Line 2: |
Line 2: |
| | number = ML102070183 | | | number = ML102070183 |
| | issue date = 07/26/2010 | | | issue date = 07/26/2010 |
| | title = Waterford-2010-10-Draft Outline Comments | | | title = 2010-10-Draft Outline Comments |
| | author name = Apger G W | | | author name = Apger G |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = | | | addressee name = |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:DRAFT OUTLINE COMMENTS Facility: Waterford 3 First Exam Date: October 4, 2010 (OP) |
| | Written Exam Outline (7-13-10) |
| | Comment Resolution RO T2G1 KA reselected 1 System 062: Generic 2.2.17 is not in the list of KAs in ES-401 D.1.b. Reselect. |
| | RO T1G2 KA reselected 2 EAPE 076: Generic 2.1.14 is not in the list of KAs in ES-401 D.1.b. Reselect. |
| | SRO T2G2 KA reselected 3 System 076: Generic 2.4.22 is not in the list of KAs in ES-401 D.1.b. Reselect. |
| | Administrative JPM Outline (7-12-10) |
| | Comment Resolution Every exam has had an EP classification No action required. Note to facility only. |
| | 1 (back to 2006). Ensure this is unique when submitting the draft JPM. |
| | Control Room / In-Plant System JPM Outline (7-12-10) |
| | Comment Resolution 1 S1-Used on 2009 Exam (P) Comment only. No action required. |
| | 2 S4-Used on 2009 Exam (P) Comment only. No action required. |
| | 3 S6-Used on 2010 Re-take (P) Comment only. No action required. |
| | 4 P3-Modified from 2010 Retake JPM Comment only. No action required. |
| | Simulator Scenario Outline Comments (7-13-10) |
| | Comment Resolution A) Event 5 should be split out. The SEE MARKUP pdf file. |
| | component malfunction is a Comments incorporated separate event. |
| | Sc1 B) Events 8 and 9 are not events (component malfunctions). They are actions required by OBDI 202 - IOLE Process |
| | |
| | procedure for the 2nd major event. One is a critical task. The other annotates the wrong generator. |
| | C) Second critical task depends on break size. Need to maintain pressure above 945psig or this is no longer a CT. |
| | A) Post trip events are the same as Did not use this in 2009. |
| | scenario 2 on the 2009 exam as Scenario OK as is. |
| | well as the initial conditions. |
| | Swap out-of-service train and Sc2 faulted EDG. Change the starting power. |
| | B) Missing horizontal borders between events 2,3 and 4,5. |
| | A) Change this to start at the critical LOW POWER MODE 3 hold (1E-8 [Westinghouse Events changed and comments incorporated parlance]), and require rods to be bumped out to establish SUR and bring Rx to POAH; then hold Sc3 at Mode 2 power. |
| | B) Once there, fail a steam dump, TDAFWP or something to give a positive reactivity excursion, requiring action to prevent transition to Mode 1. |
| | A) Can we let the condition in event Comments incorporated 5 degrade until tripping the pump is required? After SPTA has been entered, initiate event 6. |
| | Sc4 B) Horizontal borders missing. |
| | C) Remove Spare from Op-test number. We dont know the spare until after validation. OBDI 202 - IOLE Process}} |
Latest revision as of 15:40, 13 November 2019
|
---|
Category:License-Operator
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20294A1372020-08-26026 August 2020 08 Public Forms ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 2024-09-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20294A1372020-08-26026 August 2020 08 Public Forms IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15225A5222015-09-14014 September 2015 2015-09 Draft Written Exam and Revised Outlines 2024-09-03
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: Waterford 3 First Exam Date: October 4, 2010 (OP)
Written Exam Outline (7-13-10)
Comment Resolution RO T2G1 KA reselected 1 System 062: Generic 2.2.17 is not in the list of KAs in ES-401 D.1.b. Reselect.
RO T1G2 KA reselected 2 EAPE 076: Generic 2.1.14 is not in the list of KAs in ES-401 D.1.b. Reselect.
SRO T2G2 KA reselected 3 System 076: Generic 2.4.22 is not in the list of KAs in ES-401 D.1.b. Reselect.
Administrative JPM Outline (7-12-10)
Comment Resolution Every exam has had an EP classification No action required. Note to facility only.
1 (back to 2006). Ensure this is unique when submitting the draft JPM.
Control Room / In-Plant System JPM Outline (7-12-10)
Comment Resolution 1 S1-Used on 2009 Exam (P) Comment only. No action required.
2 S4-Used on 2009 Exam (P) Comment only. No action required.
3 S6-Used on 2010 Re-take (P) Comment only. No action required.
4 P3-Modified from 2010 Retake JPM Comment only. No action required.
Simulator Scenario Outline Comments (7-13-10)
Comment Resolution A) Event 5 should be split out. The SEE MARKUP pdf file.
component malfunction is a Comments incorporated separate event.
Sc1 B) Events 8 and 9 are not events (component malfunctions). They are actions required by OBDI 202 - IOLE Process
procedure for the 2nd major event. One is a critical task. The other annotates the wrong generator.
C) Second critical task depends on break size. Need to maintain pressure above 945psig or this is no longer a CT.
A) Post trip events are the same as Did not use this in 2009.
scenario 2 on the 2009 exam as Scenario OK as is.
well as the initial conditions.
Swap out-of-service train and Sc2 faulted EDG. Change the starting power.
B) Missing horizontal borders between events 2,3 and 4,5.
A) Change this to start at the critical LOW POWER MODE 3 hold (1E-8 [Westinghouse Events changed and comments incorporated parlance]), and require rods to be bumped out to establish SUR and bring Rx to POAH; then hold Sc3 at Mode 2 power.
B) Once there, fail a steam dump, TDAFWP or something to give a positive reactivity excursion, requiring action to prevent transition to Mode 1.
A) Can we let the condition in event Comments incorporated 5 degrade until tripping the pump is required? After SPTA has been entered, initiate event 6.
Sc4 B) Horizontal borders missing.
C) Remove Spare from Op-test number. We dont know the spare until after validation. OBDI 202 - IOLE Process