Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22292A1185 October 20225 to Updated Final Safety Analysis Report, Chapter 15, FiguresFeedwater Controller Failure
ML22292A0815 October 20225 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9
ML22292A1025 October 20225 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6D, Figures 6.2.1 Through 6C-1Loop seal
Post Accident Monitoring
Hydrostatic
GOTHIC
ML22292A1085 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3Earthquake
Turbine Missile
ML22292A1365 October 20225 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5-1, at the Controls Main Control Room El. 306'-0
ML22292A0775 October 20225 to Updated Final Safety Analysis Report, Chapter 8, Figures
ML22292A0665 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Figures
ML22292A1275 October 20225 to Updated Final Safety Analysis Report, Chapter 14, Figures
ML22292A0935 October 20225 to Updated Final Safety Analysis Report, Chapter 10, Figures
ML22292A0895 October 20225 to Updated Final Safety Analysis Report, Chapter 5, Figures
ML22292A1375 October 20225 to Updated Final Safety Analysis Report, Chapter 12, Figures
ML22292A1105 October 20225 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-33 Through End
ML22292A1175 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Figures
ML22292A1305 October 20225 to Updated Final Safety Analysis Report, Chapter 17, Figures
ML22292A1385 October 20225 to Updated Final Safety Analysis Report, Chapter 18, Figures
ML22292A1095 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Figures 2K.28A Through End
ML22292A1015 October 20225 to Updated Final Safety Analysis Report, Chapter 2, Figures 2H.43 Through 2K-27F
ML22292A0635 October 20225 to Updated Final Safety Analysis Report, Chapter 7, Figures
ML22292A0995 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.4-2e Thru End
ML22292A0655 October 20225 to Updated Final Safety Analysis Report, Chapter 1, Figures
ML22292A0925 October 20225 to Updated Final Safety Analysis Report, Chapter 11, Figures
ML18018B32018 January 2018Undersized Documents - Transformer 2MTX-XM1B - Oil Cooler Piping, Failed Windings, Tank Bulging, Preparation for Removal, HV Tap Changer, and Lv Leads and Bracing
ML18018B19418 January 2018Undersized Documents, Drawings and Photographs
ML17037C7256 February 2017Drawing; Figure 7.15-1, Rod Worth Minimizer Functional Control Diagram
ML17037C5626 February 2017Plate 4-9 - Geologic Plan View of Fault Cooling Tower Piping Trench
ML17037B4556 February 2017Drawing 12177-EE-1AR-3, 600V One Line Diagram 2EHS*MCC102 Auxiliary Building North - Nine Mile Point Nuclear Station - Unit 2.
ML17037A7106 February 2017Figure 12.7-1a Radiation Zones - Reactor Building.
ML17037C6606 February 2017Figure 5.4-3; Steam Concentration Following a LOCA with CAD Operation
ML17037C6596 February 2017Figure 5.4-2; Hydrogen and Oxygen Concentration in Primary Containment Following a LOCA
ML17037C6586 February 2017Figure 5.3-2; Stand-by Gas Treatment System
ML17037C5696 February 2017Plate 5-10A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-8 Through T-4-10
ML17037C5676 February 2017Plate 5-10 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-1 Through T-4-7
ML17037C5666 February 2017Plate 5-9A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-9 and T-3-10
ML17037C5656 February 2017Plate 5-9 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-1 Through T-3-8
ML17037C5646 February 2017Plate 5-1 - Composite Site Stratigraphic Column
ML17037C5636 February 2017Plate 4-10 - Cross Section CT-2 West Wall Cooling Tower Piping Trench
ML17037A7126 February 2017Figure 12.7-2a, Radiation Zones-Turbine Building, Radwaste Building, and Screenwell.
ML17037A8186 February 2017Drawing No. 12177-ESK-4CEC24
ML17037A6896 February 2017Figure 12.1-1, General Arrangement Reactor Building - Plans
ML17037A6906 February 2017Figure 7.9 - 1A, Feedwater Control System.
ML17037A6926 February 2017Figure 7.6-7, Rod Block Interlocks from Neutron Monitoring System
ML17037A8296 February 2017Drawing No. 12177-ESK-4CEC14A
ML17037A8386 February 2017Drawing - (Drawing No. Not Available)
ML17037A7146 February 2017Drawing No. 12241-GSK-31, Over Excavated Area - Reactor Containment - Locations.
ML17037A4626 February 2017Drawing 807E154TY, Revision 3, Leak Detection System Elementary Diagram. Sheet 4
ML17037A8276 February 2017Drawing No. 12177-ESK-4CEC15
ML17037B4566 February 2017Drawing 12177-EE-1AQ-3, 600V One Line Diagram 2EHS*MCC101 & 2EHS*MCC301 Screenwell Building - Nine Mile Point Nuclear Station - Unit 2.
ML17037A8166 February 2017Drawing No. 12177-ESK-4CEC25A
ML17037A6946 February 2017Figure 7.4-10, Power Range Neutron Monitoring System Instrument Electrical Diagram
ML17037A7056 February 2017Figure 2.7-16, Screenwell Building Plan and Sections