| issue date = 07/25/2008
| issue date = 07/25/2008
| title = Acceptance Review Regarding Third Ten-Year Interval Inservice Inspection Program Relief Request Numbers I3R-03 and I3R-04
| title = Acceptance Review Regarding Third Ten-Year Interval Inservice Inspection Program Relief Request Numbers I3R-03 and I3R-04
| author name = Vaaler M G
| author name = Vaaler M
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2
| addressee name = Burton C L
| addressee name = Burton C
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000400
| docket = 05000400

Revision as of 10:01, 12 July 2019

Acceptance Review Regarding Third Ten-Year Interval Inservice Inspection Program Relief Request Numbers I3R-03 and I3R-04
ML082060034
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/25/2008
From: Vaaler M
NRC/NRR/ADRO/DORL/LPLII-2
To: Burton C
Carolina Power & Light Co
Vaaler, Marlayna, NRO/DNRL 415-3178
References
TAC MD8743, TAC MD8744
Download: ML082060034 (4)


Text

July 25, 2008

Chris L. Burton, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - ACCEPTANCE REVIEW REGARDING THIRD TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM RELIEF REQUEST NUMBERS I3R-03 AND I3R-04 (TAC NOS. MD8743 AND MD8744)

Dear Mr. Burton:

By letter dated April 29, 2008 (Agencywide Documents Access and Management System Accession No. ML081330461), Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc., submitted Relief Requests I3R-03 and I3R-04 for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). The proposed relief requests would 1) grant relief from requirements related to the pressure testing of the reactor pressure vessel head flange seal leak detection system, and 2) authorize an alternative for examination of various piping and valves in the Class 1 pressure boundary. Both relief requests pertain to the third 10-year inspection interval at HNP.

Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The purpose of this letter is to provide the final results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review and make an independent assessment

regarding the acceptability of the proposed change. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and

make an independent assessment r egarding the acceptability of the pr oposed amendment in terms of regulatory requirements and the protection of public health and safety and the

environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. Should you have any ques tions regarding this review, please contact me at (301) 415-3178.

Sincerely,

/RA/ Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-400

cc: See next page

ML082060034 NRR-106 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME MVaaler CSola TBoyce/BMozarfari for DATE 07/25/08 07/24/08 07/25/08 Mr. Chris L. Burton Shearon Harris Nuclear Power Plant, Carolina Power & Light Company Unit No. 1

cc:

Mr. Kelvin Henderson Plant General Manager Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.

Post Office Box 165, Mail Zone 3 New Hill, North Carolina 27562-0165

Director of Site Operations Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.

Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165

Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.

Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165

Ms. Kimberly A. Harshaw, Manager Support Services Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.

Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165

Resident Inspector / Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998

Mr. J. Paul Fulford Manager, Performance Evaluation and Regulatory Affairs PEB 5 Progress Energy Carolinas, Inc.

Post Office Box 1551 Raleigh, North Carolina 27602-1551

Mr. David T. Conley Associate General Counsel II -

Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551

Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326

Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602

Mr. Tony Gurley, Chair Board of County Commissioners of Wake County Post Office Box 550 Raleigh, North Carolina 27602

Mr. Carl Thompson, Chair Board of County Commissioners of Chatham County Post Office Box 87 Pittsboro, North Carolina 27312

Mr. John H. O'Neill, Jr.

Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street NW.

Washington, DC 20037-1128

Mr. John D. Runkle Attorney at Law Post Office Box 3793

Chapel Hill, Nort h Carolina 27515-3793

Mr. Jim Warren NC Waste Awareness & Reduction Network Post Office Box 61051 Durham, North Carolina 27715-1051

Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510

Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211