.0:

1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service.
2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop.
4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running.
5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment P is correct)

And Identified the error that SU#2 can not be placed in service in current configuration.

TASK PERFORMANCE AIDS: OP 2107.001 limits and precautions (section 5), completed section 11.0, and completed Attachment P.

SIMULATOR SETUP: N/A.

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Reviewed procedure OP 2107.001 Identified 4 of the following 5 errors: N/A SAT UNSAT section 11.0 and Attachment P for

1) Procedure step 11.6 was errors.

marked as NA when the initial conditions stated that the auto-transformer was out of service.

2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop.
4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running.
5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment P is correct)

(C) 2. Determined that SU#2 availability. Determined that and that SU#2 could N/A SAT UNSAT not be placed in service in current configuration.

END STOP TIME:

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS

  • Mode 4; 250 EFPD. All ESF systems are in normal alignment.
  • Startup Transformer #3 is supplying all AC electrical busses.
  • A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.
  • B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.
  • Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
  • Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
  • Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
  • 2H2 loading is 4MVA, 2H1 loading is 5 MVA
  • Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
  • Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps
  • Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
  • Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:

The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.

List the errors identified below:

1) 2)

3) 4)

Can Startup Transformer #2 be placed in service given the initial condition information? _____________

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS

  • Mode 4; 250 EFPD. All ESF systems are in normal alignment.
  • Startup Transformer #3 is supplying all AC electrical busses.
  • A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.
  • B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.
  • Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
  • Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
  • Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
  • 2H2 loading is 4MVA, 2H1 loading is 5 MVA
  • Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
  • Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps
  • Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
  • Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:

The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.

List the errors identified below:

1) 2)

3) 4)

Can Startup Transformer #2 be placed in service given the initial condition information? _____________

ANO-2-JPM-NRC-TTBCSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: Conduct of Operations (A.1)

TASK: Calculate Time to Boil using computer program JTA#: ANO2RONORM4 KA VALUE RO: 3.9 SRO: 4.0 KA

REFERENCE:

2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform Classroom: Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: Classroom:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1015.008 Attachment E EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-TTBCSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Plant shutdown for repair of Steam Generator Tube Leak. Making preparations for draining the RCS to 24 inches above the bottom of the hotleg to install nozzle dams. PZR level is 40%.

Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />; one (1) PZR code safety valve is removed; PZR manway is installed; ECCS vent valves are de-energized OPEN; NO RCP seal work inprogress; NO RCS cold or hot leg openings; RCS Temperature is 105°F.

TASK STANDARD:

Identify Three (3) of the following four (4) errors in the original Time to boil calculation :

1) 2 code safety valves were recorded as removed and only one was removed in initial conditions.
2) Initial RCS water level was recorded as 42 above the bottom of the hot leg instead of the correct 24.
3) Current RCS temperature was recorded as 80°F instead of 105°F as stated in the initial conditions.
4) Time after shutdown was recorded as 3 days 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> instead of the correct 1 day and 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> (35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />).

AND Identify that the RCS cannot be drained to reduced inventory due to TTTCU is less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

TASK PERFORMANCE AIDS:

1015.008 attachment E, Computer operational with the current revision of LOSDC2 installed.

(SP-94-C-0001-01, Rev. 13), set up shortcut to program on the desktop.

SIMULATOR SETUP:

NA EXAMINER'S NOTES:

ANO-2-JPM-NRC-TTBCSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Compare time to boil (TTB) Computer program independently N/A SAT UNSAT calculation using LOSDC2 run and calculations compared to program.

(C) 2. Identified 3 of the 4 errors N/A SAT UNSAT

1) 2 code safety valves were recorded as removed instead of 1 code safety valve removed.
2) Initial RCS water level was recorded as 42 above the bottom of the hot leg instead of the correct 24.
3) Current RCS temperature was recorded as 80°F instead of the correct 105°F.
4) Time after shutdown was recorded as 3 days 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> instead of the correct 1 day 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> (35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />).

(C) 3. Determined that the actual Determined that the RCS cannot N/A SAT UNSAT Time until core uncovery: be drained to reduced inventory.

is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 50 min 36 sec EXAMINERS NOTE:

Prompt the Examinee that the file should not be printed or saved.

END

ANO-2-JPM-NRC-TTBCSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Given the following Plant conditions:

  • Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams.
  • PZR level is 40%.
  • Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />;
  • One (1) PZR code safety valve is removed;
  • PZR manway is installed;
  • ECCS vent valves are de-energized OPEN;
  • NO RCP seal work in progress;
  • NO RCS cold or hot leg openings;
  • RCS Temperature is 105°F.

INITIATING CUE:

CRS/SM directs: CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.

Do not print data or save LOSCD2 file.

List the errors identified below:

1) 2)

3)

Answer the following question Yes or No:

Can the RCS be drained to reduced inventory given the initial condition information?

ANO-2-JPM-NRC-TTBCSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Given the following Plant conditions:

  • Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams.
  • PZR level is 40%.
  • Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />;
  • One (1) PZR code safety valve is removed;
  • PZR manway is installed;
  • ECCS vent valves are de-energized OPEN;
  • NO RCP seal work in progress;
  • NO RCS cold or hot leg openings;
  • RCS Temperature is 105°F.

CRS/SM directs: CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.

Do not print data or save LOSCD2 file.

List the errors identified below:

1) 2)

3)

Can the RCS be drained to reduced inventory given the initial condition information? _____________

ANO-2-JPM-NRC-MAINTSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Conduct of Operations (A.2)

TASK: Supervisory review of maintenance activities JTA#: ANO-SRO-ADMIN-NORM-48 KA VALUE RO: 2.1 SRO: 3.1 KA

REFERENCE:

2.2.19 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform Classroom: Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: Classroom:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1025.003, Conduct of Maintenance EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-MAINTSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2.

  • The clearance has been removed.
  • There are currently no Equipment Status Log (ESL) entries.

TASK STANDARD:

Identified 3 of the following 4 errors.

1) 2SW-1514A As Found and Restoration positions are listed as CLOSED when required to be OPEN.
2) 2SW-1514C Restoration position is listed as OPEN when required to be CLOSED.
3) 2SW-1514L Restoration position is listed as OPEN when required to be CLOSED.
4) 2SW-1514L Restorer and Verifier initials are the same.

TASK PERFORMANCE AIDS:

Marked up copy of form 1025.003C, Maintenance Configuration Tracking Log Copy of OP 2104.019 Attachment D.

SIMULATOR SETUP:

NA EXAMINER'S NOTES:

ANO-2-JPM-NRC-MAINTSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Evaluators Note: Provide examinee with a copy of 1025.003, Maintenance Configuration Tracking Log Sheet.

1. Review the Maintenance Examinee reviewed the N/A SAT UNSAT Configuration Tracking Log Maintenance Configuration Sheet Tracking Log Sheet and compared it to the normal lineup in 2104.029, Attachment D.

(C) 2. Identified 3 of the 4 errors. N/A SAT UNSAT Identified 3 of the following 4 errors.

1) 2SW-1514A As Found and Restoration positions are listed as CLOSED when required to be OPEN.
2) 2SW-1514C Restoration position is listed as OPEN when required to be CLOSED.
3) 2SW-1514L Restoration position is listed as OPEN when required to be CLOSED.
4) 2SW-1514L Restorer and Verifier initials are the same.

END

ANO-2-JPM-NRC-MAINTSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Given the following Plant conditions:

  • The clearance has been removed.
  • There are currently no Equipment Status Log (ESL) entries.

INITIATING CUE:

CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.

List the errors identified below:

1) 2)

3)

ANO-2-JPM-NRC-MAINTSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Given the following Plant conditions:

  • The clearance has been removed.
  • There are currently no Equipment Status Log (ESL) entries.

INITIATING CUE:

CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.

List the errors identified below:

1) 2)

3)

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: A.3: Radiation Control TASK: Review and approve Containment Purge Gaseous Release JTA#: ANOSROADMINNORM189 KA VALUE RO: 2.5 SRO: 3.4 KA

REFERENCE:

2.3.9 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: CLASSROOM:

Perform Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.033 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is in Mode 5.

Todays date is 03/10/2005.

Chemistry has completed Containment atmosphere radioactivity analysis.

Purge Exhaust Filter Unit doors have been verified closed and dogged.

Initial flow from 2RITS-8233, Containment Purge, is 8.5 SCFM.

Initial count rate on 2RITS-8233, Containment Purge, is 60 cpm.

Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.

Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.

Last test reading run-time from engineering programs group is 7532.5 hrs.

Current run-time reading from 2B85-C7 is 8284.9 hrs.

A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.

TASK STANDARD:

Four of the following Five errors must be identified:

  • Since data recorded in step 1.4.5 was incorrect the filter run-time should have been given to Engineering programs for evaluation.
  • Step 4.3 calculated count rate limits are wrong.
  • Step 4.4 since current CAMS radiation readings exceed the calculated limits, the permit should have been resubmitted to chemistry.
  • Step 4.8 2RITS-8233 set point is recorded incorrectly.
  • Potentiometer dial set point circled is incorrect due to recording the set point incorrectly; this results in a non-conservative trip value for 2RITS-8233.

AND The release permit must not be approved, but returned to chemistry for reanalysis.

TASK PERFORMANCE AIDS: A marked-up copy of Supplement 1 Containment Purge Gaseous Release Permit through section 4 and chemistry release data.

SIMULATOR SETUP: NA

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.

START TIME:

PERFORMANCECHECKLIST STANDARD CIRCLE ONE EXAMINERS NOTE: Provide a marked-up copy of OP 2104.033 Supplement 1.

1. Perform supervisor review for Reviews the containment purge N/A approval of the Containment purge gaseous release permit.

gaseous release permit and determine errors.

EXAMINERS NOTE: The following list identify errors in the supplement 1 provided. The acceptance criterion is given in the task standard. Examinee must identify 4 of the 5 errors.

  • Data recorded in section 1.4.5
  • Filter run-time is beyond 720 hrs; was incorrect the filter run-time this should be evaluated by should have been given to engineering programs before Engineering programs for proceeding with release.

evaluation.

  • Step 4.3 calculated count rate
  • Calculated count rate limits were limits are wrong. given to be particulate 542 CPM and gaseous 464 CPM but should have been Particulate2168 CPM and gaseous 1856 CPM.
  • Step 4.4 since current CAMS
  • The Purge permit should be radiation readings exceed the resubmitted to chemistry but the (C) 2.

allowable limits, the permit steps were marked as NA due N/A SAT UNSAT should have been resubmitted to current radiation readings chemistry. exceeding calculated limits.

  • Set point for 2RITS-8233 is recorded incorrectly. recorded as 15000 CPM not 150 CPM as specified in Chemistry report.
  • Potentiometer dial set point should recording the set point be 3.84, but 5.68 is circled.

incorrectly; this results in a non-conservative trip value for 2RITS-8233.

EXAMINERS NOTE: The Examinee should discuss that the release will be resubmitted to chemistry and Engineering programs should evaluate the runtime on the exhaust filter.

3. The release should not be approved Would not approve the release to (C) and should be resubmitted to begin. N/A SAT UNSAT chemistry.

END STOP TIME:

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS

  • Plant is in Mode 5.
  • Todays date is 03/10/2005.
  • Chemistry has completed Containment atmosphere radioactivity analysis.
  • Purge Exhaust Filter Unit doors have been verified closed and dogged.
  • Initial count rate on 2RITS-8233, Containment Purge, is 60cpm.
  • Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.
  • Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.
  • Last test reading run-time from engineering programs group is 7532.5 hrs.
  • Current run-time reading from 2B85-C7 is 8284.9 hrs.
  • A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.

Initiating CUE:

The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.

List the errors identified below:

1) 2)

3) 4)

Can this release permit be approved given the initial condition information? _____________

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS

  • Plant is in Mode 5.
  • Todays date is 03/10/2005.
  • Chemistry has completed Containment atmosphere radioactivity analysis.
  • Purge Exhaust Filter Unit doors have been verified closed and dogged.
  • Initial count rate on 2RITS-8233, Containment Purge, is 60cpm.
  • Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.
  • Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.
  • Last test reading run-time from engineering programs group is 7532.5 hrs.
  • Current run-time reading from 2B85-C7 is 8284.9 hrs.
  • A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.

Initiating CUE:

The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.

List the errors identified below:

1) 2)

3) 4)

Can this release permit be approved given the initial condition information? _____________

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: A4 Emergency Plan TASK: Determine Emergency Action Level JTA#: ANO-SM-EOPAOP-EMERG-301 KA VALUE RO: 2.3 SRO: 4.1 KA

REFERENCE:

2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 1903.010 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater.

o A S/G = 47 wide range o B S/G = 52 wide range.

  • The crew has initiated Once Thru Cooling using the ECCS Vents.
  • RCS leakage is estimated to be 875 gpm.
  • Containment temperature, pressure and sump level are rapidly rising.
  • SIAS, CCAS and CIAS have actuated.
  • Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.

TASK STANDARD:

Declared a Site Area Emergency based on EAL 6.9, Loss of Both S/Gs as a Heat Removal Method TASK PERFORMANCE AIDS: OP 1903.010 SIMULATOR SETUP: N/A.

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Review E-Plan procedure Review 1903.010 index and EAL N/A SAT UNSAT 1903.010 to determine classification tabs.

classification.

(C) 4. Reviewed EAL 6.9., Site Area Site Area Emergency declared N/A SAT UNSAT Emergency based Loss of Both based Loss of Both S/Gs as a S/Gs as a Heat Removal Heat Removal Method Method END

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS

  • A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater.

o A S/G = 47 wide range o B S/G = 52 wide range.

  • The crew has initiated Once Thru Cooling using the ECCS Vents.
  • RCS leakage is estimated to be 875 gpm.
  • Containment temperature, pressure and sump level are rapidly rising.
  • SIAS, CCAS and CIAS have actuated.
  • Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.

INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS

  • A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater.

o A S/G = 47 wide range o B S/G = 52 wide range.

  • The crew has initiated Once Thru Cooling using the ECCS Vents.
  • RCS leakage is estimated to be 875 gpm.
  • Containment temperature, pressure and sump level are rapidly rising.
  • SIAS, CCAS and CIAS have actuated.
  • Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.

INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

ANO-2-JPM-NRC-CVCS2 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 004 DATE:

SYSTEM/DUTY AREA: Chemical and Volume Control System TASK: Perform Emergency Boration (Alternate Success Path)

JTA#: ANO2-RO-EOPAOP-OFFNORM-193 KA VALUE RO: 3.9 SRO: 3.7 KA

REFERENCE:

004 A4.07 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE (S): OP 2203.032, OP 2103.015 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-CVCS2 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 3, A Shutdown Margin is calculated following a reactor trip.

TASK STANDARD:

Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using BAM Pumps via Emergency Borate Valve (2CV-4916-2). This is an alternate success path JPM.

TASK PERFORMANCE AIDS:

AOP 2203.032 Steps 2 through 6. Copy of RHOBAL Shutdown margin, OP 2103.015 Worksheet 4, showing SDM not met.

SIMULATOR SETUP:

A Mode 3 IC will be set up for this JPM. Use CASE file JPM01.

The elements of this file are:

Trigger 5 = 2CV-4873-1a = 75%. 2CV-4873-1a (VCT Outlet) malfunction set to 75%;

Then overrides 2HS-4873-2 are set to false and 2HS-4873-3 set to false to turn lights off.

This case file will simulate the VCT Outlet valve tripping its output breaker due to a motor fault as it tries to shut.

ANO-2-JPM-NRC-CVCS2 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."

PERFORMANCE CHECKLIST STANDARD (Circle One)

(C) 1. Review SDM calculation and Recognize that SDM is not met N/A SAT UNSAT recognize SDM is not met for and that emergency boration is current conditions. required.

EXAMINERS NOTE:

Examinee may review the instruction section of OP 2103.015 and then ask what method of emergency boration the CRS/SM recommends.

EXAMINERS CUE:

When the examinee determines emergency boration is required, provide the following information, even if the examinee does not ask for direction:

Borate using the BAM Tank Gravity Feed valves per AOP 2203.032 starting with step 2.

2. Verify at least one Charging Pump On Panel 2C09, verified CCP(s) N/A SAT UNSAT (CCP) running with flow greater running.

Step than 40 GPM.

2 Observed red light ON; green light POSITIVE CUE: OFF above at least one of the Red light(s) ON. following handswitch(es):

Flow is greater than 40 gpm. 2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863).

3. Align Boric Acid Supply To CCP On Panel 2C09, opened BAMT N/A SAT UNSAT Suction. Gravity Feed Valves 2CV-4920-1 Step and/or 2CV-4921-1 3.A POSITIVE CUE:

Red light(s) ON. Observed red light ON and green light OFF above handswitch(es):

NEGATIVE CUE:

Green light(s) ON.

In the following step the VCT Outlet Valve will NOT close requiring an alternate success path.

ANO-2-JPM-NRC-CVCS2 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

4. Close Volume Control Tank (VCT) On Panel 2C09, observed that N/A SAT UNSAT Outlet Valve (2CV-4873-1). 2CV-4873-1 did NOT go closed.

Step 4 POSITIVE CUE: Observed green light OFF; red Green light OFF. light OFF above VCT Outlet Valve Red light OFF. handswitch (2HS-4873-1).

NEGATIVE CUE:

Red light ON.

(C) 5. Start at least ONE BAM Pump. On Panel 2C09, start 2P39A N/A SAT UNSAT and/or 2P39B.

Step POSITIVE CUE:

4.A Red light ON. Observed RED light ON above the BAM pump started, 2HS-4919-2 NEGATIVE CUE: (2P39A) or 2HS-4910-2 (2P39B).

Green light ON.

(C) 6. Open Emergency Borate From On Panel 2C09, opened 2CV- N/A SAT UNSAT BAM Pumps Valve (2CV-4916-2). 4916-2.

Step 4.B POSITIVE CUE:

Red light ON. Observed red light ON; green light OFF above Emergency Borate NEGATIVE CUE: Valve, 2CV-4916-2.

Green light ON.

7. Verify Boric Acid Makeup Flow On Panel 2C09, verified 2CV- N/A SAT UNSAT Control Valve (2CV-4926) closed. 4926 closed.

Step 4.C POSITIVE CUE: Observed green light ON; red light Green light ON. OFF above Boric Acid Makeup Flow Controller (2FIC-4926).

NEGATIVE CUE:

Red light ON.

8. Check Reactor Makeup Water Flow On Panel 2C09, verified 2CV- N/A SAT UNSAT Control Valve (2CV-4927) or VCT 4927 or 2CV-4941 closed.

Step Makeup Isol valve (2CV-4941) 5 closed. Observed green light ON; red light OFF above Reactor Makeup POSITIVE CUE: Water Flow Controller (2FIC-4927)

Green light ON. or above 2CV-4941 handswitch.

NEGATIVE CUE:

Red light ON.

9. Check Charging Header Flow On Panel 2C09 (upright portion), N/A SAT UNSAT (2FIS-4863) greater than 40 gpm. observed flow greater than 40 Step gpm on Charging Header Flow 6 POSITIVE CUE: indicator (2FIS-4863).

Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)

END

ANO-2-JPM-NRC-CVCS2 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINER COPY JPM INITIAL TASK CONDITIONS:

Mode 3. A Shutdown Margin has been calculated following a reactor trip.

INITIATING CUE:

The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."

ANO-2-JPM-NRC-CVCS2 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE COPY JPM INITIAL TASK CONDITIONS:

Mode 3. A Shutdown Margin has been calculated following a reactor trip.

INITIATING CUE:

The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."

PROC./WORK PLAN N

O. PROCEDURE

/WORK PLAN TITLE: PAGE: 2 of 21 2103.015 REACTIVITY BALANCE CALCULATION CHANGE: 035-04-0

ANO-2-JPM-NRC-EOP01 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 09 DATE:

SYSTEM/DUTY AREA: Abnormal/Emergency Operations TASK: Secure Containment Spray JTA#: ANO2-RO-EOPAOP-EMERG-13 KA VALUE RO: 3.2 SRO: 3.7 KA

REFERENCE:

026 A2.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2202.003 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-EOP01 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Containment spray actuation signal has actuated inadvertently and 2K04 D-1, CSAS ACT, is in Alarm. I&C has corrected the problem. No testing is currently in progress.

TASK STANDARD: CSAS is reset and CSAS actuated components are secured.

TASK PERFORMANCE AIDS: EOP 2203.012D Annunciator 2K04 D1, CSAS ACT SIMULATOR SETUP: Inadvertent containment spray actuated. Containment Temperature. < 140 ° F, Pressure < 22.5 psia.

ANO-2-JPM-NRC-EOP01 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator 2D1, CSAS ACT.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify CSAS NOT valid. Determined that Containment N/A SAT UNSAT pressure less than 22.5 PSIA Step (PMS, SPDS or control board 2.1 indication).

Determined that Containment temperature less than 140°.

EXAMINERS NOTE:

There is only one channel available on the simulator. Resetting B trip path will reset all the other channels also.

2. Place Spray Pumps in PTL. On panels 2C16/17, placed N/A SAT UNSAT handswitches for Containment Step Spray Pumps (2P35A and 2.3 2P35B) in Pull To Lock (PTL).

Examiners CUE: Observed green lights ON above handswitches.

CRS acknowledges TS entry into 3.0.3. Enter TS 3.0.3.

(C) 3. Reset CSAS on 2C23. On panel 2C23B, obtained key N/A SAT UNSAT and placed it in trip path to be Step reset.

Examiners Note:

Give examinee Key #15 when Placed trip path key switch to 2.6.1 asked. UNLK.

Depressed CSAS pushbutton for 2.6.2 trip path.

Verified Trip Path lights reset (on 2.6.3 2C03) (Not a critical item) 2.6.4 Placed trip path key switch to LK.

EXAMINERS NOTE:

There is only one channel available on the simulator. Resetting 2C40 actuation path will reset all the other channels also.

ANO-2-JPM-NRC-EOP01 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 3. Reset CSAS on 2C40 On 2C40, depressed CSAS N/A SAT UNSAT lockout reset pushbutton.

Step On 2C40 verify reset lights are 2.6.6 ON.

2.6.7 (C) 4. Close Containment Spray On panels 2C16/17, placed N/A SAT UNSAT Header Isolation Valves. handswitches for Containment Step Spray Header Isolation valves 2.6.8 (2CV-5612-1 and 2CV-5613-2) in CLOSE.

Observed green lights ON above handswitches.

(C) 5. Stop Containment Spray On panels 2C16/17, removed N/A SAT UNSAT Pumps. handswitches for Containment Step Spray Pumps (2P35A and 2.6.9 2P35B) from PTL and placed in normal after stop.

Observed green lights ON above handswitches.

6. Exit Tech Spec 3.0.3. Notify CRS to exit tech spec 3.0.3 N/A SAT UNSAT when both spray pumps are Step taken out of PTL.

EXAMINERs CUE: Exiting 2.6.10 Tech Spec 3.0.3 has been entered into the station log.

END STOP TIME:

ANO-2-JPM-NRC-EOP01 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Containment spray actuation signal has actuated inadvertently.

2K04 D-1, CSAS ACT, is in alarm.

I&C has corrected the problem.

No Testing is currently in progress.

INITIATING CUE:

The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.

ANO-2-JPM-NRC-EOP01 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Containment spray actuation signal has actuated inadvertently.

2K04 D-1, CSAS ACT, is in alarm.

I&C has corrected the problem.

No Testing is currently in progress.

INITIATING CUE:

The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.

ANO-2-JPM-NRC-CREV01 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 00 DATE:

SYSTEM/DUTY AREA: Abnormal/Emergency Operations TASK: Manually actuate Control Room Ventilation ALTERNATE SUCCESS PATH JTA#: ANO2-RO-EOPAOP-EMERG-13 KA VALUE RO: 2.9 SRO: 3.1 KA

REFERENCE:

073 A301 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): OP 2104.007 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-CREV01 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid 2RITS-8750-1A is in alarm. ALTERNATE SUCCESS PATH JPM TASK STANDARD: All Control room ventilation components have been actuated and 2VSF 9 secured and outside air damper has been closed and air reserve aligned.

TASK PERFORMANCE AIDS:

Marked up copy of OP 2104.007 section 7.0, Radiation and Chlorine detector alarm response actions. Steps 7.1 and 7.2 are complete.

SIMULATOR SETUP: Alarm 2K11 D10 in alarm. Control room ventilation radiation monitor above alarm setpoint.

Insert the following malfunctions:

XRI2RITS8750-1; value = 2000 (Control room radiation monitor in alarm)

X_RM8750; value = TRUE (Control room ventilation components will not actuate)

Insert the following overrides for 2C33:

  • DO_CI_8603_A; value = OFF
  • DO_CI_8603_R; value = OFF

ANO-2-JPM-NRC-CREV01 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm.

Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINERS NOTE:

Do not allow examinee to go to unit 1. Provide cue when determining unit 1 control room component status.

1. Verify Unit 1 control room is On C141 on unit 1, verify N/A SAT UNSAT isolated. CV7905 and CV7907 dampers step are closed.

7.1.2 Examiners CUE:

Unit 1 control room supply damper CV7905 and Unit 1 control room return damper CV7907 have been closed.

(C) 2. Verify unit 2 control room is On 2C33, verify 2UCD 8683, unit N/A SAT UNSAT isolated. 2 supply damper is closed by step taking handswitch to the closed 7.1.2 position and verifying green light is ON above handswitch.

On 2C33, verify 2UCD 8685, unit 2 return damper is closed by taking handswitch to the closed position and verifying green light is ON above handswitch.

3. Verify Unit 1 control room At breaker B1544 on Unit 1, N/A SAT UNSAT supply fans are stopped. verify VSF-8A handswitch in stop step and green light ON.

7.1.3 Examiners CUE: At breaker B4161 on Unit 1, Unit 1 control room supply verify VSF-8B handswitch in stop fans VSF8A and VSF8B and green light ON.

handswitches are in stop and green lights ON.

Examiners note:

Transition to back of control room to panel 2C22.

ANO-2-JPM-NRC-CREV01 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Verify Unit 2 control room On panel 2C22, took handswitch N/A SAT UNSAT supply fans are stopped. for 2VSF8A and 2VSF8B to stop step and verified Green light ON 7.1.3 above handswitch.

(C) 5. Verify Unit 2 control room On panel 2C22, took handswitch N/A SAT UNSAT exhaust fans are stopped. for 2VSF43A and 2VSF43B to step stop and verified Green light ON 7.1.3 above handswitch.

6. Verify Unit 1 control room On unit 1 panel C19, verified VEF N/A SAT UNSAT smoke exhaust fan is stopped. 43 fan in stop and green light ON.

step 7.1.3 Examiners CUE:

Unit 1 control room smoke exhauster fan VEF43 handswitch is in stop and green light ON.

Examiners note:

Transition to front of control room to panel 2C33.

Examiners Note:

The following is the alternate success path step.

7. Verify 2VSF9 running with On panel 2C33 rotated N/A SAT UNSAT insufficient air flow. handswitch for 2VSF9 to start.

step On panel 2C33 verified RED light 7.1.4 ON above handswitch for 2VSF9.

On panel 2C33 verified PCD-8607B red light ON.

On panel 2C33 recognized low air flow by Amber light ON and Red light OFF above 2VSF9 handswitch.

ANO-2-JPM-NRC-CREV01 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 8. Close 2VSF9 outside Air On panel 2C33 placed N/A SAT UNSAT damper 2PCD8607B. handswitch for 2PCD8607B to step RESERVE.

7.1.5 EXAMINERs CUE: When On panel 2C33, secured 2VSF 9 asked, report 2nd person by taking handswitch to STOP.

verification of handswitch 2PCD8607B is complete.

EXAMINERs CUE: When asked to go to Unit 1 and Contacts unit 1 to start VSF 9.

start VSF9, report that VSF 9 is running with proper discharge flow.

EXAMINERs NOTE:

This JPM does not examine the examinees use of Tech Specs, JPM can be ended at this step.

10. Initiate condition report and Discuss writing a condition report N/A SAT UNSAT determine tech spec and entry into Tech Spec due to step applicability due to 2VSF 9 2VSF9 inoperability. Attempt to 7.1.5 inoperability. access OP 2104.007 attachment B component/tech spec cross-reference, to determine tech spec applicability.

END STOP TIME:

ANO-2-JPM-NRC-CREV01 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation alarm, 2RITS-8750-1A, is in alarm and not bypassed.

INITIATING CUE:

The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.

ANO-2-JPM-NRC-CREV01 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation alarm, 2RITS-8750-1A, is in alarm and not bypassed.

INITIATING CUE:

The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.

ANO-2-JPM-NRC-IA02 PAGE 1 OF 5 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Instrument Air System TASK: Perform actions required by low Instrument Air Header Pressure JTA#: ANO2-RO-EOPAOP-EMER-157 KA VALUE RO: 3.1 SRO: 3.2 KA

REFERENCE:

078 A3.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): AOP 2203.021 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-IA02 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.

TASK STANDARD:

Unit 2 fully isolated from Unit 1 instrument air.

TASK PERFORMANCE AIDS:

AOP 2203.021; AOP 2203.012K SIMULATOR SETUP:

T1= IAINSTAIR, value = 13, Ramp = 1:00 minute.

Set trigger T2 to qh3c315 (closed position indication for 2CV3015)

T2=IAINSTAIR, value = 7.

Full power IC, Trigger T1 when candidate ready to start JPM

ANO-2-JPM-NRC-IA02 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINER'S NOTE:

AO and WCO duties are already in progress.

(C) 1. Open Instrument Air header On panel 2C14, placed N/A SAT UNSAT cross-connect valves with handswitches for 2CV-3004 and Step Unit 1. 2CV-3015 to OPEN.

2.a Observed red lights ON and green lights OFF above handswitches for 2CV-3004 and 2CV-3015.

2. Notify Unit-1 of intent to Notified Unit-1 of intent to N/A SAT UNSAT cross-connect instrument air. cross-connect instrument air.

Step 2.b Examiners CUE:

Unit-1 personnel acknowledge cross-connecting instrument air.

EXAMINERs NOTE:

Provide the CUE below after the examinee identifies IA header pressure is less than 60 psig from indication on 2C14.

3. Monitor Instrument Air header On panel 2C14, monitored N/A SAT UNSAT pressure. Instrument Air header pressure Step on 2PIS-3013 for results of 4

Examiners CUE: actions.

Unit 1 SM reports that Unit 1 IA pressure is 55 psig and going down.

ANO-2-JPM-NRC-IA02 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4 Close Instrument Air header On panel 2C14, placed N/A SAT UNSAT cross-connect valve with Unit handswitches for 2CV-3004 and Step

1. 2CV-3015 to CLOSED.

4.A Observed green lights ON and red lights OFF above handswitches for 2CV-3004 and 2CV-3015.

Examiners Note:

When Unit 2 instrument air header is isolated from Unit 1 provide the following cue:

A large IA leak exists on the instrument air piping and can be isolated by closing 2IA-99.

5 Direct Auxiliary Operator to Direct Auxiliary Operator to N/A SAT UNSAT CLOSE manual Instrument Air CLOSE manual Instrument Air Step header cross-connect valves. header cross-connect valves 4.B 2IA-47, 2IA-48, and 2IA-192.

NOTE: candidate may elect to close 2IA99 before closing manual valves.

6 Check IA header pressure Monitors IA header pressure on N/A SAT UNSAT greater than 35 psig. 2C14 to verify pressure stays Step above 25 psig.

5

6. Direct AO to check IA header Direct AO to check IA header N/A SAT UNSAT pressure and air receivers pressure locally.

Step pressure.

6 Direct AO to check IA air receivers.

Examiners Cue:

AO reports IA header pressure as indicated on 2C14.

Examiners note:

AO reports that the IA A air receiver pressure is as indicated on 2C14 and the B IA receiver pressure is

+5 # as indicated on 2C14.

ANO-2-JPM-NRC-IA02 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

7. Check IA header flow locally. Direct AO to report IA header N/A SAT UNSAT flow locally.

Step 8

Examiners Cue:

IA Header Flow is 700 SCFM.

(C) 8. Direct AO to close 2 IA-99. N/A SAT UNSAT Step 8

Examiners Cue:

AO has been directed to Direct AO to close 2IA-99 or close 2IA-99. inform CRS to direct AO to close 2IA-99. Refer to OP Examiners note: 2203.021 Attachment E to Notify simulator operator to determine that 2CV-0427 and take IA leak to 0. 2CV-0437 will fail OPEN when IA is isolated to them.

Simulator operator: When direction given to close 2IA-99, take IA leak malfunction to 0.

END STOP TIME:

ANO-2-JPM-NRC-IA02 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.

INITIATING CUE:

The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.

ANO-2-JPM-NRC-IA02 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.

INITIATING CUE:

The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.

ANO-2-JPM-NRC-MTG05 PAGE 1 of 8 Job Performance Measure UNIT: 2 REV #: 007 DATE:

SYSTEM/DUTY AREA: Main Turbine Generator System TASK: Perform a Manual Synchronization of the Main Turbine Generator to the System (Alternate Success Path)

JTA#: ANO2-RO-TURBC-NORM-12 KA VALUE RO: 2.9 SRO: 3.2 KA

REFERENCE:

045 K3.01 X X APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

Perform PLANT SITE: SIMULATOR: LAB POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X 15 Minutes APPROXIMATE COMPLETION TIME IN MINUTES:

REFERENCE(S): OP 2106.009 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE

ANO-2-JPM-NRC-MTG05 PAGE 2 of 8 Job Performance Measure BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant startup is in progress. OP 2106.009 is completed through step 16.2.

TASK STANDARD: Turbine Generator tripped. Uncontrolled MTG load increase stopped.

TASK PERFORMANCE AIDS: OP 2106.009 Step 16.0 SIMULATOR SETUP: Startup in progress. Reactor power ~ 5%. Main transformer Cooling Group Breaker Lineup is complete (ATT. E). Turbine first stage pressure feedback is in auto.

Trigger 1 to component malfunction 2CV0242 value = 1.00 ramp = 2:00 delay 10 sec; Trigger 2 to component malfunction 2CV208 value = 1.00 ramp = 2:00 delay 10 sec; T1 set to ce4r9728 (BKR 5130) and T2 set to ce4r9731 (BKR 5134).

ANO-2-JPM-NRC-MTG05 PAGE 3 of 8 Job Performance Measure INITIATING CUE:

The CRS directs, Synchronize the Main Turbine Generator to the grid and load to about 50 Mwe using OP 2106.009 beginning with step 16.3.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Notify Pine Bluff Dispatcher Using dedicated dispatcher N/A SAT UNSAT of intent to sync to system. telephone, notified Pine Bluff step dispatcher of intent to sync to 16.3.1 POSITIVE CUE: system.

Pine Bluff dispatcher notified.

(C) 2. Place synchronizing hand On panel 2C01, placed N/A SAT UNSAT switch for EITHER Breaker synchronizing hand switch for step 5130 OR Breaker 5134 to EITHER Breaker 5130 16.3.2 MANUAL. (2HS-9727) OR Breaker 5134 (2HS-9730) in MANUAL.

POSITIVE CUE: Observed EITHER hand switch Hand switch 2HS-9727 OR 2HS-9727 OR 2HS-9730 in 2HS-9730 in MANUAL. MANUAL.

(C) 3. Verify Synchroscope On panel 2C01, pressed N/A SAT UNSAT rotating slowly in the INCREASE or DECREASE step CLOCKWISE direction. pushbutton on Load Selector 16.3.3 until synchroscope is rotating slowly in CLOCKWISE POSITIVE CUE: direction.

Synchroscope rotating slowly in CLOCKWISE On panel 2C10, observed direction. synchroscope rotating slowly in CLOCKWISE direction.

ANO-2-JPM-NRC-MTG05 PAGE 4 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Verify Generator Voltage On panel 2C10, verified N/A SAT UNSAT slightly higher than System generator voltage slightly step Voltage AND check higher than system voltage.

16.3.4 Generator Voltage phase to 16.3.5 phase. AND POSITIVE CUE: On panel 2C01, checked Voltage slightly higher than generator voltage phase to system voltage. phase using installed indications and handswitch 2HS-9733.

On panel 2C10, observed voltages on Incoming slightly higher than Running voltmeters.

5. Announce to the control Announced to the control N/A SAT UNSAT room the intention to room the intention to step synchronize to system. synchronize to system.

16.3.6 POSITIVE CUE:

Control room personnel notified.

(C) 6. Close Generator Output On panel 2C01, closed N/A SAT UNSAT Breaker and check turbine Generator Output Breaker step picked up load. selected so that Breaker 16.3.7 CLOSES with synchroscope in 16.3.8 POSITIVE CUE: the 12 OCLOCK position.

Red light ON.

Load increase indicated. Observed load increase indicated on Load (2JI-9625)

OR PMS or SPDS computers.

On panel 2C01, observed breaker closed indication (red light ON, green light OFF) for operated breaker.

OR On panel 2C10 mimic, observed red light ON and green light OFF for breaker just closed (5130 or 5134).

ANO-2-JPM-NRC-MTG05 PAGE 5 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 7. Adjust load to ~ 10 Mwe. On panel 2C01, adjusted load N/A SAT UNSAT to ~ 10 Mwe by pressing step INCREASE OR DECREASE 16.3.9 POSITIVE CUE: pushbutton on Load Select.

Load ~ 10 Mwe.

Observed load at ~ 10 Mwe as indicated on LOAD (2JI-9625) or on PMS or SPDS computers.

8. Verify SDBCS response On panel 2C04, Verify 2CV0303 N/A SAT UNSAT is responding to load increase step by closing (HIC demand signal 16.3.10 POSITIVE CUE: lowering).

SDBCS valves are closing.

9. Select Load Rate Limit of 1/2 On panel 2C01, Verify Load N/A SAT UNSAT

% per minute. Rate Limit of 1/2 % per minute step light illuminated 16.4 POSITIVE CUE:

1/2 % per minute illuminated.

EXAMINERS AND SIMULATOR OPERATOR NOTE:

Trigger T-1, #1 control valve opening if BRK5130 closed or Trigger T-2, #2 control valve opening if BRK5134 closed with 10 sec delay.

(C) 10. Recognize that turbine load is On panel 2C01, observed N/A SAT UNSAT still increasing. turbine load still increasing on LOAD (2JI-9625) or on PMS or SPDS Computers.

NEGATIVE CUE:

Turbine load is increasing uncontrollably.

ANO-2-JPM-NRC-MTG05 PAGE 6 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 11. Attempts to lower load using On panel 2C01, attempted to N/A SAT UNSAT decrease pushbutton reduce turbine load using the decrease pushbutton AND/OR AND/OR Manually trips Main Turbine Generator using trip Manually tripped Main Turbine pushbutton Generator by depressing the trip pushbutton.

POSITIVE CUE:

Main Turbine Generator is Verified MTG tripped, tripped. Generator Output Breakers open, Exciter Field Breaker NOTE: open, all valves closed, and Attempting to decrease load electrical loads shifted to SU using the decrease #3.

pushbutton is not critical and does not need to be performed. Tripping the turbine is critical.

END STOP TIME:

ANO-2-JPM-NRC-MTG05 PAGE 7 of 8 Job Performance Measure EXAMINER S COPY JPM INITIAL TASK CONDITIONS:

Plant startup is in progress. OP 2106.009 is completed through step 16.2.

The CRS directs:

"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."

ANO-2-JPM-NRC-MTG05 PAGE 8 of 8 Job Performance Measure EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Plant startup is in progress. OP 2106.009 is completed through step 16.2.

The CRS directs:

"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."

ANO-2-JPM-NRC-SIT01 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 010 DATE:

SYSTEM/DUTY AREA: Safety Injection System TASK: Perform a high pressure fill of a SIT (SIT "A") (Alternate Success Path)

JTA#: ANO2ROECCSNORM2 KA VALUE RO: 3.3 SRO: 3.7 KA

REFERENCE:

006 A2.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP-2104.001 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-SIT01 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: HPSI pump (2P89A) is running on minimum recirculation TASK STANDARD: Safety Injection Tank (2T2A) level has been increased ~0.3% and fill is secured prior to 2T2A pressure exceeding 624psig (Hi Hi pressure) or level exceeding 89.5% (Hi Hi level)

THIS IS AN ALTERNATE SUCCESS PATH JPM TASK PERFORMANCE AIDS: OP 2104.001 Section 8.0 SIMULATOR SETUP: SIT A level low enough to accept a 0.3% water addition and Safety Injection Tank (2T2A) pressure is <608 psig.

Setup overrides to deenergize the red and green lights for 2CV 5015-1 when the handswitch is is taken to the open position and have the valve open 1%. HPSI pump (2P89A) is running on minimum recirculation. RCS PRESSURE > 1500psia.

Set trigger T4= of4r0151 (triggered when 2HS5015-1 red light is energized).

T4 - CV50151 = 0.1; fail HPSI injection MOV partially open.

T4 - DO_HS_5015_G = OFF Time delay = 2 sec; HPSI injection MOV green light off.

T4 - DO_HS_5015_R = OFF Time delay =2 sec; HPSI injection MOV red light off.

ANO-2-JPM-NRC-SIT01 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Open SIT (2T2A) Drain Valve On panel 2C17, placed N/A SAT UNSAT (2SV-5001-1). handswitch for 2SV-5001-1 to Step OPEN.

8.4.1 Observed red light ON above handswitch.

(C) 2. Open SIT (2T2A) Check On panel 2C33, placed N/A SAT UNSAT Valve Bypass (2SV-5004). handswitch for 2SV-5004 to Step OPEN.

8.4.1 Observed red light ON above handswitch.

3. Monitor SIT level and While filling SIT A, monitored N/A SAT UNSAT pressure during fill. level to ensure level maintained Step 8.3 < 87.9%.

While filling SIT A, monitored SIT pressure closely to ensure pressure maintained < 624 psig.

(C) 4. Throttle open HPSI Header 1 On panel 2C17, throttled N/A SAT UNSAT Injection to RCP A Discharge 2CV-5015-1 OPEN by placing Step (2CV-5015-1). handswitch to OPEN 8.4.2 momentarily as required to establish an SIT fill rate.

Observed red and green lights ON above handswitch.

Observed SIT (2T2A) control board level instrument(s):

2LIS-5008 (2C17) 2LI-5010 (2C17) 2LIS-5009 (2C16)

OR Observed SIT (2T2A) level on PMS, or SPDS computer point/trend display.

ANO-2-JPM-NRC-SIT01 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5. Attempts to close HPSI On panel 2C17, placed N/A SAT UNSAT Header 1 Injection to RCP A handswitch for 2CV-5015-1 to Step Discharge valve. CLOSE.

8.4.3.A Recognized that 2CV-5015-1 would NOT close and both red and green lights are deenergized.

(C) 6. Stop the level increase in On panel 2C17, placed N/A SAT UNSAT 2T2A SIT. handswitch for A HPSI pump (2P-89A) in stop Observed 2P89A stopped.

OR On panel 2C17 placed Step handswitch for SIT A Drain Valve 8.4.3.B (2SV-5001-1) to CLOSED.

Step 8.4.3.C Observed green light ON above handswitch.

OR On panel 2C33, placed handswitch for SIT A Check Valve Bypass (2SV-5004) to CLOSED.

Observed green light ON above handswitch.

7. Inform CRS of failure of Informed CRS that 2CV-5015-1 N/A SAT UNSAT 2CV-5015-1 to close. failed to close.

Examiners Cue:

Acknowledge communication as CRS.

Direct Examinee to secure from filling A SIT.

8. Close SIT (2T2A) Drain On panel 2C17, placed N/A SAT UNSAT Valve. handswitch for SIT A Drain Valve Step (if not closed previously.) (2SV-5001-1) to CLOSE.

8.4.3.B Observed green light ON above handswitch.

9. Close SIT (2T2A) Check On panel 2C33, placed N/A SAT UNSAT Valve Bypass. handswitch for SIT A Check Step (if not closed previously.) Valve Bypass (2SV-5004) to 8.4.3.C CLOSE.

Observed green light ON above handswitch.

ANO-2-JPM-NRC-SIT01 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 10. On panel 2K07, Alarms C3, 2T2A SIT High High Pressure N/A SAT UNSAT SIT Press Hi Hi or C4 Level alarm NOT received (SIT Hi Hi NOT received. pressure > 624 psig) or High High level alarm NOT received (87.5%).

END STOP TIME:

ANO-2-JPM-NRC-SIT01 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

HPSI pump (2P89A) is running on minimum recirculation.

INITIATING CUE:

The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."

ANO-2-JPM-NRC-SIT01 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

HPSI pump (2P89A) is running on minimum recirculation.

INITIATING CUE:

The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."

ANO-2-JPM-NRC-ELEC001 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 008 DATE:

SYSTEM/DUTY AREA: AC Electrical Distribution System TASK: Perform backfeed of a non-vital bus (2A1 from 2A3) , Respond to a Loss of Offsite Power JTA#: ANO2-RO-EOPAOP-EMER-32 KA VALUE RO: 3.7 SRO: 4.1 KA

REFERENCE:

062 A2.11 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): EOP 2202.007 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-ELEC001 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.

EOP 2202.007 steps have been completed through step 30.

TASK STANDARD:

Non-vital bus 2A1 has been powered from vital bus 2A3.

TASK PERFORMANCE AIDS:

EOP 2202.007 steps 28 through 34.

SIMULATOR SETUP:

IC with loss of offsite power. Open feeder breakers for 2B 1, 2, 7. Close 2CV 0400 & 2CV0460.

Verify Remote function 4162A1strip value = TRUE is triggered. Complete SPTAs and EOP 2202.007 through step 31.

ANO-2-JPM-NRC-ELEC001 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One) 1 Check 2A1 lockout relay reset. On annunciator panel 2K01, verified N/A SAT UNSAT 2K01-B7 "L.O. RELAY TRIP" for Step 2A1 in "slow flash" OR NOT 31.A illuminated.

2 Place "SU 2 to 2A1" (2A111) in On panel 2C10, placed 2A111 in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

3 Place "Unit Aux to 2A1" (2A112) On panel 2C10, placed 2A112 in N/A SAT UNSAT in PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

4 Place "SU 3 to 2A1" (2A113) in On panel 2C10, placed 2A113 in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

(C) 5 Place "2A1 to 2B3" (2A103) in On panel 2C10, placed 2A103 in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

(C) 6 Place "2A1 to 2B9" (2A109) in On panel 2C10, placed 2A109 in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

7 Place condensate pump (2P2A) in On panel 2C02, placed 2P2A in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.C Observed green light ON; red light OFF over hand switch.

8 Place condensate pump (2P2C) in On panel 2C02, placed 2P2C in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.C Observed green light ON; red light OFF over hand switch.

ANO-2-JPM-NRC-ELEC001 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 9 Place heater drain pump (2P8A) in On panel 2C02, placed 2P8A in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.C Observed green light ON; red light OFF over hand switch.

10 Place auxiliary feed pump (2P75) On panel 2C02, placed 2P75 in PTL. N/A SAT UNSAT in PTL and verify breaker open.

Step Observed green light ON; red light 31.C OFF over hand switch.

Examiners note:

Transition to back of control room to panel 2C22 11 Place main chiller (2VCH-1A) On panel 2C22, placed 2HS-3810 N/A SAT UNSAT handswitch (2HS-3810) in PTL for 2VCH-1A in PTL.

Step and verify breaker open.

31.D Observed green lights ON; red lights OFF over hand switch.

EXAMINER'S NOTE:

Transition to front of control room panel 2C10 Provide the following cue when the need for local actions is identified:

CUE: Local actions for EOP 2202.007 step 30.E using Attachment 24 have been completed.

(C) 12 Energize non-vital bus (2A1). On panel 2C33, installed the N/A SAT UNSAT synchronizer selector switch for Step 2A309 and placed switch in ON.

33 Placed 2A3 supply breaker (2A309) to CLOSE.

Observed red light ON; green light OFF over 2A309 hand switch.

(C) 13 Check diesel generator load. On panel 2C33, verified 2DG1 load N/A SAT UNSAT

< 2850 KW, whenever load is Step changed.

34 Observed 2DG1 load on Wattmeter W2DG1 and verified or was aware of 2DG1 load change after energizing 2A1.

14 Energize non-vital 480v bus 2B1. On panel 2C10, placed 2A1 to 2B1 N/A SAT UNSAT Feeder (2A102) in CLOSE.

Step 35 Observed red light ON; green light OFF above hand switch.

ANO-2-JPM-NRC-ELEC001 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 15 Energize non-vital 480v bus 2B7. On panel 2C10, placed 2A1 to 2B7 N/A SAT UNSAT Feeder (2A104) in CLOSE.

Step 35 Observed red light ON; green light OFF above hand switch.

Examiners note:

When 480VAC busses 2B1 and 2B7 are energized the JPM can be ended.

END STOP TIME:

ANO-2-JPM-NRC-ELEC001 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY:

JPM INITIAL TASK CONDITIONS:

A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.

EOP 2202.007 steps have been completed through step 30.

INITIATING CUE:

The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."

ANO-2-JPM-NRC-ELEC001 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY:

JPM INITIAL TASK CONDITIONS:

A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.

EOP 2202.007 steps have been completed through step 30.

INITIATING CUE:

The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 1 of 7 SYSTEM/DUTY AREA: Diesel Generator System (Alternate Success Path)

TASK: Start up the AAC diesel generator manually locally during a Loss of Offsite Power JTA # : ANO2-AO-AACDG-OFFNORM-18 KA VALUE RO: 3.9 SRO: 4.0 KA

REFERENCE:

2.1.23 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: X LAB:

TESTING METHOD: SIMULATE: X PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 minutes REFERENCE(S) OP 2104.037, Exhibit 1 EXAMINEES NAME: SSN:

EVALUATORS NAME: DATE THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time: Stop Time: Total Time:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

SIGNED: DATE:

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 2 of 7 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

This is an alternate success path JPM.

JPM INITIAL TASK CONDITIONS:

The following conditions exist:

1. The reactor has tripped due to a loss of off-site power.
2. Both emergency diesel generators are tied to their respective buses.
3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
4. The PC on 2C14 AND 2C435 have both failed TASK STANDARD:

The AAC Diesel has been started and is at 4160 V and 900 rpm with the output breaker (2A-1001) closed. The 480V bus 2B16 has been powered from the AAC diesel generator.

TASK PERFORMANCE AIDS:

1. OP 2104.037 Exhibit 1

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 3 of 7 INITIATING CUE:

The CRS provides the following direction:

1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
2. Bring the unit up to rated speed and voltage carrying house loads.

START TIME:

EXAMINERS NOTE:

Provide examinee with copy of 2104.037, Exhibit 1 If asked if 125 VDC is available, tell them that the indications for bus availability are as seen.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Place Local/Remote switch in On panel 2C-440, placed the N/A SAT UNSAT LOCAL. (2HS-7118) Local/Remote switch in LOCAL.

(Step (2HS-7118) 1.1)

EXAMINERS CUE:

Local/Remote switch indicates LOCAL.

EXAMINERS NOTE:

The failure of the AAC diesel to start by the local handswitch will cause the examinee to start the AAC diesel by an alternate means. There will be no change in AAC diesel generator frequency or noise level when the local start switch is taken to START.

Provide the following cue after 35 seconds when the local start switch is taken to START. (35 seconds is the delay time to allow for the lube oil pressure to build up on the EDG)

2. Start the AAC Diesel using the On panel 2C-440 turned the local N/A SAT UNSAT local start switch. (2HS-7117) control switch CW to start.

(Step 1.2)

EXAMINERS CUE:

The local start switch is in start, but the engine does not start.

TRANSITION NOTE:

Go to the AAC diesel engine room.

3. Open the pre-lube pump On the south side of the engine at N/A SAT UNSAT solenoid (2SV-7224) for >10 the generator end, rotated the (Step seconds. manual operator of 2SV-7224 2.1)

CW to open for >10 seconds.

EXAMINERS CUE:

2SV-7224 manual operating stem has been rotated and air noise is heard.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 4 of 7 (C) 4. Open EITHER of the air start On the south side of the engine at N/A SAT UNSAT solenoid valves: the generator end, rotated the (Step manual operator of one of the air 2.2) - 2SV-7222 OR start solenoid valves CW to open.

- 2SV-7223 2SV-7222 OR 2SV-7223 EXAMINERS CUE:

2SV-7222 (2SV-7223) manual Looked for an increase in engine operating stem has been noise and/or discharge of oil and rotated and engine speed and air from the air start motors.

noise level increases.

5. Close the air start solenoid On the south side of the engine at N/A SAT UNSAT valve that was opened. the generator end, rotated the (Step manual operator for the air start 2.3) solenoid valve CCW to close.

EXAMINERS CUE:

Manual operator rotated CCW to its original position.

6. Close the pre-lube solenoid After > 10 seconds on the south N/A SAT UNSAT (2SV-7224). side of the engine at the (Step generator end, rotated the 2.3) manual operator of 2SV-7224 EXAMINERS CUE: CCW to close.

No more air noise is heard.

7. Verify the AAC Diesel On panel 2C-440, observed N/A SAT UNSAT Generator is at rated speed and generator frequency at 60 Hz and (Step voltage. voltage at 4160V.

3.0)

EXAMINERS CUE:

Frequency indicates 60 Hz and voltage indicates 4160V.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 5 of 7 EXAMINERS NOTE:

When the examinee inspects the condition of 2A-1001, provide the NEGATIVE CUE first to indicate that the breaker has not automatically closed. Once the action has been taken to close the breaker, provide the POSITIVE CUE.

(C) 8. Verify the AAC Generator Observed breaker position N/A SAT UNSAT Output Breaker (2A-1001) is indication on the door of 2A-1001.

(Step CLOSED 4.1)

EXAMINERS CUE:

The green breaker OPEN light is lit.

AND Rotated breaker local control The white breaker spring switch for 2A-1001 to the CLOSE charging light is lit. position.

EXAMINERS CUE:

The Red breaker CLOSED light is lit.

TRANSITION NOTE:

Go to the upstairs area of the switchgear room.

9. Verify the London Feed to MCC Verifies 2B16-A1 is Open. N/A SAT UNSAT 2B161 breaker 2B16-A1 is (Step Observes the mechanical OPEN.

4.2) position indicator breaker for 2B16-A1 to show green open and the green breaker position EXAMINERS CUE:

indication light is lit.

Green OPEN light is lit on 2B16-A1 and mechanical position indicator showing green open

10. Verify Load Center 2B16 Supply Verifies 2B16-B1 is Open. N/A SAT UNSAT from the AAC diesel (2B16-B1)

(Step Observes the mechanical is CLOSED.

4.3) position indicator breaker for 2B16-B1 to show red closed and the red breaker position indication EXAMINERS CUE:

light is lit.

Red CLOSED light is lit on 2B16-B1 and mechanical position indicator showing red closed.

END STOP TIME: ________________

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 6 of 7 Examiners Copy JPM INITIAL TASK CONDITIONS The following conditions exist:

1. The reactor has tripped due to a loss of off-site power.
2. Both emergency diesel generators are tied to their respective buses.
3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
4. The PC on 2C14 AND 2C435 have both failed.

INITIATING CUE:

The CRS provides the following direction:

1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
2. Bring the unit up to rated speed and voltage carrying house loads.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 7 of 7 Examinees Copy JPM INITIAL TASK CONDITIONS The following conditions exist:

1. The reactor has tripped due to a loss of off-site power.
2. Both emergency diesel generators are tied to their respective buses.
3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
4. The PC on 2C14 AND 2C435 have both failed.

INITIATING CUE:

The CRS provides the following direction:

1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
2. Bring the unit up to rated speed and voltage carrying house loads.

ANO-2-JPM-NRC-FPEM1 PAGE 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 009 DATE:

SYSTEM/DUTY AREA: Spent Fuel Pool Cooling System TASK: Perform service water emergency makeup to the SFP (with Loop 1 service water)

JTA#: ANO2-WCO-SFP-EMER1 KA VALUE RO: 3.1 SRO: 3.5 KA

REFERENCE:

033 A2.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE (S): OP 2104.006 EXAMINEES NAME: SSN:

EVALUATORS NAME:

THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-FPEM1 PAGE 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The following conditions exist:

1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
2. Neither fuel pool cooling pump is available.
3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level
4. Fuel pool level is low.
5. 2P66 is aligned to the RWT and running.

TASK STANDARD:

1. Emergency SFP makeup from Loop 1 service water has been initiated.

TASK PERFORMANCE AIDS:

1. OP 2104.006 Section 14.2

ANO-2-JPM-NRC-FPEM1 PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE: The CRS provides the following direction:

Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

TRANSITION NOTE:

Go to elevation 335 RAB, north end of hallway.

1. Secure Spent Fuel Pool Locally rotated 2P66 handswitch N/A SAT UNSAT Purification Pump (2P66). (2HS-5411) to STOP and released.

Step 14.2.1 Examiners Cue: Observed green light ON, red light OFF.

Green light ON, red light OFF.

TRANSITION NOTE:

Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.

(C) 2. Verify Borated MU or RWT to Closed 2FP-32 by turning N/A SAT UNSAT 2P-66 (2FP-32) closed. handwheel clockwise and Step observing valve stem insertion 14.2.2 until resistance felt.

Examiners Cue:

2FP-32 stem is fully inserted and resistance is felt.

TRANSITION NOTE:

Go to elevation 335' RAB just off elevator (if local verification is performed)

(C) 3. Verify RWT Recirculation Contacted Control Room to close N/A SAT UNSAT Isolation (2CV-5637-1) closed. 2CV-5637-1.

Step 14.2.2 Examiners Cue: And When Control Room is Locally at 2CV-5637-1, verify that contacted, then Control room valve stem is in the down (closed) reports 2CV-5637-1 has been position and closed limit switch is taken to Closed. actuated after the valve is closed by the Control Room. (if local Or verification performed)

After the Control Room Closes 2CV-5637-1, then 2CV-5637-1 is Closed (if local verification is performed)

ANO-2-JPM-NRC-FPEM1 PAGE 4 of 7 JOB PERFORMANCE MEASURE (C) 4. Verify RWT Recirculation Contacted Control Room to close N/A SAT UNSAT Isolation (2CV-5638-2) closed. 2CV-5638-2.

Step 14.2.2 And Examiners Cue: Locally at 2CV-5638-2, verify that valve stem is in the down (closed)

When Control Room is position and closed limit switch is contacted, then Control room actuated after the valve is closed reports 2CV-5638-2 has been by the Control Room. (if local taken to Closed.

verification performed)

Or After the Control Room Closes 2CV-5638-2, then 2CV-5638-2 is Closed (if local verification is performed)

TRANSITION NOTE:

Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.

(C) 5. Open Borated MU, RWT, SW Opened 2FP-31 by turning N/A SAT UNSAT to Fuel Pool (2FP-31). handwheel CCW.

Step 14.2.3 Examiners Cue: Observed valve stem fully withdrawn out of the valve.

2FP-31 stem is fully extended.

(C) 6. Open RWT to Fuel Pool Opened 2FP-46 by turning N/A SAT UNSAT Isolation (2FP-46). handwheel CCW.

Step 14.2.4 Examiners Cue: Observed valve stem fully withdrawn out of the valve.

2FP-46 stem is fully extended.

TRANSITION NOTE:

Go to elevation 335' RAB just off elevator.

(C) 7. Close SW Header 1 Telltale Closed 2SW-8401 by turning N/A SAT UNSAT Drain (2SW-8401). handwheel CW.

Step 14.2.5 Examiners Cue: Observed valve stem fully inserted into the valve.

2SW-8401 has stem inserted into handwheel.

8. Ensure position of 2SW-57 is Logged position of 2SW-57 by: N/A SAT UNSAT logged in Category "E" Log.

Step Using a plant telephone, Gaitronics, 14.2.6 OR radio; contacted Control Room and directed entry in Category "E" Examiners Cue:

Log.

Valve position is logged.

OR Ensured Category "E" log entry made upon completion of evolution.

ANO-2-JPM-NRC-FPEM1 PAGE 5 of 7 JOB PERFORMANCE MEASURE (C) 9. Open SW Header 1 Emergency Unlocked locking device on N/A SAT UNSAT Feed Isolation (2SW-57). 2SW-57 using category "E" valve Step key.

14.2.6 Opened 2SW-57 by turning Examiners Cue:

handwheel CCW.

2SW-57 valve stem is fully Observed valve stem fully extended.

withdrawn out of the valve.

10. Station an Operator to monitor Verified that an Operator was N/A SAT UNSAT SFP level in communication stationed to monitor SFP level in Step with Operator at SW Header 1 communication with Operator at 14.2.7 Emergency Feed Isolation to SW Header 1 Emergency Feed SF Pool (2SW-138) Isolation to SF Pool (2SW-138)

Examiners Cue:

Operator responds to radio communications.

EXAMINERS NOTE:

- Final valve position is at discretion of examinee to ensure level is raised / maintained.

- Operator stationed to monitor SFP level in accordance with initial conditions.

(C) 11. Throttle open SW Header 1 Throttled open 2SW-138 by N/A SAT UNSAT Emergency Feed Isolation to turning handwheel CCW.

Step SF Pool (2SW-138).

14.2.9 Observed valve stem withdrawn Examiners Cue: out of the valve commensurate with valves throttling.

Operator stationed at SFP reports level rising slowly.

END STOP TIME:

ANO-2-JPM-NRC-FPEM1 PAGE 6 of 7 JOB PERFORMANCE MEASURE Examiners Copy JPM INITIAL TASK CONDITIONS The following conditions exist:

1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
2. Neither fuel pool cooling pump is available.
3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level.
4. Fuel pool level is low.
5. 2P66 is aligned to the RWT and running.

INITIATING CUE:

The CRS provides the following direction:

Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.

ANO-2-JPM-NRC-FPEM1 PAGE 7 of 7 JOB PERFORMANCE MEASURE Examinees Copy JPM INITIAL TASK CONDITIONS The following conditions exist:

1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
2. Neither fuel pool cooling pump is available.
3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level.
4. Fuel pool level is low.
5. 2P66 is aligned to the RWT and running.

INITIATING CUE:

The CRS provides the following direction:

Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.

ANO-2-JPM-NRC-LOF01 PAGE 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 003 DATE:

SYSTEM/DUTY AREA: Condensate and Feed Water System TASK: Align Condensate pump for start during a loss of all Feed Water event JTA#: ANO2-RO-EOPAOP-EMER-28 KA VALUE RO: 4.0 SRO: 3.9 KA

REFERENCE:

CE E06 EA1.1 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE (S): OP 2202.006 EXAMINEES NAME: SSN:

EVALUATORS NAME:

THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

ANO-2-JPM-NRC-LOF01 PAGE 2 of 7 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

1. Equipment Out OF Service:
  • 2P-7A for Outboard Pump Bearing Replacement.
2. The plant has tripped from 100% power due to an inadvertent CSAS.
3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).

TASK STANDARD: "D" Condensate Pump has been prepared for restart and the actions of 2202.006, Loss of Feedwater EOP through Step 16F has been completed.

TASK PERFORMANCE AIDS: OP 2202.006 Step 16

ANO-2-JPM-NRC-LOF01 PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Transition Note:

Go to elevation 370 Turbine Building, east of the elevator, to the 2A-1 / 2 Bus area.

Examiners Note:

When in front of breaker, give picture of inside breaker cubicle (DC control power breaker).

The candidate may want to read MIS placard on the DC breaker. If so, show the candidate the close up picture of the DC Breaker.

(C) 1. Locally open "DC CONTROL Points to the DC Control Power N/A SAT UNSAT POWER" breakers in breaker Molded Case Circuit Breaker.

Step cubicles 2A106.

16.A Positions the DC Control Power Examiners Cue: Breaker located in 2A106 in the down (open) position.

Once the candidate has located the breaker cubicle, Show the picture of the inside of the 2A106 breaker cubicle Positive Cue:

Molded Case DC Control Power breaker for 2A106 switch positioned down.

(C) 2. Locally open "DC CONTROL Points to the DC Control Power N/A SAT UNSAT POWER" breakers in breaker Molded Case Circuit Breaker.

Step cubicle 2A205.

16.A Positions the DC Control Power Examiners Cue: Breaker located in 2A205 in the down (open) position.

Once the candidate has located the breaker cubicle, Show the picture of the inside of the 2A205 breaker cubicle Positive CUE:

Molded Case DC Control Power breaker for 2A205 switch positioned down.

(C) 3. Verify Hotwell level greater than Hotwell is checked > 38% by N/A SAT UNSAT 38%. observing the remote Hotwell Step level instrument above Breaker 16.B Examiners Cue: Cubicle 2A205.

Hotwell level is greater than 38%. OR By Contacting the Control Room

ANO-2-JPM-NRC-LOF01 PAGE 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

Transition Note:

Go to elevation 335 Turbine Building, south of the Main Condenser on platform.

(C) 4. Verify both Condensate Pump Both Condensate Pump Recirc N/A SAT UNSAT Recirc valves closed. Valves, 2CV0662 and 2CV-0663, Step are checked closed by observing 16.C Examiners Cue: valve position indication on valve Both Condensate Pump stem. Indicator should be down Recirc Valves indicate closed. and in contact with switch for both valves.

OR By Contacting the Control Room TRANSITION NOTE:

Go to elevation 330 Turbine Building, west side walkway to check valve position locally.

5. Verify both Main Feedwater Both Main Feed water Pump N/A SAT UNSAT Pump Recirc valves closed. Recirc Valves, 2CV-0741 and Step 2CV-0749, are checked closed by 16.D Examiners Cue: checking valve position locally.

Both Main Feedwater Pump OR Recirc Valves indicate closed.

By Contacting the Control Room Transition Note Go to elevation 330 Turbine Building, near southwest stairwell and west of the Condensate Pumps in the Turbine Building Basement to check valve position locally.

Examiners Note:

The procedure being used does not specify which valves to use to isolate the SU/BD DI Pressure Regulating Control Valve. The Candidate could close 2CS-12 (throttled isolation upstream and this one valve would isolate the DI flow OR a combination of the inlet (2CS-57) and bypass (2CS-59) OR outlet (2CS-58) and bypass (2CS-59)

6. Locally verify condensate to The SU/BD DI is verified isolated N/A SAT UNSAT SU/BD DI isolated. locally by checking the manual Step isolation valves, 2CS-57 Inlet to 16.E Examiners Cue: pressure regulator, 2PCV4505, 2CS-12 is closed (if used) or 2CS-58 Outlet from pressure regulator 2PCV4505 and 2CS-2CS-58 is closed (if used) 59, regulator bypass, by rotating handwheel(s) in CW direction 2CS-57 is closed. (if used) until resistance is felt.

2CS-59 is closed. (if used) OR Close Combined Isolation 2CS-12 by rotating handwheel in CW direction until resistance is felt.

Transition Note Go to elevation 335 Turbine Building, southwest corner to check valve position locally.

Candidate will need climb to platform for valve operation.

ANO-2-JPM-NRC-LOF01 PAGE 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

7. Locally open D Condensate The D Condensate Pump N/A SAT UNSAT Pump Discharge Valve 10 turns. Discharge Valve is rotated in CW Step direction until resistance is felt 16.F Examiners Cue: and then rotated in the CCW D Condensate Pump direction until valve is 10 turns Discharge Valve is opened 10 open.

turns.

END STOP TIME:

ANO-2-JPM-NRC-LOF01 PAGE 6 of 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

1. Equipment Out OF Service:
  • 2P-7A for Outboard Pump Bearing Replacement.
2. The plant has tripped from 100% power due to an inadvertent CSAS.
3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).

INITIATING CUE:

The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.

ANO-2-JPM-NRC-LOF01 PAGE 7 of 7 JOB PERFORMANCE MEASURE CANDIDATES COPY JPM INITIAL TASK CONDITIONS:

1. Equipment Out OF Service:
  • 2P-7A for Outboard Pump Bearing Replacement.
2. The plant has tripped from 100% power due to an inadvertent CSAS.
3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).

INITIATING CUE:

The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.

ANO-2-JPM-NRC-LOF01 PAGE 8 of 7 JOB PERFORMANCE MEASURE 2A205 CONDENSATE PUMP 2P-2CB 152-205 CS

ANO-2-JPM-NRC-LOF01 PAGE 9 of 7 JOB PERFORMANCE MEASURE 2A106 CONDENSATE PUMP 2P-2C 152-106 CS

ANO-2-JPM-NRC-LOF01 PAGE 10 of 7 JOB PERFORMANCE MEASURE

ANO-2-JPM-NRC-LTOP PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Respond to Annunciator for LTOP valve misalignment JTA#: ANO2-RO-PZR-OFFNORM-11 KA VALUE RO: 3.8 SRO: 4.1 KA

REFERENCE:

010 K4.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP 2203.012J EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-LTOP PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

A loss of off site power has occurred.

A Natural Circulation Reactor Coolant System cool down is in progress.

2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.

TASK STANDARD:

Placed both loop 1 and loop 2 LTOPs in service.

TASK PERFORMANCE AIDS:

OP 2203.012J, Annunciator 2K10 Corrective Action SIMULATOR SETUP:

RCS and PZR cool down in progress.

RCS pressure less than 400 psia.

Power available to LTOP Isolation valves.

RCS Thot (both 2TIS4614-1 and 2TIS4714-2) indicate < 280°F Annunciators 2K10 C4 and C5 are in alarm.

ANO-2-JPM-NRC-LTOP PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Examiner note: Valves may be opened in any order and either alarm window may be mitigated first.

1. Determined misalignment not Determined that the LTOPs N/A SAT UNSAT (Step directed by a procedure step. should be in service for given 2.1) conditions.

Examiners cue:

CRS reports that RCS cool down is controlled by Natural Circulation cool down AOP.

2. Determine RCS T-Hot Using PMS, SPDS or 2C04 N/A SAT UNSAT (Step temperature is less than 280°F. control board indications 2.2) determined that 2TIS-4614-1 is less than 280°F and N/Ad step to isolate LTOPs.
3. Determine RCS T-Hot Using PMS, SPDS or 2C04 N/A SAT UNSAT (Step temperature is less than 270°F. control board indications 2.3) determined that 2TIS-4614-1 is less than 270°F and implemented step.

(C) 4. Opened 2CV-4730-1, LTOP On 2C09, took hand switch for N/A SAT UNSAT (Step isolation valve. 2CV-4730-1 to clockwise direction 2.3) and observed that Green light OFF and Red light ON.

(C) 5. Opened 2CV-4741-1, LTOP On 2C09, took hand switch for N/A SAT UNSAT (Step isolation valve. 2CV-4741-1 to clockwise direction 2.3) and observed that Green light OFF and Red light ON.

(C) 6. Opened 2CV-4731-2, LTOP On 2C09, took hand switch for N/A SAT UNSAT (Step isolation valve. 2CV-4731-2 to clockwise direction 2.3) and observed that Green light OFF and Red light ON.

(C) 7. Opened 2CV-4740-2, LTOP On 2C09, took hand switch for N/A SAT UNSAT (Step isolation valve. 2CV-4741-1 to clockwise direction 2.3) and observed that Green light OFF and Red light ON.

ANO-2-JPM-NRC-LTOP PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

8. Verified Alarms 2K10-C4 and On 2K10, verified that alarm N/A SAT UNSAT (Step 2K10-C5 alarms cleared. window C4 and C5 light are in 3.1) slow flash and acknowledged alarm lights to verify that alarm windows clear.

END

ANO-2-JPM-NRC-LTOP PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY:

INITIAL CONDITIONS:

  • A loss of off site power has occurred.
  • 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.

INITIATING CUE:

The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.

ANO-2-JPM-NRC-LTOP PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY:

INITIAL CONDITIONS:

  • A loss of off site power has occurred.
  • 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.

INITIATING CUE:

The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.