ML19340C501: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 24: | Line 24: | ||
) | ) | ||
LUKE F0WER COMPANY ) Docket Nos. 50-369 | LUKE F0WER COMPANY ) Docket Nos. 50-369 | ||
) 50-370 (William B. McGuire Nuclear. ) | ) 50-370 (William B. McGuire Nuclear. ) | ||
Station, Units 1 and 2)~ ) | Station, Units 1 and 2)~ ) | ||
AFFIDAVIT OF JESSE L. R1 LEY. | AFFIDAVIT OF JESSE L. R1 LEY. | ||
My name is Jesse L. Riley. I reside at 654 Henley Place in Charlotte, N. C. 1 am a retired research scientist, specializing in the chemistry and physics of manufacturing artificial fibers. | My name is Jesse L. Riley. I reside at 654 Henley Place in Charlotte, N. C. 1 am a retired research scientist, specializing in the chemistry and physics of manufacturing artificial fibers. | ||
- I still set as a consultant to my former employer. I am, and for a number '? years have been, acting as the representative of the | - I still set as a consultant to my former employer. I am, and for a number '? years have been, acting as the representative of the Carolina Environmental Study Group in this and other proceedings. | ||
At the suggestion of Edward Ketchen, NRC staff counsel in the instant proceeding, I met with him, Robert Tedesco, Assistant Director of Reactor Licensing, and Lawrence Chandler, also a Staff Counsel, in Charlotte on October 7, 1980. The object of the meeting was to see if there were a basis for CESG joining in a stipulation in which it would withdraw its opposition to the issuance or a license to load.ruel, operate at low power, etc.,- | |||
Carolina Environmental Study Group in this and other proceedings. | |||
At the suggestion of Edward Ketchen, NRC staff counsel in the instant proceeding, I met with him, Robert Tedesco, Assistant Director of Reactor Licensing, and Lawrence Chandler, also a Staff Counsel, in Charlotte on October 7, 1980. The object of the meeting was to see if there were a basis for CESG joining in a | |||
stipulation in which it would withdraw its opposition to the issuance or a license to load.ruel, operate at low power, etc.,- | |||
for McGuire unit 1. On that day and in several subsequent phone conversations Staff communicated fully and responsively information relevant to the possible generation of hydrogen at this stage of operation. | for McGuire unit 1. On that day and in several subsequent phone conversations Staff communicated fully and responsively information relevant to the possible generation of hydrogen at this stage of operation. | ||
Staff discussed computer models involving decay heat from a core _ operated briefly at 5% power; the rate of water boiloff in the event that only the passive components of the ECCS were operable;- the time of first core exposure; the amount =of core exposure'at subsequent times; the temperature / time relationship of 0.0111yo | Staff discussed computer models involving decay heat from a core _ operated briefly at 5% power; the rate of water boiloff in the event that only the passive components of the ECCS were operable;- the time of first core exposure; the amount =of core exposure'at subsequent times; the temperature / time relationship of 0.0111yo | ||
$QT . _ | $QT . _ | ||
the circa11oy sheath; the time.at which hydrogen generation would begin; and the time when the hydrogen reaction would have gone far enough to bring the level cf hydrogen in the containment to 4 percent, the lower limit for self-propagating combustion. | the circa11oy sheath; the time.at which hydrogen generation would begin; and the time when the hydrogen reaction would have gone far enough to bring the level cf hydrogen in the containment to 4 percent, the lower limit for self-propagating combustion. | ||
The most relevant computer study finding was that the containment would be filled with hydrogen at the 4 percent level approximately 16 hours after the onset of the LOCA. | The most relevant computer study finding was that the containment would be filled with hydrogen at the 4 percent level approximately 16 hours after the onset of the LOCA. | ||
. /A4-< .f | . /A4-< .f | ||
/ G Subscribed to and sworn to before me this f7 day of November, 1980 | / G Subscribed to and sworn to before me this f7 day of November, 1980 i7lvL LA - | ||
i7lvL LA - | |||
Q KotaffPublic | Q KotaffPublic | ||
.' yy dinmissien Expires August 25,1982 l | |||
.' yy dinmissien Expires August 25,1982 | i 1 | ||
1 | |||
1 | |||
o., | o., | ||
.A l l4rf g | .A l l4rf g UNITED STATES OF AMERICA 4 NUCLEAR REGULATORY COMMISSION , | ||
UNITED STATES OF AMERICA 4 NUCLEAR REGULATORY COMMISSION | |||
BEFORE THE ATCMIC SAFETY AND LICENSING BOART [O - | BEFORE THE ATCMIC SAFETY AND LICENSING BOART [O - | ||
C A | C A | ||
Line 74: | Line 55: | ||
(William B. McGuire Nuclear ) | (William B. McGuire Nuclear ) | ||
Station, Units 1 and 2) ) | Station, Units 1 and 2) ) | ||
i AFFIRMATION OF SERVICE I hereby affirm that copies of "CESG's Reply to Applicant's Motion for Summary uitposition Regardin6 Application for License Authorizing Fuel Loading, Etc.; Motion to ConsolidP+ Near Term operating License and Uperating License l'roceedings; and Further Contentions," date tiov. 7, 1950, have been served on the ro11owing | i AFFIRMATION OF SERVICE I hereby affirm that copies of "CESG's Reply to Applicant's Motion for Summary uitposition Regardin6 Application for License Authorizing Fuel Loading, Etc.; Motion to ConsolidP+ Near Term operating License and Uperating License l'roceedings; and Further Contentions," date tiov. 7, 1950, have been served on the ro11owing by deposit in the United States mail this 7th day of November: | ||
by deposit in the United States mail this 7th day of November: | |||
Robert M. Laro, Esq. Edward G. Ketchen, Esq. | Robert M. Laro, Esq. Edward G. Ketchen, Esq. | ||
Chairman, Atomic Safety and Counsel for NRC Regulatory Licensing Board Staff U.S. Nuclear Regulatory Office of the Executive Cornission Legal Director | Chairman, Atomic Safety and Counsel for NRC Regulatory Licensing Board Staff U.S. Nuclear Regulatory Office of the Executive Cornission Legal Director | ||
Line 82: | Line 61: | ||
U.S. Nuclear. Regulatory Associate General Counsel Cormission Duke Power Company Washington, D.C. 20555 Post Office Box 2178 - | U.S. Nuclear. Regulatory Associate General Counsel Cormission Duke Power Company Washington, D.C. 20555 Post Office Box 2178 - | ||
Charlotte, North Carolina 28242 Dr. Cadet H. Hand, Jr. | Charlotte, North Carolina 28242 Dr. Cadet H. Hand, Jr. | ||
Director Chairman Bodega Marine Laboratory Atomic Safety and Licensing of California Board Panel Post Office Box 247 U.S. Nuclear Regulatory Bodega Say, California 94924 Commission Washington, D.C. 20555 J. Michael McGarry, Ill, Esq. Chase R. Stechens Debevoise and Liberman Docketing an'd Service 1200 Seventeenth Street, N . h. . Section Washington, D.C. 20036 Office of the Secretary | Director Chairman Bodega Marine Laboratory Atomic Safety and Licensing of California Board Panel Post Office Box 247 U.S. Nuclear Regulatory Bodega Say, California 94924 Commission Washington, D.C. 20555 J. Michael McGarry, Ill, Esq. Chase R. Stechens Debevoise and Liberman Docketing an'd Service 1200 Seventeenth Street, N . h. . Section Washington, D.C. 20036 Office of the Secretary U.S. Nuclear Regulatory Chairman, Atomic Safety Commission and Licensing Appeal Board Wash'ngton, D.C. 20555 ' | ||
U.S. Nuclear Regulatory Chairman, Atomic Safety | |||
Commission and Licensing Appeal Board Wash'ngton, D.C. 20555 | |||
U.S. Nuclear Regulatory Ccenission Washington, D.C. 20555 | U.S. Nuclear Regulatory Ccenission Washington, D.C. 20555 | ||
*I!and delivered. jy v, [' | *I!and delivered. jy v, [' | ||
[esseL.Riley h !}} | [esseL.Riley h !}} |
Latest revision as of 10:52, 31 January 2020
ML19340C501 | |
Person / Time | |
---|---|
Site: | Mcguire, McGuire ![]() |
Issue date: | 11/07/1980 |
From: | Jeffrey Riley CAROLINA ENVIRONMENTAL STUDY GROUP |
To: | |
Shared Package | |
ML19340C481 | List: |
References | |
NUDOCS 8011170505 | |
Download: ML19340C501 (3) | |
Text
. _ _
(h.) .
UNITED STATES OF AMERICA NUCLEAR REGULATC3Y COMMISSION
~
BEFORE THE - ATOMIC SAFETY AND LICENSING E0ARD in the Matter of )
)
LUKE F0WER COMPANY ) Docket Nos. 50-369
) 50-370 (William B. McGuire Nuclear. )
Station, Units 1 and 2)~ )
AFFIDAVIT OF JESSE L. R1 LEY.
My name is Jesse L. Riley. I reside at 654 Henley Place in Charlotte, N. C. 1 am a retired research scientist, specializing in the chemistry and physics of manufacturing artificial fibers.
- I still set as a consultant to my former employer. I am, and for a number '? years have been, acting as the representative of the Carolina Environmental Study Group in this and other proceedings.
At the suggestion of Edward Ketchen, NRC staff counsel in the instant proceeding, I met with him, Robert Tedesco, Assistant Director of Reactor Licensing, and Lawrence Chandler, also a Staff Counsel, in Charlotte on October 7, 1980. The object of the meeting was to see if there were a basis for CESG joining in a stipulation in which it would withdraw its opposition to the issuance or a license to load.ruel, operate at low power, etc.,-
for McGuire unit 1. On that day and in several subsequent phone conversations Staff communicated fully and responsively information relevant to the possible generation of hydrogen at this stage of operation.
Staff discussed computer models involving decay heat from a core _ operated briefly at 5% power; the rate of water boiloff in the event that only the passive components of the ECCS were operable;- the time of first core exposure; the amount =of core exposure'at subsequent times; the temperature / time relationship of 0.0111yo
$QT . _
the circa11oy sheath; the time.at which hydrogen generation would begin; and the time when the hydrogen reaction would have gone far enough to bring the level cf hydrogen in the containment to 4 percent, the lower limit for self-propagating combustion.
The most relevant computer study finding was that the containment would be filled with hydrogen at the 4 percent level approximately 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> after the onset of the LOCA.
. /A4-< .f
/ G Subscribed to and sworn to before me this f7 day of November, 1980 i7lvL LA -
Q KotaffPublic
.' yy dinmissien Expires August 25,1982 l
i 1
1
o.,
.A l l4rf g UNITED STATES OF AMERICA 4 NUCLEAR REGULATORY COMMISSION ,
BEFORE THE ATCMIC SAFETY AND LICENSING BOART [O -
C A
'3
. g
) B 'c In the Matter of V
)
Docket Nos. 50-369 I c3 G DUKE PCWER COMPANY )
). 50-370 -
(William B. McGuire Nuclear )
Station, Units 1 and 2) )
i AFFIRMATION OF SERVICE I hereby affirm that copies of "CESG's Reply to Applicant's Motion for Summary uitposition Regardin6 Application for License Authorizing Fuel Loading, Etc.; Motion to ConsolidP+ Near Term operating License and Uperating License l'roceedings; and Further Contentions," date tiov. 7, 1950, have been served on the ro11owing by deposit in the United States mail this 7th day of November:
Robert M. Laro, Esq. Edward G. Ketchen, Esq.
Chairman, Atomic Safety and Counsel for NRC Regulatory Licensing Board Staff U.S. Nuclear Regulatory Office of the Executive Cornission Legal Director
, dashington, D.C. 20555 U.S. Nuclear Regulatory Commission Dr. Ermeth A. Luebke Washington, D.C. 20555 Atcmic Safety and Licensing Board ', William L. Porter, Esq.
U.S. Nuclear. Regulatory Associate General Counsel Cormission Duke Power Company Washington, D.C. 20555 Post Office Box 2178 -
Charlotte, North Carolina 28242 Dr. Cadet H. Hand, Jr.
Director Chairman Bodega Marine Laboratory Atomic Safety and Licensing of California Board Panel Post Office Box 247 U.S. Nuclear Regulatory Bodega Say, California 94924 Commission Washington, D.C. 20555 J. Michael McGarry, Ill, Esq. Chase R. Stechens Debevoise and Liberman Docketing an'd Service 1200 Seventeenth Street, N . h. . Section Washington, D.C. 20036 Office of the Secretary U.S. Nuclear Regulatory Chairman, Atomic Safety Commission and Licensing Appeal Board Wash'ngton, D.C. 20555 '
U.S. Nuclear Regulatory Ccenission Washington, D.C. 20555
- I!and delivered. jy v, ['
[esseL.Riley h !