{{Adams|number = ML111450021}}
{{Adams
| number = ML111450021
| issue date = 05/24/2011
| title = Letter Only - IR 05000293-11-011, 04/11/2011 - 04/15/2011, Pilgrim Nuclear Power Station, Temporary Instruction 2515/183, Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event.
| author name = Rogge J
| author affiliation = NRC/RGN-I/DRS/EB3
| addressee name = Smith R
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000293
| license number = DPR-035
| contact person =
| document report number = IR-11-011
| document type = Letter
| page count = 4
}}


{{IR-Nav| site = 05000293 | year = 2011 | report number = 011 }}
{{IR-Nav| site = 05000293 | year = 2011 | report number = 011 }}


=Text=
=Text=
{{#Wiki_filter:OFFICITT USE ONIY - StrEURITY RETATEB INFORII,I '\TIONMay 24,2011Mr. Robert SmithSite Vice PresidentEntergy Nuclear Operations, lnc.Pilgrim Nuclear Power Station600 Rocky Hill RoadPlymouth, MA 02360-5508
{{#Wiki_filter:==SUBJECT:==
PILGRIM NUCLEAR POWER  STATION - NRC INSPECTION REPORT 05000293t2011011


SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT05000293t2011011
==Dear Mr. Smith:==
On April 15,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Pilgrim Nuclear Power Station (PNPS), using Temporary Instruction 2515/183, "Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection report documents the inspection results which were discussed on April 15, 2011, with you and other members of your staff.
 
The inspection examined activities conducted under 10 CFR 50.54 (hh) and your License Condition 3.L(b)7 relative to the implementation of 8.5.b mitigating strategies. The inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
 
This report documents one NRC identified finding of very low safety significance (Green). The finding was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it was entered into your Corrective Action Program, the NRC is treating this finding as a non-cited violation (NCV), consistent with Section2.3.2.a of the NRC's Enforcement Policy. lf you contest the NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.
 
20555-0001, with copies to the Regional Administrator, Region l; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident lnspector at Pilgrim. In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the RegionalAdministrator, Region I and the NRC Resident Inspector at Pilgrim.


==Dear Mr. Smith:==
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from the Enclosure, this document is DECONTROLLED.
On April 15,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection atyour Pilgrim Nuclear Power Station (PNPS), using Temporary Instruction 2515/183, "Followupto the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection reportdocuments the inspection results which were discussed on April 15, 2011, with you and othermembers of your staff.The inspection examined activities conducted under 10 CFR 50.54 (hh) and your LicenseCondition 3.L(b)7 relative to the implementation of 8.5.b mitigating strategies. The inspectioninvolved examination of selected procedures and records, observation of activities, andinterviews with station personnel.This report documents one NRC identified finding of very low safety significance (Green). Thefinding was determined to involve a violation of NRC requirements. However, because of itsvery low safety significance and because it was entered into your Corrective Action Program,the NRC is treating this finding as a non-cited violation (NCV), consistent with Section2.3.2.a ofthe NRC's Enforcement Policy. lf you contest the NCV in this report, you should provide aresponse within 30 days of the date of this inspection report, with the basis for your denial, tothe U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.20555-0001, with copies to the Regional Administrator, Region l; the Director, Office ofEnforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and theNRC Resident lnspector at Pilgrim. In addition, if you disagree with the cross-cutting aspectassigned to the finding in this report, you should provide a response within 30 days of the dateof this inspection report, with the basis for your disagreement, to the RegionalAdministrator,Region I and the NRC Resident Inspector at Pilgrim.Enclosure contains Sensitive UnclassifiedNon-Safeguards Information. Whenseparated from the Enclosure, thisdocument is DECONTROLLED.EFFICIALUSE ONtY SECURITY RETATED Ii.lFORMANEN OFFIGIAT USE ENIY SEEURITY RETATEB INFORMATIEN In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room and from thePublicly Available Records System (PARS) component of the NRC Agencywide DocumentsAccess and Management System (ADAMS), accessible from the NRC Web site athttp://wrrvw.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However,because of the sensitive information contained in the enclosure, and in accordance with 10 CFR2.390, a copy of this letter's enclosure will not be available for public inspection.
 
EFFICIALUSE ONtY SECURITY RETATED Ii.lFORMANEN


Sincerely,/RNJohn F. Rogge, ChiefEngineering Branch 3Division of Reactor SafetyDocket No.: 50-293License No.: DPR-35
OFFIGIAT USE ENIY SEEURITY RETATEB INFORMATIEN In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room and from the Publicly Available Records System (PARS) component of the NRC Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://wrrvw.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.


===Enclosure:===
Sincerely,
lnspection Report 05000293/201 101 1
/RN John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-293 License No.: DPR-35 Enclosure: lnspection Report 05000293/201 101 1 w/Attachment: Supplemental Information cc: Wencl: w/ OUO-SRI:
D. Burke, Security Manager J. Giarrussio, SLO, Massachusetts Emergency Management Agency cc: Wo encl: w/o OUO-SRI:
Distribution via ListServ OFFICIAT USE ONIY SECURITY RETATED INFERM\TIEN


===w/Attachment:===
OFFICIAT USE ONIY SEGURITY RETATED INFORMATION
Supplemental Informationcc: Wencl: w/ OUO-SRI:D. Burke, Security ManagerJ. Giarrussio, SLO, Massachusetts Emergency Management Agencycc: Wo encl: w/o OUO-SRI:Distribution via ListServOFFICIAT USE ONIY SECURITY RETATED INFERM\TIEN
}}
}}

Latest revision as of 20:14, 12 November 2019

Letter Only - IR 05000293-11-011, 04/11/2011 - 04/15/2011, Pilgrim Nuclear Power Station, Temporary Instruction 2515/183, Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event.
ML111450021
Person / Time
Site: Pilgrim
Issue date: 05/24/2011
From: Rogge J
Engineering Region 1 Branch 3
To: Rich Smith
Entergy Nuclear Operations
References
IR-11-011
Download: ML111450021 (4)


Text

SUBJECT:

PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT 05000293t2011011

Dear Mr. Smith:

On April 15,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Pilgrim Nuclear Power Station (PNPS), using Temporary Instruction 2515/183, "Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection report documents the inspection results which were discussed on April 15, 2011, with you and other members of your staff.

The inspection examined activities conducted under 10 CFR 50.54 (hh) and your License Condition 3.L(b)7 relative to the implementation of 8.5.b mitigating strategies. The inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.

This report documents one NRC identified finding of very low safety significance (Green). The finding was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it was entered into your Corrective Action Program, the NRC is treating this finding as a non-cited violation (NCV), consistent with Section2.3.2.a of the NRC's Enforcement Policy. lf you contest the NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.

20555-0001, with copies to the Regional Administrator, Region l; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident lnspector at Pilgrim. In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the RegionalAdministrator, Region I and the NRC Resident Inspector at Pilgrim.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from the Enclosure, this document is DECONTROLLED.

EFFICIALUSE ONtY SECURITY RETATED Ii.lFORMANEN

OFFIGIAT USE ENIY SEEURITY RETATEB INFORMATIEN In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room and from the Publicly Available Records System (PARS) component of the NRC Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://wrrvw.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,

/RN John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-293 License No.: DPR-35 Enclosure: lnspection Report 05000293/201 101 1 w/Attachment: Supplemental Information cc: Wencl: w/ OUO-SRI:

D. Burke, Security Manager J. Giarrussio, SLO, Massachusetts Emergency Management Agency cc: Wo encl: w/o OUO-SRI:

Distribution via ListServ OFFICIAT USE ONIY SECURITY RETATED INFERM\TIEN

OFFICIAT USE ONIY SEGURITY RETATED INFORMATION