ML20153D148: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:' f ''"'"'% | ||
i s | |||
' UNITED STATES | |||
e | !. {,, o r g ' # | ||
f' CLEAR REGULATORY COMMISSI | |||
: 4. 7 e | |||
Comissioner Roberts | W ASHINGTO N, 0. C. 20$55 q% | ||
Comissioner Asselstine - -- | 'j | ||
i FROM: | \\; | ||
Divisien of Licensing | s.- p Docket No: 50-275/323 f.fi' MEMORANDUM FOR: | ||
Chainnan Palladino Comissioner Gilinsky Comissioner Ahearne I | |||
Comissioner Roberts | |||
[ | |||
Comissioner Asselstine - -- | |||
g- ' | |||
i FROM: | |||
Darrell G. Eisenhut, Director Divisien of Licensing | |||
==SUBJECT:== | ==SUBJECT:== | ||
ALLEGATIONS REGARDING DI ABLO CANYON | ALLEGATIONS REGARDING DI ABLO CANYON (BOARD NOTIFICATION 83-48) | ||
(BOARD NOTIFICATION 83-48) | In accordance with the procedures for Board Notification, the enclosed infor-mation is being transmitted directly to the Comission. | ||
In accordance with the procedures for Board Notification, the enclosed infor-mation is being transmitted directly to the Comission. | l In a telephone call on March 2B,1983, from D. Fleischaker, representing the Joint Intervenors in the Diablo Canyon proceeding, the NRC was alerted to the attached incoming letter. That letter was received in my office on i | ||
copy was eventually received fmm Congressman Udall's office. | Friday, April 1,1983, despite several attempts to receive it earlier. A copy was eventually received fmm Congressman Udall's office. | ||
[ | |||
The staff will be reviewing this informat.4cn promptly. | The staff will be reviewing this informat.4cn promptly. | ||
re G. Eise t, i ector Division of Licensing | re G. Eise t, | ||
i ector Division of Licensing | |||
==Enclosure:== | ==Enclosure:== | ||
As Stated | As Stated cc: | ||
cc: | J. F. Wolf, ASLB G. O. Bright, ASLB J. Kline, ASLB T. S. Moore, ASL AB W. R. Johnson, ASLAB J. H. Buck, ASLAB l | ||
G. O. Bright, ASLB J. Kline, ASLB T. S. Moore, ASL AB | SECY OGC l | ||
W. R. Johnson, ASLAB | OPE EDO Parties to the Proceeding | ||
J. H. Buck, ASLAB | |||
==Contact:== | ==Contact:== | ||
D. G. Eisenhut ONRR ovan L, .i s X':.7672 | D. G. Eisenhut ONRR ovan L,.i s X':.7672 8805090071 880418 PDR FOIA | ||
8805090071 880418 | ~ | ||
HAMLIN07-444 PDR}} | |||
Latest revision as of 02:58, 11 December 2024
Text
' f "'"'%
i s
' UNITED STATES
!. {,, o r g ' #
f' CLEAR REGULATORY COMMISSI
- 4. 7 e
W ASHINGTO N, 0. C. 20$55 q%
'j
\\;
s.- p Docket No: 50-275/323 f.fi' MEMORANDUM FOR:
Chainnan Palladino Comissioner Gilinsky Comissioner Ahearne I
Comissioner Roberts
[
Comissioner Asselstine - --
g- '
i FROM:
Darrell G. Eisenhut, Director Divisien of Licensing
SUBJECT:
ALLEGATIONS REGARDING DI ABLO CANYON (BOARD NOTIFICATION 83-48)
In accordance with the procedures for Board Notification, the enclosed infor-mation is being transmitted directly to the Comission.
l In a telephone call on March 2B,1983, from D. Fleischaker, representing the Joint Intervenors in the Diablo Canyon proceeding, the NRC was alerted to the attached incoming letter. That letter was received in my office on i
Friday, April 1,1983, despite several attempts to receive it earlier. A copy was eventually received fmm Congressman Udall's office.
[
The staff will be reviewing this informat.4cn promptly.
re G. Eise t,
i ector Division of Licensing
Enclosure:
As Stated cc:
J. F. Wolf, ASLB G. O. Bright, ASLB J. Kline, ASLB T. S. Moore, ASL AB W. R. Johnson, ASLAB J. H. Buck, ASLAB l
SECY OGC l
OPE EDO Parties to the Proceeding
Contact:
D. G. Eisenhut ONRR ovan L,.i s X':.7672 8805090071 880418 PDR FOIA
~
HAMLIN07-444 PDR