| H. Fire Sunoression Water System - A fire suppression water system shall consist of: a water source (s); gravity tank (s) or pump (s); | | H. Fire Sunoression Water System - A fire suppression water system shall consist of: a water source (s); gravity tank (s) or pump (s); |
| and distribution piping with associated sectionalizing control or isolation valves. Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser. | | and distribution piping with associated sectionalizing control or isolation valves. Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser. |
| X. Staggered Test Basis - A staggered test basis shall consist of: (a) a test schedule for D systems, subsystems, trains, or other designated components obtained by dividing the specified test i | | X. Staggered Test Basis - A staggered test basis shall consist of: (a) a test schedule for D systems, subsystems, trains, or other designated components obtained by dividing the specified test i interval into n equal subintervals; (b) the testing of one system, ' |
| ;
| |
| interval into n equal subintervals; (b) the testing of one system, ' | |
| subsystem, train or other designated components at the beginning of each subinterval. | | subsystem, train or other designated components at the beginning of each subinterval. |
| Y. Source Check - A source check shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source. | | Y. Source Check - A source check shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source. |
Line 95: |
Line 93: |
| EE. Automatic Primary Containment Isolation Valvel - Are primary ' | | EE. Automatic Primary Containment Isolation Valvel - Are primary ' |
| containment isolation valves which receive an automatic primary containment group isolation signal. | | containment isolation valves which receive an automatic primary containment group isolation signal. |
| -- ;
| |
| L 1 See FSAR Figure:1.6-1 Revisionh Amendment No. Sb | | L 1 See FSAR Figure:1.6-1 Revisionh Amendment No. Sb |
| --}} | | --}} |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20072T0521994-09-0606 September 1994 Proposed Tech Specs Modification to Append a of Operating License DPR-35 Re Maintenance of Filled Discharge Pipe ML20072S0501994-09-0606 September 1994 Proposed Tech Specs Re Instrumentation That Initiates Primary Containment Isolation & Initiates or Controls Core & Containment Systems ML20072S0081994-09-0606 September 1994 Proposed Tech Specs Re Primary Containment,Oxygen Concentration & Vacuum Relief ML20072S0861994-09-0606 September 1994 Proposed Tech Specs Re Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20069M3311994-06-0909 June 1994 Proposed Tech Specs,Increasing Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys,Including Section 4.5.H, Maint of Filled Discharged Pipe ML20067B7111994-02-0909 February 1994 Proposed Tech Specs Revising Wording for Page 3 of License DPR-35,clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion BECO-93-156, Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3)1993-12-10010 December 1993 Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059A9361993-10-19019 October 1993 Proposed Tech Specs for Removal of Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors BECO-93-132, Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint1993-10-19019 October 1993 Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint ML20046D0441993-08-0909 August 1993 Proposed Tech Specs,Proposing 24 Month Fuel Cycle ML20044G1331993-05-20020 May 1993 Proposed Tech Specs Reducing MSIV Low Turbine Inlet Pressure Setpoint from Greater than or Equal to 880 Lb Psig to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode from 880 Psig to 785 Psig BECO-93-016, Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively1993-02-11011 February 1993 Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively 1999-06-16
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16
[Table view] |
Text
-
1.0 DEFINITIONS (Continued)
Surveillance Freguency - Each Surveillance Requirement shall be U.
performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.
-The Surveillance Frequency establishes the limit for which the specified time interval for Surveillance Requirements may be extended. It permits an allowable extension of the normal surveillance interval to facilitate surveillance schedule and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g., transient conditions or other ongoing surveillance or maintenance activities. It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages. The limitation of Definition "U" is based on engineering judgment and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements. This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance interval.
V. Surveillance Interval - The surveillance interval is the calendar timo between surveillance tests, checks, calibrations, and examinations to be performed upon an instrument or component when it is required to be operable. These tests may be waived when the i 1
instrument, component, or system is not required to be operable, but the instrument, component, or system shall be tested prior to being declared operable. The operating cycle interval is 18 months and the 25% tolerance given in Definition "U" is applicable.
H. Fire Sunoression Water System - A fire suppression water system shall consist of: a water source (s); gravity tank (s) or pump (s);
and distribution piping with associated sectionalizing control or isolation valves. Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.
X. Staggered Test Basis - A staggered test basis shall consist of: (a) a test schedule for D systems, subsystems, trains, or other designated components obtained by dividing the specified test i interval into n equal subintervals; (b) the testing of one system, '
subsystem, train or other designated components at the beginning of each subinterval.
Y. Source Check - A source check shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source.
Amendment No. 42, 89 Sa 8912190284 891207 PDR P ADOCK 0500029.?
i
r
]
1:0 DEFINITIONS (Continued)
- 2. Offsite Dose Calculation Manual (ODCM) - An offsite dose calculation manual (ODCM) shall be a manual containing the current methodology and ;
parameters to be used for the calculation of offsite doses due to i l radioactive gaseous ard liquid effluents, the calculation of gaseous and liquid effluent monitoring instrumentation alarm / trip setpoints, and the ;
conduct of the Radiological Environmental Monitoring Program. !
AA. Action - Action shall be that part of a specification which prescribes remedial measures required under designated conditions.
BB. Member (s) of the PublicI - Member (s) of the public shall include all i persons who are not occupationally associated with the plant. This i category does not include employees of the utility, its contractors, or 1 vendors. Also excluded from this category are persons who enter the site to service equipment or to make deliveries. This category does :
include persons who use portions of the site for recreational, i occupational or other purposes not associated with the site.
CC. Site Boundarvi - The site boundary is shown in Figure 1.6-1 in the FSAR.
DD. Radwaste Treatment System
- 1. Gaseous Radwaste Treatment System - The gaseous radwaste treatment system is that system identified in Figure 4.8-2.
- 2. Liouid Radwaste Treatment System - The liquid radwaste treatment system is that system identified in Figure 4.8-1.
EE. Automatic Primary Containment Isolation Valves - Are primary containment isolation valves which receive an automatic primary containment group isolation signal, n
3 See FSAR Figure 1.6-1 i i I-
- Revision l Amendment No. 89, 173 Sb i
-w
e- - .
.. .d a ATTACHMENT C t
4 .
p.-_
k t
.)
i l.0 DEFINITIONS (Continued)
U. stated thes Surveil specificat1 Y 's,recuency peri - Unless ic surv 111ance/e otherwi [sts, ks, cc bration ,
and exam tions s 11 be p formed,Atthint specif) d survei nce inte vals. ese int vals ma e adjupted plus $7. .
The 1 maxim combined interv 1 time f any t ree cons utive mb6PEC tes) shall n exceed .25 tim the sp ified i erval, he WT4 dtv le inte al is c sidere o be 18 nths a the
'EF/4m Qgrating tated o icabl . _
V. Surveillance Interval - The surveillance interval is the calendar time between surveillance tests, checks, Calibrations, and examinations to be performed upon an instrument or component when it is required to be operable. These tests may be waived when the instrument, component, or system is not required to be operable, but qO the instrument, component, or system shall be tested prior to being declared operable.f ' se--
SECTtrXL Q ___ p Fire SupDre3Tio? rwa'tFFTyMA fire suppression water system AbDtJ) H.
shall consist of; a water source (s); gravity tank (s) or pump (s);
and distribution piping with associated sectionalizing control or isolation valves. Such valves shall include hydrant post indicator valves and the first valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.
X. Staggered Test Basis - A staggered test basis shall consist of: (a) a test schedule for n systems, subsystems, trains, or other
.^- designated components obtained by dividing the specified test a interval into n equal subi subsystem, train or otherdesignated ntervals; components (b) the testing of beginning one system, at the of each subinterval. ,
Y. Source Check - A source check shall be the qualitative assessment of channel response when the channel senser is exposed to a radioactive source.
Z. Offsite Dese Calculation Manual (ODCM) - An offsite dose calculation //
Mogy manual (ODCM) shall be a manuBI containing the current methodology :
and parameters to be used for the calculation of offsite doses due /
70 PMf- to radioactive gaseous and liquid effluents, the calculation of /
g gaseous and liquid effluent monitoring instrumentation alarm / trip setpoints, and the conduct of the Radiological Environmental Monitoring Program.
v E
V Amendment No. , Sa l
J
po . , .
>EF/Miny l .0 DEFINITIONS (Continued) go 4,
- g o vt.D ,AA.- Action - Action shall be that part of a specification which prescribes HERt. remedial measures required under designated conditions.
D0L TD
~Ar g BB. Member (s) of the PublicI - Member (s) of the public shall include all
-op g persons who are not occupationally associated with the plant. This category does not include employees of the utility, its contractors, or DcFinm00 vendors. Also excluded from this category are persons who enter the
- g st site to service equipment or to make deliveries. This category does include persons who use portions of the site for recreational, occupational or other purposes not associated with the site.
CC, Sitr__Boundarvi . The site boundary is shown in Figure 1.6-1 in the FSAR.
DD, Radwaste Treatment System
- 1. Gaseous Radwaste Treatment System - The gaseous radwaste treatment system is that system identified in Figure 4.8-2.
- 2. Liouid Radwaste Treatment System - The liquid radwaste treatment system is that system identified in Figure 4.8-1.
EE. Automatic Primary Containment Isolation Valvel - Are primary '
containment isolation valves which receive an automatic primary containment group isolation signal.
L 1 See FSAR Figure:1.6-1 Revisionh Amendment No. Sb
--