(One intermediate revision by the same user not shown) |
Line 60: |
Line 60: |
|
| |
|
| {{a|1R01}} | | {{a|1R01}} |
| ==1R01 Adverse Weather Protection 4 | | ==1R01 Adverse Weather Protection 4== |
| ==
| | |
| 1R04 Equipment Alignment 5 | | {{a|1R04}} |
| | ==1R04 Equipment Alignment 5== |
|
| |
|
| {{a|1R05}} | | {{a|1R05}} |
| ==1R05 Fire Protection 6 | | ==1R05 Fire Protection 6== |
| ==
| | |
| 1R07 Heat Sink Performance 7 | | {{a|1R07}} |
| | ==1R07 Heat Sink Performance 7== |
|
| |
|
| {{a|1R11}} | | {{a|1R11}} |
| ==1R11 Licensed Operator Requalification 8 | | ==1R11 Licensed Operator Requalification 8== |
| ==
| | |
| 1R12 Maintenance Effectiveness 9 | | {{a|1R12}} |
| | ==1R12 Maintenance Effectiveness 9== |
|
| |
|
| {{a|1R13}} | | {{a|1R13}} |
| ==1R13 Maintenance Risk Assessments and Emergent Work Control 9 | | ==1R13 Maintenance Risk Assessments and Emergent Work Control 9== |
| ==
| | |
| 1R15 Operability Evaluations 10 | | {{a|1R15}} |
| | ==1R15 Operability Evaluations 10== |
|
| |
|
| {{a|1R18}} | | {{a|1R18}} |
| ==1R18 Plant Modifications 11 | | ==1R18 Plant Modifications 11== |
| ==
| | |
| 1R19 Post Maintenance Testing 11 | | {{a|1R19}} |
| | ==1R19 Post Maintenance Testing 11== |
|
| |
|
| {{a|1R20}} | | {{a|1R20}} |
| ==1R20 Refueling and Other Outage Activities 12 | | ==1R20 Refueling and Other Outage Activities 12== |
| ==
| | |
| 1R22 Surveillance Testing 15 EMERGENCY PREPAREDNESS 1EP2 Alert Notification System Evaluation 15 1EP3 Emergency Preparedness Organization Staffing and Augmentation 16 1EP4 Emergency Action Level and Emergency Plan Changes 16 1EP5 Correction of Emergency Preparedness Weaknesses | | {{a|1R22}} |
| | ==1R22 Surveillance Testing 15== |
| | |
| | EMERGENCY PREPAREDNESS 1EP2 Alert Notification System Evaluation 15 1EP3 Emergency Preparedness Organization Staffing and Augmentation 16 1EP4 Emergency Action Level and Emergency Plan Changes 16 1EP5 Correction of Emergency Preparedness Weaknesses |
|
| |
|
| ==RADIATION SAFETY== | | ==RADIATION SAFETY== |
Line 93: |
Line 101: |
| ==2RS5 Radiation Monitoring Instrumentation== | | ==2RS5 Radiation Monitoring Instrumentation== |
|
| |
|
| {{a|2RS6}} | | {{a|2RS6}} |
| ==2RS6 Radioactive Gaseous and Liquid Effluent Treatment== | | ==2RS6 Radioactive Gaseous and Liquid Effluent Treatment== |
|
| |
|
| {{a|2RS7}} | | {{a|2RS7}} |
| ==2RS7 Radiological Environmental Monitoring Program== | | ==2RS7 Radiological Environmental Monitoring Program== |
|
| |
|
| {{a|2RS8}} | | {{a|2RS8}} |
| ==2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling,== | | ==2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling,== |
| 22 Storage and Transportation | | 22 Storage and Transportation |
|
| |
|
| ==OTHER ACTIVITIES== | | ==OTHER ACTIVITIES== |
Line 107: |
Line 115: |
| ==4OA1 Performance Indicator (PI) Verification== | | ==4OA1 Performance Indicator (PI) Verification== |
|
| |
|
| {{a|4OA2}} | | {{a|4OA2}} |
| ==4OA2 Identification and Resolution of Problems== | | ==4OA2 Identification and Resolution of Problems== |
|
| |
|
| {{a|4OA3}} | | {{a|4OA3}} |
| ==4OA3 Event Follow-up== | | ==4OA3 Event Follow-up== |
|
| |
|
| {{a|4OA5}} | | {{a|4OA5}} |
| ==4OA5 Other Activities== | | ==4OA5 Other Activities== |
|
| |
|
| {{a|4OA6}} | | {{a|4OA6}} |
| ==4OA6 Meetings, Including Exit== | | ==4OA6 Meetings, Including Exit== |
|
| |
|
| {{a|4OA7}} | | {{a|4OA7}} |
| ==4OA7 Licensee-identified Violations== | | ==4OA7 Licensee-identified Violations== |
| 40 ATTACHMENT: | | 40 ATTACHMENT: |
|
---|
Category:Inspection Report
MONTHYEARIR 05000259/20240102024-11-12012 November 2024 Design Basis Assurance Inspection Program Inspection Report 05000259/2024010 and 05000260/2024010 and 05000296/2024010 IR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information IR 05000260/20244012024-04-10010 April 2024 Security Baseline Inspection Report 05000260/2024401 and 05000260/2024401 and 05000296/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 IR 05000259/20230042024-02-0606 February 2024 Integrated Inspection Report 05000259/2023004; 05000260/2023004 and 05000296/2023004 IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 IR 05000259/20234022023-06-12012 June 2023 – Material Control and Accounting Program Inspection Report 05000259 2023402, 05000260 2023402 and 05000296 2023402 IR 05000259/20230912023-05-0808 May 2023 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter; NRC Inspection Report 05000259/2023091 IR 05000259/20230012023-05-0303 May 2023 Integrated Inspection Report 05000259/2023001, 05000260/2023001 and 05000296/2023001 IR 05000259/20234402023-03-23023 March 2023 – Special Inspection Supplemental Report 05000259 2023440 and 05000260 2023440 and 05000296 2023440 Cover Letter IR 05000259/20234012023-03-0808 March 2023 – Security Baseline Inspection Report 05000259 2023401 and 05000260/2023401 and 05000296/2023401 IR 05000259/20230902023-03-0202 March 2023 NRC Inspection Report 05000259/2023090 and 05000260 2023090 and Preliminary White Finding and Apparent Violation IR 05000259/20220062023-03-0101 March 2023 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022006, 05000260/2022006 and 05000296/2022006 IR 05000259/20220042023-02-0707 February 2023 Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004 IR 05000259/20220032022-11-0909 November 2022 Browns Perry Nuclear Plant - Integrated Inspection Report 05000259/2022003, 05000260/2022003 and 05000296/2022003 IR 05000259/20220122022-09-20020 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000259 2022012, 05000260 2022012 and 05000296 2022012 IR 05000259/20220112022-09-16016 September 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000259/2022011 and 05000260/2022011 and 05000296/2022011 IR 05000259/20224022022-09-0606 September 2022 Security Baseline Inspection Report 05000259/2022402 and 05000260/2022402 and 05000296/2022402 Cover Letter IR 05000259/20220052022-08-30030 August 2022 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022005, 05000260/2022005 and 05000296/2022005 IR 05000259/20220022022-08-0808 August 2022 Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002 IR 05000259/20224202022-07-19019 July 2022 – Security Baseline Inspection Report 05000259/2022420, 05000260/2022420 and 05000296/2022420 ML22181A9562022-06-29029 June 2022 Bf Report 2022-401 Base Public Cover Letter ML22173A1622022-06-21021 June 2022 Replacement Steam Dryer Visual Inspection Results (U3R20) IR 05000259/20220012022-05-12012 May 2022 Integrated Inspection Report 05000259/2022001, 05000260/2022001, 05000296/2022001 and Exercise of Enforcement Discretion IR 05000259/20220102022-03-30030 March 2022 Triennial Fire Protection Inspection Report 05000259/2022010 and 05000260/2022010 and 05000296/2022010 and Apparent Violation IR 05000259/20224012022-03-0808 March 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000259/2022401; 05000260/2022401; 05000296/2022401 IR 05000259/20210062022-03-0202 March 2022 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 (Report No. 05000259/2021006, 05000260/2021006 and 05000296/2021006 IR 05000259/20210042022-01-31031 January 2022 Integrated Inspection Report 05000259/2021004, 05000260/2021004 and 05000296/2021004 IR 05000259/20214032022-01-19019 January 2022 NRC Inspection Report 05000259/2021403, 05000260/2021403 and 05000296/2021403 IR 05000259/20214022022-01-18018 January 2022 Brows Ferry Nuclear Plant - Security Baseline Inspection Report 05000259/2021402 and 05000260/2021402 and 05000296/2021402 IR 05000259/20210032021-11-0909 November 2021 Integrated Inspection Report 05000259/2021003, 05000260/2021003, 05000296/2021003 and 07200052/2021001 IR 05000259/20214012021-08-31031 August 2021 Security Baseline Inspection Report 05000259/2021401 and 05000260/2021401 and 05000296/2021401 IR 05000259/20210112021-08-24024 August 2021 Temporary Instruction 2515/TI-193 Inspection Report 05000259/2021011, 05000260/2021011, and 05000296/2021011 IR 05000259/20210052021-08-23023 August 2021 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3- Report Nos. 05000259/2021005, 05000260/2021005 and 5000296/2021005 ML21217A2832021-08-0505 August 2021 Resident Integrated Inspection Report 2021-002 IR 05000259/20213012021-07-28028 July 2021 NRC Operator License Examination Report Nos. 05000259/2021301, 05000260/2021301, 05000296/2021301 IR 05000259/20210102021-07-26026 July 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000259/2021010 and 05000260/2021010 and 05000296/2021010 2024-09-03
[Table view] Category:Letter
MONTHYEARIR 05000259/20240102024-11-12012 November 2024 Design Basis Assurance Inspection Program Inspection Report 05000259/2024010 and 05000260/2024010 and 05000296/2024010 IR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML24151A6322024-05-30030 May 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION uly 30, 2010
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - NRC INTEGRATED INSPECTION REPORT 05000259/2010003, 05000260/2010003, 05000296/2010003, 05000259/2010501, 05000260/2010501, 05000296/2010501, AND 07200052/2010002
Dear Mr. Krich:
On June 30, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Browns Ferry Nuclear Plant, Units 1, 2, and 3. The enclosed inspection report documents the inspection results which were discussed, on July 9, 2010, with Mr. Keith Polson and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
In addition to the routine Reactor Oversight Process (ROP) baseline inspections for all three units, the inspectors have continued to apply the Augmented Inspection Plan (AIP) on Unit 1 as delineated in NRC letters dated May 16, 2007, December 6, 2007, and May 21, 2008. The Unit 1 AIP was conducted to compensate for the lack of valid data for certain Performance Indicators (PI). These additional augmented baseline inspections were only considered to be an interim substitute for the invalid Unit 1 PIs until complete and accurate PI data was developed and declared valid. However, following the second quarter of 2010, all Unit 1 PIs will now have sufficient past data and operating experience to be considered valid, and thereby end the need for any further augmented inspections. Consequently, beginning with the third quarter of 2010, the AIP is considered closed and all Unit 1 PIs, including the Mitigating Systems Performance Index PIs, will be reported, assessed, and inspected, in accordance with Inspection Manual Chapter (0305), Operating Reactor Assessment Program, and IMC 2515, Light Water Reactor Inspection Program - Operations Phase.
TVA 2 Based on the results of this inspection, the NRC has determined that two Severity Level IV violations of NRC requirements occurred. The NRC has also identified two additional findings that were evaluated under the risk significance determination process as having a very low safety significance (Green). The NRC has determined that violations of NRC requirements are associated with these findings. Additionally, a licensee-identified violation, which was determined to be of very low safety significance, is listed in this report. However, because of the very low safety significance and categorization as Severity Level IV, and because they were entered into your corrective action program, the NRC is treating these as non-cited violations (NCVs) consistent with Section VI.A.1 of the NRC Enforcement Policy. If you wish to contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.:
Document Control Desk, Washington DC 20555-001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Browns Ferry Nuclear Plant. In addition, if you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II, and the NRC Resident Inspector at the Browns Ferry Nuclear Plant.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Eugene F. Guthrie, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296,72-052 License Nos.: DPR-33, DPR-52, DPR-68 Enclosure: Inspection Report 05000259/2010003, 05000260/2010003, 05000296/2010003, 05000259/2010501, 05000260/2010501, 05000296/2010501, AND 07200052/2010002 w/Attachment: Supplemental Information cc w/encl. (See page 3)
_________________________
OFFICE RII:DRP RII:DRP RII:DRP RII:DRS RII:DRP RII:DRP SIGNATURE Via email Via email Via emai Via telecon CRK /RA/ EFG /RA/
NAME CStancil KKorth TRoss HGepford CKontz EGuthrie DATE 07/30/2010 07/30/2010 07/30/2010 07/30/2010 07/30/2010 07/30/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO
TVA 3 cc w/encl:
Mr. K. J. Polson Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Mr. J. J. Randich General Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Mr. F. R. Godwin Manager, Site Licensing & Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 James L. McNees, CHP Director, Office of Radiation Control Alabama State Dept. of Public Health P.O. Box 303017 Montgomery, AL 36130-3017 Chairman, Limestone County Commission 310 West Washington Street Athens, AL 35611
TVA 4 Letter to R. from Eugene F. Guthrie dated July 30, 2010 SUBJECT: BROWNS FERRY NUCLEAR PLANT - NRC INTEGRATED INSPECTION REPORT 05000259/2010003, 05000260/2010003, 05000296/2010003, 05000259/2010501, 05000260/2010501, 05000296/2010501, AND 07200052/2010002 Distribution w/encl:
C. Evans, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource
Table of Contents
SUMMARY OF FINDINGS
REPORT DETAILS
REACTOR SAFETY
1R01 Adverse Weather Protection 4
1R04 Equipment Alignment 5
1R05 Fire Protection 6
1R07 Heat Sink Performance 7
1R11 Licensed Operator Requalification 8
1R12 Maintenance Effectiveness 9
1R13 Maintenance Risk Assessments and Emergent Work Control 9
1R15 Operability Evaluations 10
1R18 Plant Modifications 11
1R19 Post Maintenance Testing 11
1R20 Refueling and Other Outage Activities 12
1R22 Surveillance Testing 15
EMERGENCY PREPAREDNESS 1EP2 Alert Notification System Evaluation 15 1EP3 Emergency Preparedness Organization Staffing and Augmentation 16 1EP4 Emergency Action Level and Emergency Plan Changes 16 1EP5 Correction of Emergency Preparedness Weaknesses
RADIATION SAFETY
2RS5 Radiation Monitoring Instrumentation
2RS6 Radioactive Gaseous and Liquid Effluent Treatment
2RS7 Radiological Environmental Monitoring Program
2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling,
22 Storage and Transportation
OTHER ACTIVITIES
4OA1 Performance Indicator (PI) Verification
4OA2 Identification and Resolution of Problems
4OA3 Event Follow-up
4OA5 Other Activities
4OA6 Meetings, Including Exit
4OA7 Licensee-identified Violations
40 ATTACHMENT: