ML063460556: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:EXAMINATION OUTLINE SUBMITTAL
{{#Wiki_filter:EXAMINATION OUTLINE SUBMITTAL FOR THE FERMI RETAKE EXAMINATION AUGUST 2006
                                -
FOR THE FERMI RETAKE EXAMINATION AUGUST 2006


June 29,2006 NRC-06-0050 Mr. Hironori Peterson, Chief Operations Branch Division of Reactor Safety U. S. NRC Region I11 Suite 210 2443 Warrenville koad Lisle, Illinois 60532-4352
June 29,2006 NRC-06-0050 Mr. Hironori Peterson, Chief Operations Branch Division of Reactor Safety U. S. NRC Region I11 Suite 210 2443 Warrenville koad Lisle, Illinois 60532-4352
Line 84: Line 82:
ES-401                                                          2                                                        Form ES-401-1 p - 4 01                                              BWR Examination Outline                                                        Form ES-401-1
ES-401                                                          2                                                        Form ES-401-1 p - 4 01                                              BWR Examination Outline                                                        Form ES-401-1
                                                           )mal Plant Evolutions - Tier IIGroup 1 (RO)
                                                           )mal Plant Evolutions - Tier IIGroup 1 (RO)
EIAPE # I Name I Safety Function
EIAPE # I Name I Safety Function K K  K K/A Topias)
                                                  ,
K K  K K/A Topias)
Partial or Complete Loss of Forced ore Flow Circulation / 1 8 4 I lyl I l l 0
Partial or Complete Loss of Forced ore Flow Circulation / 1 8 4 I lyl I l l 0
Reurculation system 295003 Partial or Complete Loss of AC I 6 5
Reurculation system 295003 Partial or Complete Loss of AC I 6 5

Latest revision as of 22:32, 13 March 2020

Examination Outline Submittal for the Fermi Retake Examination - August 2006
ML063460556
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/08/2006
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Detroit Edison
Shared Package
ML062420262 List:
References
50-341/06-302 50-341/06-302
Download: ML063460556 (11)


Text

EXAMINATION OUTLINE SUBMITTAL FOR THE FERMI RETAKE EXAMINATION AUGUST 2006

June 29,2006 NRC-06-0050 Mr. Hironori Peterson, Chief Operations Branch Division of Reactor Safety U. S. NRC Region I11 Suite 210 2443 Warrenville koad Lisle, Illinois 60532-4352

Dear Mr. Peterson:

Enclosed please find the following examination materials submitted to the NRC in preparation for the upcoming Fermi 2 Initial License Retake Examination scheduled to occur during the week of August 7,2006:

. Seventy-five (75) question Reactor Operator Examination (Hardcopy wmeferences)

. Plant Procedures (Compact Disc)

Appropriate quality verification checklists from Revision 9, NUREG 102 1 The examination materials were developed using the appropriate guidance contained in Revision 9, NUREG 1021. These materials shall be withheld from public disclosure until after the examinations are complete.

We look forward to working with you during this process. If you have any questions or comments regarding the contents of the items listed above, please contact Mr.

Timothy Horan at (734) 586-4961.

Enclosure

ES-201 Examination Outline Qualitv Checklist Form ES-201-2 Facility: Fermi-2 Date of Examination: '8/11/2006 Initials Item Task Description

1. I a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES401. IR R

I I b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.l of ES-401 and whether all KIA cateaories are amroDriatelv sampled.

T T I c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

~

r N I d. Assess whether the justifications for deselected or rejected WA statements are appropriate.

I

a. Using Form ES-301-5. verify that the proposed scenario sets cover the required number
2. of normal evolutions, instrument and component failures, technical specifications, C

and major transients.

b. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the applicants' audit test(s), and scenarios will not be repeated on subsequent days. Pb
c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in Appendix D.

- a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

3.

(1) the outline(s) contain(s) the required number of control room and in-plant tasks w disbibuted among the safety functions as specified on the form J (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit test(s)

(4) the number of new or modified tasks meets or exceeds the minimums specified on the form W

(5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations PIP

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. Np.
4. a. Assess whether plant-specific priorities (induding PRA and IPE insights) are covered in the appropriate exam section. 4
b. Assess whether the 10 CFR 55.41143 and 55.45 sampling is appropriate.

N c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.

E &f R

A d.

e.

Check for duplication and overlap among exam sections.

Check the entire exam for balance of coverage.

Q L

f. Assess whether the exam fits the appropriate job level (RO or SRO).

Date

a. Author 6/16/2006
b. Facility Reviewer (*) 6/76/2006
c. NRC Chief Examiner (#) &130/2006 d NRC Supervisor I .

NOTE: # Independent NRC Reviewer inibal items in Column "c', chief examiner concurrence required

ES-401 BWR Examination Outline FORM ES-401-1 Note: 1. Ensure that at least two topics from every applicable WA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each WA category shall not be less than two).

2. The point total for each group and tier in the proposed outline must match that specified in the table.

The final point total for each group and tier may deviate by i1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.

3. Systemdevolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to ES-401, Attachment 2 , for guidance regarding the elimination of inappropriate WA statements.

4 Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.

5 Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected Use the RO and SRO ratings for the RO and SRO-only portions, respectively.

6. Select SRO topics for Tiers 1 and 2 from the shaded systems and WA categories.

7.' The generic (G) WASin Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system.

a. On the following pages, enter the WA numbers, a brief descnption of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G' on the SRO-only exam, enter it on the left side of Column A2 for Tier 2 , Group 2 (Note $1 does not apply). Use duplicate pages for RO and SRO-only exams.
9. For Tier 3, select topics from Section 2 of the WA catalog, and enter the WA numbers, descriptions, IRs, and point totals (#)on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.

ES-401,Page 16 of 33

ES-401 2 Form ES-401-1 p - 4 01 BWR Examination Outline Form ES-401-1

)mal Plant Evolutions - Tier IIGroup 1 (RO)

EIAPE # I Name I Safety Function K K K K/A Topias)

Partial or Complete Loss of Forced ore Flow Circulation / 1 8 4 I lyl I l l 0

Reurculation system 295003 Partial or Complete Loss of AC I 6 5

295004 Partial or Total Loss of DC Pwr I 6 95005 Main Turbine Generator Trip I 3 Ahility to recognize aonormal indicabons for sy6:sm operating 295006 SCRAM I 1 Dararneterswhich are entry-level conditions for emergency and amormai operating procedures 0

Control Room Abandonment / 7 1

0 295018 Partial or Total Loss of CCW I 8 1

0 295019 Partial or Total Loss of lnst Air i 8 1

95021 Loss of Shutdown Cooling I 4 5

O I I I Reactor recirculation I3l1 20 1195023 Refueling Acc / 8 I l l I I IArea radiabon levels

-4 95024 High Drywell Pressure / 5 0

02.*Knowledge of limihng conditions for operations and safety Ilmits 2

34 1 295025 High Reactor Pressure I 3 Pressure effects on reactor water level 35 1 6

95026 Suppression Pool High Water Suppression chamber pressure MaiY-IBIi SBLC lnlectlon 32 37 2 emp I 5 1p95027 High Containment Temperature / 5 I l l DELETED SEE ES-lO:-I 0 24 1195028 High Drywell Temperature / 5 I I I: Emergency depressurization 36 1 95030 Low Suppression Pool Wtr Lvl I 5 O1 l I I ECCS systems (NPSHconsioerations) Plant-Specific 0

95031 Reactor Low Water Level / 2 Aaequate core cooling 46 1 295037 SCRAM Condition Present and Power 04.0 Knowledge symptom based EOP mitigabon svategies 31 1 4bove APRM Downscale or Unknown / 1 6 0

295038 High Off-site Release Rate I 9 Protecbon of the general publii 42 1 2

0 00000 Plant Fire On Site I 8 Breakers relays, and disconnects 25 1 4

A Category Totals 3 4 4 3 3 3 Group Point To;al 20 ES-401, Page 17 of 33

ES-401 3 Form ES-401-1 BWR Examination Outline Form ES-401-ES-401,Page 18 of 33

ES-401 4 Form ES-401-1 ES-40 1, Page 19 of 33

ES-401-1 5 Form ES-401-1 s-401 BWR Examination Outline Form ES-401-'

Plant Systems - Tier 2IGrouo 2 (RO)

ES-401, Page 20 Of 33

ES-401 Generic Knowledge and Abilities Outline (Tier 3) F O ~ ES-401-3 I

le: Fermi 2 Date of Exam: 8/11/2006 Category

onduct of

)perations I

Equipment lontrol 3.

iadiation Zontrol 1.

mergency

'rocedures Plan her 3 Point ESllOl , Page 26 of 33

Summary of Systematic Random Selection Process 1 . Random Number Generator was used using Excel Spreadsheet RANDBETWEEN fimction to generate all random selections.

2. For All Tiers, Random Selection was used to generate KA Topics and Statements.
3. Commencing with Tier 1 Group 1, the random number 2 was generated for the first APE, 295001. An A m statement was randomly chosen using the Random Number Generator.
4. Systematic and uniform sampling was assured by progressing through KA Categories on the ES-401-1 form with the exception of APE 295016. No AK1 category topic exists. Randomly selected an AK2 statement and reverted to the previously described sequence on the next APE.This was noted on ES-40 1-4.
5. For Tier 1 Group 2, random number 2 was generated to select the first KA Category (K2). Random selection produced topics and statements with sequentially selected KA Categories (Kl, K2, K3, AI,A2, and G).
6. For Tier 2 Group 1, random number 7 was generated to select the first KA Category (A1 ). Random selection produced statements with sequentially selected KA Categories (KI,K2, K3, K4,K5,K6 A l , A2, A3, A4 and G).
7. For Tier 2 Group 2, random number 6 was generated to select the first KA Category (K6). Random selection produced systems and statements with sequentiaIIy seIected KA Categories (KI, K2, K3, A l , A2, and G).

~~ ~

ES-401 Record of Reiected WAS Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A 1/1 295027 High Containment Temperature (Mk 3) is N/A at Fermi-2. Plant is equipped with a Mk 1 Containment 1/2 29501 1 High Containment Temperature (Mk 3) is N/A at Fermi-2. Plant is equipped with a Mk 1 Containment 2/1 207000 Isolation Condenser is N/A at Fermi-2. Plant is equipped with RCIC.

2/ 1 209002 HPCS is N/A at Fermi-2. Plant is equipped with HPCI.

2/2 201004 RSCS is abandoned in place at Fermi-2.

2/2 201005 RClS is N/A at Fermi-2. Plant is equipped with RMCS/ RBM/RWM.

2/2 239003 MSIV-LCS is abandoned in place at Fermi-2 1/1 295016 K1 Initial random selection led to K1 category. There are no K1 statements, used K2 for this topic and returned to category progression on next KA.

2/1 21 1000 K6.01 Low Importance (2.4) randomly reselected statement K6.03 2/1 215005 K1.03 Double Jeopardy with 215002 K2.03, both topics involved RBM / APRM I interraction. Randomly reselected KA 215005 K1.16, same KA category.

1/2 I 295010 2.2.22 1 Double Jeopardy (High Drywell Pressure) with Question 21, KA EPE I 295024 (High D$ei Pressure) 2.2.22. Selected 2.4.31 as replacement.

1 I ES-401, Page 27 of 33