Line 2: |
Line 2: |
| | number = ML110610205 | | | number = ML110610205 |
| | issue date = 02/25/2011 | | | issue date = 02/25/2011 |
| | title = Beaver Valley, Units 1 & 2, 10 CFR 50.55a Request (VRR5) Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency | | | title = 10 CFR 50.55a Request (VRR5) Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency |
| | author name = Harden P A | | | author name = Harden P A |
| | author affiliation = FirstEnergy Nuclear Generation Corp | | | author affiliation = FirstEnergy Nuclear Generation Corp |
Letter Sequence Request |
---|
|
|
MONTHYEARML1106102052011-02-25025 February 2011 10 CFR 50.55a Request (VRR5) Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency Project stage: Request ML1108804692011-03-29029 March 2011 Acceptance Review Results Regarding Relief Request VRR3, VRR4, and VRR5 (ME5749, ME5750, ME5752, ME5781, and ME5782) Project stage: Acceptance Review ML1131304282011-11-22022 November 2011 Relief Request VRR5 Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency for the 10-Year Inservice Testing Program Interval Project stage: Other 2011-02-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] |
Text
FENOCBeaver Valley Power Station P.O. Box 4 FirstEnergy Nuclear Operating CompanyShippingport, PA 15077 Paul A. Harden724-682-5234 Site Vice PresidentFax: 724-643-8069 February 25, 2011 L-11-023 10 CFR 50.55a Attention: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 10 CFR 50.55a Request (VRR5) Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency In accordance with 10 CFR 50.55a, FirstEnergy Nuclear Operating Company (FENOC) requests Nuclear Regulatory Commission (NRC) approval of proposed alternatives for the Beaver Valley Power Station (BVPS), Unit No.1 fourth interval Inservice Testing Program for Pumps and Valves (IST Program) and the BVPS, Unit No. 2 third interval 1ST Program. The proposed alternative is associated with full-stroke open exercise tests of turbine driven auxiliary feedwater pump discharge valves.
In support of the spring 2012 refueling outage, FENOC requests approval of the proposed requests by March 14, 2012.
There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Thomas A. Lentz, Manager - Fleet Licensing, at 330-761-6071.
Paul A. Harden
Enclosure:
10 CRF 50.55a Request Number: VRR5, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)
Beaver Valley Power Station, Unit Nos. 1 and 2 L-11-023 Page 2 cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative
10CFR 50.55a Request Number: VRR5 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)
Page 1 of 3
--Hardship or Unusual Difficulty without Compensating In crease in Level of Quality or Safety--
1.0 ASME Code Components Affected
1FW-33, Turbine-Driven Auxiliary Feedwater Pump (TDAFWP) Discharge Check Valve (Class 3, Category C) 2FWE*FCV122, TDAFWP Discharge Check and Recirculating Valve (Class 3, Category B/C)
2.0 Applicable Code Edition and Addenda
American Society of Mechanical Engineers (ASME) Operations an d Maintenance (OM)
Code-2001, with Addenda through OMb-2003. 3.0 Applicable Code Requirement ISTC-3510, "Exercising Test Frequency," states in part: "Active Category A, Category B, and Category C check valves shall be exercised nominally every 3 months-"
4.0 Reason for Request
2FWE*FCV122 is a three-way automatic recircul ation control valve t hat acts as both a manual automatic flow control valve in one direction and a check valve in the other direction. 1FW-33 is a check valve onl
- y. Both 2FWE*FCV122 and 1FW-33 are normally closed during plant operation and ar e required to open in order to allow auxiliary feedwater flow to the steam generators (SGs) during an accident. The relatively cold auxiliary feedwater is drawn from a demineralized water storage tank, which is not routinely treated for pH or oxygen control.
In accordance with ISTC-5221, "Valve Obturator Movement," and NUREG-1482, "Guidelines for Inservice Testing at Nuclear Power Plants," Revision 1, Section 4.1.3, "Full Flow Testing of Check Valves," a full-stroke exercise in the open direction may be achieved by passing the maximum required accident condition flow through the valve.
A full-stroke open exercise of these check valves can only be performed when auxiliary feedwater flow is aligned to the SGs during the full-flow (comprehensive pump) test of the TDAFWP. The TDAFWP full-flow test can only be performed in Modes 1, 2, or 3 because steam from any of the three SG s is required to drive the pump.
The following information describes why aligning auxiliary feedwater flow to the SGs in order to perform a full-stroke exercise test in the open direct ion on a three-month frequency results in hardship:
Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR5
Page 2 of 3
a) The introduction of relatively cold aux iliary feedwater into the SGs produces a potential for thermal shock to both the main feed piping (thermal sleeves) and the secondary side of the SGs. Although t he thermal sleeves and SGs are designed for thermal shock, exposure to such events should be minimized in order to ensure the benefits of plant life extension are realized. b) Feeding the SGs with a large volume of rela tively cold water coul d also result in a large level transient in the SGs and could cause a reactor trip. Therefore, in order to avoid a reactor trip, it is nece ssary to reduce reactor power to 97 percent or less, which places additi onal burden on plant operators. c) The TDAFW pumps receive their suct ion from a demineralized water storage tank. The water in these demineralized water storage tanks is not routinely treated for pH or oxygen c ontrol, which could impact the corrosion rates in the secondary system. From a chemistry perspective, based on the lack of oxygen control in this water source, it is prudent to minimize the use of this water while in Modes 1, 2, or 3.
5.0 Proposed
Alternative and Basis for Use Per ISTC-3522(c), "Category C Check Valves," "If exercising is not practicable during operation at power and cold shutdown, it s hall be performed during refueling outages."
Because it has been considered not practic able to perform during operation at power and cold shutdown, the quarte rly testing of valves 1FW-33 and 2FWE*FCV122 required by ISTC-3510 has, to date, only been performed at a refueling outage frequency, in Mode 3, during startup.
On the basis of an analysis performed by Westinghouse in September 2010, "Beaver Valley Units 1 and 2 Transient Analysis of at Power Auxiliary Feedwater Functional Test
- Final Report," performance of the test during power operation is now considered acceptable at an initial power le vel no greater than 97 percent.
Although testing during power operation has been determined to be acceptable, FENOC desires to test the pump and associat ed discharge check valve at the two-year frequency. As an alternative to the testing required at a nominal quarterly frequency by ISTC-3510, FENOC proposes to perform full-st roke exercises of valves 1FW-33 and 2FWE*FCV122 in the open direction when auxiliar y feedwater flow is aligned to the SGs during the full-flow (comprehensive pump) test of the TDAFWP, to be performed once every two years.
A review of the Beaver Valley Power Stat ion, Unit Nos. 1 and 2 Inservice Testing Programs trending database indicated that over the past 10 years, these valves have consistently passed the full-stroke exercise test in the open direction. Testing at a
refueling outage frequency has been adequate to demonstrate the continued reliability and acceptable operation of the valves. Te sting these check valves during power operation at the nominal quarterly frequency required by ISTC-3510 would result in the hardship described above, without a compensating increase in the level of quality and safety.
Beaver Valley Power Station, Unit Nos. 1 and 2 10 CFR 50.55a Request Number: VRR5
Page 3 of 3
6.0 Duration
of Proposed Alternative The proposed alternatives identified in this relief request shall be utilized during the remainder of the BVPS Unit No. 1 fourth 10-Year Inservice Test Interval, which began on September 20, 2007 and the BVPS Unit No. 2 th ird 10-Year Inservice Test Interval, which began on Nove mber 18, 2007. 7.0 References Westinghouse Report, Beaver Valley Units 1 and 2 Transient Analysis of at Power Auxiliary Feedwater Functional Test, LT R-PCSA-10-5, dated S eptember 2, 2010.