ML17037C660: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML17037C660
| number = ML17037C660
| issue date = 02/06/2017
| issue date = 02/06/2017
| title = Nine Mile Point, Unit 2 - Figure 5.4-3; Steam Concentration Following a LOCA with CAD Operation
| title = Figure 5.4-3; Steam Concentration Following a LOCA with CAD Operation
| author name =  
| author name =  
| author affiliation = Niagara Mohawk Power Corp
| author affiliation = Niagara Mohawk Power Corp
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:14 l2 IO I-IJJ I Z 0 IJI (3 O Z o IO 20 30 40 50 TIME-DAYS 60 70 80 90 100 FIG.5.4-3 STEAM CONCENTRATION FOLLOWING A LOCA WITH CAD OPERATION NINE MILE POINT NUCLEAR STATION-UNIT 2 NIAGARA MOHAWK POWER CORPORATION PRELIMINARY SAFETY ANALYSIS REPORT}}
{{#Wiki_filter:14 l2 IO I-IJJ I
Z 0
IJI (3
Z oO IO 20 30 40     50   60 70         80       90       100 TIME-DAYS FIG. 5.4-3 STEAM CONCENTRATION FOLLOWING A LOCA WITH CAD OPERATION NINE MILE POINT NUCLEAR STATION-UNIT 2 NIAGARA MOHAWK POWER CORPORATION PRELIMINARY SAFETY ANALYSIS REPORT}}

Latest revision as of 08:57, 30 October 2019

Figure 5.4-3; Steam Concentration Following a LOCA with CAD Operation
ML17037C660
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/06/2017
From:
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML17037C660 (1)


Text

14 l2 IO I-IJJ I

Z 0

IJI (3

Z oO IO 20 30 40 50 60 70 80 90 100 TIME-DAYS FIG. 5.4-3 STEAM CONCENTRATION FOLLOWING A LOCA WITH CAD OPERATION NINE MILE POINT NUCLEAR STATION-UNIT 2 NIAGARA MOHAWK POWER CORPORATION PRELIMINARY SAFETY ANALYSIS REPORT