| issue date = 05/08/2015
| issue date = 05/08/2015
| title = Notice of Availability of the Draft Environmental Impact Statement for the Construction Permit of the Proposed Shine Medical Radioisotope Production Facility
| title = Notice of Availability of the Draft Environmental Impact Statement for the Construction Permit of the Proposed Shine Medical Radioisotope Production Facility
| author name = Wrona D J
| author name = Wrona D
| author affiliation = NRC/NRR/DLR/RERGUB
| author affiliation = NRC/NRR/DLR/RERGUB
| addressee name = Bynum R V
| addressee name = Bynum R
| addressee affiliation = SHINE Medical Technologies, Inc
| addressee affiliation = SHINE Medical Technologies, Inc
| docket = 05000608
| docket = 05000608
Line 13: Line 13:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 8, 2015 Richard Vann Bynum, PhD Chief Operating Officer SHINE Medical Technologies, Inc.
2555 Industrial Drive Monona, WI 53713
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY
==Dear Dr. Bynum:==
The U.S. Nuclear Regulatory Commission (NRC) staff has completed the draft Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE), for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the draft EIS and the associated Federal Register Notice of Availability. This notice advises the public that the draft EIS is publicly available at the NRC public document room (PDR) or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The accession number for the draft ElS is ML15127A241. In addition, the following library has agreed to make a paper copy of the draft EIS available: Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin 53545.
As discussed in Chapter 6 of the draft EIS, the preliminary recommendation is that after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safety issues mandate otherwise, the issuance of the requested construction permit to SHINE. This recommendation is based on the following:
* SHINEs Environmental Report;
* the NRC staffs consultation with Federal, State, and local agencies;
* the NRC staffs independent environmental review; and
* the NRC staffs consideration of public comments.
Public meetings to discuss the findings of the draft EIS will be held on June 10, 2015, at the Rotary Botanical Gardens, 1455 Palmer Drive, Janesville, WI 53545. The first meeting will begin with an open house from 1:00 p.m. until 2:00 p.m., followed by an NRC presentation and opportunity to hear public comments from 2:00 p.m. until 4:00 p.m., as necessary. The second meeting will begin with an open house from 6:00 p.m. until 7:00 p.m., followed by a repeat of the
R. Bynum                                      NRCs earlier presentation and an opportunity to hear public comments from 7:00 p.m. until 9:00 p.m., as necessary. An NRC meeting notice will be published to provide more details about these public meetings. A separate Notice of Availability of the draft environmental impact statement will be placed in the Federal Register through the U.S. Environmental Protection Agency.
If you have any questions regarding this matter, please contact Ms. Michelle Moser, environmental project manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at Michelle.Moser@nrc.gov.
Sincerely,
                                              /RA/
David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608
==Enclosures:==
: 1) Draft EIS
: 2) Federal Register Notice cc w/encl: Distribution List
ML15105A472 (Pkg)
ML15105A335 (Ltr)
ML15105A291 (FRN)                                                  *concurred via email OFFICE LA:DLR          PM:RERB:DLR        BC: DPR            OGC              BC:RERB:DLR NAME      IBetts      MMoser            AAdam              MYoung            DWrona DATE      4/16/15      4/28/15            4/28/15            4/30/15          5/8/15
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:
E-MAIL:
PUBLIC Public                DHowe          SLynch      JLynch          SHarwell RTR r/f              MAdams        CWeber      CFrazier        MConley RidsNrrDpr            MMoser        DBarss      LLondon        JWeil RidsNrrDprPrta        AAdams        ASapountzis MYoung          VHuckabay RidsNrrDprPrtb        LTran          DSeymour    TZaki          DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY:
Jim Costedio                                    Laura Bub Licensing Manager                                Environmental Analysis and Review SHINE Medical Technologies, Inc.                  Specialist 2555 Industrial Drive                            State of Wisconsin Monona, WI 53713                                Department of Natural Resources 3911 Fish Hatchery Road Kirsten Cutler, Ph.D.                            Fitchburg, WI 53711 National Security and International Affairs Office of Science and Technology Policy          TRTR Newsletter Executive Office Building                        University of Florida 1650 Pennsylvania Avenue                        Department of Nuclear Washington, DC 20503                            Engineering Sciences 202 Nuclear Sciences Center Randy Howell                                    Gainesville, FL 32611 National Nuclear Security Administration, NA-212                                          Mark Freitag U.S. Department of Energy                        City Manager 1000 Independence Ave SW                        P.O. Box 5005 Washington, DC 20585                            Janesville, WI 53547-5005 Paul Schmidt                                    Bill McCoy Manager                                          1326 Putnam Avenue Radiation Protection Section                    Janesville, WI 53546 Wisconsin Department of Health Services P.O. Box 2659                                    Alfred Lembrich Madison, WI 53701-2659                          541 Miller Avenue Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546}}

Latest revision as of 13:58, 31 October 2019

Notice of Availability of the Draft Environmental Impact Statement for the Construction Permit of the Proposed Shine Medical Radioisotope Production Facility
ML15105A335
Person / Time
Site: SHINE Medical Technologies
Issue date: 05/08/2015
From: David Wrona
NRC/NRR/DLR/RERGUB
To: Bynum R
SHINE Medical Technologies
Moser M 415-6509
References
Download: ML15105A335 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 8, 2015 Richard Vann Bynum, PhD Chief Operating Officer SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Dr. Bynum:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed the draft Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE), for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the draft EIS and the associated Federal Register Notice of Availability. This notice advises the public that the draft EIS is publicly available at the NRC public document room (PDR) or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The accession number for the draft ElS is ML15127A241. In addition, the following library has agreed to make a paper copy of the draft EIS available: Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin 53545.

As discussed in Chapter 6 of the draft EIS, the preliminary recommendation is that after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safety issues mandate otherwise, the issuance of the requested construction permit to SHINE. This recommendation is based on the following:

  • SHINEs Environmental Report;
  • the NRC staffs consultation with Federal, State, and local agencies;
  • the NRC staffs independent environmental review; and
  • the NRC staffs consideration of public comments.

Public meetings to discuss the findings of the draft EIS will be held on June 10, 2015, at the Rotary Botanical Gardens, 1455 Palmer Drive, Janesville, WI 53545. The first meeting will begin with an open house from 1:00 p.m. until 2:00 p.m., followed by an NRC presentation and opportunity to hear public comments from 2:00 p.m. until 4:00 p.m., as necessary. The second meeting will begin with an open house from 6:00 p.m. until 7:00 p.m., followed by a repeat of the

R. Bynum NRCs earlier presentation and an opportunity to hear public comments from 7:00 p.m. until 9:00 p.m., as necessary. An NRC meeting notice will be published to provide more details about these public meetings. A separate Notice of Availability of the draft environmental impact statement will be placed in the Federal Register through the U.S. Environmental Protection Agency.

If you have any questions regarding this matter, please contact Ms. Michelle Moser, environmental project manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at Michelle.Moser@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosures:

1) Draft EIS
2) Federal Register Notice cc w/encl: Distribution List

ML15105A472 (Pkg)

ML15105A335 (Ltr)

ML15105A291 (FRN) *concurred via email OFFICE LA:DLR PM:RERB:DLR BC: DPR OGC BC:RERB:DLR NAME IBetts MMoser AAdam MYoung DWrona DATE 4/16/15 4/28/15 4/28/15 4/30/15 5/8/15

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY:

Jim Costedio Laura Bub Licensing Manager Environmental Analysis and Review SHINE Medical Technologies, Inc. Specialist 2555 Industrial Drive State of Wisconsin Monona, WI 53713 Department of Natural Resources 3911 Fish Hatchery Road Kirsten Cutler, Ph.D. Fitchburg, WI 53711 National Security and International Affairs Office of Science and Technology Policy TRTR Newsletter Executive Office Building University of Florida 1650 Pennsylvania Avenue Department of Nuclear Washington, DC 20503 Engineering Sciences 202 Nuclear Sciences Center Randy Howell Gainesville, FL 32611 National Nuclear Security Administration, NA-212 Mark Freitag U.S. Department of Energy City Manager 1000 Independence Ave SW P.O. Box 5005 Washington, DC 20585 Janesville, WI 53547-5005 Paul Schmidt Bill McCoy Manager 1326 Putnam Avenue Radiation Protection Section Janesville, WI 53546 Wisconsin Department of Health Services P.O. Box 2659 Alfred Lembrich Madison, WI 53701-2659 541 Miller Avenue Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546