Line 3: Line 3:
| issue date = 04/18/2011
| issue date = 04/18/2011
| title = from Ed Knutson to Mel Gray: FW Fitzpatrick Hardened Vent
| title = from Ed Knutson to Mel Gray: FW Fitzpatrick Hardened Vent
| author name = Knutson E C
| author name = Knutson E
| author affiliation = NRC/RGN-I/DRP/PB2
| author affiliation = NRC/RGN-I/DRP/PB2
| addressee name = Gray M K
| addressee name = Gray M
| addressee affiliation = NRC/RGN-I/DRP/PB4
| addressee affiliation = NRC/RGN-I/DRP/PB4
| docket = 05000333
| docket = 05000333
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Gray, Mel From: Knutson, Ed Sent: Monday, April 18, 2011 11:38 AM To: Gray, Mel  
{{#Wiki_filter:Gray, Mel From:                     Knutson, Ed Sent:                     Monday, April 18, 2011 11:38 AM To:                       Gray, Mel


==Subject:==
==Subject:==
FW: FitzPatrick Hardened Vent Attachments:
FW: FitzPatrick Hardened Vent Attachments:               Fitz Hardened Vent.pdf From: Knutson, Ed Sent: Thursday, March 17, 2011 1:47 PM To: Vaidya, Bhalchandra
Fitz Hardened Vent.pdf From: Knutson, Ed Sent: Thursday, March 17, 2011 1:47 PM To: Vaidya, Bhalchandra


==Subject:==
==Subject:==
FitzPatrick Hardened Vent Attached is from a 1995 inspection report concerning completion of the TI that looked at hardened vents.
FitzPatrick Hardened Vent Attached is from a 1995 inspection report concerning completion of the TI that looked at hardened vents.
UNITED STATES NUCLEAR REGULATORY COMMISStON REGION I~~ 475 ALLEN DALE ROAD KING OF PRUSSIA, PENNSYLVANIA 1W4(1.1415
 
'April 18,. 1995 Mr. Harry P., Salmon, Jr.Resi'dent, Manager New YorkPower Authority James A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, New York 13093  
UNITED STATES NUCLEAR REGULATORY COMMISStON REGION I
          ~~                         475 ALLEN DALE ROAD KING OF PRUSSIA, PENNSYLVANIA 1W4(1.1415
                                                  'April 18,. 1995 Mr. Harry P., Salmon, Jr.
Resi'dent, Manager New YorkPower Authority James A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, New York 13093


==SUBJECT:==
==SUBJECT:==
.
.       NOTIC'E OF VIOLATION (NRC REGION I INSPECTION NO. 50-333/95-06)
NOTIC'E OF VIOLATION (NRC REGION I INSPECTION NO. 50-333/95-06)


==Dear,==
==Dear,==
Mr., Salmoný.This refe~rs to -the results of, the routi'ne resident safety inspection conducted byjMessrs.
Mr., Salmoný.
W.. C.o.ok and R. Fernandes from February 12, 1995 to March 25, 1995 at, the- ýJame's ,A. FitzPatrick Nuclear Power Plant, Scriba, New York. A summary of the inspiec ,tion findings was presented to you and members of your staff at ,an exit .-meeting on April 1?, 1995.Thisinspectioon was directed toward areas important to public health' and safety.. eas examined during the inspection are described in the NRC Region I inspection report, whichi is enclosed with this letter. Within these areas, the inspectioneconsisted of observation of activities, interviews with personneluand document reviews.Performance by the plant staff during this inspection period was mixed.NYPA's deliberate and cautious approach to verifying the extent of fuel assembly debris and potential fuel pin damage demonstrated a safety consc'ious philosophy.
This refe~rs to -the results of, the routi'ne resident safety inspection conducted byjMessrs. W..C.o.ok and R. Fernandes from February 12, 1995 to March 25, 1995 at, the-ýJame's ,A.FitzPatrick Nuclear Power Plant, Scriba, New York. A summary of the inspiec,tion findings was presented to you and members of your staff at
On the other hand, a number of personnel performance errors that involved radiation protection requirements and surveillance testing procedural noncompliances indicated carelessness by members of your staff for ,administrative controls.
,an exit .-meeting on April 1?, 1995.
Several examples of procedural noncompliance were citediand are discussed in detail in the enclosed report. We note that these, events occurred during 'your 1994-95' refuel outage and that NYPA has expe~rienced similar performance declines during previous planned outages.Your continued strong management attention is warranted.
Thisinspectioon was directed toward areas important to public health' and safety..     eas examined during the inspection are described in the NRC Region I inspection report, whichi     is enclosed with this letter. Within these areas, the inspectioneconsisted of observation of activities, interviews with personneluand document reviews.
You are required to respond to this letter and, should' follow the instructions specified in the enclosed Notice of Violation (Notice) when preparing your response.
Performance by the plant staff during this inspection period was mixed.
In your response, you s*iould document the specific actions taken and any additi'onal actions you plan to prevent recurrence.
NYPA's deliberate and cautious approach to verifying the extent of fuel assembly debris and potential fuel pin damage demonstrated a safety consc'ious philosophy. On the other hand, a number of personnel performance errors that involved radiation protection requirements and surveillance testing procedural noncompliances indicated carelessness by members of your staff for
After reviewing ,Your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC e~nforcement-action is necessary to ensure compliance with NRC regulatory requiremen ts,.In'acco~rd'ance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will' beplaced in the NRC Public Document Room.Theresponhse directed by this, letter and the enclosed Notice are not subject"to the clearance procedures of the Office of Management and Budget 'as required by .the Paperwork Reduction Act of '1980, Pub. L. No. 96.511.
,administrative controls. Several examples of procedural noncompliance were citediand are discussed in detail in the enclosed report. We note that these, events occurred during 'your 1994-95' refuel outage and that NYPA has expe~rienced similar performance declines during previous planned outages.
10 0 Two component hangers on the. A emepgency firl ter;7 train were6 not reflected' on plaant drawin"gs ,and pare .a different design. than those similarly:
Your continued strong management attention is warranted.
depicted on '-the drawings.;
You are required to respond to this letter and, should' follow the instructions specified in the enclosed Notice of Violation (Notice) when preparing your response. In your response, you s*iould document the specific actions taken and any additi'onal actions you plan to prevent recurrence. After reviewing
Thetiiensee iniftiated drawing chaniges tJo, reflect the supports and prdvided the inspector with calculations , to.,demonstrate the structural integrity of system supports,.::
,Your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC e~nforcement-action is necessary to ensure compliance with NRC regulatory requiremen ts,.
The inspector reviewed the c aicUlationsiand hadno 6further questions.
In'acco~rd'ance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will' beplaced in the NRC Public Document Room.
* Two AODs, 701OD-114 and '70MOD-113, were disconnected and lock wired in the cl osed and, open position, respec tively. The inspector' subsequently l earned that the configuration Iwas the result of. a temporary modi~fication (No.ý 93-152) pu-t into. place, to :addre~ss si~ngle fali~l~u reýconcerns previouslyy Identified, by, the licensee,.
Theresponhse directed by this, letter and the enclosed Notice are not'assubject required "tothe clearance procedures of the Office of Management and Budget by .the Paperwork Reduction Act of '1980, Pub.           L. No. 96.511.
The temporary modification placed the modulating .dampers' in failY-safei positions, to ,ensure that the control !room I.s provided a' maximum ýsupply of, fresh airf and to ensure positi~ve  
 
ýcontrol room air pressure,,,:duri'ngg emebrgencqdfty conditions.
10 0       Two plaant component   hangers on the. A emepgency firl ter;7 train were6 not reflected' on         drawin"gs ,and pare .a different design. than those similarly:
The inspector also learned a... minor modihficationi , wa jin, prgestocnetthis tlelmporar modification, into a perna'nent-syttem-moodif ic-a tion.The inpctor reviewe"'d, the mi nor modi f ,ictioakg n had no further' quedstions...
depicted on'-the drawings.; Thetiiensee iniftiated drawing chaniges tJo, reflect the supports and prdvided the inspector with calculations , to.
41 As. part of the system. wa1kdown "the e :to : te NYPA staff that ,two MODs, and' M0"-114, and flow element FE'-102 were omited frmis-bu~ilt drawing FB-3-5C, Re-v. 12, Equipment Room Heating, Vent and Air Conditioning.
        ,demonstrate the structural integrity of filt*er system supports,.:: The inspector reviewed the c aicUlationsiand hadno6further questions.
However, the inspector noted that the tcomponents were identified on the control room flow diagram FB-45A and Identified in the FSAR. The inspector was concerned that despite a temporary modification and a minobr modification being processed for two safety-,related components,, this deficiency in the as-built drawin~g ws,,-not Identified by the, NYPA staff. The.:insipector identified his to NYPA. ' NYPAP's' evaluation  
* Two AODs, 701OD-114 and '70MOD-113, were disconnected and lock wired in the cl osed and, open position, respec tively. The inspector' subsequently learned that the configuration Iwas the result of. a temporary modi~fication (No.ý 93-152) pu-t into. place, to :addre~ss si~ngle fali~l~ureý concerns previouslyy Identified, by, the licensee,. The temporary modification placed the modulating .dampers' in failY-safei positions, to
:was inotf:compliete' at the end, o6f. theý period.The issue will remaini unresolved pendinig  
          ,ensure that the control !room I.s provided a'maximum ýsupply of, fresh airf and to ensure positi~ve ýcontrol room air pressure,,,:duri'ngg emebrgencqdfty conditions. The inspector also learned tha*t a... minor modihficationi ,wa jin, prgestocnetthis tlelmporar modification, into a perna'nent-syttem-moodific-a tion.The inpctor reviewe"'d, the mi nor modi f ,ictioakg n had no further' quedstions...
!of NYPA 'eval uation and subsequent NRC rfeview. (RF WG643) /-The. inspector-s cdonclluded: -that the: control room :emergency.
41       As. part of the system. wa1kdown "the inspectorid*entfied              :toe :NYPA te staff that ,two MODs, MOD*,113, and' M0"-114, and flow element FE'-102 were omited frmis-bu~ilt drawing FB-3-5C, Re-v. 12, Equipment Room Heating, Vent and Air Conditioning. However, the inspector noted that the tcomponents were identified on the control room flow diagram FB-45A and Identified in the FSAR. The inspector was concerned that despite a temporary modification and a minobr modification being processed for two safety-,related components,, this deficiency in the as-built drawin~g ws,,-
ventilatiton!, system was ope-rable,.
not Identified by the, NYPA staff. The.:insipector identified his *concerns to NYPA. ' NYPAP's' evaluation :was inotf:compliete' at the end, o6f. theý period.
and': with the.
The issue will remaini unresolved pendinig compl*etion !of NYPA 'evaluation and subsequent NRC rfeview. (RF WG643) /-
bf the observations noted abovehad, no6 further qetos 4.3' TI 2515/121 Verification of Mark IHardenedtVent Modificaions As part of a comprehensive plan for closiniigL:
The. inspector-s cdonclluded: -that the: control room :emergency. ventilatiton!, system was ope-rable,. and': with the. e*xceptxihon bf the observations noted abovehad, no6 further qetos 4.3'     TI 2515/121       Verification of Mark IHardenedtVent Modificaions As part of a comprehensive plan for closiniigL: severe accident   i     issuesi, the NRC
severe accident i issuesi, the NRC.staff undertook a program to determine if any actions should be taken, on a generi c basis, to reduce the vul nerabilI ty, of BWR' Mark I containments .to:severe accideht challenges.
.staff undertook a program to determine if any actions should be taken, on a generi c basis, to reduce the vul nerabilI ty, of BWR' Mark I containments .to
At the conclusion of the Mark I Containment Performance Improvement Program, the. staff identified a number of plant.-Mod ifi cat ions Ithat would substantiially,,, enhance the pl ants' capabil ity t bboth prevent! and mitigate the conseque'nce I s of severe accidents.
:severe accideht challenges. At the conclusion of the Mark I Containment Performance Improvement Program, the. staff identified a number of plant.
R icommended
-Mod ifi cat ions Ithat would substantiially,,, enhance the pl ants' capabil ity t bboth prevent! and mitigate the conseque'nce Is of severe accidents. icommendedR
'improvements, included imprved hardened" etwe-0 vent capabilitj!.y:.
'improvements, included imprved hardened" etwe-0 vent capabilitj!.y:. On Septembe0r" 1',19809,, Ithe? NRC: i'ss~ue'dGeneric Ldetter (-GL) 89-1l6,, "Installatin o
On Septembe0r" 1', 19809,, Ithe? NRC: i'ss~ue'dGeneric Ldetter (-GL) 89-1l6,, "Installatin o.a Hardened Wetwell Vent ," r,,equesting liten'see~s wi.th MNark- I ctinai~nments "to-, cons~ider instal ation of' hardened, wetwei i vent systemsunder the provisi,ons of 10* CFR 50.59. Using guidance provided in Temporaryiinnstction  
.aHardened Wetwell Vent ,"r,,equesting liten'see~s wi.th MNark- I ctinai~nments "to-,
('I)2515/,"Vrfcato of~ Mark& I Hardened 'ent. Modfctos.G  
cons~ider instal ation of' hardened, wetwei i vent systemsunder the provisi,ons of 10* CFR 50.59.     Using guidance provided in Temporaryiinnstction ('I)2515/,
: 91) the.flRC'  
      "Vrfcato     of~ Mark& I Hardened 'ent. Modfctos.G 91) the.flRC' ~is in
~is in al the process of ,conduct ing inspections ,to verify iicensees" impl ementationof commitments made in response to, GL 89-16. , Byltes a7 ctbr2, 18,,and July 2u5, 1990, NYPA not fified:the  
 
ýýNRC, staff ,that it' would defer it s decision on harden ed wetwel 1 vent i on until the Fitzpatrick Indiv'idual Plant, Examinati:n (IP'E) as completed.
al the process of ,conduct ing inspections ,to verify iicensees" impl ementationof commitments made in response to, GL 89-16.                     ,
The NRC reviewed the information provided 4n tihose letters and also, inspected the,-existing wetwell vent path at, FitzPatricL,..
a7 Byltes       ctbr2, 18,,and July 2u5, 1990, NYPA not fified:the ýýNRC, itn*Stalal    i on staff ,that it' would defer its decision on harden ed wetwel 1asvent                completed.        The until the Fitzpatrick Indiv'idual           Plant, Examinati:n     (IP'E)
As a result -o f these activiti~es, the, NRC identified weaknesses:
NRC reviewed the information provided 4n tihose letters and also, inspected the,-
in procedures and operations trai;ning al'Sdo, determined that all Boil ing, Water Reactor Owners Group (,BWRO) Fy crifteri a were not met by the licensee's current design. However, because the design was expected to achieVe the desired reduction in coe damage frequency, the NRC approved NYPA's request toi defer its decision 'o Ifully implement the BWROGýhardened vent general destgn criteria until completion of their IE. This aproa adIntal safety- eval uati on, is documented in an NRC letter dat~d January. 24,1 1991.The January 19911 letter talo approved the dferai of improvemets in Ioperator tranin ad po'dus u Il IPE comlto .After the~ FitzPatr'ick,'
existing wetwell vent path at, FitzPatricL,.. As a result -o                 f these activiti~es, the, NRC identified       weaknesses:   in procedures   and   operations     trai;ning *and al'Sdo, determined that all Boil ing, Water Reactor Owners Group (,BWRO) crifteri a wereFy not met by the licensee's current design. However, because the design was expected to achieVe the desired reduction in coe damage frequency,                             the NRC approved NYPA's request toi defer its decision               'o Ifully     implement     the     BWROGý hardened vent general destgn criteria until               completion       of their IE.         This aproaadIntal safety- eval uati on, is documented in an NRC letter dat~d January. 24,1 1991.
WEl` was completed, the NRC eed the ýchang t6o the and pr6o6edures  
The January 19911 lettertalo          approved the dferai of improvemets inIoperator ad po'dus u tranin                        IlIPE comlto         .After the~FitzPatr'ick,'WEl` was
: propoqsed' by the l-icnse Th subseqen NRC s~afetyhts  
                              *rev. eed the
`6h NIf evaluation, of t"he Vent-related proced6res and propqosed wag trns mitted by NRC' ltte'r April 27, 1992.In a September.280, 1992 le tter, the NRCdetermined that the current ve' path fet the, intent of the BW'IaROG design criteria,,, based on additionalt infor.ati'oh provided, by, NYPA and results of the previous NRC inspection' of thee vent path.Thits letter forwvarded the NRC staff',s safety evaluation for the harde~ned vent.n, -addition, the NCfound that the plant ,Procedures and training Wver~e adeq~ua'te toprovide'-the"Information and g.Ujdanqce necessary for ope~rators to.effectively  
                          ýchang                       t6o the tra*ining and pr6o6edures                 :
'use. the 'FitzPatric~k, hardened.
completed, the NRC propoqsed' by the l-icnse         Th subseqen `6h NIfNRC s~afetyhts evaluation, of t"he Vent-related proced6res and propqosed *r.Aining wag trnsmitted by NRC' ltte'r Ja,*ed April 27, 1992.
wtwe~ll- vent.The, inspector reviewed the referenced reports: and determi-ned ithat all T appl icabl.e portiidons of TI -2501,1121 for, the hardened vent at rt zPa trihk have been effectively addrietsd.
In a September.280, 1992 le tter, the NRCdetermined that the current ve' path fet the, intent of the BW'IaROG design criteria,,, based on additionalt                 infor.ati'oh provided, by, NYPA and results of the previous NRC inspection'                   of thee vent path.
The FitzPatrick wetwell 'vent, met, th:e intent of the NRC approved BWROG cy'Qpeati Procd....were avalbet direct, the ini t iat ion -nd, termnat ion of vent ing,, ':oppe~rator training on the was ýacceptable, and operators were found to beý " .knowledgeable of-the design and funct iion. .of, t heý system. TI 2515/121 is closed.4;4 Previously 1ýIdentofi:d Iýtems S dd..U.. ...rol v.I1tem.(92-14-01): -Rel a Room. CO System Testing As noted in inspection report, 0-3331/95-02', Section 4.C;2_.1,, NY0A, conducted, special' test procedure, STP-76AU, Relay Room Enclosure i-ntegrity T:estf,-, to! ..cq lect data "for an' engi neering anal ysiis perfOre' In li ieu ofa full discharge test of the relay room CO 2 fire suppression system. The engineering analys"'is was performed.
Thits letter forwvarded the NRC         staff',s safety   evaluation     for   the harde~ned vent.
for WYPA: by Yankee Engineerinhg Seryvices via a February 1995~EngineePrilng ,Report to, NYPA and captured under a memorandum (JAF-RPT-FPS-02009o).
n,-addition, the NCfound         that   the plant   ,Procedures     and   training     Wver~e adeq~ua'te toprovide'-the"Information           and g.Ujdanqce   necessary     for ope~rators       to.
teda ted:March 2, "1995. Based, uponl satisfactory completion of th i s eng ng}}
effectively 'use.the 'FitzPatric~k,hardened. wtwe~ll- vent.
The, inspector reviewed the referenced reports: and determi-ned ithat allT appl icabl.e portiidons of TI -2501,1121 for, the hardened vent at 'vent,                    rt zPa trihk     have been effectively       addrietsd. The FitzPatrick       6hard*end      wetwell             met, th:e cy'Qpeati           Procd....
intent of the NRC approved BWROG guideJpqs.*H.
were avalbet            direct, the ini tiat ion -nd,termnat ion of vent ing,, ':oppe~rator training on the sys*temý was ýacceptable, and operators were found to beý is knowledgeable of-the design and funct iion..of, t heý system. TI 2515/121 closed.
4;4     Previously 1ýIdentofi:d Iýtems S     dd..U.....rol v.I1tem.(92-14-01): -Rel a Room. CO System Testing As noted in inspection report, 0-3331/95-02',             Section 4.C;2_.1,, NY0A, conducted,     to! ..
STP-76AU,   Relay   Room   Enclosure i-ntegrity T:estf,-,
special' test procedure,                                                                        discharge cq lect data "for an' engi neering anal ysiis perfOre' In li ieu ofa full analys"'is test of the relay room CO2        fire   suppression     system.     The   engineering February 1995~
was performed. for WYPA: by Yankee Engineerinhg Seryvices via a(JAF-RPT-FPS-02009o).
EngineePrilng ,Report to, NYPA and captured under a memorandum ted:March 2, teda          "1995. Based, uponl satisfactory completion of th i s eng ineer*i ng}}

Latest revision as of 09:03, 6 February 2020

from Ed Knutson to Mel Gray: FW Fitzpatrick Hardened Vent
ML13017A358
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/18/2011
From: Knutson E
Reactor Projects Branch 2
To: Mel Gray
Reactor Projects Region 1 Branch 4
References
FOIA/PA-2013-0010, IR-95-006
Download: ML13017A358 (4)


Text

Gray, Mel From: Knutson, Ed Sent: Monday, April 18, 2011 11:38 AM To: Gray, Mel

Subject:

FW: FitzPatrick Hardened Vent Attachments: Fitz Hardened Vent.pdf From: Knutson, Ed Sent: Thursday, March 17, 2011 1:47 PM To: Vaidya, Bhalchandra

Subject:

FitzPatrick Hardened Vent Attached is from a 1995 inspection report concerning completion of the TI that looked at hardened vents.

UNITED STATES NUCLEAR REGULATORY COMMISStON REGION I

~~ 475 ALLEN DALE ROAD KING OF PRUSSIA, PENNSYLVANIA 1W4(1.1415

'April 18,. 1995 Mr. Harry P., Salmon, Jr.

Resi'dent, Manager New YorkPower Authority James A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, New York 13093

SUBJECT:

. NOTIC'E OF VIOLATION (NRC REGION I INSPECTION NO. 50-333/95-06)

Dear,

Mr., Salmoný.

This refe~rs to -the results of, the routi'ne resident safety inspection conducted byjMessrs. W..C.o.ok and R. Fernandes from February 12, 1995 to March 25, 1995 at, the-ýJame's ,A.FitzPatrick Nuclear Power Plant, Scriba, New York. A summary of the inspiec,tion findings was presented to you and members of your staff at

,an exit .-meeting on April 1?, 1995.

Thisinspectioon was directed toward areas important to public health' and safety.. eas examined during the inspection are described in the NRC Region I inspection report, whichi is enclosed with this letter. Within these areas, the inspectioneconsisted of observation of activities, interviews with personneluand document reviews.

Performance by the plant staff during this inspection period was mixed.

NYPA's deliberate and cautious approach to verifying the extent of fuel assembly debris and potential fuel pin damage demonstrated a safety consc'ious philosophy. On the other hand, a number of personnel performance errors that involved radiation protection requirements and surveillance testing procedural noncompliances indicated carelessness by members of your staff for

,administrative controls. Several examples of procedural noncompliance were citediand are discussed in detail in the enclosed report. We note that these, events occurred during 'your 1994-95' refuel outage and that NYPA has expe~rienced similar performance declines during previous planned outages.

Your continued strong management attention is warranted.

You are required to respond to this letter and, should' follow the instructions specified in the enclosed Notice of Violation (Notice) when preparing your response. In your response, you s*iould document the specific actions taken and any additi'onal actions you plan to prevent recurrence. After reviewing

,Your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC e~nforcement-action is necessary to ensure compliance with NRC regulatory requiremen ts,.

In'acco~rd'ance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will' beplaced in the NRC Public Document Room.

Theresponhse directed by this, letter and the enclosed Notice are not'assubject required "tothe clearance procedures of the Office of Management and Budget by .the Paperwork Reduction Act of '1980, Pub. L. No. 96.511.

10 0 Two plaant component hangers on the. A emepgency firl ter;7 train were6 not reflected' on drawin"gs ,and pare .a different design. than those similarly:

depicted on'-the drawings.; Thetiiensee iniftiated drawing chaniges tJo, reflect the supports and prdvided the inspector with calculations , to.

,demonstrate the structural integrity of filt*er system supports,.:: The inspector reviewed the c aicUlationsiand hadno6further questions.

  • Two AODs, 701OD-114 and '70MOD-113, were disconnected and lock wired in the cl osed and, open position, respec tively. The inspector' subsequently learned that the configuration Iwas the result of. a temporary modi~fication (No.ý93-152) pu-t into. place, to :addre~ss si~ngle fali~l~ureý concerns previouslyy Identified, by, the licensee,. The temporary modification placed the modulating .dampers' in failY-safei positions, to

,ensure that the control !room I.s provided a'maximum ýsupply of, fresh airf and to ensure positi~ve ýcontrol room air pressure,,,:duri'ngg emebrgencqdfty conditions. The inspector also learned tha*t a... minor modihficationi ,wa jin, prgestocnetthis tlelmporar modification, into a perna'nent-syttem-moodific-a tion.The inpctor reviewe"'d, the mi nor modi f ,ictioakg n had no further' quedstions...

41 As. part of the system. wa1kdown "the inspectorid*entfied :toe :NYPA te staff that ,two MODs, MOD*,113, and' M0"-114, and flow element FE'-102 were omited frmis-bu~ilt drawing FB-3-5C, Re-v. 12, Equipment Room Heating, Vent and Air Conditioning. However, the inspector noted that the tcomponents were identified on the control room flow diagram FB-45A and Identified in the FSAR. The inspector was concerned that despite a temporary modification and a minobr modification being processed for two safety-,related components,, this deficiency in the as-built drawin~g ws,,-

not Identified by the, NYPA staff. The.:insipector identified his *concerns to NYPA. ' NYPAP's' evaluation :was inotf:compliete' at the end, o6f. theý period.

The issue will remaini unresolved pendinig compl*etion !of NYPA 'evaluation and subsequent NRC rfeview. (RF WG643) /-

The. inspector-s cdonclluded: -that the: control room :emergency. ventilatiton!, system was ope-rable,. and': with the. e*xceptxihon bf the observations noted abovehad, no6 further qetos 4.3' TI 2515/121 Verification of Mark IHardenedtVent Modificaions As part of a comprehensive plan for closiniigL: severe accident i issuesi, the NRC

.staff undertook a program to determine if any actions should be taken, on a generi c basis, to reduce the vul nerabilI ty, of BWR' Mark I containments .to

severe accideht challenges. At the conclusion of the Mark I Containment Performance Improvement Program, the. staff identified a number of plant.

-Mod ifi cat ions Ithat would substantiially,,, enhance the pl ants' capabil ity t bboth prevent! and mitigate the conseque'nce Is of severe accidents. icommendedR

'improvements, included imprved hardened" etwe-0 vent capabilitj!.y:. On Septembe0r" 1',19809,, Ithe? NRC: i'ss~ue'dGeneric Ldetter (-GL) 89-1l6,, "Installatin o

.aHardened Wetwell Vent ,"r,,equesting liten'see~s wi.th MNark- I ctinai~nments "to-,

cons~ider instal ation of' hardened, wetwei i vent systemsunder the provisi,ons of 10* CFR 50.59. Using guidance provided in Temporaryiinnstction ('I)2515/,

"Vrfcato of~ Mark& I Hardened 'ent. Modfctos.G 91) the.flRC' ~is in

al the process of ,conduct ing inspections ,to verify iicensees" impl ementationof commitments made in response to, GL 89-16. ,

a7 Byltes ctbr2, 18,,and July 2u5, 1990, NYPA not fified:the ýýNRC, itn*Stalal i on staff ,that it' would defer its decision on harden ed wetwel 1asvent completed. The until the Fitzpatrick Indiv'idual Plant, Examinati:n (IP'E)

NRC reviewed the information provided 4n tihose letters and also, inspected the,-

existing wetwell vent path at, FitzPatricL,.. As a result -o f these activiti~es, the, NRC identified weaknesses: in procedures and operations trai;ning *and al'Sdo, determined that all Boil ing, Water Reactor Owners Group (,BWRO) crifteri a wereFy not met by the licensee's current design. However, because the design was expected to achieVe the desired reduction in coe damage frequency, the NRC approved NYPA's request toi defer its decision 'o Ifully implement the BWROGý hardened vent general destgn criteria until completion of their IE. This aproaadIntal safety- eval uati on, is documented in an NRC letter dat~d January. 24,1 1991.

The January 19911 lettertalo approved the dferai of improvemets inIoperator ad po'dus u tranin IlIPE comlto .After the~FitzPatr'ick,'WEl` was

  • rev. eed the

ýchang t6o the tra*ining and pr6o6edures  :

completed, the NRC propoqsed' by the l-icnse Th subseqen `6h NIfNRC s~afetyhts evaluation, of t"he Vent-related proced6res and propqosed *r.Aining wag trnsmitted by NRC' ltte'r Ja,*ed April 27, 1992.

In a September.280, 1992 le tter, the NRCdetermined that the current ve' path fet the, intent of the BW'IaROG design criteria,,, based on additionalt infor.ati'oh provided, by, NYPA and results of the previous NRC inspection' of thee vent path.

Thits letter forwvarded the NRC staff',s safety evaluation for the harde~ned vent.

n,-addition, the NCfound that the plant ,Procedures and training Wver~e adeq~ua'te toprovide'-the"Information and g.Ujdanqce necessary for ope~rators to.

effectively 'use.the 'FitzPatric~k,hardened. wtwe~ll- vent.

The, inspector reviewed the referenced reports: and determi-ned ithat allT appl icabl.e portiidons of TI -2501,1121 for, the hardened vent at 'vent, rt zPa trihk have been effectively addrietsd. The FitzPatrick 6hard*end wetwell met, th:e cy'Qpeati Procd....

intent of the NRC approved BWROG guideJpqs.*H.

were avalbet direct, the ini tiat ion -nd,termnat ion of vent ing,, ':oppe~rator training on the sys*temý was ýacceptable, and operators were found to beý is knowledgeable of-the design and funct iion..of, t heý system. TI 2515/121 closed.

4;4 Previously 1ýIdentofi:d Iýtems S dd..U.....rol v.I1tem.(92-14-01): -Rel a Room. CO System Testing As noted in inspection report, 0-3331/95-02', Section 4.C;2_.1,, NY0A, conducted, to! ..

STP-76AU, Relay Room Enclosure i-ntegrity T:estf,-,

special' test procedure, discharge cq lect data "for an' engi neering anal ysiis perfOre' In li ieu ofa full analys"'is test of the relay room CO2 fire suppression system. The engineering February 1995~

was performed. for WYPA: by Yankee Engineerinhg Seryvices via a(JAF-RPT-FPS-02009o).

EngineePrilng ,Report to, NYPA and captured under a memorandum ted:March 2, teda "1995. Based, uponl satisfactory completion of th i s eng ineer*i ng