ML15252A443: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:FIGURE 1  
{{#Wiki_filter:NYS000566 Submitted: September 9, 2015 FIGURE 1 BEe (1)
 
(3)  (2) 1.0
Figure 1: Comparison of Limit Line (LL) and Best Estimate (BE) predictions, with embrittlement (BEe) and without embrittlement (BEne). Note: (1) BEne predicts possible failure at end of life (EOL). (2) BEe predicts failure (CUFen = 1.0) before end of life. (3) BEe predicts possible failure well before end of life. BEne 1017 FLUENCE (n/cm2) CUFen Limit Line (LL) Best Estimate (BE) (3) BEe 1.0 (2) (1)  - EOL (PEO) TIME}}
                                          +
BEne Limit Line (LL)
CUFen          Best Estimate (BE) 1017                                    FLUENCE (n/cm2)
EOL (PEO)        TIME Figure 1: Comparison of Limit Line (LL) and Best Estimate (BE) predictions, with embrittlement (BEe) and without embrittlement (BEne).
Note:
(1) BEne predicts possible failure at end of life (EOL).
(2) BEe predicts failure (CUFen = 1.0) before end of life.
(3) BEe predicts possible failure well before end of life.}}

Latest revision as of 09:11, 5 February 2020

NYS000566 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey
ML15252A443
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/09/2015
From:
State of NY, Office of the Attorney General
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28270, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15252A443 (1)


Text

NYS000566 Submitted: September 9, 2015 FIGURE 1 BEe (1)

(3) (2) 1.0

+

BEne Limit Line (LL)

CUFen Best Estimate (BE) 1017 FLUENCE (n/cm2)

EOL (PEO) TIME Figure 1: Comparison of Limit Line (LL) and Best Estimate (BE) predictions, with embrittlement (BEe) and without embrittlement (BEne).

Note:

(1) BEne predicts possible failure at end of life (EOL).

(2) BEe predicts failure (CUFen = 1.0) before end of life.

(3) BEe predicts possible failure well before end of life.