ML17081A454: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:0311712017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Power Reactor Event# 52615. Site: COLUMBIA GENERATING STATION Notification Date I Time: 03/16/2017 15:07 (EDT) Unit: 2 Region: 4 State: WA Event Date I Time: 03/14/2017 16:00 (PDT} Reactor Type: [2] GE-5 Last Modification:
{{#Wiki_filter:0311712017                     U.S. Nuclear Regulatory Commission Operations Center Event Report                         Pagel Power Reactor                                                                                       Event#         52615.
03/16/2017 Containment Type: MARK II NRC Notified by: DON GREGOIRE Notifications:
Site: COLUMBIA GENERATING STATION                 Notification Date I Time: 03/16/2017       15:07 (EDT)
NEIL OKEEFE R4DO -HQ Ops Officer: BETHANY CECERE HAROLD GRAY R1DO Emergency Class: NON EMERGENCY FRANK EHRHARDT R2DO 10 CFR Section: KARLA STOEDTER R3DO 21.21 (d)(3)(i)
Unit: 2             Region: 4       State: WA           Event Date I Time: 03/14/2017         16:00 (PDT}
DEFECTS AND NONCOMPLIANCE PART 21/50.55 REACTOR !;:MAIL Unit Scram Code RX Crit lnit Power Initial RX Mode Curr Power Current RX Mode 2 N Yes 98 Power Operation 98 Power Operation  
Reactor Type:     [2] GE-5                                           Last Modification: 03/16/2017 Containment Type:       MARK II NRC Notified by: DON GREGOIRE                                   -
\ PART 21 NOTIFICATION  
Notifications: NEIL OKEEFE                     R4DO HQ Ops Officer: BETHANY CECERE                                                     HAROLD GRAY                   R1DO Emergency Class: NON EMERGENCY                                                         FRANK EHRHARDT                 R2DO 10 CFR Section:                                                                     KARLA STOEDTER                 R3DO 21.21 (d)(3)(i)       DEFECTS AND NONCOMPLIANCE                                       PART 21/50.55 REACTOR !;:MAIL Unit Scram Code       RX Crit lnit Power   Initial RX Mode                 Curr Power Current RX Mode 2         N           Yes   98         Power Operation                 98             Power Operation
-EVALUATION OF A DEVIATION  
                                                                                                              \
-STARTER CONTACTOR FAILURE "Pursuant to 10 CFR Part 21, this is a non-emergency notification by Energy Northwest concerning a defect in Size 1 Freedom Series Starters with nominal 120 VAC coils manufactured by AZZ/NLI [Nuclear Logistics Inc.] used at Columbia Generating Station. "On February 8, 2017 Energy Northwest was notified by NLI of a deviation associated with starter contactors used at Columbia that failed to close due to overheating of the starter coil. The coils that were provided were determined to not meet specified voltage ratings. "The evaluation completed by Energy Northwest on March 14, 2017 concluded .that'the deviation did create a Safety Hazard, and is reportable under 10 CFR 21.21 (d)(1) as a defect. "A 30 day report will be issued by April 13, 2017 per 10 CFR 21.21 (d)(4)." The licensee performed a prompt operability assessment for the two starters currently installed.
PART 21 NOTIFICATION - EVALUATION OF A DEVIATION - STARTER CONTACTOR FAILURE "Pursuant to 10 CFR Part 21, this is a non-emergency notification by Energy Northwest concerning a defect in Size 1 Freedom Series Starters with nominal 120 VAC coils manufactured by AZZ/NLI [Nuclear Logistics Inc.] used at Columbia Generating Station.
The licensee will notify the NRC Resident Inspector.  
  "On February 8, 2017 Energy Northwest was notified by NLI of a deviation associated with starter contactors used at Columbia that failed to close due to overheating of the starter coil. The coils that were provided were determined to not meet specified voltage ratings.
\ ********************************************************************************************************************************
                                                                                                                                \
"The evaluation completed by Energy Northwest on March 14, 2017 concluded .that'the deviation did create a Sub~tantial Safety Hazard, and is reportable under 10 CFR 21.21 (d)(1) as a defect.
,, ... , .. '*' .... ,,_ 0 H ''''''"''"" NO ,, . ' ". ... PAGE 1 NRCFORM 361 U.S. NUCLEAR REGULATORY COMMISSION OPERATIONS CENTER REACTOR PLANT . EVENT NOTIFICATION WORKSHEET EN# 52S15 NRC OPERATION TELEPHONE PRIMARY-301-816-5100 ot 800*532*3469*, BACKUPS-[1st]
"A 30 day report will be issued by April 13, 2017 per 10 CFR 21.21 (d)(4)."
301-951-0550 or 800.1149-3694*, 12ndl 301*415*0550 !3rd! 301-415-0553  
The licensee performed a prompt operability assessment for the two starters currently installed.
*1..icenseas who maintain their own ETS are Provided these telephona numbars.
The licensee will notify the NRC Resident Inspector.
TIME: FACILITY OR ORGANIZATION UNIT NAMi= OF CALLER GALL SACK# 1507 Columbia Generating Station 00 Don Gregoire 509-377 -8616 EVENT TIME & ZONE EVENT DATE POWF.R/MbDE 9EFOR!i POWllRIMODF.
 
l\FTi;;R 1600 PDT 3/14/17 9811 9811 EVENT Cl.;ASSIFICATIONS 1*Hr. Non*Emora1mev 10 CFR !i0.72CbU1)
              '*'       0 H ''''''"''"" NO ,, .'   ".       ...                                                                                                                   PAGE 1 of~
MfAl Salo S/D Caoabflllv AINJ GENERAL EMERGENCY GEN/AAEC TSDcvlhtlon ADE\/ (v)(B) RHRCapaGlty AINE SITE AREA !EMERGENCY SITIAAEC 4*Hr.
NRCFORM 361                                                                                                                           U.S. NUCLEAR REGULATORY COMMISSION (1~-MOOJ OPERATIONS CENTER REACTOR PLANT
10 CFR S0.72(b)(2) (v)(C) Control of Rad AIN( ALERT Ol TS ReQutred 5/0 ASHU (vllDl Acr.lderil Miligalion AIN[ UNUSUAL EVENT -. UNU/MF.C iv)(A) ECCS Disch11rgo lo RCS f\OOS {xii) Offsitl) Modloal /\MEl: 50.72 NON-EMERGENCY next columM) (lv)(B) RPS*/\ctuaUon (sorfuii)
                                                            . EVENT NOTIFICATION WORKSHEET                                                       EN# 52S15 NRC OPERATION TELEPHONE NU~BER; PRIMARY- 301-816-5100 ot 800*532*3469*, BACKUPS-[1st] 301-951-0550 or 800.1149-3694*,
AR.PS (xiii) Loss Comm/Asmt1Rs3p PHYSICAL SECURITY (73.71) DODD xi) OffSUa APRE 60*Dsy Optional 1 o CFR. 50.73(al(1) 137?? S*Hr. Non-l:mergency 10 CFR 50.72(b)(3)
12ndl 301*415*0550 ~md !3rd! 301-415-0553                                                           *1..icenseas who maintain their own ETS are Provided these telephona numbars.
* Invalid System AIN\i i:lfNESS DUiY HFTi (il)(A) Degraded Condition AOEG other Unepecified R1>q11lremtlnt (Identify).
NOTl~ICATION TIME:                 FACILITY OR ORGANIZATION                           UNIT               NAMi= OF CALLER                                       GALL SACK#
OTHER UNSPECIFIF.D RF.QMT, (Ree last ootumn) 11)(6) Unanalyzed Gondillon AUNA x INFORMATION ONLY Qv)(A) Specified Syslem AESF NONI DESCRIPTION Include: Systems affected, actuations and their Initiating signals, causes, effect of avent on plant, actions tal<en or plann0d, etc. (Contim;r; on Pursuant to 10 CFR Part 21, this is a non-emargency notification by Energy Northwest concerning a defect in Size 1 Freedom Series Starters with nominal 120 VAC coils manufactured by AZZ/NLI used at Columbia Generating Station. On February 8, 2017 Energy Northwest was notified by NU of a deviation associated with starter contactors used at Columbia that failed to close due to overheating of the starter coil. The coils that were provided were determined to not meet specified voltage ratings. The evaluation completed by Energy Northwest on March 14, 2017 concluded that the deviation did create a Substantial Safety Hazard, and is reportable under 10 CFR 21.21(d)(1) as a defect. A 30 day report will be issued by April 13, 2017 per 10 CFR 21.21(d)(4).
1507                               Columbia Generating Station                         00                 Don Gregoire                                           509-377-8616 EVENT TIME &ZONE                   EVENT DATE                     POWF.R/MbDE 9EFOR!i                                               POWllRIMODF. l\FTi;;R 1600 PDT                           3/14/17                       9811                                                             9811 EVENT Cl.;ASSIFICATIONS                               1*Hr. Non*Emora1mev 10 CFR !i0.72CbU1)                           MfAl         Salo S/D Caoabflllv                   AINJ GENERAL EMERGENCY                               GEN/AAEC                         TSDcvlhtlon                           ADE\/       (v)(B)       RHRCapaGlty                           AINE SITE AREA !EMERGENCY                             SITIAAEC       4*Hr. Non*Em~rgon~y        10 CFR S0.72(b)(2)                 (v)(C)       Control of Rad Rel~n~e                AIN(
NOTIFICATIONS YES NO Wlllal5 ANYTHING UNUSUAL OR Cl VSS (Explain _Jlbove) NRC: RESIDENT x NOT UNDERSTOOD?
ALERT                                           AU~IAAli:C        Ol           TS ReQutred 5/0                       ASHU         (vllDl       Acr.lderil Miligalion                 AIN[
i&I NO STATE(Gl x DID Al.I. SYSTEMS iZl YES l.OCAI. x FUNCTION AS CJ NO (ExpJeln 9bOVG) OTH6R, GOV x Moor: 01' nON l ESTIMATED I
UNUSUAL EVENT - .                               UNU/MF.C             iv)(A)       ECCS Disch11rgo lo RCS                 f\OOS       {xii)         Offsitl) Modloal                   /\MEl:
INFO ON BACK ME.DIA/PRESS RELEASE. x UNTIL CORRECTED:
50.72 NON-EMERGENCY                   (~ec next columM)           (lv)(B)       RPS*/\ctuaUon (sorfuii)               AR.PS       (xiii)       Loss Comm/Asmt1Rs3p                 ACO~
1 RE:START DATE:; N/A CJ m liil NO ?.5665 R4}}
PHYSICAL SECURITY (73.71)                           DODD           xi)         OffSUa Nol~ioalion                    APRE               60*Dsy Optional 1o CFR. 50.73(al(1)
MATERlAUEXPOSU~E                                      137??     S*Hr. Non-l:mergency 10 CFR 50.72(b)(3)
* Invalid Specifi~d System Actu~Uon*    AIN\i i:lfNESS ~OR DUiY                                     HFTi         (il)(A)       Degraded Condition                     AOEG         other Unepecified R1>q11lremtlnt (Identify).
OTHER UNSPECIFIF.D RF.QMT,               (Ree last ootumn)         11)(6)       Unanalyzed Gondillon                   AUNA   x                                                     NON~
INFORMATION ONLY                                       NN~.        Qv)(A)       Specified Syslem A~tvRlfon              AESF                                                         NONI DESCRIPTION Include: Systems affected, actuations and their Initiating signals, causes, effect of avent on plant, actions tal<en or plann0d, etc. (Contim;r; on b~ok)
Pursuant to 10 CFR Part 21, this is a non-emargency notification by Energy Northwest concerning a defect in Size 1 Freedom Series Starters with nominal 120 VAC coils manufactured by AZZ/NLI used at Columbia Generating Station.
On February 8, 2017 Energy Northwest was notified by NU of a deviation associated with starter contactors used at Columbia that failed to close due to overheating of the starter coil. The coils that were provided were determined to not meet specified voltage ratings.
The evaluation completed by Energy Northwest on March 14, 2017 concluded that the deviation did create a Substantial Safety Hazard, and is reportable under 10 CFR 21.21(d)(1) as a defect.
A 30 day report will be issued by April 13, 2017 per 10 CFR 21.21(d)(4).
NOTIFICATIONS                           YES       NO         Wlllal5       ANYTHING UNUSUAL OR NRC: RESIDENT                                                     x         NOT UNDERSTOOD?                       Cl  VSS (Explain _Jlbove)              i&I NO STATE(Gl                                             x                       DID Al.I. SYSTEMS iZl YES                               CJ   NO (ExpJeln 9bOVG) x                        FUNCTION AS RF..QUJ~~07 l.OCAI.
OTH6R, GOV AG~NCIES ME.DIA/PRESS RELEASE.
x x
Moor: 01' Ol'~flAnON UNTIL CORRECTED: 1 l ESTIMATED RE:START DATE:; N/A I CJ m ADOITIONA~ INFO ON BACK liil NO
?.5665 R4}}

Latest revision as of 18:31, 4 February 2020

Part 21 Notification - Evaluation of a Deviation - Starter Contactor Failure
ML17081A454
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/17/2017
From: Gregoire D
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
52615
Download: ML17081A454 (2)


Text

0311712017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Power Reactor Event# 52615.

Site: COLUMBIA GENERATING STATION Notification Date I Time: 03/16/2017 15:07 (EDT)

Unit: 2 Region: 4 State: WA Event Date I Time: 03/14/2017 16:00 (PDT}

Reactor Type: [2] GE-5 Last Modification: 03/16/2017 Containment Type: MARK II NRC Notified by: DON GREGOIRE -

Notifications: NEIL OKEEFE R4DO HQ Ops Officer: BETHANY CECERE HAROLD GRAY R1DO Emergency Class: NON EMERGENCY FRANK EHRHARDT R2DO 10 CFR Section: KARLA STOEDTER R3DO 21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21/50.55 REACTOR !;:MAIL Unit Scram Code RX Crit lnit Power Initial RX Mode Curr Power Current RX Mode 2 N Yes 98 Power Operation 98 Power Operation

\

PART 21 NOTIFICATION - EVALUATION OF A DEVIATION - STARTER CONTACTOR FAILURE "Pursuant to 10 CFR Part 21, this is a non-emergency notification by Energy Northwest concerning a defect in Size 1 Freedom Series Starters with nominal 120 VAC coils manufactured by AZZ/NLI [Nuclear Logistics Inc.] used at Columbia Generating Station.

"On February 8, 2017 Energy Northwest was notified by NLI of a deviation associated with starter contactors used at Columbia that failed to close due to overheating of the starter coil. The coils that were provided were determined to not meet specified voltage ratings.

\

"The evaluation completed by Energy Northwest on March 14, 2017 concluded .that'the deviation did create a Sub~tantial Safety Hazard, and is reportable under 10 CFR 21.21 (d)(1) as a defect.

"A 30 day report will be issued by April 13, 2017 per 10 CFR 21.21 (d)(4)."

The licensee performed a prompt operability assessment for the two starters currently installed.

The licensee will notify the NRC Resident Inspector.

'*' 0 H '""" NO ,, .' ". ... PAGE 1 of~

NRCFORM 361 U.S. NUCLEAR REGULATORY COMMISSION (1~-MOOJ OPERATIONS CENTER REACTOR PLANT

. EVENT NOTIFICATION WORKSHEET EN# 52S15 NRC OPERATION TELEPHONE NU~BER; PRIMARY- 301-816-5100 ot 800*532*3469*, BACKUPS-[1st] 301-951-0550 or 800.1149-3694*,

12ndl 301*415*0550 ~md !3rd! 301-415-0553 *1..icenseas who maintain their own ETS are Provided these telephona numbars.

NOTl~ICATION TIME: FACILITY OR ORGANIZATION UNIT NAMi= OF CALLER GALL SACK#

1507 Columbia Generating Station 00 Don Gregoire 509-377-8616 EVENT TIME &ZONE EVENT DATE POWF.R/MbDE 9EFOR!i POWllRIMODF. l\FTi;;R 1600 PDT 3/14/17 9811 9811 EVENT Cl.;ASSIFICATIONS 1*Hr. Non*Emora1mev 10 CFR !i0.72CbU1) MfAl Salo S/D Caoabflllv AINJ GENERAL EMERGENCY GEN/AAEC TSDcvlhtlon ADE\/ (v)(B) RHRCapaGlty AINE SITE AREA !EMERGENCY SITIAAEC 4*Hr. Non*Em~rgon~y 10 CFR S0.72(b)(2) (v)(C) Control of Rad Rel~n~e AIN(

ALERT AU~IAAli:C Ol TS ReQutred 5/0 ASHU (vllDl Acr.lderil Miligalion AIN[

UNUSUAL EVENT - . UNU/MF.C iv)(A) ECCS Disch11rgo lo RCS f\OOS {xii) Offsitl) Modloal /\MEl:

50.72 NON-EMERGENCY (~ec next columM) (lv)(B) RPS*/\ctuaUon (sorfuii) AR.PS (xiii) Loss Comm/Asmt1Rs3p ACO~

PHYSICAL SECURITY (73.71) DODD xi) OffSUa Nol~ioalion APRE 60*Dsy Optional 1o CFR. 50.73(al(1)

MATERlAUEXPOSU~E 137?? S*Hr. Non-l:mergency 10 CFR 50.72(b)(3)

  • Invalid Specifi~d System Actu~Uon* AIN\i i:lfNESS ~OR DUiY HFTi (il)(A) Degraded Condition AOEG other Unepecified R1>q11lremtlnt (Identify).

OTHER UNSPECIFIF.D RF.QMT, (Ree last ootumn) 11)(6) Unanalyzed Gondillon AUNA x NON~

INFORMATION ONLY NN~. Qv)(A) Specified Syslem A~tvRlfon AESF NONI DESCRIPTION Include: Systems affected, actuations and their Initiating signals, causes, effect of avent on plant, actions tal<en or plann0d, etc. (Contim;r; on b~ok)

Pursuant to 10 CFR Part 21, this is a non-emargency notification by Energy Northwest concerning a defect in Size 1 Freedom Series Starters with nominal 120 VAC coils manufactured by AZZ/NLI used at Columbia Generating Station.

On February 8, 2017 Energy Northwest was notified by NU of a deviation associated with starter contactors used at Columbia that failed to close due to overheating of the starter coil. The coils that were provided were determined to not meet specified voltage ratings.

The evaluation completed by Energy Northwest on March 14, 2017 concluded that the deviation did create a Substantial Safety Hazard, and is reportable under 10 CFR 21.21(d)(1) as a defect.

A 30 day report will be issued by April 13, 2017 per 10 CFR 21.21(d)(4).

NOTIFICATIONS YES NO Wlllal5 ANYTHING UNUSUAL OR NRC: RESIDENT x NOT UNDERSTOOD? Cl VSS (Explain _Jlbove) i&I NO STATE(Gl x DID Al.I. SYSTEMS iZl YES CJ NO (ExpJeln 9bOVG) x FUNCTION AS RF..QUJ~~07 l.OCAI.

OTH6R, GOV AG~NCIES ME.DIA/PRESS RELEASE.

x x

Moor: 01' Ol'~flAnON UNTIL CORRECTED: 1 l ESTIMATED RE:START DATE:; N/A I CJ m ADOITIONA~ INFO ON BACK liil NO

?.5665 R4