ML20093E624: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:- .
{{#Wiki_filter:-
I Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 l
Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 October 12,1995 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operatino Report for September.1995 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of September is provided.
October 12,1995                                                             Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operatino Report for September.1995 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of September is provided.
Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.
Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.
kor %0A RogerO Ander on Director Licensing and Management issues c:     Regional Administrator-lil, NRC NRR Project Manager, NRC Sr Resident Inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg
kor %0A RogerO Ander on Director Licensing and Management issues c:
              - .;p       n ,
Regional Administrator-lil, NRC NRR Project Manager, NRC Sr Resident Inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg
              ,i . g ./ U C * }
-.;p n,
9510170006 950930 PDR       ADOCK 05000263                                                                     p R                       PDR                                                                     8 1
,i. g./ U C * }
9510170006 950930 PDR ADOCK 05000263 p
R PDR 8
1


                  ~       _-    - . .    -.=   -          ..      . -                  .-      .-  -.
~
. 4       ,
-.=
            '  .                      OPERATING DATA REPORT
4 o
-  o
OPERATING DATA REPORT DOCKET NO.
                          -                                          DOCKET NO. 50-263
50-263 DATE 10- 1-95
                    ''~
' ' ~
DATE   10- 1-95 COMPLETED BY     H. H. Paustian TELEPHONE   612/295-5151 4
COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 4
OPERATING STATUS
OPERATING STATUS
                                                                      ] Notes                       j i 1. Unit Name           -
] Notes j
Monticello        ]                            ]
Monticello
: 2. Reporting period:                             September         ]                             ]
]
3. Licensed Thermal Power (MWt):                       1670       )                             ]
]
  . 4. Nameplate Rating (Gross MWe):                           569     ]                             ]
i 1. Unit Name
j 5. Design Electrical Rating (Net MWe):                 545.4       ]                             ]
: 2. Reporting period:
6. Maximum Dependable Capacity (Gross MWe):               564     )                             ]
September
: 7. Maximum Dependable Capacity (Net MWe) :           - 536       )                             ]
]
i 8.     If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
]
: 3. Licensed Thermal Power (MWt):
1670
)
]
. 4. Nameplate Rating (Gross MWe):
569
]
]
j 5. Design Electrical Rating (Net MWe):
545.4
]
]
: 6. Maximum Dependable Capacity (Gross MWe):
564
)
]
s 7. Maximum Dependable Capacity (Net MWe) :
- 536
)
]
i 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
4 i
4 i
i 9.     Power Level To Which Restricted, If Any (Net MWe) :                 N/A
i 9.
}10. Reasons For Restrictions, If Any: ,__N/A i
Power Level To Which Restricted, If Any (Net MWe) :
1 i                                                   THIS MONTH           YR.-TO-DATE   CUMULATIVE j
N/A
[11. Hours In Reporting Period                                 720             6551         212592
}10. Reasons For Restrictions, If Any:,__N/A i
.1:2 . Number Of Hours Reactor Was Critical               720.0             6551.0     173550.9
1 i
  .13 . Reactor Reserve Shutdown Hours                         0.0               0.0         940.7
THIS MONTH YR.-TO-DATE CUMULATIVE j
;14. Hours Generator On-Line                             720.0             6551.0     170661.9 E15. Unit Reserve Shutdown Hours                               0.0               0.0           0.0
[11. Hours In Reporting Period 720 6551 212592
: 16. Gross Thermal Energy Generated (MWH)             1199806           10898947     264385399
.1:2. Number Of Hours Reactor Was Critical 720.0 6551.0 173550.9
: 17. Gross Electrical Energy Generated (MWH)'408326                   3686967     89370445
.13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
: 18. Net Electrical Energy Generated (MWH)         391730             3542580     85517690
;14. Hours Generator On-Line 720.0 6551.0 170661.9 E15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 19. Unit Service Factor                           100.0%             100.0%           80.3%
: 16. Gross Thermal Energy Generated (MWH) 1199806 10898947 264385399
: 20. Unit Availability Factor                     100.0%             100.0%           80.3%
: 17. Gross Electrical Energy Generated (MWH)'408326 3686967 89370445
: 21. Unit Capacity Factor (Using MDC Net)         101.5%             100.9%           75.0%
: 18. Net Electrical Energy Generated (MWH) 391730 3542580 85517690
: 22. Unit Capacity Factor (Using DER Net)           99.8%               99.2%         73.8%
: 19. Unit Service Factor 100.0%
: 23. Unit Forced Outage Rate                         0.0%                 0.0%           3.5%
100.0%
80.3%
: 20. Unit Availability Factor 100.0%
100.0%
80.3%
: 21. Unit Capacity Factor (Using MDC Net) 101.5%
100.9%
75.0%
: 22. Unit Capacity Factor (Using DER Net) 99.8%
99.2%
73.8%
: 23. Unit Forced Outage Rate 0.0%
0.0%
3.5%
: 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
: 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_ Refueling - 4/10/96 - 38 days
_ Refueling - 4/10/96 - 38 days
Line 63: Line 100:
: 26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
: 26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


5-       .
5-
.r.
.r.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-263 UNIT   Monticello~~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
DATE 10- 1-95 COMPLETED BY H. H. Paustian TELEPHONE   612/295-5151 MONTH OF     September DAY   AVERAGE DAILY POWER LEVEL                   DAY   AVERAGE DAILY POWER LEVEL
50-263 UNIT Monticello~~
                    '(MWe-Net)                                         (MWe-Net) 1                 533.                             17               542.
DATE 10- 1-95 COMPLETED BY H.
2                 533.                             18               546.
H.
3                 536.                             19'             548.
Paustian TELEPHONE 612/295-5151 MONTH OF September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
4                 534.                             20               550.
'(MWe-Net)
5                 539.                             21               551.
(MWe-Net) 1 533.
6                 536.                             22               551.
17 542.
7                 540.                             23               551.
2 533.
8'                 541.                             24               551.
18 546.
9                 543.                             25               551.
3 536.
.10                   542.                             26               550.
19' 548.
11                   543.                             27               550.
4 534.
12                   542.                             28               551.
20 550.
13                   541.                             29               549.
5 539.
14                   541.                             30               549.
21 551.
15                   543.
6 536.
16                   545.
22 551.
INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.             Compute to the nearest whole megawatt.
7 540.
23 551.
8' 541.
24 551.
9 543.
25 551.
.10 542.
26 550.
11 543.
27 550.
12 542.
28 551.
13 541.
29 549.
14 541.
30 549.
15 543.
16 545.
INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.


n     .
n NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50-263 DATE   10- 1-95 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH       SEP 9-01-95                                                                 i to   Power operation.                                               '
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 10- 1-95 COMPLETED BY H.
H. Paustian TELEPHONE 612/295-5151 MONTH SEP 9-01-95 i
to Power operation.
9-30-95 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
9-30-95 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
l l
l l
l
l


                                                                                                                                                                          + .
+.
IMIT SHIRDOWNS AND POWER REDUCTIONS.                                 DOOTT No. 50-263                     ...
IMIT SHIRDOWNS AND POWER REDUCTIONS.
INIT NAME ~%mticen_ _o
DOOTT No. 50-263 INIT NAME ~%mticen_ _o DATE 70-01,
                                                                                                                              ,                DATE 70-01                                                                                 REPORT MONTH         September                                         12295Y-151 No. Date                  Duration Reason Method             LER         System Comp.                     Cause & Corrective Ty(pe
12295Y-151 REPORT MONTH September Duration Reason Method LER System Comp.
: 1) (hours)       (2)     of           No.         Code   Code                   .
Cause & Corrective Ty(pe (hours)
Action to Shutdown                       (4)   (5)                       Prevent Recurrence (3)
(2) of No.
None 1         -
Code Code Action to No.
2                                                           3                         4                 .
Date 1)
F: Forced                 Reason:                                                     Method:                     Draft IEEE Standard S: Scheduled             A-Equipment Failure (Explain)                               Manual                   805-1984(P805-D5)
Shutdown (4)
B-Maintenance or Test                                         2-Manual Scram                                                           ,
(5)
C-Refueling                                                   3-Automatic Scram     5                                               .i' tor Restriction                                   4-Other (Explain)           IEEE Standard 803A-1983 E     rator Training & License Examination F-   inistrative G-Operational Error (Explain)
Prevent Recurrence (3)
H-Other (Explain)                                                                                                                       !
None 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
.i tor Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E
rator Training & License Examination F-inistrative G-Operational Error (Explain)
H-Other (Explain)
L
L
_-                                 _      _.}}
-}}

Latest revision as of 10:31, 13 December 2024

Monthly Operating Rept for Sept 1995 for Monticello Nuclear Generating Plant
ML20093E624
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/30/1995
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9510170006
Download: ML20093E624 (5)


Text

-

Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 October 12,1995 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operatino Report for September.1995 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of September is provided.

Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.

kor %0A RogerO Ander on Director Licensing and Management issues c:

Regional Administrator-lil, NRC NRR Project Manager, NRC Sr Resident Inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg

-.;p n,

,i. g./ U C * }

9510170006 950930 PDR ADOCK 05000263 p

R PDR 8

1

~

-.=

4 o

OPERATING DATA REPORT DOCKET NO.

50-263 DATE 10- 1-95

' ' ~

COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 4

OPERATING STATUS

] Notes j

Monticello

]

]

i 1. Unit Name

2. Reporting period:

September

]

]

3. Licensed Thermal Power (MWt):

1670

)

]

. 4. Nameplate Rating (Gross MWe):

569

]

]

j 5. Design Electrical Rating (Net MWe):

545.4

]

]

6. Maximum Dependable Capacity (Gross MWe):

564

)

]

s 7. Maximum Dependable Capacity (Net MWe) :

- 536

)

]

i 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

4 i

i 9.

Power Level To Which Restricted, If Any (Net MWe) :

N/A

}10. Reasons For Restrictions, If Any:,__N/A i

1 i

THIS MONTH YR.-TO-DATE CUMULATIVE j

[11. Hours In Reporting Period 720 6551 212592

.1:2. Number Of Hours Reactor Was Critical 720.0 6551.0 173550.9

.13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7

14. Hours Generator On-Line 720.0 6551.0 170661.9 E15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1199806 10898947 264385399
17. Gross Electrical Energy Generated (MWH)'408326 3686967 89370445
18. Net Electrical Energy Generated (MWH) 391730 3542580 85517690
19. Unit Service Factor 100.0%

100.0%

80.3%

20. Unit Availability Factor 100.0%

100.0%

80.3%

21. Unit Capacity Factor (Using MDC Net) 101.5%

100.9%

75.0%

22. Unit Capacity Factor (Using DER Net) 99.8%

99.2%

73.8%

23. Unit Forced Outage Rate 0.0%

0.0%

3.5%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

_ Refueling - 4/10/96 - 38 days

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

5-

.r.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263 UNIT Monticello~~

DATE 10- 1-95 COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 MONTH OF September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

'(MWe-Net)

(MWe-Net) 1 533.

17 542.

2 533.

18 546.

3 536.

19' 548.

4 534.

20 550.

5 539.

21 551.

6 536.

22 551.

7 540.

23 551.

8' 541.

24 551.

9 543.

25 551.

.10 542.

26 550.

11 543.

27 550.

12 542.

28 551.

13 541.

29 549.

14 541.

30 549.

15 543.

16 545.

INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

n NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 10- 1-95 COMPLETED BY H.

H. Paustian TELEPHONE 612/295-5151 MONTH SEP 9-01-95 i

to Power operation.

9-30-95 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

l l

l

+.

IMIT SHIRDOWNS AND POWER REDUCTIONS.

DOOTT No. 50-263 INIT NAME ~%mticen_ _o DATE 70-01,

12295Y-151 REPORT MONTH September Duration Reason Method LER System Comp.

Cause & Corrective Ty(pe (hours)

(2) of No.

Code Code Action to No.

Date 1)

Shutdown (4)

(5)

Prevent Recurrence (3)

None 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) Manual 805-1984(P805-D5)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

.i tor Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E

rator Training & License Examination F-inistrative G-Operational Error (Explain)

H-Other (Explain)

L

-