Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22292A118 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 15, Figures | Feedwater Controller Failure |
ML22292A081 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9 | |
ML22292A102 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1 | Loop seal Post Accident Monitoring Hydrostatic GOTHIC |
ML22292A108 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 | Earthquake Turbine Missile |
ML22292A136 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5-1, at the Controls Main Control Room El. 306'-0 | |
ML22292A077 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 8, Figures | |
ML22292A066 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Figures | |
ML22292A127 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 14, Figures | |
ML22292A093 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 10, Figures | |
ML22292A089 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 5, Figures | |
ML22292A137 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 12, Figures | |
ML22292A110 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End | |
ML22292A117 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Figures | |
ML22292A130 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 17, Figures | |
ML22292A138 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 18, Figures | |
ML22292A109 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End | |
ML22292A101 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F | |
ML22292A063 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 7, Figures | |
ML22292A099 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e Thru End | |
ML22292A065 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 1, Figures | |
ML22292A092 | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 11, Figures | |
ML18018B320 | 18 January 2018 | Undersized Documents - Transformer 2MTX-XM1B - Oil Cooler Piping, Failed Windings, Tank Bulging, Preparation for Removal, HV Tap Changer, and Lv Leads and Bracing | |
ML18018B194 | 18 January 2018 | Undersized Documents, Drawings and Photographs | |
ML17037C725 | 6 February 2017 | Drawing; Figure 7.15-1, Rod Worth Minimizer Functional Control Diagram | |
ML17037C562 | 6 February 2017 | Plate 4-9 - Geologic Plan View of Fault Cooling Tower Piping Trench | |
ML17037B455 | 6 February 2017 | Drawing 12177-EE-1AR-3, 600V One Line Diagram 2EHS*MCC102 Auxiliary Building North - Nine Mile Point Nuclear Station - Unit 2. | |
ML17037A710 | 6 February 2017 | Figure 12.7-1a Radiation Zones - Reactor Building. | |
ML17037C660 | 6 February 2017 | Figure 5.4-3; Steam Concentration Following a LOCA with CAD Operation | |
ML17037C659 | 6 February 2017 | Figure 5.4-2; Hydrogen and Oxygen Concentration in Primary Containment Following a LOCA | |
ML17037C658 | 6 February 2017 | Figure 5.3-2; Stand-by Gas Treatment System | |
ML17037C569 | 6 February 2017 | Plate 5-10A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-8 Through T-4-10 | |
ML17037C567 | 6 February 2017 | Plate 5-10 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-1 Through T-4-7 | |
ML17037C566 | 6 February 2017 | Plate 5-9A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-9 and T-3-10 | |
ML17037C565 | 6 February 2017 | Plate 5-9 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-1 Through T-3-8 | |
ML17037C564 | 6 February 2017 | Plate 5-1 - Composite Site Stratigraphic Column | |
ML17037C563 | 6 February 2017 | Plate 4-10 - Cross Section CT-2 West Wall Cooling Tower Piping Trench | |
ML17037A712 | 6 February 2017 | Figure 12.7-2a, Radiation Zones-Turbine Building, Radwaste Building, and Screenwell. | |
ML17037A818 | 6 February 2017 | Drawing No. 12177-ESK-4CEC24 | |
ML17037A689 | 6 February 2017 | Figure 12.1-1, General Arrangement Reactor Building - Plans | |
ML17037A690 | 6 February 2017 | Figure 7.9 - 1A, Feedwater Control System. | |
ML17037A692 | 6 February 2017 | Figure 7.6-7, Rod Block Interlocks from Neutron Monitoring System | |
ML17037A829 | 6 February 2017 | Drawing No. 12177-ESK-4CEC14A | |
ML17037A838 | 6 February 2017 | Drawing - (Drawing No. Not Available) | |
ML17037A714 | 6 February 2017 | Drawing No. 12241-GSK-31, Over Excavated Area - Reactor Containment - Locations. | |
ML17037A462 | 6 February 2017 | Drawing 807E154TY, Revision 3, Leak Detection System Elementary Diagram. Sheet 4 | |
ML17037A827 | 6 February 2017 | Drawing No. 12177-ESK-4CEC15 | |
ML17037B456 | 6 February 2017 | Drawing 12177-EE-1AQ-3, 600V One Line Diagram 2EHS*MCC101 & 2EHS*MCC301 Screenwell Building - Nine Mile Point Nuclear Station - Unit 2. | |
ML17037A816 | 6 February 2017 | Drawing No. 12177-ESK-4CEC25A | |
ML17037A694 | 6 February 2017 | Figure 7.4-10, Power Range Neutron Monitoring System Instrument Electrical Diagram | |
ML17037A705 | 6 February 2017 | Figure 2.7-16, Screenwell Building Plan and Sections |