| title = NPDES Monthly Report for the Month of August 2006. No Violations Occurred During This Period
| title = NPDES Monthly Report for the Month of August 2006. No Violations Occurred During This Period
| author name = Pearce L W
| author name = Pearce L
| author affiliation = First Energy Services, Inc
| author affiliation = First Energy Services, Inc
| addressee name =  
| addressee name =  
Line 26: Line 26:
Date Report Completed:
Date Report Completed:
oSignatue Of Reporter:
oSignatue Of Reporter:
Title of Reporter: 09/07/2006  
Title of Reporter: 09/07/2006
(_ 1.040 Vice President, Nuclear Form No EPA 4500 (8-91)(Generated by SWIMS)Formerly EPA SURI Page 1 of 1  
(_ 1.040 Vice President, Nuclear Form No EPA 4500 (8-91)(Generated by SWIMS)Formerly EPA SURI Page 1 of 1  
&7 -1 MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code Reported Date (Month Year): Application:
&7 -1 MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code Reported Date (Month Year): Application:

Revision as of 12:19, 13 July 2019

NPDES Monthly Report for the Month of August 2006. No Violations Occurred During This Period
ML062710398
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/07/2006
From: Pearce L
First Energy Services
To:
Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency
References
PY-CEI/OEPA0460L
Download: ML062710398 (10)


Text

FENOC Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 L. W. Pearce Vice President, Nuclear September 7, 2006 PY-CEFOEPA-0460L Ohio Environmental Protection Agency Division of Water Pollution Control Enforcement Section, ES/MOR P.O. Box 1049 Columbus, Ohio 43216-1049 Ladies and Gentlemen:

Enclosed are the NPDES monthly report forms for the month of August 2006. No violations occurred during this period.If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.Sincerely, 440-280-5382 vwaýýJn 4io to Enclosures cc: NRC Region III NRC Resident Inspector NRC Project Manager NRC Document Control Desk (Docket No. 50-440)AZ MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application:

9f7/2006 Perry Nuclear Power Plant 004 August 2006 31B00016*GD Perry Nuclear Power Plant Sampling Station

Description:

10 Center Rd. Po int s tati ve ofscriptione PerryOH44081 Point Representative of Discharge in(l) -Enter I for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab: Analyst: in(2) -Enter frequency of sampling CCB125 Liz Ryan 33 3 3 ________(2)1 11 __ _ I 999 1. 999 __ 1_ _(50060) (00400) (01119) (00011) (34044) (50050) (78739)'Chlorine, Total: pPH Copper, Total 'Water Temperature Oxidants, Total Flow Rate .orination/Brominatu i I Residual S.U. Recoverable F Residual MGO Duration Day mg/i ug/l mg/l Minutes 01 1 AA 8.58 87 AH 110.3 100 02 AA -88 AH 110.8 100 03 AA 88 1 AH 113.2 100 04 AA 8.64 86 AX 115.9 50 05 AA 87 AX 115.1 100 06 AA 83 AH 114.8 -100 0O7 I AA 84 AX 115.1 100.- -... .. ... .- ... .............. -o 08 AA8.57 85 L AX _ 110.5 100 09 0.07 83 AH 121.6 102 10 0.13 82 T AX 121.4 100-1 AA 8.28 83 AH 108.7 100 272 A 124.5 100 13 AAA 123 14 AA 74 AH 120.3 100 15 AA 8.63 81 AX 119.4 50 16 AA 80 AH 128 100 17 AA 4 79 AH 127.2 100 AA 8.43 79 AH 122.9 100 019 AA s AH 117.4 100 I--20 AA 82 AX 121.8 100 21 AA 79 AH 123.3 100 22 AA 8.44 79 AH 107.3 AR 23 AA 79 AH 87 AH 24 AA 79 AR 88.4 AH 25 AA 8.6 81 AH 119.9 50 26 AA _ __82 AX 122.9 100 27 AA 82 AH 123.7 50 28 AA 81 AH 124.8 100 29 AA 8.52 81 AX 126.7 108 30 AA 80 AH 124.2 80 31 0.07 H76 A 125.7 100 TOTAL 0.27 76.69 4 2513 0 3635.8 2590 AVG 0.0087 N/A 4 81.0645 0 117.2839 95.6 MAx 0.13 8.64 4 88 0 128 108 MIN 0 8.28 4 71 0 87 50 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the Information, I believe the submitted information is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

Date Report Completed:

oSignatue Of Reporter:

Title of Reporter: 09/07/2006

(_ 1.040 Vice President, Nuclear Form No EPA 4500 (8-91)(Generated by SWIMS)Formerly EPA SURI Page 1 of 1

&7 -1 MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code Reported Date (Month Year): Application:

9M12006 Perry Nuclear Power Plant 004 August 2006 31B00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station

Description:

Perry OH44081 Point Representative of Discharge Reporting Code Result Date Additional Remarks 1Mdl 34044 08/01/2006 No bromination events this date 34044 08/02/2006 No bromination events this date 34044 08/03/2006 No bromination events this date 34044 08/04/2006 No bromination events this date 34044 08/05/2006 No bromination events this date 34044 08/0/200 N ent hsa 34044 08/06/2006 No bromination events this date 34044 08/07/2006 No bromination events this date 34044 08/08/2006 No bromination events this date 34044 08/10/2006 No bromination events this date 34044 08/10/2006 No bromination events this date 34044 08/11/2006 No bromination events this date 34044 08/12/2006 No bromination events this date 34044 08/13/2006 No bromination events this date 34044 08/14/2006 No bromination events this date 34044 08/15/2006 No bromination events this date 34044 08/16/2006 No bromination events this date 34044 08/18/2006 No bromination events this date 34044 08/18/2006 No bromination events this date 34044 08/19/2006 No bromination events this date 34044 08/21/2006 No bromination events this date 34044 08/21/2006 No bromination events this date 34044 08/22/2006 No bromination events this date 34044 08/23/2006 No bromination events this date 34044 08/24/2006 No bromination events this date 34044 08/25/2006 No bromination events this date 34044 08/27/2006 No bromination events this date 1.3 08/2/2006 34044 08/27/2006 No broinination events this date 34044 083/20____eetstisdt 34044 08/28/2006 No bromination events this date 34044 08/29/2006 No bromination events this date 34044 08/32/2006

° bromination events this date 34044 08/03/2006 No bromination events this date 50060 08/01/2006 -less than MDLe.0 50060 08/02/2006 Less than MDLe.05 50060 08/03/2006 Less than MDL :.05 50060 08/04/2006 Less than MDL .05 50060 08/05/2006 Less than MDL i.05 50060 08/06/2006 Less than MDL -.05 50060 08/07/2006 Less than MDL i.05 50060 08/08/2006 Less than MDL i.05 Reporting Code Result Date ldditional Remarks 1Mdl 50060 08/09/2006

.05 50060 08/10/2006 j .05 50060 08/11/2006 Less than MDL .05 50060 08/12/2006 Less than MDL .05 50060 08/13/2006 less than MDL 50060 08/14/2006 Less than MDL .05 50060 08/15/2006 less than MDL 05 50060 08/16/2006 Less than MDL .05 50060 08/17/2006 Less than MDL .05 50060 08/18/2006 less than MDL 50060 08/19/2006 Less than MDL .05 50060 08/20/2006 Less than MDL 50060 08/21/2006 Less than MDL .05 50060 08/22/2006 Less than MDL .05 50060 08/23/2006 less than MDL ..05 50060 08/24/2006 Less than MDL .05 50060 08/25/2006 Less than MDL .05 50060 08/26/2006 Less than MDL .05 50060 08/27/2006 rless than MDL 50060 08/28/2006 Less than MDL .05 50060 08/29/2006 Less than MDL 05 50060 08/30/2006 Less than MDL .05 50060 08/31/2006 05 78739 08/22/2006 so chlorination/bromination performed on this date 78739 08/23/2006 No chlorination/bromination performed on this date 78739 08/24/2006

.0o chlorination/broination performed on this date MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application:

g/M2o Perry Nuclear Power Plant 601 August 2006 31B00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station Description PerryOH44081 Discharge from Regenerate Neutralization Pits in(1) -Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab: Analyst: in(2) -Enter frequency of sampling CCB 125 Liz Ryan ( ) 3..3 1.. ...-. .i .(2)r 1 1 1 I 999 I I II-I I R P Day (00400) (00530)pH Total Suspended S.U. Solids mg/l (00550)Oil and Grease, Total mg/l (50050)Flow Rate MGD 01 AH 02 iAH.-~ j .... A.. ..... ---------03 _ AS 04 7.68 11 AA 0.0164-f~~ ~ ~ ~~~~~~~~~~~~~~

...... ..............

..........

.... ..... ......... ... ........ ...... ............

.05 __ _ _ _ _ _AM _ _ _ _06 AM 08 AH 110 8.45 AA AA 0.0163 I.----------------L--.-

___------

_____________

11 AM 12 ! ___AM __ __ ___13 AH 14 _AH 15 AH 16 AM*17 A_. _18 _ _19 T ---__20 -AM 21 A_j2 AH 23 AM*24 -AM ___25 8.16 6 AA 0.0174 26 _ _ -_ _AMH _ _ _ _-27 AH 29 AM 30 _A 31 AM TOTAL2 24.29 17 0 0.0501 0 0 0 AVG r N/A 5.6667 0 ( 0.0167 MAX 8.45 11 0 0.0174 _MINI 7.68 0 0 0.0163 0 0 0 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my Inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment Date Report Completed:

Signaturg of eporter: Title of Reporter: 09/07/2006 P2 Vice President, Nuclear Form No EPA 4500 (8-91)(Generated by SWIMS)Formerly EPA SURI Page 1 of I MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year) Application:

9r712006 Perry Nuclear Power Plant 601 August 2006 31B00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station

Description:

Perry OH44081 Discharge from Regenerate Neutralization Pits Reporting Code Result Date Additional Remarks iMdl 00530 08/10/2006 fess than MDL 4.00550 08/04/2006 less than MDL 00550 08/10/2006 Less than MDL 5.p 00550 08/25/2006 Less than MDL 5.50050 08/01/2006 No discharge performed on this date 50050 08/02/2006 No discharge performed on this date 50050 08/03/2006 No discharge performed on this date 50050 08/05/2006 ho discharge performed on this date 500501 08/06/2006 o discharge performed on this date.. " 50050 08/07/2006 No discharge performed on this date 50050 08/08/2006 No discharge performed on this date 50050 08/09/2006 No discharge performed on this date 50050 08/01/2006 No discharge performed on this date 50050 08/12/2006 No discharge performed on this date 50050 08/13/2006 No discharge performed on this date 50050 08/21/2006 No discharge performed on this date 50050 08/15/2006 No discharge performed on this date 50050 08/16/2006 No discharge performed on this date 50050 08/17/2006 No discharge performed on this date 5 0 05 0 08/18/2006 No discharge performed on this date 50050 08/19/2006 No discharge performed on this date 50050 08/12/2006 No discharge performed on this date 50050 08/21/2006 No discharge performed on this date 50050 08/21/2006 No discharge performed on this date 50050 08/23/2006 No discharge performed on this date 500 822 ois p o onthisdate 50050 08/24/2006 Po discharge performed on this date t 50050 08/26/2006 No discharge performed on this date 50050 08/27/2006 No discharge performed on this date 50050 08/28/2006 No discharge performed on this date 50050 08/29/2006 No discharge performed on this date 50050 08/30/2006 No discharge performed on this date 50050 08/31/2006 No discharge performed on this date MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year) Application:

917/2006 Perry Nuclear Power Plant 602 August 2006 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station Description PerryOH44081 Discharge from Chemical Cleaning Lagoon in(1) -Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab: Analyst: in(2) -Enter frequency of sampling CCB125 Liz Ryan (1) 2 2 3 2 3 I) 998 J 998 1 1 1 998 1 1 999 1 1 Day (00980)Iron, Total Recoverable ug/l (01119)Copper, Total Recoverable ug/l (00400)pH S.U.(00530)Total Suspended Solids mg/l (00550)Oil and Grease, Total mg/l (50050)Flow Rate MGD 03___05~ ~~~~ -- ------...


.

---.---...

___-I ------.-.---------

________________

___________

.------------

.--.---..--.---.-

09 11-12 15 17 18 _ _ i 19 i 21 r 22 23 24 -- __ _ _ _ _ _ _ __ _28_------.-_--__

__ -__ _ _25!26]27 _-_i28 29 ._-30 i 31 TOTAL 0 0 0 0 0 0 0 MAX 0 _MIN 0 0o 0 0 0 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the Information, I believe the submitted information Is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, Including the possibility of fine and imprisonment Date Report Completed:

Sig eer: Title of Reporter: 09/07/2006 Vice President, Nuclear Form No EPA 4500 (8-91)(Generated by SWIMS)Formerly EPA SURI Page I of I MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application*

9/712006 Perry Nuclear Power Plant 602 August 2006 3IB00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station

Description:

Perry OH 44081 Discharge from Chemical Cleaning Lagoon Reporting Code Result Date Additional Remarks !Mdl 00980 08/01/2006 No discharge performed this month MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP: Station Code: Reported Date (Month Year): Application:

9M12006 Perry Nuclear Power Plant 800 August 2006 31B00016*GD Perry Nuclear Power Plant 10 Center Rd. Sampling Station Description PerryOH44081 Intake Water from Lake Erie in(l) -Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab: Analyst: in(2) -Enter frequency of sampling CCB125 Liz Ryan (2)1 1 999 (01119) (00011)Copper, Total Water Temperatureý Recoverable F Day I ug/h o, [ __ _ 80 02 180 !*-bz. ....... .........

-807 .. .... ... ..................................

..............

......03~ 81 ___041....04 80 05 81 _ -6 77 -07 77 08 I 79 _S 0 9 .... .. .. .... .. .... ....09 -j 78[10 ___ 77[-ii-- -_ s 76_12 59 13 57 1 -14 61 6 1-i 71 _7 1_16 I 74 17 872 1872 19 72 .I_ _1i8 __ 72 ___ __ _____ _ __20 74 21 73__ _ _j 22 73 i 23 74 ii S24 74 25 74 1 26 74 27 74 28 75 29 74 _ _.t30 73 (t 31 im68 TOTAL 8 2284 0 0 0 0 0 AVG 8 73.6774 MAX 8 81 MIN 8 57 0 0 0 0 0 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the Information, I believe the submitted information is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

Date Report Completed:

Title of Reporter: 09/07/2006 W ; 0 P Vice President, Nuclear Form No EPA 4500 (8-91)(Generated by SWIMS)Formerly EPA SURI Page I of 1 4500 MONTHLY REPORT FORM Name, Address City, County, ZIP: Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Rd.Perry OH 44081 Station Code: 800 Reported Date (Month Year): August 2006 Application:

31B00016*GD 91712006 Sampling Station

Description:

Intake Water from Lake Erie