ML17037A689
| ML17037A689 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 02/06/2017 |
| From: | Niagara Mohawk Power Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037A689 (1) | |
Text
LP RHR LOOP LEVEL PUMP CORE SPRAY LOOP lEVEL PUMP b
RHR HEAT EXCHANGER
/
FL DR SUMP l PUMP RHR INST. RACK LP CORE SPRAY INSTR RACK RHR HEAT EXCI '1NG R
STANDBY GAS TREATMENT ELEC DUCT~
R R TRACK RHR HEAT EXCHANGER I
ELEC DUCT RCIC TURBlflE DRIVE PUMP RCIC INST RACK SUMPR RCIC CNDS PUMP RCIC VAC PUMP ELEC DUCT L DR SUMP &
PUMP RCIC BAROMETRIC CNDS 5 VAC TANKS DRYWELL EQUIP DRAIN
- PUMPSp, RCIC LOOP LEVEL PUMP Pi MP 4&b LP COFIE 5PRAY PIMP DRYWELL EOUP DR CCCLER CRYWELL EQUIP DR REC STY BKCF)
)DRYWELL FL
-TEMP OR REC I SLAP DW FL DR PP 7)
~P ELEC DUCT ELEC DINT CLOSED LOOP COOLING WATER HEAT EXCHANGBts FLCOR DR SUMP & PUMP CRD PUMPS D2 ZI ELEV ELEC IRKT SUMP
ELEC DUCT
&sit&SF YMCC RECIRC PUMP INST RACK MN STM INST RACN ECIRC SYS iNST RMH REQRC SYS INST Rf&FB
~SUPPR HAMBER ACCE55 IPE I.H SUPPR CHAMBER AC Ess FFIEIGHT CAR HOIST SPACE AF ELEC DUCT
>2 2t ELEC DUCT DRIVE MECHANISM FOR NEUTRON MONITORING SYS MCC SEAL PIPE TUNNEL Stffts ELEC O)CT ELEC PENETRATIONS PIPE I
HASE ELEC DUCT ELEC PENETRATIONS RECIRC PUMP LTYP)
DRYWEb& FL LADDER)
PIPE 5
CHASE ftHR HEAT EXCHANGER 9
U2 EQUIP DR SUM'&PUMP RHR HEAT EXCHANGER FLDR suM' PUMP PLAN 3-3 RHR INST RACK HP CORE SPRAY INSTR RACK LPCILOOP LEVEL PUMP RHR LDOP LEVEL PUMP RHR HEAI EXCHAFGER PLAN 4-4 COND TRANSFER PUMPS PLAN 5-5 CRD ACCUM MDNITOR RACK ELEC DUCT AREA CRD MASTER CONTROL STATION AIR LOClt 10 TURBINE BLDG OPERATING FLOOR ELEC DUCT MCC CRO HlDRAULK NST RACK UISIS RV LEVEL& PRE&5
~+~~SAM IRM DRIVE ELEC DUC1 4 EN T I L A T ION E QUIP ME N T AIR LOCK MCC HE TING COOLING EQUIP MCC OUTSIDE APIR NTAKE EST TK ELEC DUCT STORAGE TANK STANDBY LIQUID CONTROI SYSTEM PUMPS PIPE t&NST HO I51 TUNNEL U 'D HIM t'.TYP) 8 TYP)
ELEC pPENETRAIIOHS
- f SPACE CRD LEVELX G R V LEVEL &PRESS INST RACK
~Y5-IHI IBBBBK IHbI REPAIR CRO STGRAGE ELEC DUCT
'ET PUMP INST RACK CRD ACCUM MONITOFI RACK PLAN 6-6 EL&V)
NYM&fcxst',
'LEC DUCT CRD HYDRAULK LADDER Q2 CRD REMOVAL HATCH ELEV ELEC IXXT REACTOR I
'3 RWCU SPACE /
PUMPS MC PLAN 7-7 CNDS TFLANSFE
]
j ELEC2J LADDER tO1ES I SCALE IS 2 GENERAL ARRGT REACTOR BLDG PLANS 1 EL1V FM-2COB 5 BSP3 INDICATES SHIELD WALL5 FIG. 12.1-1 GENERAL ARRANGEMENT REACTOR BUILDING-PLANS NINF MILE POINT NUCLEAR STATION-UNIT 2 NIAGARA MOHAWK POWER CORPORATION PRELIMINARY SAFETY ANALYSIS REPORT