ML15086A289: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML15086A289 | | number = ML15086A289 | ||
| issue date = 03/27/2015 | | issue date = 03/27/2015 | ||
| title = | | title = Response to Notice of Violation IR 05000313/2014010 and 05000368/2014010 | ||
| author name = Lantz R | | author name = Lantz R | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-E | | author affiliation = NRC/RGN-IV/DRP/RPB-E | ||
| addressee name = Browning J | | addressee name = Browning J | ||
Line 13: | Line 13: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000313/2014010]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD. | |||
ARLINGTON, TX 76011-4511 | |||
March 27, 2015 | |||
EA-14-088 | |||
Jeremy Browning, Site Vice | |||
President | |||
Entergy Operations, Inc. | |||
Arkansas Nuclear One | |||
1448 SR 333 | |||
Russellville, AR 72802-0967 | |||
SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - RESPONSE TO NOTICE OF | |||
VIOLATION (NRC INSPECTION REPORT 05000313/2014010 | |||
AND 05000368/2014010) | |||
Dear Mr. Browning: | |||
On January 22, 2015, the Nuclear Regulatory Commission (NRC) cited Entergy Operations, | |||
Inc.s failure to design, construct, and maintain the Unit 1 and Unit 2 auxiliary building and | |||
emergency diesel fuel storage building flood barriers so that they would protect safety-related | |||
equipment from flooding as required by 10 CFR 50, Appendix B, Criterion III, Design Control, | |||
and Criterion V, Instructions, Procedures, and Drawings. The Notice of Violation, enclosed | |||
with Inspection Report 05000313/2014010 and 05000368/2014010 (ML15023A076), required | |||
you to respond in writing within 30 days. You responded by letter dated February 23, 2015 | |||
(ML15054A607). | |||
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We | |||
will review your corrective actions during a future inspection. We noted that your response | |||
included a discussion regarding an exception to one aspect of the Notice of Violation involving | |||
the safety-related classification of the Unit 1 decay heat vault drain valves. Your response | |||
indicated that the non-safety related classification for these valves is consistent with the | |||
licensing basis for Arkansas Nuclear One. The NRC also received correspondence from your | |||
staff on February 11, 2015 (ML15079A381), in which your staff presented additional comments | |||
regarding information contained in the Notice of Violation and inspection report referenced | |||
above. We will provide our response to these documents in a future letter. | |||
J. Browning -2- | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | |||
made available electronically for public inspection in the NRC Public Document Room or from | |||
the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible | |||
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic | |||
Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Ryan Lantz, Chief | |||
Project Branch E | |||
Division of Reactor Projects | |||
Docket No. 50-313 and 50-368 | |||
License No. DPR-51 and NPF-6 | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | |||
made available electronically for public inspection in the NRC Public Document Room or from | |||
the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible | |||
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic | |||
Reading Room). | |||
Sincerely,/RA/ Ryan Lantz, Chief Project Branch E Division of Reactor Projects Docket No. 50-313 and 50-368 License No. DPR-51 and NPF-6 | Sincerely, | ||
/RA/ | |||
Ryan Lantz, Chief | |||
Project Branch E | |||
Division of Reactor Projects | |||
Docket No. 50-313 and 50-368 | |||
License No. DPR-51 and NPF-6 | |||
DISTRIBUTION: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) | |||
Senior Resident Inspector (Brian.Tindell@nrc.gov) | |||
Resident Inspector (Matt.Young@nrc.gov) | |||
Branch Chief, DRP/E (Ryan.Lantz@nrc.gov) | |||
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov) | |||
Project Engineer, DRP/E (Jim.Melfi@nrc.gov) | |||
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Michael.Waters@nrc.gov) | |||
DOCUMENT LOCATION: S:\DRP\PBE\ANO\ANO Acknowledgement Letter to NOV Response Mar-15rls | |||
X SUNSI Review ADAMS X Publicly Available X Non-Sensitive Keyword: | |||
By: CHY X Yes No Non-Publicly Available Sensitive | |||
OFFICE SPE:DRP/E C:DRP/E | |||
NAME CHYoung RELantz | |||
SIGNATURE /RA/ /RA by | |||
Email/ | |||
DATE 03/25/15 03/27/15 | |||
OFFICIAL RECORD COPY | |||
}} | }} |
Latest revision as of 00:51, 5 December 2019
ML15086A289 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 03/27/2015 |
From: | Ryan Lantz NRC/RGN-IV/DRP/RPB-E |
To: | Jeremy G. Browning Entergy Operations |
Young C | |
References | |
Download: ML15086A289 (3) | |
See also: IR 05000313/2014010
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
March 27, 2015
Jeremy Browning, Site Vice
President
Entergy Operations, Inc.
Arkansas Nuclear One
1448 SR 333
Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - RESPONSE TO NOTICE OF
VIOLATION (NRC INSPECTION REPORT 05000313/2014010
AND 05000368/2014010)
Dear Mr. Browning:
On January 22, 2015, the Nuclear Regulatory Commission (NRC) cited Entergy Operations,
Inc.s failure to design, construct, and maintain the Unit 1 and Unit 2 auxiliary building and
emergency diesel fuel storage building flood barriers so that they would protect safety-related
equipment from flooding as required by 10 CFR 50, Appendix B, Criterion III, Design Control,
and Criterion V, Instructions, Procedures, and Drawings. The Notice of Violation, enclosed
with Inspection Report 05000313/2014010 and 05000368/2014010 (ML15023A076), required
you to respond in writing within 30 days. You responded by letter dated February 23, 2015
(ML15054A607).
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We
will review your corrective actions during a future inspection. We noted that your response
included a discussion regarding an exception to one aspect of the Notice of Violation involving
the safety-related classification of the Unit 1 decay heat vault drain valves. Your response
indicated that the non-safety related classification for these valves is consistent with the
licensing basis for Arkansas Nuclear One. The NRC also received correspondence from your
staff on February 11, 2015 (ML15079A381), in which your staff presented additional comments
regarding information contained in the Notice of Violation and inspection report referenced
above. We will provide our response to these documents in a future letter.
J. Browning -2-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA/
Ryan Lantz, Chief
Project Branch E
Division of Reactor Projects
Docket No. 50-313 and 50-368
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the NRCs Agencywide Documents Access Management System (ADAMS), which is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA/
Ryan Lantz, Chief
Project Branch E
Division of Reactor Projects
Docket No. 50-313 and 50-368
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Branch Chief, DRP/E (Ryan.Lantz@nrc.gov)
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
DOCUMENT LOCATION: S:\DRP\PBE\ANO\ANO Acknowledgement Letter to NOV Response Mar-15rls
X SUNSI Review ADAMS X Publicly Available X Non-Sensitive Keyword:
By: CHY X Yes No Non-Publicly Available Sensitive
OFFICE SPE:DRP/E C:DRP/E
NAME CHYoung RELantz
SIGNATURE /RA/ /RA by
Email/
DATE 03/25/15 03/27/15
OFFICIAL RECORD COPY