IR 05000409/2008401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 11/18/2008
| issue date = 11/18/2008
| title = IR 05000409-08-401, (Dnms), on 10/21/2008, for La Crosse Boiling Water Reactor (Cover Letter Only)
| title = IR 05000409-08-401, (Dnms), on 10/21/2008, for La Crosse Boiling Water Reactor (Cover Letter Only)
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DNMS/DB
| author affiliation = NRC/RGN-III/DNMS/DB
| addressee name = Christians R
| addressee name = Christians R
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ber 18, 2008
[[Issue date::November 18, 2008]]


Mr. Roger Christians Plant Manager Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8894
==SUBJECT:==
 
LA CROSSE BOILING WATER REACTOR (LACBWR)
SUBJECT: LA CROSSE BOILING WATER REACTOR (LACBWR)
NRC SECURITY INSPECTION REPORT 050-00409/2008-401(DNMS)
NRC SECURITY INSPECTION REPORT 050-00409/2008-401(DNMS)


Line 29: Line 27:
On October 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the LACBWR Nuclear Power Station. The enclosed inspection report documents the inspection results, which were discussed at the conclusion of the on-site inspection on October 21, 2008, with Mr. Dan Tesar, Site Security Manager, and other members of your staff.
On October 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the LACBWR Nuclear Power Station. The enclosed inspection report documents the inspection results, which were discussed at the conclusion of the on-site inspection on October 21, 2008, with Mr. Dan Tesar, Site Security Manager, and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
=s rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings of significance were identified.
No findings of significance were identified.
Line 36: Line 35:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
=s enclosure will not be available for public inspection.


Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/
Sincerely,
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch  
/RA/
 
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos. 05000409 License Nos. DPR-45 Enclosure:
Docket Nos. 05000409 License Nos. DPR-45  
Inspection Report 050-00409/2008-401(DNMS)
 
cc w/encl: Dan Tesar, Security Manager cc w/o encl: W. L. Berg, General Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section WI Department of Health and Social Services, Division of Health DISTRIBUTION:
===Enclosure:===
S. Wastler, NSIR/DSP/DDMS/MWISB P. Kelley, NSIR/DSP/DDMS/MWISB D. Riffle, NSIR/DSO/DDSO K. Banovac, FSME D. Persinko, FSME S. Reynolds, RIII J. Andersen, RIII A. Barker, RIII DOCUMENT NAME: G:\SEC\Work in progress\LACBWR 2008 401 DNMS OUO-Cover Ltr.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII   RIII   RIII NAME EABonano:mb CALipa DATE 11/18/08 11/18/08 OFFICIAL RECORD COPY
Inspection Report 050-00409/2008-401(DNMS)  
 
cc w/encl: Dan Tesar, Security Manager  
 
cc w/o encl: W. L. Berg, General Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section WI Department of Health and Social Services, Division of Health  
 
DISTRIBUTION
: S. Wastler, NSIR/DSP/DDMS/MWISB P. Kelley, NSIR/DSP/DDMS/MWISB D. Riffle, NSIR/DSO/DDSO K. Banovac, FSME D. Persinko, FSME S. Reynolds, RIII  
 
J. Andersen, RIII A. Barker, RIII  
 
DOCUMENT NAME: G:\SEC\Work in progress\LACBWR 2008 401 DNMS OUO-Cover Ltr.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME EABonano:mb CALipa DATE 11/18/08 11/18/08 OFFICIAL RECORD COPY
}}
}}

Latest revision as of 12:02, 14 November 2019

IR 05000409-08-401, (Dnms), on 10/21/2008, for La Crosse Boiling Water Reactor (Cover Letter Only)
ML083231100
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/18/2008
From: Christine Lipa
NRC/RGN-III/DNMS/DB
To: Christians R
Dairyland Power Cooperative
References
IR-08-401
Download: ML083231100 (2)


Text

ber 18, 2008

SUBJECT:

LA CROSSE BOILING WATER REACTOR (LACBWR)

NRC SECURITY INSPECTION REPORT 050-00409/2008-401(DNMS)

Dear Mr. Christians:

On October 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the LACBWR Nuclear Power Station. The enclosed inspection report documents the inspection results, which were discussed at the conclusion of the on-site inspection on October 21, 2008, with Mr. Dan Tesar, Site Security Manager, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos. 05000409 License Nos. DPR-45 Enclosure:

Inspection Report 050-00409/2008-401(DNMS)

cc w/encl: Dan Tesar, Security Manager cc w/o encl: W. L. Berg, General Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section WI Department of Health and Social Services, Division of Health DISTRIBUTION:

S. Wastler, NSIR/DSP/DDMS/MWISB P. Kelley, NSIR/DSP/DDMS/MWISB D. Riffle, NSIR/DSO/DDSO K. Banovac, FSME D. Persinko, FSME S. Reynolds, RIII J. Andersen, RIII A. Barker, RIII DOCUMENT NAME: G:\SEC\Work in progress\LACBWR 2008 401 DNMS OUO-Cover Ltr.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME EABonano:mb CALipa DATE 11/18/08 11/18/08 OFFICIAL RECORD COPY