|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML103140700 | | | number = ML103140700 |
| | issue date = 11/10/2010 | | | issue date = 11/10/2010 |
| | title = 2010/11/10 Diablo Canyon Lr - Draft RAI Set 34 AMP | | | title = Lr - Draft RAI Set 34 AMP |
| | author name = | | | author name = |
| | author affiliation = NRC/NRR | | | author affiliation = NRC/NRR |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 DiabloCanyonNPEm Resource From: Ferrer, Nathaniel Sent: Wednesday, November 10, 2010 4:10 PM To: Grebel, Terence Cc: DiabloCanyonNPEm Resource | | {{#Wiki_filter:DiabloCanyonNPEm Resource From: Ferrer, Nathaniel Sent: Wednesday, November 10, 2010 4:10 PM To: Grebel, Terence Cc: DiabloCanyonNPEm Resource |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Draft RAI Set 34 AMP Attachments:Draft RAI Set 34 AMP follow-ups.docTerry, Attached is Draft RAI Set 34 containing draft RAIs, specifically on portions of aging management programs. Please review the attached draft RAIs and let me know if and when you would like to have a teleconference call. The purpose of the call will be to obtain clarification on the staff's request. | | Draft RAI Set 34 AMP Attachments: Draft RAI Set 34 AMP follow-ups.doc |
| | : Terry, Attached is Draft RAI Set 34 containing draft RAIs, specifically on portions of aging management programs. |
| | Please review the attached draft RAIs and let me know if and when you would like to have a teleconference call. The purpose of the call will be to obtain clarification on the staff's request. |
| | Please let me know if you have any questions. |
| | Nathaniel Ferrer Project Manager Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)4151045 1 |
|
| |
|
| Please let me know if you have any questions.
| | Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2169 Mail Envelope Properties (26E42474DB238C408C94990815A02F0913677F2D50) |
| | |
| NathanielFerrerProjectManagerDivisionofLicenseRenewalOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommission(301)415 1045 Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2169 Mail Envelope Properties (26E42474DB238C408C94990815A02F0913677F2D50)
| |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Draft RAI Set 34 AMP Sent Date: 11/10/2010 4:09:57 PM Received Date: 11/10/2010 4:10:00 PM From: Ferrer, Nathaniel Created By: Nathaniel.Ferrer@nrc.gov Recipients: "DiabloCanyonNPEm Resource" <DiabloCanyonNPEm.Resource@nrc.gov> | | Draft RAI Set 34 AMP Sent Date: 11/10/2010 4:09:57 PM Received Date: 11/10/2010 4:10:00 PM From: Ferrer, Nathaniel Created By: Nathaniel.Ferrer@nrc.gov Recipients: |
| Tracking Status: None "Grebel, Terence" <TLG1@pge.com> | | "DiabloCanyonNPEm Resource" <DiabloCanyonNPEm.Resource@nrc.gov> |
| Tracking Status: None Post Office: HQCLSTR01.nrc.gov | | Tracking Status: None "Grebel, Terence" <TLG1@pge.com> |
| | | Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 549 11/10/2010 4:10:00 PM Draft RAI Set 34 AMP follow-ups.doc 60922 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| Files Size Date & Time MESSAGE 549 11/10/2010 4:10:00 PM Draft RAI Set 34 AMP follow-ups.doc 60922 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: | | Recipients Received: |
| Diablo Canyon Nuclear Power Plant, Units 1 and 2 (DCPP) License Renewal Application (LRA) Draft Request for Additional Information Set 34 Aging Management Programs D-RAI B2.1.32-1 (follow-up)
| |
|
| |
|
| ===Background===
| | Diablo Canyon Nuclear Power Plant, Units 1 and 2 (DCPP) |
| : By letter dated September 30, 2010, the applicant responded to follow-up RAI B2.1.32-1 regarding the Structures Monitoring Program acceptance criteria. In the response, the applicant stated that prior to the period of extended operation, the acceptance criteria for concrete structural elements for safety-related structures will be revised to incorporate the quantitative
| | License Renewal Application (LRA) |
| | Draft Request for Additional Information Set 34 Aging Management Programs D-RAI B2.1.32-1 (follow-up) |
|
| |
|
| evaluation criteria provided in ACI 349.3R.
| | ==Background:== |
| Issue: The qualitative acceptance criteria should apply to all concrete elements within the scope of the Structures Monitoring Program; however, the applicant's response only addresses safety-related structures. In addition, the response makes no mention of conducting a baseline inspection with qualitative acceptance criteria. In order to properly monitor and trend structural degradation during the period of extended operation, a baseline inspection in accordance with ACI 349.3R acceptance criteria, must be completed prior to the period of extended operation.
| |
|
| |
|
| Request: 1) Update the acceptance criteria for all in-scope concrete elements or justify why it is not needed. 2) Provide plans and a schedule to conduct a baseline inspection in accordance with the ACI 349.3R acceptance criteria prior to the period of extended operation, or justify why a baseline inspection is not needed.}} | | By letter dated September 30, 2010, the applicant responded to follow-up RAI B2.1.32-1 regarding the Structures Monitoring Program acceptance criteria. In the response, the applicant stated that prior to the period of extended operation, the acceptance criteria for concrete structural elements for safety-related structures will be revised to incorporate the quantitative evaluation criteria provided in ACI 349.3R. |
| | Issue: |
| | The qualitative acceptance criteria should apply to all concrete elements within the scope of the Structures Monitoring Program; however, the applicants response only addresses safety-related structures. In addition, the response makes no mention of conducting a baseline inspection with qualitative acceptance criteria. In order to properly monitor and trend structural degradation during the period of extended operation, a baseline inspection in accordance with ACI 349.3R acceptance criteria, must be completed prior to the period of extended operation. |
| | Request: |
| | : 1) Update the acceptance criteria for all in-scope concrete elements or justify why it is not needed. |
| | : 2) Provide plans and a schedule to conduct a baseline inspection in accordance with the ACI 349.3R acceptance criteria prior to the period of extended operation, or justify why a baseline inspection is not needed.}} |
|
---|
Category:E-Mail
MONTHYEARML24285A1902024-10-0808 October 2024 Email - Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Environmental Assessment ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24250A0502024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML24291A1322024-09-0505 September 2024 E-mail to California Department of Public Health for Diablo Canyon ISFSI License Renewal Environmental Assessment ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24135A1562024-05-13013 May 2024 July 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML24060A0022024-02-28028 February 2024 (External Sender) Pre-Sub Mittal EWS Participants List E-mail ML24045A1972024-02-0606 February 2024 Tribal Consultation Request ML24033A3062024-02-0101 February 2024 Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension ML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mothers for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition 2024-09-06
[Table view] |
Text
DiabloCanyonNPEm Resource From: Ferrer, Nathaniel Sent: Wednesday, November 10, 2010 4:10 PM To: Grebel, Terence Cc: DiabloCanyonNPEm Resource
Subject:
Draft RAI Set 34 AMP Attachments: Draft RAI Set 34 AMP follow-ups.doc
- Terry, Attached is Draft RAI Set 34 containing draft RAIs, specifically on portions of aging management programs.
Please review the attached draft RAIs and let me know if and when you would like to have a teleconference call. The purpose of the call will be to obtain clarification on the staff's request.
Please let me know if you have any questions.
Nathaniel Ferrer Project Manager Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)4151045 1
Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2169 Mail Envelope Properties (26E42474DB238C408C94990815A02F0913677F2D50)
Subject:
Draft RAI Set 34 AMP Sent Date: 11/10/2010 4:09:57 PM Received Date: 11/10/2010 4:10:00 PM From: Ferrer, Nathaniel Created By: Nathaniel.Ferrer@nrc.gov Recipients:
"DiabloCanyonNPEm Resource" <DiabloCanyonNPEm.Resource@nrc.gov>
Tracking Status: None "Grebel, Terence" <TLG1@pge.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 549 11/10/2010 4:10:00 PM Draft RAI Set 34 AMP follow-ups.doc 60922 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Diablo Canyon Nuclear Power Plant, Units 1 and 2 (DCPP)
License Renewal Application (LRA)
Draft Request for Additional Information Set 34 Aging Management Programs D-RAI B2.1.32-1 (follow-up)
Background:
By letter dated September 30, 2010, the applicant responded to follow-up RAI B2.1.32-1 regarding the Structures Monitoring Program acceptance criteria. In the response, the applicant stated that prior to the period of extended operation, the acceptance criteria for concrete structural elements for safety-related structures will be revised to incorporate the quantitative evaluation criteria provided in ACI 349.3R.
Issue:
The qualitative acceptance criteria should apply to all concrete elements within the scope of the Structures Monitoring Program; however, the applicants response only addresses safety-related structures. In addition, the response makes no mention of conducting a baseline inspection with qualitative acceptance criteria. In order to properly monitor and trend structural degradation during the period of extended operation, a baseline inspection in accordance with ACI 349.3R acceptance criteria, must be completed prior to the period of extended operation.
Request:
- 1) Update the acceptance criteria for all in-scope concrete elements or justify why it is not needed.
- 2) Provide plans and a schedule to conduct a baseline inspection in accordance with the ACI 349.3R acceptance criteria prior to the period of extended operation, or justify why a baseline inspection is not needed.