| title = Notification of NRC Component Design Bases Inspection (05000528/2016007; 05000529/2016007; 05000530/2016007) and Initial Request for Information | | title = Notification of NRC Component Design Bases Inspection (05000528/2016007; 05000529/2016007; 05000530/2016007) and Initial Request for Information | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Edington R | | addressee name = Edington R | ||
| addressee affiliation = Arizona Public Service Co | | addressee affiliation = Arizona Public Service Co | ||
| docket = 05000528, 05000529, 05000530 | | docket = 05000528, 05000529, 05000530 | ||
Line 14: | Line 14: | ||
| page count = 8 | | page count = 8 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000528/2016007]] | ||
=Text= | =Text= |
Revision as of 06:57, 20 June 2019
ML16111B331 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 04/20/2016 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Edington R Arizona Public Service Co |
References | |
IR 2016007 | |
Download: ML16111B331 (8) | |
See also: IR 05000528/2016007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511
April 20, 2016
Mr. Randall K. Edington
Executive Vice President Nuclear/CNO
Arizona Public Service Company
P.O. Box 52034, MS 7602
Phoenix, AZ 85072-2034
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF NRC COMPONENT DESIGN BASES INSPECTION
(05000528/2016007; 05000529/2016007; 05000530/2016007)
AND INITIAL REQUEST FOR INFORMATION
Dear Mr. Edington:
On July 18, 2016, the U.S. Nuclear Regulatory Commission (NRC) w
ill begin a triennial baseline Component Design Bases Inspection at the Palo Verde Generating Station. A seven-person
team will perform this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."
The inspection focuses on components and operator actions that have high risk and low design
margins. The samples reviewed during this inspection will be identified during an information
gathering visit and during the subsequent in-office preparation week. In addition, a number of
operating experience issues will also be selected for review.
The inspection will include an information gathering site visit by the team leader and a senior
reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of five NRC inspectors and two contractors, of which six
will focus on engineering and one on operations. The current inspection schedule is as follows:
Onsite Information Gathering Visit: July 18 - 22, 2016 Preparation Week: July 25 - 29, 2016
Onsite Weeks: August 1 - 5, 15 - 19, and August 29 - September 2, 2016.
The purpose of the information gathering visit is to meet with members of your staff to identify potential risk-significant components and operator actions. The lead inspector will also request a tour of the plant with members of your operations staff and probabilistic safety assessment staff. During the onsite weeks, several days of time will be needed on the plant-referenced
simulator in order to facilitate the development of operator action-based scenarios. Additional
R. Edington - 2 -
information and documentation needed to support the inspection will be identified during the inspection, including interviews with engineering managers, engineers, and probabilistic safety assessment staff.
Our experience with these inspections has shown that they are extremely resource intensive, both for the NRC inspectors and the licensee staff.
In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed for the inspection. The request has been divided into two groups. The first group lists information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than July 11, 2016. Insofar as
possible, this information should be provided electronically to the lead inspector. Since the
inspection will be concentrated on high risk/low margin components, calculations associated with your list of high risk components should be available to review during the information gathering visit to assist in our selection of components based on available design margin.
The second group of documents requested lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. An additional request will be made by the team during the preparation week once
the specific components have been selected. Additional requests by inspectors will also be made throughout all three onsite weeks for specific documents needed to complete the review
of that component/selection. It is important that all of these documents are up to date and
complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests,
questions, and concerns are addressed in a timely manner.
The lead inspector for this inspection is Wayne Sifre. We understand that our licensing engineer contact for this inspection is Mr. Dave Heckman.
If there are any questions about the inspection or the requested materials, please contact the lead inspector by telephone at
817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the O
ffice of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for
public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
R. Edington - 3 -
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos: 50-528; 50-529; 50-530
License Nos: NPF-41; NPF-51; NPF-74
Enclosure: Component Design Bases Inspection Request for Information
- 1 - Enclosure
Initial Request for Information
Component Design Bases Inspection Palo Verde Nuclear Generating Station
Inspection Report: 05000528/2016007, 05000529/2016007, 05000530/2016007
Information Gathering Dates: July 18 - 22, 2016
Inspection Dates: August 1 - 5, 2016, August 15 - 19, 2016, August 29 - September 2, 2016
Inspection Procedure: IP 71111.21, "Component Design Bases Inspection"
Lead Inspector: Wayne Sifre, Senior Reactor Inspector
I. Information Requested Prior to Information Gathering Visit (July 18, 2016)
The following information (Section I of this enclosure) should be sent to the Region IV
office in hard copy or electronic format (Certrec IMS preferred), to the attention of Wayne
Sifre by July 11, 2016, to facilitate the reduction in the items to be selected for a final list
during the preparation week July 25, 2016. The inspection team will finalize its sample
selections during the prep week and will provide an additional information request with specific items by sample. This information shall be made available by the first day of the onsite portion of the inspection. The specific items selected from the lists shall be
available and ready for review on the day indicated in this request. *Please provide requested documentation electronically in "pdf" files, Excel, or other searchable formats, if possible. The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of pressurized water reactor technology. If requested documents are large and/or only hard copy
formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection.
1. An Excel spreadsheet of equipment basic events (with definitions) including
importance measures sorted by risk
achievement worth (RAW) and Fussell-
Vesely (FV) from your internal events probabilistic risk assessment (PRA). Include basic events with RAW value of 1.3 or greater.
2. A list of the top 50 cut-sets from your PRA.
3. Copies of PRA "system notebooks," and the latest PRA summary document.
4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted by RAW and FV. Provide copies of your human reliability worksheets for these items.
- 2 - 5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire.
6. Any pre-existing evaluation or list of components and associated calculations
with low design margins.
7. A list of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment.
8. A list of operating experience evaluations for the last 2 years.
9. A list of all time-critical operator actions in procedures.
10. A list of permanent and temporary modifications sorted by component identified
in Item 1.
11. A list of current "operator work arounds/burdens."
12. A list of the design calculations, which provide the design margin information for components included in Item 1. (Calculations should be available during the
information gathering visit).
13. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years.
14. A copy of the current management and engineering organizational charts.
15. A copy of the Palo Verde Nuclear Generating Station IPEEE, if available electronically.
16. A list of any common-cause failures of components in the last 3 years.
17. An electronic copy of the Design Bases Documents.
18. An electronic copy of the System Health notebooks.
19. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.
20. A copy of engineering/operations related audits completed in the last 2 years.
21. A list of motor operated valves (MOVs) in the program, design margin and risk
ranking. 22. A list of air operated valves (AOVs) in the valve program, design margin and risk
ranking. 23. Structure, system, and components in the Maintenance Rule (a)(1) category.
- 3 - 24. Site top 10 issues list, if available.
25. Procedures used to accomplish operator actions associated with the basic events in your PRA.
26. A list of licensee contacts for the inspection team with pager or phone numbers.
27. Electronic copies of the Technical Specifications, Technical Specifications Bases, and the Updated Final Safety Analysis Report.
II. Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).
Inspector Contact Information:
Wayne Sifre Eric Stamm Jim Drake Senior Reactor Inspector Senior Reactor Inspector Senior Reactor Inspector 817-200-1193 404-997-4575 817-200-1558
Wayne.Sifre@nrc.gov Eric.Stamm@nrc.gov James.Drake@nrc.gov
Shiattin Makor Chad Stott Reactor Inspector Reactor Inspector 817-200-1507 817-200-1526
Shiattin.Makor@nrc.gov Chad.Stott@nrc.gov
Mailing Address:
U.S. NRC, Region IV Attn: Wayne Sifre
1600 East Lamar Blvd.
Arlington, TX 76011-4511
R. Edington - 2 -
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos: 50-528; 50-529; 50-530 License Nos: NPF-41; NPF-51; NPF-74
Enclosure: Component Design Bases Inspection Request for Information
ADAMS ACCESSION NUMB
ER: ML16111B331 SUNSI Review By: WSifre
ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE DRS/EB1 C:EB1 NAME WSifre TFarnholtz SIGNATURE /RA/ /RA/ DATE 4/19/16 4/20/16 OFFICIAL RECORD COPY
Letter to Randall K. Edington from Thomas Farnholtz, dated April 20, 2016
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF NRC COMPONENT DESIGN BASES INSPECTION (05000528/2016007; 05000529/2016007; 05000530/2016007)
AND INITIAL REQUEST FOR INFORMATION
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
Resident Inspector (David.You@nrc.gov)
Resident Inspector (Dustin.Reinert@nrc.gov)
PV Administrative Assistant (Yvonne.Dubay@nrc.gov) Branch Chief, DRP/D (Jeffrey.Josey@nrc.gov) Project Engineer, DRP/D (Jim.Melfi@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Siva.Lingam@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)