{{#Wiki_filter:ust 1, 2019
{{#Wiki_filter:August 1, 2019


==SUBJECT:==
==SUBJECT:==
Line 33: Line 33:


Sincerely,
Sincerely,
/RA/
/RA/  
Billy C. Dickson, Chief Branch 2 Division of Reactor Projects Docket No. 05000346 License No. NPF-3
 
Billy C. Dickson, Chief Branch 2 Division of Reactor Projects Docket No. 05000346 License No. NPF-3  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Number: 05000346 License Number: NPF-3 Report Number: 05000346/2019002 Enterprise Identifier: I-2019-002-0064 Licensee: FirstEnergy Nuclear Operating Co.
Docket Number:
05000346  
 
License Number:
NPF-3  
 
Report Number:
05000346/2019002  
 
Enterprise Identifier: I-2019-002-0064  


Facility: Davis-Besse Nuclear Power Station Location: Oak Harbor, OH Inspection Dates: April 01, 2019 to June 30, 2019 Inspectors: J. Cassidy, Senior Health Physicist J. Harvey, Resident Inspector V. Meghani, Reactor Inspector D. Mills, Senior Resident Inspector J. Rutkowski, Project Engineer J. Steffes, Senior Resident Inspector Approved By: Billy C. Dickson, JR, Chief Branch 2 Division of Reactor Projects Enclosure
Licensee:
FirstEnergy Nuclear Operating Co.
 
Facility:
Davis-Besse Nuclear Power Station  
 
Location:
Oak Harbor, OH  
 
Inspection Dates:
April 01, 2019 to June 30, 2019  
 
Inspectors:
J. Cassidy, Senior Health Physicist  
 
J. Harvey, Resident Inspector  
 
V. Meghani, Reactor Inspector  
 
D. Mills, Senior Resident Inspector  
 
J. Rutkowski, Project Engineer  
 
J. Steffes, Senior Resident Inspector  
 
Approved By:
Billy C. Dickson, JR, Chief
Branch 2
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Davis-Besse Nuclear Power Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Davis-Besse Nuclear Power Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


List of Findings and Violations Failure to Follow the Train 2 Containment Radiation Monitor Surveillance Procedure Cornerstone           Significance                           Cross-Cutting     Report Aspect            Section Mitigating             Green                                   [H.5] - Work      71152 Systems                NCV 05000346/2019002-01                 Management Open/Closed A Green finding with an associated non-cited violation of Title 10 CFR Part 50, Appendix B,
===List of Findings and Violations===
Failure to Follow the Train 2 Containment Radiation Monitor Surveillance Procedure Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000346/2019002-01 Open/Closed  
[H.5] - Work Management 71152 A Green finding with an associated non-cited violation of Title 10 CFR Part 50, Appendix B,
Criterion V, "Instructions, Procedures, and Drawings," was self-revealed on April 9, 2019, when the licensee failed to accomplish the train 2 normal containment radiation monitor surveillance in accordance with the appropriate procedure.
Criterion V, "Instructions, Procedures, and Drawings," was self-revealed on April 9, 2019, when the licensee failed to accomplish the train 2 normal containment radiation monitor surveillance in accordance with the appropriate procedure.


Additional Tracking Items None.
===Additional Tracking Items===
None.


=PLANT STATUS=
=PLANT STATUS=
Line 64: Line 105:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection Summer Readiness Sample (IP Section 03.01)==
===Summer Readiness Sample (IP Section 03.01) (1 Sample)===
{{IP sample|IP=IP 71111.01|count=1}}
: (1) The inspectors evaluated summer readiness of offsite and alternate Alternating Current (AC) power systems during the week ending May 25, 2019
: (1) The inspectors evaluated summer readiness of offsite and alternate Alternating Current (AC) power systems during the week ending May 25, 2019


==71111.04 - Equipment Alignment Partial Walkdown Sample (IP Section 03.01)==
==71111.04 - Equipment Alignment==
{{IP sample|IP=IP 71111.04|count=2}}
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) High Pressure Injection train 1 following planned testing during the week ending April 27, 2019
: (1) High Pressure Injection train 1 following planned testing during the week ending April 27, 2019
: (2) Emergency Diesel Generator 1 during Safety Features Actuation System Channel 2 testing during the week ending May 18, 2019
: (2) Emergency Diesel Generator 1 during Safety Features Actuation System Channel 2 testing during the week ending May 18, 2019


==71111.04S - Equipment Alignment Complete Walkdown Sample (IP Section 03.02)==
==71111.04S - Equipment Alignment==
{{IP sample|IP=IP 71111.04S|count=1}}
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
: (1) Decay Heat/Low Pressure Injection system during the week ending June 8, 2019
: (1) Decay Heat/Low Pressure Injection system during the week ending June 8, 2019


==71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)==
==71111.05Q - Fire Protection==
{{IP sample|IP=IP 71111.05Q|count=4}}
===Quarterly Inspection (IP Section 03.01) (4 Samples)===
 
The inspectors evaluated fire protection program implementation in the following selected areas:
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Service Water Pipe Tunnel, Fire Area BG, during the week ending May 11, 2019
: (1) Service Water Pipe Tunnel, Fire Area BG, during the week ending May 11, 2019
Line 89: Line 127:
: (4) Electrical Penetration Room 1, Fire Area DG, during the week ending May 18, 2019
: (4) Electrical Penetration Room 1, Fire Area DG, during the week ending May 18, 2019


==71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)==
==71111.06 - Flood Protection Measures==
{{IP sample|IP=IP 71111.06|count=1}}
===Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)===
 
The inspectors evaluated internal flooding mitigation protections in the:
The inspectors evaluated internal flooding mitigation protections in the:
: (1) Emergency Diesel Generator 1 and 2 rooms during the week ending May 25, 2019
: (1) Emergency Diesel Generator 1 and 2 rooms during the week ending May 25, 2019


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
{{IP sample|IP=IP 71111.11Q|count=1}}
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
: (1) Reactor power reduction and control rod exercising on June 1, 2019 Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
: (1) Reactor power reduction and control rod exercising on June 1, 2019  
 
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated licensed operator requalification activities in the simulator on May 14, 2019
: (1) The inspectors observed and evaluated licensed operator requalification activities in the simulator on May 14, 2019


==71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)==
==71111.12 - Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12|count=1}}
===Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)===
 
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Component Cooling Water train 2 isolated due to Component Cooling Water Heat Exchanger 2 Outlet Isolation Valve Leak-By during the week ending April 13, 2019
: (1) Component Cooling Water train 2 isolated due to Component Cooling Water Heat Exchanger 2 Outlet Isolation Valve Leak-By during the week ending April 13, 2019


==71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13|count=4}}
===Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)===
 
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) Start-Up Transformer X01 planned outage concurrent with unexpected loss of the Lemoyne line during the week ending May 4, 2019
: (1) Start-Up Transformer X01 planned outage concurrent with unexpected loss of the Lemoyne line during the week ending May 4, 2019
Line 115: Line 152:
: (4) Pressurizer Essential Heater bank 1 emergent work concurrent with Component Cooling Water heat exchanger 2 outlet isolation valve planned maintenance during the week ending June 8, 2019
: (4) Pressurizer Essential Heater bank 1 emergent work concurrent with Component Cooling Water heat exchanger 2 outlet isolation valve planned maintenance during the week ending June 8, 2019


==71111.15 - Operability Determinations and Functionality Assessments Operability Determination or Functionality Assessment (IP Section 02.02)==
==71111.15 - Operability Determinations and Functionality Assessments==
{{IP sample|IP=IP 71111.15|count=2}}
===Operability Determination or Functionality Assessment (IP Section 02.02) (2 Samples)===
 
The inspectors evaluated the following operability determinations and functionality assessments:
The inspectors evaluated the following operability determinations and functionality assessments:
: (1) CR 2019-04242, Service Water valve SW280, containment air cooler 2 service water, leaking by closed seat during the week ending June 1, 2019
: (1) CR 2019-04242, Service Water valve SW280, containment air cooler 2 service water, leaking by closed seat during the week ending June 1, 2019
: (2) CR 2019-04973, Emergency Diesel Generator 2, 184-Day Test with unexpected speed and voltage variations during the week ending June 8, 2019
: (2) CR 2019-04973, Emergency Diesel Generator 2, 184-Day Test with unexpected speed and voltage variations during the week ending June 8, 2019


==71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)==
==71111.18 - Plant Modifications==
{{IP sample|IP=IP 71111.18|count=1}}
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)


The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
: (1) Engineering Change Package 17-0397-001, Steam Generator operate range indication adjusted down 3 percent, during the week ending May 25, 2019
: (1) Engineering Change Package 17-0397-001, Steam Generator operate range indication adjusted down 3 percent, during the week ending May 25, 2019


==71111.19 - Post-Maintenance Testing Post Maintenance Test Sample (IP Section 03.01)==
==71111.19 - Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=3}}
===Post Maintenance Test Sample (IP Section 03.01) (3 Samples)===
 
The inspectors evaluated the following post maintenance tests:
The inspectors evaluated the following post maintenance tests:
: (1) Emergency Diesel Generator 2 Testing following Seal-In Contact Replacement during the week ending June 8, 2019
: (1) Emergency Diesel Generator 2 Testing following Seal-In Contact Replacement during the week ending June 8, 2019
Line 136: Line 171:
: (3) Safety Features Actuation System Channel 1 Testing following Power Supply Replacement during the week ending June 22, 2019
: (3) Safety Features Actuation System Channel 1 Testing following Power Supply Replacement during the week ending June 22, 2019


==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:
==71111.22 - Surveillance Testing==
Containment Isolation Valve Testing (IP Section 03.01)==
The inspectors evaluated the following surveillance tests:  
{{IP sample|IP=IP 71111.22|count=1}}
 
: (1) Containment Personnel Hatch Local Leak Rate Testing following Containment Entry during the week ending June 8, 2019
===Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)===
: (1) Containment Personnel Hatch Local Leak Rate Testing following Containment Entry during the week ending June 8, 2019  


===Inservice Testing (IP Section 03.01) (2 Samples)===
===Inservice Testing (IP Section 03.01) (2 Samples)===
: (1) High Pressure Injection 1 Quarterly Test during the week ending April 27, 2019
: (1) High Pressure Injection 1 Quarterly Test during the week ending April 27, 2019
: (2) High Pressure Injection 2 Quarterly Test during the week ending May 18, 2019
: (2) High Pressure Injection 2 Quarterly Test during the week ending May 18, 2019  


===Surveillance Tests (other) (IP Section 03.01) (3 Samples)===
===Surveillance Tests (other) (IP Section 03.01) (3 Samples)===
Line 151: Line 187:


==RADIATION SAFETY==
==RADIATION SAFETY==
 
==71124.05 - Radiation Monitoring Instrumentation==
==71124.05 - Radiation Monitoring Instrumentation Calibration and Testing Program (IP Section 02.02)==
===Calibration and Testing Program (IP Section 02.02) (1 Sample)===
{{IP sample|IP=IP 71124.05|count=1}}
 
The inspectors evaluated the calibration and testing program implementation.
The inspectors evaluated the calibration and testing program implementation.
: (1) Alarm setpoint and calibration method check of personnel contamination monitors, portal monitors and small article monitors
: (1) Alarm setpoint and calibration method check of personnel contamination monitors, portal monitors and small article monitors
* Small Article Monitors; SAM-11
* Small Article Monitors; SAM-11
* Personnel Contamination Monitor; ARGOS-5AB
* Personnel Contamination Monitor; ARGOS-5AB
* Portal Monitor; GEM-5 Failure to meet calibration or source check acceptance criteria
* Portal Monitor; GEM-5  
* None were available during this inspection
 
Failure to meet calibration or source check acceptance criteria
* None were available during this inspection  


===Walkdowns and Observations (IP Section 02.01) (1 Sample)===
===Walkdowns and Observations (IP Section 02.01) (1 Sample)===
Line 170: Line 206:
* Fluke 451B Number LI 2.7.521
* Fluke 451B Number LI 2.7.521
* Fluke 451P Number LI 2.7.614
* Fluke 451P Number LI 2.7.614
* Ludlum Model 12 Number LI 2.7.622 Source check demonstration
* Ludlum Model 12 Number LI 2.7.622  
 
Source check demonstration
* Fluke 451B
* Fluke 451B
* Fluke 451P
* Fluke 451P
* Telepole Area radiation monitors and continuous air monitors
* Telepole  
 
Area radiation monitors and continuous air monitors
* Continuous Air Monitor; AMS-4, 411 Chemistry Corridor
* Continuous Air Monitor; AMS-4, 411 Chemistry Corridor
* Continuous Air Monitor; AMS-4, Spent Fuel Pool Area
* Continuous Air Monitor; AMS-4, Spent Fuel Pool Area
Line 180: Line 220:
* Area Radiation Monitor; RE/RI 8421, Penetration Room
* Area Radiation Monitor; RE/RI 8421, Penetration Room
* Area Radiation Monitor; RE/RI 8420, Penetration Room
* Area Radiation Monitor; RE/RI 8420, Penetration Room
* Area Radiation Monitor; RE/RI 8429, 411 Chemistry Corridor Personnel contamination monitors, portal monitors and small article monitors
* Area Radiation Monitor; RE/RI 8429, 411 Chemistry Corridor  
 
Personnel contamination monitors, portal monitors and small article monitors
* Personnel Contamination Monitor; ARGOS-5AB, LI 2.12.106
* Personnel Contamination Monitor; ARGOS-5AB, LI 2.12.106
* Portal Monitor; GEM-5, LI 2.12.94
* Portal Monitor; GEM-5, LI 2.12.94
Line 187: Line 229:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
The inspectors verified licensee performance indicators submittals listed below:  
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) ===
 
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
  (1)  (April 2018 to April 2019)
MS06: Emergency AC Power Systems (IP Section 02.05) (1 Sample)
  (1)  (April 2018 to April 2019)
MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)
  (1)  (April 2018 to April 2019)


==71152 - Problem Identification and Resolution Annual Follow-Up of Selected Issues (IP Section 02.03)==
(1)  
{{IP sample|IP=IP 71152|count=1}}
(April 2018 to April 2019)


===MS06: Emergency AC Power Systems (IP Section 02.05) (1 Sample)===
(1) (April 2018 to April 2019)
===MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)===
(1) (April 2018 to April 2019)
==71152 - Problem Identification and Resolution==
===Annual Follow-Up of Selected Issues (IP Section 02.03) (1 Sample)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) CR 2019-03346, unexpected annunciator 7-6-C, RAD (radiation) monitor system trouble Ch 1 (channel 1)
: (1) CR 2019-03346, unexpected annunciator 7-6-C, RAD (radiation) monitor system trouble Ch 1 (channel 1)


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60854.1 - Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants Pre-Operational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants (1 Partial)
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL  
  (1)     (Partial)
 
60854.1 - Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants  
 
Pre-Operational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants (1 Partial)  
 
(1)  
(Partial)
This inspection is on-going and is anticipated to be documented in Inspection Report 2019004.
This inspection is on-going and is anticipated to be documented in Inspection Report 2019004.


60856.1 - Review of 10 CFR 72.212(b) Evaluations at Operating Plants Review of 10 CFR 72.212(b) Evaluations at Operating Plants (1 Partial)
60856.1 - Review of 10 CFR 72.212(b) Evaluations at Operating Plants  
  (1)     (Partial)
 
Review of 10 CFR 72.212(b) Evaluations at Operating Plants (1 Partial)  
 
(1)  
(Partial)
This inspection is on-going and is anticipated to be documented in Inspection Report
This inspection is on-going and is anticipated to be documented in Inspection Report


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Failure to Follow the Train 2 Containment Radiation Monitor Surveillance Procedure Cornerstone           Significance                             Cross-Cutting   Report Aspect          Section Mitigating           Green                                     [H.5] - Work    71152 Systems              NCV 05000346/2019002-01                   Management Open/Closed A Green finding with an associated non-cited violation of Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, was self-revealed on April 9, 2019, when the licensee failed to accomplish the train 2 Normal Containment Radiation Monitor Surveillance in accordance with the appropriate procedure.
Failure to Follow the Train 2 Containment Radiation Monitor Surveillance Procedure Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems
 
Green NCV 05000346/2019002-01 Open/Closed  
 
[H.5] - Work Management 71152 A Green finding with an associated non-cited violation of Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, was self-revealed on April 9, 2019, when the licensee failed to accomplish the train 2 Normal Containment Radiation Monitor Surveillance in accordance with the appropriate procedure.


=====Description:=====
=====Description:=====
Line 261: Line 322:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation   Description or Title                                       Revision or
Inspection
Procedure                                                                                              Date
Procedure
71111.01   Calculations     C-EE-01.03-008 AC Power System Analysis                                   7
Type
71111.01   Procedures       DB-OP-01300   Switchyard Management                                     14
Designation
71111.01   Procedures       DB-OP-0246     Degraded Grid                                             7
Description or Title
71111.01   Procedures       DB-OP-06913   Seasonal Plant Preparation Checklist                       34
Revision or
71111.01   Procedures       DB-SC-03023   Off-Site AC Sources Lined Up and Available                 34
Date
71111.01   Procedures       NOP-OP-1003   Grid Reliability Protocol                                 9
71111.01
71111.04   Corrective Action CR 2019-04161  LT2787 Minor Diesel Fuel Leak, EDG 1 Day Tank;            05/06/2019
Calculations
C-EE-01.03-008
AC Power System Analysis
71111.01
Procedures
DB-OP-01300
Switchyard Management
71111.01
Procedures
DB-OP-0246
Degraded Grid
71111.01
Procedures
DB-OP-06913
Seasonal Plant Preparation Checklist
71111.01
Procedures
DB-SC-03023
Off-Site AC Sources Lined Up and Available
71111.01
Procedures
NOP-OP-1003
Grid Reliability Protocol
71111.04
Corrective Action
Documents
Documents
71111.04   Drawings         M-017A         Diesel Generators                                         22
CR 2019-04161
71111.04   Drawings         OS-003         Operational Schematic High Pressure Injection System       40
LT2787 Minor Diesel Fuel Leak, EDG 1 Day Tank;
71111.04   Procedures       DB-OP-06011   HPI Train 1 Valve Checklist                               32
05/06/2019
71111.04   Procedures       DB-OP-06316   EDG 1 Valve Checklist                                     63
71111.04
71111.04S Corrective Action CR 2018-04538  BACC: DH Pump 2 Outboard Seal Boric Acid                  06/14/2018
Drawings
M-017A
Diesel Generators
71111.04
Drawings
OS-003
Operational Schematic High Pressure Injection System
71111.04
Procedures
DB-OP-06011
HPI Train 1 Valve Checklist
71111.04
Procedures
DB-OP-06316
EDG 1 Valve Checklist
71111.04S
Corrective Action
Documents
Documents
71111.04S  Corrective Action CR 2018-11174  BACC: Small Deposits on DH1A Stem                          12/21/2018
CR 2018-04538
BACC: DH Pump 2 Outboard Seal Boric Acid
06/14/2018
71111.04S
Corrective Action
Documents
Documents
71111.04S  Corrective Action CR 2019-00643  Time Between DH1A MOV Closed Seat Contact to Control      01/22/2019
CR 2018-11174
Documents                        Switch Trip Greater than 0.15 Seconds
BACC: Small Deposits on DH1A Stem
71111.04S Corrective Action CR 2019-02380  CCW Leak from DH Pump 2 Bearing Cooling Connection        03/15/2019
2/21/2018
71111.04S
Corrective Action
Documents
Documents
71111.04S  Corrective Action CR 2019-04402  NRC Identified Suspect Weld                                05/15/2019
CR 2019-00643
Time Between DH1A MOV Closed Seat Contact to Control
Switch Trip Greater than 0.15 Seconds
01/22/2019
71111.04S
Corrective Action
Documents
Documents
71111.04S Drawings         OS-003         High Pressure Injection System                             40
CR 2019-02380
71111.04S Drawings         OS-004-SH 1   Decay Heat Removal/Low Pressure Injection System           60
CCW Leak from DH Pump 2 Bearing Cooling Connection
71111.04S Procedures       DB-OP-06012   Decay Heat and Low Pressure Injection System Operating     73
03/15/2019
71111.04S
Corrective Action
Documents
CR 2019-04402
NRC Identified Suspect Weld
05/15/2019
71111.04S
Drawings
OS-003
High Pressure Injection System
71111.04S
Drawings
OS-004-SH 1
Decay Heat Removal/Low Pressure Injection System
71111.04S
Procedures
DB-OP-06012
Decay Heat and Low Pressure Injection System Operating
Procedure
Procedure
71111.04S Procedures       DB-PF-000     Preservice/In-Service Weld Preparation, Identification and 5
71111.04S
Procedures
DB-PF-000
Preservice/In-Service Weld Preparation, Identification and
Data Recording
Data Recording
71111.04S Procedures       DB-SP-03213   ECCS Flow Path Verification                               8
71111.04S
71111.04S Procedures       NA-QC-00252   Quality Control Review of Brazing and Weld Travelers       6
Procedures
71111.04S Procedures       NA-QC-00253   ASME/ANSI Visual Weld Inspection                           4
DB-SP-03213
Inspection Type             Designation     Description or Title                                   Revision or
ECCS Flow Path Verification
Procedure                                                                                            Date
71111.04S
71111.04S Work Orders       200635686       Perform Filling and Venting DH Train 1 Post-Maintenance 10/10/2016
Procedures
NA-QC-00252
Quality Control Review of Brazing and Weld Travelers
71111.04S
Procedures
NA-QC-00253
ASME/ANSI Visual Weld Inspection  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.04S
Work Orders
200635686
Perform Filling and Venting DH Train 1 Post-Maintenance
MODEs 1 to 3 in Accordance with DB-OP-06012
MODEs 1 to 3 in Accordance with DB-OP-06012
71111.04S Work Orders       200678232       Operation and Control of Locked Valves - Decay Heat     02/22/2018
10/10/2016
71111.04S
Work Orders
200678232
Operation and Control of Locked Valves - Decay Heat
Pump 2
Pump 2
71111.04S Work Orders       200686502       Locked Valve Verification Test                         03/19/2018
2/22/2018
71111.04S Work Orders       200693246       Capped Valve Verification                               03/20/2018
71111.04S
71111.05Q Drawings         A-224F          Fire Protection General Floor Plan Elevation 6030     26
Work Orders
71111.05Q Miscellaneous     Davis-Besse Unit Fire Hazards Analysis                                  27
200686502
Locked Valve Verification Test
03/19/2018
71111.04S
Work Orders
200693246
Capped Valve Verification
03/20/2018
71111.05Q Drawings
24F
Fire Protection General Floor Plan Elevation 6030
71111.05Q Miscellaneous
Davis-Besse Unit
Fire Hazard
Fire Hazard
Analysis Report
Analysis Report
71111.05Q Miscellaneous     Davis-Besse Unit Fire Area Evaluation                                    26
Fire Hazards Analysis
71111.05Q Miscellaneous
Davis-Besse Unit
Fire Hazard
Fire Hazard
Analysis Report
Analysis Report
71111.05Q Procedures       DB-EP-04023     Fire Rated Barrier Visual Inspection                   20
Fire Area Evaluation
71111.05Q Procedures       PFP-AB-303       No. 3 Mechanical Penetration Room, Rooms 303 and 303PC 6
71111.05Q Procedures
71111.05Q Procedures       PFP-AB-304       Risk Significant Area                                   6
DB-EP-04023
71111.05Q Procedures       PFP-AB-402       No. 1 Electrical Penetration Room, Room 402             5
Fire Rated Barrier Visual Inspection
71111.05Q Procedures       PFP-B-250       Service Water Pipe Tunnel, Room 250, Fire Area BG       5
71111.05Q Procedures
71111.05Q Procedures       PFP-IS-52       Service Water Pump Room, Room 52, Fire Area BF         3
PFP-AB-303
71111.06   Drawings         C-53             Yard Utilities Plan - Sheet 7                           46
No. 3 Mechanical Penetration Room, Rooms 303 and 303PC
71111.06   Drawings         C-55             Yard Utilities - Details Oil Separators                 11
71111.05Q Procedures
71111.06   Drawings         M-172           Drainage Systems Auxiliary Building 585-0             20
PFP-AB-304
71111.06   Procedures       PFP-AB-318       Pre-Fire Plan Diesel Generator 1-1 Room                 07/22/2010
Risk Significant Area
71111.06   Procedures       PFP-AB-321A     Pre-Fire Plan Diesel Fuel Oil Day Tank 1-1 Room         07/22/2010
71111.05Q Procedures
71111.06   Procedures       RA-EP-02880     Internal Flooding                                       4
PFP-AB-402
71111.11Q Miscellaneous     FENOC Simulator OTLC 2019SA DBS102 CSRO Drill                            0
No. 1 Electrical Penetration Room, Room 402
71111.05Q Procedures
PFP-B-250
Service Water Pipe Tunnel, Room 250, Fire Area BG
71111.05Q Procedures
PFP-IS-52
Service Water Pump Room, Room 52, Fire Area BF
71111.06
Drawings
C-53
Yard Utilities Plan - Sheet 7
71111.06
Drawings
C-55
Yard Utilities - Details Oil Separators
71111.06
Drawings
M-172
Drainage Systems Auxiliary Building 585-0
71111.06
Procedures
PFP-AB-318
Pre-Fire Plan Diesel Generator 1-1 Room
07/22/2010
71111.06
Procedures
PFP-AB-321A
Pre-Fire Plan Diesel Fuel Oil Day Tank 1-1 Room
07/22/2010
71111.06
Procedures
RA-EP-02880
Internal Flooding
71111.11Q Miscellaneous
FENOC Simulator
Guide
Guide
71111.11Q Procedures         DB-SC-03272     Control Rod Exercising Test                             6
OTLC 2019SA DBS102 CSRO Drill
71111.11Q Procedures         NOP-OP-1002     Conduct of Operations                                   13
71111.11Q Procedures
71111.12   Calculations     C-ICE-048.01-   SFAS BWST Low Level Setpoint                            8
DB-SC-03272
Control Rod Exercising Test
71111.11Q Procedures
NOP-OP-1002
Conduct of Operations
71111.12
Calculations
C-ICE-048.01-
004
004
71111.12   Calculations     C-NSA-011.01-26 Calculation Computation                                 R00
SFAS BWST Low Level Setpoint
71111.12   Corrective Action CR 2016-03466   Liner Torn in SW37                                     03/15/2016
71111.12
Inspection Type             Designation   Description or Title                                     Revision or
Calculations
Procedure                                                                                            Date
C-NSA-011.01-26 Calculation Computation
R00
71111.12
Corrective Action
CR 2016-03466
Liner Torn in SW37
03/15/2016  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Documents
71111.12   Corrective Action CR 2018-11015  SFAS Channel 3 BWST LT125C Indicating Erratically        12/16/2018
71111.12
Corrective Action
Documents
Documents
71111.12   Corrective Action CR 2019-00579  BWST Level Transmiter for Channel 4 is Failed            01/20/2019
CR 2018-11015
SFAS Channel 3 BWST LT125C Indicating Erratically
2/16/2018
71111.12
Corrective Action
Documents
Documents
71111.12  Corrective Action CR 2019-00596  Water Found in LT1525D                                    01/21/2019
CR 2019-00579
BWST Level Transmiter for Channel 4 is Failed
01/20/2019
71111.12
Corrective Action
Documents
Documents
71111.12   Corrective Action CR 2019-01625 SW38 Excessive Leakage Most Likely due to a Degraded     02/22/2019
CR 2019-00596
Documents                        Valve Liner
Water Found in LT1525D
71111.12   Corrective Action CR 2019-02906 Incomplete Mounting Details on Drawings for BWST Level   03/28/2019
01/21/2019
Documents                        Transmitters
71111.12
71111.12   Corrective Action CR 2019-03616 Perform Performance GAP Analysis to Determine if There is 04/18/2019
Corrective Action
Documents                        a GAP in Skills and Knowledge Regarding EDG PM Scope
Documents
71111.12   Corrective Action CR 2019-03884 NRC 1Q2019 Integrated Exit - Minor Violation of 10 CR 50 04/26/2019
CR 2019-01625
Documents                        App B Crit III, Design Control
SW38 Excessive Leakage Most Likely due to a Degraded
71111.12   Drawings         M-041B         Primary Service Water System                             72
Valve Liner
71111.12   Miscellaneous     LER 2018-001   Borated Water Storage Tank Level Transmitter Out of
2/22/2019
71111.12
Corrective Action
Documents
CR 2019-02906
Incomplete Mounting Details on Drawings for BWST Level
Transmitters
03/28/2019
71111.12
Corrective Action
Documents
CR 2019-03616
Perform Performance GAP Analysis to Determine if There is
a GAP in Skills and Knowledge Regarding EDG PM Scope
04/18/2019
71111.12
Corrective Action
Documents
CR 2019-03884
NRC 1Q2019 Integrated Exit - Minor Violation of 10 CR 50
App B Crit III, Design Control
04/26/2019
71111.12
Drawings
M-041B
Primary Service Water System
71111.12
Miscellaneous
LER 2018-001
Borated Water Storage Tank Level Transmitter Out of
Tolerance Due to Reaching End of Expected Life
Tolerance Due to Reaching End of Expected Life
71111.12   Miscellaneous     NOP-CC-2007-01 BWST Level Transmitter Replacement                       0
71111.12
71111.12   Procedures       DB-MI-03147   Functional Test/Calibration of LT-12C BWST Level         12
Miscellaneous
NOP-CC-2007-01 BWST Level Transmitter Replacement
71111.12
Procedures
DB-MI-03147
Functional Test/Calibration of LT-12C BWST Level
Transmitter of SFAS Channel 3
Transmitter of SFAS Channel 3
71111.12   Procedures       NOP-OP-1001   Clearance Tagging Program                                 26
71111.12
71111.13   Drawings         E-1 SH.1       A.C. Electrical System One Line Diagram                   39
Procedures
71111.13   Drawings         E-1 SH.2       A.C. Electrical System One Line Diagram                   89
NOP-OP-1001
71111.13   Drawings         OS-041A SH 2   Operational Schematic Emergency Diesel Generator         33
Clearance Tagging Program
71111.13
Drawings
E-1 SH.1
A.C. Electrical System One Line Diagram
71111.13
Drawings
E-1 SH.2
A.C. Electrical System One Line Diagram
71111.13
Drawings
OS-041A SH 2
Operational Schematic Emergency Diesel Generator
Systems
Systems
71111.13   Drawings         OS-057 SH.2   Operational Schematic 13 BKV System                       13
71111.13
71111.13   Procedures       DB-OP-06311   345 KV Switchyard No. 1 (Main) Transformer, No. 11       49
Drawings
                                            (Auxiliary) Transformer, and Startup Transformers
OS-057 SH.2
                                            (01 and 02)
Operational Schematic 13 BKV System
71111.13   Procedures       DB-SC-03023   Off-Site AC Sources Lined up and Available               34
71111.13
71111.13   Procedures       DBBP-OPS-0011 Protected Equipment Posting                               14
Procedures
71111.13   Procedures       NOP-OP-1007   Risk Management                                           29
DB-OP-06311
71111.13   Work Orders       200788640     Turbine Shaft/ Station Ground Volts > 1
345 KV Switchyard No. 1 (Main) Transformer, No. 11  
Inspection Type             Designation     Description or Title                                       Revision or
(Auxiliary) Transformer, and Startup Transformers  
Procedure                                                                                              Date
(01 and 02)
71111.15   Calculations     C-ICE-048.01-   SFAS BWST Low Level Setpoint                              8
71111.13
Procedures
DB-SC-03023
Off-Site AC Sources Lined up and Available
71111.13
Procedures
DBBP-OPS-0011
Protected Equipment Posting
71111.13
Procedures
NOP-OP-1007
Risk Management
71111.13
Work Orders
200788640
Turbine Shaft/ Station Ground Volts > 1  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.15
Calculations
C-ICE-048.01-
004
004
71111.15   Calculations     C-ME-099.16-010 Service Water System Check Valves                         2
SFAS BWST Low Level Setpoint
71111.15   Corrective Action CR 2017-02906   Incomplete Mounting Details on Drawings for BWST Level     03/28/2019
71111.15
Documents                        Transmitters
Calculations
71111.15   Corrective Action CR 2018-11015   SFAS Channel 3 BWST LT125C Indicating Erratically         12/16/2018
C-ME-099.16-010 Service Water System Check Valves
71111.15
Corrective Action
Documents
CR 2017-02906
Incomplete Mounting Details on Drawings for BWST Level
Transmitters
03/28/2019
71111.15
Corrective Action
Documents
CR 2018-11015
SFAS Channel 3 BWST LT125C Indicating Erratically
2/16/2018
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action CR 2019-00579   BWST Level Transmiter for Channel 4 is Failed             01/20/2019
CR 2019-00579
BWST Level Transmiter for Channel 4 is Failed
01/20/2019
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action CR 2019-00596   Water Found in LT1525D                                     01/21/2019
CR 2019-00596
Water Found in LT1525D
01/21/2019
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action CR 2019-03884   NRC 1Q2019 Integrated Exit - Minor Violation of 10 CR 50   04/26/2019
CR 2019-03884
Documents                        App B Crit III, Design Control
NRC 1Q2019 Integrated Exit - Minor Violation of 10 CR 50
71111.15   Corrective Action CR 2019-04242  SW280 Leaking by Closed Seat                              05/09/2019
App B Crit III, Design Control
04/26/2019
71111.15
Corrective Action
Documents
Documents
71111.15  Corrective Action CR 2019-04973  EDG 2 184 Day Test, Speed and Voltage Variations          06/06/2019
CR 2019-04242
SW280 Leaking by Closed Seat
05/09/2019
71111.15
Corrective Action
Documents
Documents
71111.15   Drawings         M-041C         Service Water System for Containment Air Coolers           47
CR 2019-04973
71111.15   Miscellaneous     LER 2018-001   Borated Water Storage Tank Level Transmitter Out of
EDG 2 184 Day Test, Speed and Voltage Variations
06/06/2019
71111.15
Drawings
M-041C
Service Water System for Containment Air Coolers
71111.15
Miscellaneous
LER 2018-001
Borated Water Storage Tank Level Transmitter Out of
Tolerance Due to Reaching End of Expected Life
Tolerance Due to Reaching End of Expected Life
71111.15   Miscellaneous     NOP-CC-2007-01 BWST Level Transmitter Replacement                         0
71111.15
71111.15   Procedures       DB-MI-03147     Functional Test/Calibration of LT-12C BWST Level           12
Miscellaneous
NOP-CC-2007-01 BWST Level Transmitter Replacement
71111.15
Procedures
DB-MI-03147
Functional Test/Calibration of LT-12C BWST Level
Transmitter of SFAS Channel 3
Transmitter of SFAS Channel 3
71111.15   Procedures       DB-OP-06316     Starting EDG 2                                             63
71111.15
71111.15   Procedures       DB-PF-03027     Service Water Train 2 Valve Test                           38
Procedures
71111.15   Work Orders       200715992       PF3027-032 05.000 SW279/SW280 Forward Flow and             05/08/2019
DB-OP-06316
Starting EDG 2
71111.15
Procedures
DB-PF-03027
Service Water Train 2 Valve Test
71111.15
Work Orders
200715992
PF3027-032 05.000 SW279/SW280 Forward Flow and
Closure
Closure
71111.18   Corrective Action 2017-04079     OTSG Monitoring - Operating Range Level                   04/10/2017
05/08/2019
71111.18
Corrective Action
Documents
2017-04079
OTSG Monitoring - Operating Range Level
04/10/2017
71111.18
Corrective Action
Documents
Documents
71111.18  Corrective Action 2018-01897     All SG Operate Levels Not Tracking Actual SG Levels       03/04/2018
2018-01897
All SG Operate Levels Not Tracking Actual SG Levels
03/04/2018
71111.18
Corrective Action
Documents
Documents
71111.18  Corrective Action 2018-03130     S/G Operate Levels for both Steam Generator Margin to Tech 04/04/2018
2018-03130
Documents                        Spec Limit Lower-Than-Normal Following Refueling
S/G Operate Levels for both Steam Generator Margin to Tech
71111.18   Engineering       15-0269-01     SG Operate Range Indication Adjusted Down 3%               0
Spec Limit Lower-Than-Normal Following Refueling
Inspection Type             Designation   Description or Title                                       Revision or
04/04/2018
Procedure                                                                                              Date
71111.18
Engineering
15-0269-01
SG Operate Range Indication Adjusted Down 3%  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Changes
Changes
71111.18   Engineering       17-0397-001    SG Operate Range Indication Adjusted Down 3%                1
71111.18
Engineering
Changes
Changes
71111.18   Work Orders       200734969     SG 2 Operate Range Level                                   04/22/2019
17-0397-001
71111.19   Corrective Action CR 2018-07377  Found Pressurizer Heater that did not Meet Acceptance      08/20/2018
SG Operate Range Indication Adjusted Down 3%
Documents                        Criteria
71111.18
71111.19  Corrective Action CR 2019-04847  Pressurizer Essential Heater Bank 1 Breaker BE1213 Tripped  06/02/2019
Work Orders
Documents                        During Rod Testing
200734969
71111.19  Corrective Action CR 2019-04973  EDG 2 184-Day Test, Speed and Voltage Variations            06/06/2019
SG 2 Operate Range Level
04/22/2019
71111.19
Corrective Action
Documents
Documents
71111.19   Corrective Action CR 2019-05150 Pressurizer Heater Readings Slightly Out-of-Acceptance     06/12/2019
CR 2018-07377
Documents                        Criteria Limits
Found Pressurizer Heater that did not Meet Acceptance
71111.19   Procedures       DB-OP-01101   Containment Entry                                           16
Criteria
71111.19   Procedures       DB-OP-03006   Miscellaneous Instrument Shift Checks                       62
08/20/2018
71111.19   Procedures       DB-OP-03013   Containment Daily Inspection and Containment Closeout       10
71111.19
Corrective Action
Documents
CR 2019-04847
Pressurizer Essential Heater Bank 1 Breaker BE1213 Tripped
During Rod Testing
06/02/2019
71111.19
Corrective Action
Documents
CR 2019-04973
EDG 2 184-Day Test, Speed and Voltage Variations
06/06/2019
71111.19
Corrective Action
Documents
CR 2019-05150
Pressurizer Heater Readings Slightly Out-of-Acceptance
Criteria Limits
06/12/2019
71111.19
Procedures
DB-OP-01101
Containment Entry
71111.19
Procedures
DB-OP-03006
Miscellaneous Instrument Shift Checks
71111.19
Procedures
DB-OP-03013
Containment Daily Inspection and Containment Closeout
Inspection
Inspection
71111.19   Procedures       DB-OP-06316   Starting EDG 2                                             63
71111.19
71111.19   Procedures       DB-PF-04813   Miscellaneous Periodic Valve Test                           7
Procedures
71111.19   Procedures       DB-SC-03110   SFAS Chanel 1 Functional Test                               22
DB-OP-06316
71111.19   Work Orders       200767617     Order Walkdown/Preparation                                 06/19/2019
Starting EDG 2
71111.22   Calculations     C-NSA-052.01- HPI Pump Acceptance Criteria
71111.19
Procedures
DB-PF-04813
Miscellaneous Periodic Valve Test
71111.19
Procedures
DB-SC-03110
SFAS Chanel 1 Functional Test
71111.19
Work Orders
200767617
Order Walkdown/Preparation
06/19/2019
71111.22
Calculations
C-NSA-052.01-
003
003
71111.22   Corrective Action CR 2019-04429 Suspect M& TE Readings for HPI Pump 2 Flow During           05/16/2019
HPI Pump Acceptance Criteria
Documents                        Performance of DB-SP-03219
71111.22
71111.22   Corrective Action CR 2019-04429- Follow-Up to not Being Able to Obtain a Zero No-Flow       05/24/2019
Corrective Action
Documents        ATA-01        Reading on M& TE Used for Testing
Documents
71111.22   Drawings         E-65B SH.13A   Control Rod Drive Mechanism Control System CRDM Trip       4
CR 2019-04429
Suspect M& TE Readings for HPI Pump 2 Flow During
Performance of DB-SP-03219
05/16/2019
71111.22
Corrective Action
Documents
CR 2019-04429-
ATA-01
Follow-Up to not Being Able to Obtain a Zero No-Flow
Reading on M& TE Used for Testing
05/24/2019
71111.22
Drawings
E-65B SH.13A
Control Rod Drive Mechanism Control System CRDM Trip
Breaker B (Channel 1)
Breaker B (Channel 1)
71111.22   Drawings         OS-017A SH 1   Operational Schematic Auxiliary Feedwater System           35
71111.22
71111.22   Procedures       DB-MI-03011   Channel Functional Test of Reactor Trip Breaker B, RPS     35
Drawings
OS-017A SH 1
Operational Schematic Auxiliary Feedwater System
71111.22
Procedures
DB-MI-03011
Channel Functional Test of Reactor Trip Breaker B, RPS
Channel 1 Reactor Trip Module Logic, and Arts Channel 1
Channel 1 Reactor Trip Module Logic, and Arts Channel 1
Output Logic
Output Logic
71111.22   Procedures       DB-MI-09024   Installation and Removal of Foxboro I/A Series Differential 4
71111.22
Pressure Transducers
Procedures
Inspection Type       Designation Description or Title                                       Revision or
DB-MI-09024
Procedure                                                                                    Date
Installation and Removal of Foxboro I/A Series Differential
71111.22   Procedures DB-PF-03291 Containment Personnel and Emergency Airlocks Seal         14
Pressure Transducers  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.22
Procedures
DB-PF-03291
Containment Personnel and Emergency Airlocks Seal
Leakage Test
Leakage Test
71111.22   Procedures DB-SP-03152 Surveillance Test Procedure                               30
71111.22
71111.22   Procedures DB-SP-03218 HPI Train 1 Pump and Valve Test                           30
Procedures
71111.22   Procedures DB-SP-03219 HPI Train 2 Pump and Valve Test                           28
DB-SP-03152
71111.22   Procedures DB-SP-03506 AFP 2 Monthly Test                                         2
Surveillance Test Procedure
71111.22   Work Orders 200695772   HPI Pump 1 Quarterly                                       10/16/2018
71111.22
71111.22   Work Orders 200704314   HPI Pump 1 Quarterly                                       01/07/2019
Procedures
71111.22   Work Orders 200706426   AW Train 1 Level Control, Interlock and Flow Transmitter   01/31/2019
DB-SP-03218
HPI Train 1 Pump and Valve Test
71111.22
Procedures
DB-SP-03219
HPI Train 2 Pump and Valve Test
71111.22
Procedures
DB-SP-03506
AFP 2 Monthly Test
71111.22
Work Orders
200695772
HPI Pump 1 Quarterly
10/16/2018
71111.22
Work Orders
200704314
HPI Pump 1 Quarterly
01/07/2019
71111.22
Work Orders
200706426
AW Train 1 Level Control, Interlock and Flow Transmitter
Test
Test
71111.22   Work Orders 200707472   Perform DB-SP3219-003 HPI Pump 2 Quarterly FA Norm         02/18/2019
01/31/2019
71111.22   Work Orders 200712534   HPI Pump 1 Quarterly FA Norm                               04/23/2019
71111.22
71111.22   Work Orders 200714753   Channel 1 RTB TRM/ARTS Logic Breaker B                     04/23/2019
Work Orders
71111.22   Work Orders 200715403   Inlet Isolation FA Norm                                   04/26/2019
200707472
71111.22   Work Orders 200716610   HP31 Forward Flow Valve Test                               05/14/2019
Perform DB-SP3219-003 HPI Pump 2 Quarterly FA Norm
71111.22   Work Orders 200716619   AFP 2 Monthly Test                                         05/07/2019
2/18/2019
71124.05   Calibration DB-0125-4  Calibration Data Sheet - Small Article Monitor; LI 2.12.59 10/03/2017
71111.22
Work Orders
200712534
HPI Pump 1 Quarterly FA Norm
04/23/2019
71111.22
Work Orders
200714753
Channel 1 RTB TRM/ARTS Logic Breaker B
04/23/2019
71111.22
Work Orders
200715403
Inlet Isolation FA Norm
04/26/2019
71111.22
Work Orders
200716610
HP31 Forward Flow Valve Test
05/14/2019
71111.22
Work Orders
200716619
AFP 2 Monthly Test
05/07/2019
71124.05
Calibration
Records
Records
71124.05  Calibration DB-0141-3  Frisker Calibration Data Sheet; LI 2.7.539                05/03/2018
DB-0125-4
Calibration Data Sheet - Small Article Monitor; LI 2.12.59
10/03/2017
71124.05
Calibration
Records
Records
71124.05  Calibration DB-0178-3   AMS-4 Calibration Record; LI 2.8.171                      07/24/2018
DB-0141-3
Frisker Calibration Data Sheet; LI 2.7.539
05/03/2018
71124.05
Calibration
Records
Records
71124.05  Calibration DB-0199-3   Calibration Data Sheet: AMP - 50/100/200; LI 2.7.510      04/19/2018
DB-0178-3
AMS-4 Calibration Record; LI 2.8.171
07/24/2018
71124.05
Calibration
Records
Records
71124.05  Calibration DB-0395-2   Model 89 Standardization Check                            10/30/2018
DB-0199-3
Calibration Data Sheet: AMP - 50/100/200; LI 2.7.510
04/19/2018
71124.05
Calibration
Records
Records
71124.05  Calibration DB-0432-1  Counting System QC Report; LI 2.12.57                      05/22/2018
DB-0395-2
Model 89 Standardization Check
10/30/2018
71124.05
Calibration
Records
Records
71124.05  Calibration DB-0516-3  Ion Chamber Calibration Data Sheet; LI 2.7.314E            04/27/2018
DB-0432-1
Counting System QC Report; LI 2.12.57
05/22/2018
71124.05
Calibration
Records
Records
71124.05  Calibration DB-0556-3   Calibration Data Sheet - MG Telepole; LI 2.7.346          07/18/2018
DB-0516-3
Ion Chamber Calibration Data Sheet; LI 2.7.314E
04/27/2018
71124.05
Calibration
Records
Records
71124.05  Calibration DB-0558-Calibration Data Sheet: ASP-1 NRD; LI 2.7.233              03/02/2018
DB-0556-3
Calibration Data Sheet - MG Telepole; LI 2.7.346
07/18/2018
71124.05
Calibration
Records
Records
Inspection Type             Designation   Description or Title                                       Revision or
DB-0558-0
Procedure                                                                                              Date
Calibration Data Sheet: ASP-1 NRD; LI 2.7.233
71124.05   Calibration      DB-0560-2      Calibration Data Sheet: Air Sampler; LI ECP.0.36            04/23/2018
03/02/2018
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71124.05
Calibration
Records
Records
71124.05  Calibration      DB-0561-1      Calibration Data Sheet: Lapel Sample Pump; LI 2.8.456      07/17/2018
DB-0560-2
Calibration Data Sheet: Air Sampler; LI ECP.0.36
04/23/2018
71124.05
Calibration
Records
Records
71124.05  Calibration      DB-0774-0      ARGOS Calibration Record; LI 2.12.107                      1/26/2018
DB-0561-1
Calibration Data Sheet: Lapel Sample Pump; LI 2.8.456
07/17/2018
71124.05
Calibration
Records
Records
71124.05  Calibration      DB-0787-0     Calibration Data Sheet - Cronos-4; LI 2.12.98              02/26/2018
DB-0774-0
ARGOS Calibration Record; LI 2.12.107
1/26/2018
71124.05
Calibration
Records
Records
71124.05  Calibration      DB-0788-0     Calibration Data Sheet - GEM-5; LI 2.12.117                08/22/2018
DB-0787-0
Calibration Data Sheet - Cronos-4; LI 2.12.98
2/26/2018
71124.05
Calibration
Records
Records
71124.05  Calibration      DB-HP-01322    FASCTSCAN Efficiency Calibration Verification; LI 2.12.42  05/22/2018
DB-0788-0
Calibration Data Sheet - GEM-5; LI 2.12.117
08/22/2018
71124.05
Calibration
Records
Records
71124.05  Calibration      DB-HP-01324    ACCUSCAN Efficiency Calibration Verification; LI 2.12.71    01/17/2018
DB-HP-01322
FASCTSCAN Efficiency Calibration Verification; LI 2.12.42
05/22/2018
71124.05
Calibration
Records
Records
71124.05  Calibration       LI 2.12.19    Gamma Spectrometer Calibration                              07/20/2018
DB-HP-01324
ACCUSCAN Efficiency Calibration Verification; LI 2.12.71
01/17/2018
71124.05
Calibration
Records
Records
71124.05  Calibration      NOP-OP-4410-01 Fluke 451B Calibration Record; LI 2.7.518                  02/08/2018
LI 2.12.19
Gamma Spectrometer Calibration
07/20/2018
71124.05
Calibration
Records
Records
71124.05   Corrective Action CR-2019-00858 Radiochemistry Cross Check Program in Disagreement for     01/28/2019
NOP-OP-4410-01 Fluke 451B Calibration Record; LI 2.7.518
Documents                        Annual Gas Sample
2/08/2018
71124.05   Corrective Action CR-2019-01866 Davis Besse QAQC Cross Check Program Performance           02/28/2019
71124.05
Documents                        Declining Trend
Corrective Action
71124.05   Miscellaneous                   Results of Radiochemistry Cross Check Program               01/12/2018
Documents
71124.05   Miscellaneous                   Results of Radiochemistry Cross Check Program               01/28/2019
CR-2019-00858
71124.05   Miscellaneous                   Results of Radiochemistry Cross Check Program               11/01/2018
Radiochemistry Cross Check Program in Disagreement for
71124.05   Miscellaneous                   Results of Radiochemistry Cross Check Program               01/30/2018
Annual Gas Sample
71124.05   Miscellaneous                   Results of Radiochemistry Cross Check Program               04/06/2018
01/28/2019
71124.05   Procedures       DB-HP-00010   Radiation Measuring and Test Equipment Calibration and     10
71124.05
Corrective Action
Documents
CR-2019-01866
Davis Besse QAQC Cross Check Program Performance
Declining Trend
2/28/2019
71124.05
Miscellaneous
Results of Radiochemistry Cross Check Program
01/12/2018
71124.05
Miscellaneous
Results of Radiochemistry Cross Check Program
01/28/2019
71124.05
Miscellaneous
Results of Radiochemistry Cross Check Program
11/01/2018
71124.05
Miscellaneous
Results of Radiochemistry Cross Check Program
01/30/2018
71124.05
Miscellaneous
Results of Radiochemistry Cross Check Program
04/06/2018
71124.05
Procedures
DB-HP-00010
Radiation Measuring and Test Equipment Calibration and
Control Program
Control Program
71124.05   Procedures       DB-HP-00011   Quality Control for Radiation Protection Counting Equipment 5
71124.05
71124.05   Procedures       DB-HP-01112   Calibration of the Gamma Spectrometer System               7
Procedures
71124.05   Procedures       DB-HP-01320   Operation of Whole Body Counters                           12
DB-HP-00011
71124.05   Procedures       DB-HP-01322   Body Counter Calibration and Performance Testing           6
Quality Control for Radiation Protection Counting Equipment
71124.05   Procedures       DB-HP-01324   ACCUSCAN-II Whole Body Counter Calibration and             2
71124.05
Inspection Type             Designation     Description or Title                                     Revision or
Procedures
Procedure                                                                                            Date
DB-HP-01112
Calibration of the Gamma Spectrometer System
71124.05
Procedures
DB-HP-01320
Operation of Whole Body Counters
71124.05
Procedures
DB-HP-01322
Body Counter Calibration and Performance Testing
71124.05
Procedures
DB-HP-01324
ACCUSCAN-II Whole Body Counter Calibration and  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Performance Checks
Performance Checks
71124.05   Procedures       DB-HP-01325     Operation of the ABACOS 2000 ACCUSCAN II Whole Body     3
71124.05
Procedures
DB-HP-01325
Operation of the ABACOS 2000 ACCUSCAN II Whole Body
Counting System
Counting System
71124.05   Procedures       DB-HP-01407     Calibration and Use of the J.L. Shepherd Model 89       9
71124.05
71124.05   Procedures       DB-HP-01418     Air Vented Ion Chamber Calibration                       5
Procedures
71124.05   Procedures       DB-HP-01432     ASP-1 Calibration and Use                               4
DB-HP-01407
71124.05   Procedures       DB-HP-01438     Frisker Calibration                                     6
Calibration and Use of the J.L. Shepherd Model 89
71124.05   Procedures       DB-HP-01442     MGP Telepole Calibration and Use                         4
71124.05
71124.05   Procedures       DB-HP-01447     Small Article Monitor Calibration                       6
Procedures
71124.05   Procedures       DB-HP-01454     Calibration and Use of Lapel Air Samplers               9
DB-HP-01418
71124.05   Procedures       DB-HP-01456     Calibration of the Eberline AMS-4                       5
Air Vented Ion Chamber Calibration
71124.05   Procedures       DB-HP-01457     MGP AMP-50/100/200 Calibration and Use                   3
71124.05
71124.05   Procedures       DB-HP-01463     GEM-5 Gamma Exit Monitor Calibration and Use             2
Procedures
71124.05   Procedures       DB-HP-01464     Cronos-4 Object/Tool Monitor Calibration and Use         3
DB-HP-01432
71124.05   Procedures       DB-HP-01465     ARGOS-5 Personnel Contamination Monitor Calibration and 4
ASP-1 Calibration and Use
71124.05
Procedures
DB-HP-01438
Frisker Calibration
71124.05
Procedures
DB-HP-01442
MGP Telepole Calibration and Use
71124.05
Procedures
DB-HP-01447
Small Article Monitor Calibration
71124.05
Procedures
DB-HP-01454
Calibration and Use of Lapel Air Samplers
71124.05
Procedures
DB-HP-01456
Calibration of the Eberline AMS-4
71124.05
Procedures
DB-HP-01457
MGP AMP-50/100/200 Calibration and Use
71124.05
Procedures
DB-HP-01463
GEM-5 Gamma Exit Monitor Calibration and Use
71124.05
Procedures
DB-HP-01464
Cronos-4 Object/Tool Monitor Calibration and Use
71124.05
Procedures
DB-HP-01465
ARGOS-5 Personnel Contamination Monitor Calibration and
Use
Use
71124.05   Procedures       DB-HP-01466     AVS-20T Constant Flow Air Sampler Calibration           0
71124.05
71124.05   Procedures       DB-HP-06024     Calibration and Use of Tennelec S5XLB Low Background     4
Procedures
DB-HP-01466
AVS-20T Constant Flow Air Sampler Calibration
71124.05
Procedures
DB-HP-06024
Calibration and Use of Tennelec S5XLB Low Background
Counting System
Counting System
71124.05   Procedures       NOP-OP-4206     Bioassay Program                                         4
71124.05
71124.05   Procedures       NOP-OP-4410     Fluke 451B Calibration and Use                           1
Procedures
71124.05   Work Orders       DB-MI3408-001   RE4596B Channel Calibration                             03/14/2018
NOP-OP-4206
71124.05   Work Orders       DB-MI4508-002   RE2389 Channel Check                                     03/18/2018
Bioassay Program
71151     Miscellaneous     LER 2017-002   Auxiliary Feed Water Pump Turbine Bearing Damaged Due
71124.05
Procedures
NOP-OP-4410
Fluke 451B Calibration and Use
71124.05
Work Orders
DB-MI3408-001
RE4596B Channel Calibration
03/14/2018
71124.05
Work Orders
DB-MI4508-002
RE2389 Channel Check
03/18/2018
71151
Miscellaneous
LER 2017-002
Auxiliary Feed Water Pump Turbine Bearing Damaged Due
to Improperly Marked Lubricating Oil Sight Glass
to Improperly Marked Lubricating Oil Sight Glass
71151     Miscellaneous     LER 2017-002-01 Auxiliary Feed Water Pump Turbine Bearing Damaged Due
71151
Miscellaneous
LER 2017-002-01
Auxiliary Feed Water Pump Turbine Bearing Damaged Due
to Improperly Marked Lubricating Oil Sight Glass
to Improperly Marked Lubricating Oil Sight Glass
71151     Miscellaneous     LER 2018-001   Borated Water Storage Tank Level Transmitter Out-of-
71151
Miscellaneous
LER 2018-001
Borated Water Storage Tank Level Transmitter Out-of-
Tolerance Due to Reaching End of Expected Life
Tolerance Due to Reaching End of Expected Life
71151     Miscellaneous     NEI 99-02       Regulator Assessment Performance Indicator Guideline     7
71151
71152     Corrective Action CR 2018-05767   Emergency Diesel Generator 2 Water Jacket Monthly Sample 06/22/2018
Miscellaneous
Documents                        is Brown and Cloudy in Appearance
NEI 99-02
71152     Corrective Action CR 2018-10927   EDG 1 Cylinder 19 Injector Linkage                       12/13/2018
Regulator Assessment Performance Indicator Guideline
Inspection Type             Designation   Description or Title                                     Revision or
71152
Procedure                                                                                            Date
Corrective Action
Documents
CR 2018-05767
Emergency Diesel Generator 2 Water Jacket Monthly Sample
is Brown and Cloudy in Appearance
06/22/2018
71152
Corrective Action
CR 2018-10927
EDG 1 Cylinder 19 Injector Linkage
2/13/2018  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
71152
Corrective Action
Documents
Documents
71152      Corrective Action CR 2019-03346 Misposition: Unexpected Annunciator 7-6-C, RAD Monitoring 04/09/2019
CR 2019-03346
Documents                      System Trouble, Channel 1
Misposition: Unexpected Annunciator 7-6-C, RAD Monitoring
71152     Procedures       DB-SC-03212   Monthly Functional Test of RE 4597AA, CTMT Vessel (East) 21
System Trouble, Channel 1
04/09/2019
71152
Procedures
DB-SC-03212
Monthly Functional Test of RE 4597AA, CTMT Vessel (East)
Normal Range Radiation Monitor
Normal Range Radiation Monitor
71152     Procedures       DB-SC-03213   Monthly Functional Test of RE 4597BA, CTMT Vessel (West) 21
71152
Procedures
DB-SC-03213
Monthly Functional Test of RE 4597BA, CTMT Vessel (West)
Normal Range Radiation Monitor
Normal Range Radiation Monitor
71152     Procedures       NOP-OP-1007   Risk Management                                           29
71152
20
Procedures
NOP-OP-1007
Risk Management
29
}}
}}

Latest revision as of 19:45, 4 January 2025

Integrated Inspection Report 05000346/2019002
ML19214A124
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/01/2019
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR 2019002
Download: ML19214A124 (23)


Text

August 1, 2019

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONINTEGRATED INSPECTION REPORT 05000346/2019002

Dear Mr. Bezilla:

On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station. On July 18, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Davis-Besse Nuclear Power Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Davis-Besse. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Billy C. Dickson, Chief Branch 2 Division of Reactor Projects Docket No. 05000346 License No. NPF-3

Enclosure:

As stated

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2019002

Enterprise Identifier: I-2019-002-0064

Licensee:

FirstEnergy Nuclear Operating Co.

Facility:

Davis-Besse Nuclear Power Station

Location:

Oak Harbor, OH

Inspection Dates:

April 01, 2019 to June 30, 2019

Inspectors:

J. Cassidy, Senior Health Physicist

J. Harvey, Resident Inspector

V. Meghani, Reactor Inspector

D. Mills, Senior Resident Inspector

J. Rutkowski, Project Engineer

J. Steffes, Senior Resident Inspector

Approved By:

Billy C. Dickson, JR, Chief

Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Davis-Besse Nuclear Power Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Follow the Train 2 Containment Radiation Monitor Surveillance Procedure Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000346/2019002-01 Open/Closed

[H.5] - Work Management 71152 A Green finding with an associated non-cited violation of Title 10 CFR Part 50, Appendix B,

Criterion V, "Instructions, Procedures, and Drawings," was self-revealed on April 9, 2019, when the licensee failed to accomplish the train 2 normal containment radiation monitor surveillance in accordance with the appropriate procedure.

Additional Tracking Items

None.

PLANT STATUS

The Unit reduced power to nine percent on June 1, 2019, for planned control rod drive and turbine valve testing and returned to full power on June 2, 2019. Otherwise, the Unit operated at or near full rated thermal power for the entire inspection period.

On April 25, 2018, FirstEnergy Solutions (FES) / FirstEnergy Nuclear Operating Company (FENOC) notified the U.S. Nuclear Regulatory Commission (NRC) that they intend to shut down all four of their operating nuclear power plants (ADAMS Accession Number ML18115A007).

Based on that notification, the first to shut down will be Davis-Besse, by May 31, 2020. On March 31, 2018, FES, FirstEnergy Nuclear Generation (FENGEN), and FENOC filed for bankruptcy. The NRC continues to maintain focus on public health and safety and the protection of the environment. This will include a continuous evaluation by inspectors to determine whether the licensees financial condition is impacting safe operation of the plant.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Summer Readiness Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated summer readiness of offsite and alternate Alternating Current (AC) power systems during the week ending May 25, 2019

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) High Pressure Injection train 1 following planned testing during the week ending April 27, 2019
(2) Emergency Diesel Generator 1 during Safety Features Actuation System Channel 2 testing during the week ending May 18, 2019

71111.04S - Equipment Alignment

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) Decay Heat/Low Pressure Injection system during the week ending June 8, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Service Water Pipe Tunnel, Fire Area BG, during the week ending May 11, 2019
(2) Service Water Pump Room, Fire Area BF, during the week ending May 11, 2019
(3) Mechanical Penetration Room 3 and Corridor to Mechanical Penetration Rooms 3 and 4, Fire Areas AB and V, during the week ending April 27, 2019
(4) Electrical Penetration Room 1, Fire Area DG, during the week ending May 18, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Emergency Diesel Generator 1 and 2 rooms during the week ending May 25, 2019

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) Reactor power reduction and control rod exercising on June 1, 2019

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator requalification activities in the simulator on May 14, 2019

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Component Cooling Water train 2 isolated due to Component Cooling Water Heat Exchanger 2 Outlet Isolation Valve Leak-By during the week ending April 13, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Start-Up Transformer X01 planned outage concurrent with unexpected loss of the Lemoyne line during the week ending May 4, 2019
(2) Start-Up Transformer X02 planned outage and Electro-Hydraulic Control accumulator pressure check activities during the week ending May 18, 2019
(3) Emergency Diesel Generator 1 unavailable during planned testing and subsequent turbine generator planned maintenance during the week ending June 1, 2019
(4) Pressurizer Essential Heater bank 1 emergent work concurrent with Component Cooling Water heat exchanger 2 outlet isolation valve planned maintenance during the week ending June 8, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (2 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) CR 2019-04242, Service Water valve SW280, containment air cooler 2 service water, leaking by closed seat during the week ending June 1, 2019
(2) CR 2019-04973, Emergency Diesel Generator 2, 184-Day Test with unexpected speed and voltage variations during the week ending June 8, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Engineering Change Package 17-0397-001, Steam Generator operate range indication adjusted down 3 percent, during the week ending May 25, 2019

71111.19 - Post-Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Emergency Diesel Generator 2 Testing following Seal-In Contact Replacement during the week ending June 8, 2019
(2) Pressurizer Essential Heater Testing following modification during the week ending June 8, 2019
(3) Safety Features Actuation System Channel 1 Testing following Power Supply Replacement during the week ending June 22, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Containment Personnel Hatch Local Leak Rate Testing following Containment Entry during the week ending June 8, 2019

Inservice Testing (IP Section 03.01) (2 Samples)

(1) High Pressure Injection 1 Quarterly Test during the week ending April 27, 2019
(2) High Pressure Injection 2 Quarterly Test during the week ending May 18, 2019

Surveillance Tests (other) (IP Section 03.01) (3 Samples)

(1) Reactor Protection System Channel 1, Reactor Trip Breaker B testing during the week ending April 27, 2019
(2) Auxiliary Feedwater Pump train 2 Monthly Test during the week ending May 11, 2019
(3) Auxiliary Feedwater train 1 Level Control, Interlock, and Flow Transmitter Test during the week ending May 4,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Calibration and Testing Program (IP Section 02.02) (1 Sample)

The inspectors evaluated the calibration and testing program implementation.

(1) Alarm setpoint and calibration method check of personnel contamination monitors, portal monitors and small article monitors
  • Small Article Monitors; SAM-11
  • Personnel Contamination Monitor; ARGOS-5AB

Failure to meet calibration or source check acceptance criteria

  • None were available during this inspection

Walkdowns and Observations (IP Section 02.01) (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.

(1) Portable survey instruments
  • Telepole Number LI 2.7.584
  • Fluke 451B Number LI 2.7.518
  • Fluke 451B Number LI 2.7.513
  • Fluke 451B Number LI 2.7.521
  • Fluke 451P Number LI 2.7.614
  • Ludlum Model 12 Number LI 2.7.622

Source check demonstration

  • Fluke 451B
  • Fluke 451P
  • Telepole

Area radiation monitors and continuous air monitors

  • Continuous Air Monitor; AMS-4, 411 Chemistry Corridor
  • Continuous Air Monitor; AMS-4, Spent Fuel Pool Area
  • Area Radiation Monitor; RE/RI 2387A, Containment Equiptment Hatch
  • Area Radiation Monitor; RE/RI 8417A, Fuel Handling Area
  • Area Radiation Monitor; RE/RI 8429, 411 Chemistry Corridor

Personnel contamination monitors, portal monitors and small article monitors

  • Personnel Contamination Monitor; ARGOS-5AB, LI 2.12.106
  • Small Article Monitors; SAM-11, LI 2.12.86
  • Small Article Monitor; Cronos-4, LI

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1)

(April 2018 to April 2019)

MS06: Emergency AC Power Systems (IP Section 02.05) (1 Sample)

(1) (April 2018 to April 2019)

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) (April 2018 to April 2019)

71152 - Problem Identification and Resolution

Annual Follow-Up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) CR 2019-03346, unexpected annunciator 7-6-C, RAD (radiation) monitor system trouble Ch 1 (channel 1)

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

60854.1 - Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants

Pre-Operational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants (1 Partial)

(1)

(Partial)

This inspection is on-going and is anticipated to be documented in Inspection Report 2019004.

60856.1 - Review of 10 CFR 72.212(b) Evaluations at Operating Plants

Review of 10 CFR 72.212(b) Evaluations at Operating Plants (1 Partial)

(1)

(Partial)

This inspection is on-going and is anticipated to be documented in Inspection Report

INSPECTION RESULTS

Failure to Follow the Train 2 Containment Radiation Monitor Surveillance Procedure Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000346/2019002-01 Open/Closed

[H.5] - Work Management 71152 A Green finding with an associated non-cited violation of Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, was self-revealed on April 9, 2019, when the licensee failed to accomplish the train 2 Normal Containment Radiation Monitor Surveillance in accordance with the appropriate procedure.

Description:

On April 9, 2019, the licensee was performing surveillance test DB-SC-03213, Monthly Functional Test of RE4597BA, CTMT (containment) Vessel (West) Normal Range Radiation Monitor, Revision 21, for the train 2 Safety-Related Containment Atmosphere Radiation element. During the test, the control room received unexpected annunciator RAD MON SYSTEM TRBLE CH 1 for the opposite containment atmosphere radiation element train.

Upon receiving the alarm, the licensee declared the train 1 Containment Atmosphere Radiation Element inoperable. The train 2 element was previously declared inoperable for testing, so the licensee entered technical specification limiting condition for operation (LCO)3.4.15, RCS (reactor coolant system) Leakage Detection Instrumentation, condition B. The licensee subsequently restored the train 1 Radiation Element to operable status.

As described in section B 3.4.15 of the technical specification bases, the containment radiation monitors, in combination with the containment sump level/flow monitoring system, are used to detect reactor coolant pressure boundary degradation to minimize the potential for propagation to a gross failure and allow for mitigation strategies to be employed.

Upon investigation, the licensee determined the operator in the field had been given the wrong surveillance procedure by a senior reactor operator, that is, they were given a section from DB-SC-03212, which applies, to train 1 rather than train 2. Additionally, the operator had initially gone to the correct train, however, upon reviewing the procedure he had been given, the individual moved to the incorrect train component without asking for clarification.

The inspectors noted that train 1 was the protected equipment train at the time. Section 4.5.1 of NOP-OP-1007 states, in part, protected equipment postings are designed to limit plant risk, transients, and to prevent inadvertent Tech Spec entry due to maintenance, testing, or inadvertent equipment manipulations through increased personnel awareness. Additionally, section 4.5.7 states, in part, generally, work on protected equipment will not be allowed.

The inspectors discussed the importance of maintaining control over protected equipment with the licensee. Additionally, the inspectors reviewed the licensees corrective actions and questioned the licensee on the use of human performance tools.

Corrective Actions: The test was re-performed with 100 percent oversight. The individual was taken off-shift, provided remedial training regarding human performance tool use, and was subject to enhanced oversight when placed back on-shift. Additionally, the licensee discussed the importance of using a controlled procedure copy with the operations crews.

Corrective Action References: Condition report 2019-03346.

Performance Assessment:

Performance Deficiency: The licensee failed to accomplish the train 2 normal containment radiation monitor surveillance in accordance with the appropriate procedure as required by Title 10 CFR Part 50, Appendix B, Criterion V. Specifically, the licensee provided the incorrect procedure section to an individual in the field, which resulted in the individual manipulating the incorrect component and rendering the alternate train of normal range containment radiation inoperable.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems cornerstone. Specifically, the containment radiation monitors respond to a loss of coolant accident by detecting elevated radiation monitors in containment and alerting the operators. This allows for early detection and mitigation of a loss of coolant accident to prevent undesirable consequences. The licensee failed to accomplish the surveillance test for the train 2 containment atmosphere radiation element in accordance with an appropriate procedure, which resulted in negatively impacting the availability of the alternate train radiation element.

Significance: The inspectors screened the issue in accordance with IMC 0612, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012.

The inspectors answered No to all questions under Exhibit 2, Mitigating Systems Screening Questions. Specifically, the SSC did not maintain its operability, the finding did not represent a loss of system or function because the containment sump monitor was unaffected, there was not an actual loss of a single train for greater than its technical specification allowed outage time and the finding did not represent a loss of a non-technical specification train designated as high safety significant for greater than 24-hours. Therefore, the finding was screened as having very low safety significance (Green).

Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. The licensee failed to plan, control and execute a work activity, which unexpectedly rendered a containment radiation monitor inoperable. Specifically, the licensee failed to provide the correct procedure section to the individual working in the field. Additionally, individuals in the pre-job brief did not use component identification, so the incorrect procedure section was not identified. Lastly, the individual executed the work on equipment that was protected at the time.

Enforcement:

Violation: Step 4.5.4.b of test procedure DB-SC-03213, Monthly Functional Test of RE 4597BA, CTMT (Containment) Vessel (West) Normal Range Radiation Monitor, Revision 21, states, in part, close CV203, containment sample supply isolation to RE4597BA.

Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures and Drawings, states, in part, activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances, and shall be accomplished in accordance with these instructions, procedures, or drawings.

Contrary to the above, on April 9, 2019, the licensee failed to accomplish an activity affecting quality in accordance with a prescribed procedure of a type appropriate to the circumstances.

Specifically, the licensee failed to close CV203 in accordance with DB-SC-03213. Instead, the licensee closed CV106, the containment sample supply isolation to RE4597AA and RE4597AB.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 12, 2019, the inspectors presented the Radiation Protection Program to Mr. D. Noble, Radiation Protection Manager, and other members of the licensee staff.
  • On July 18, 2019, the inspectors presented the integrated inspection results to Mr. M. Bezilla and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Calculations

C-EE-01.03-008

AC Power System Analysis

71111.01

Procedures

DB-OP-01300

Switchyard Management

71111.01

Procedures

DB-OP-0246

Degraded Grid

71111.01

Procedures

DB-OP-06913

Seasonal Plant Preparation Checklist

71111.01

Procedures

DB-SC-03023

Off-Site AC Sources Lined Up and Available

71111.01

Procedures

NOP-OP-1003

Grid Reliability Protocol

71111.04

Corrective Action

Documents

CR 2019-04161

LT2787 Minor Diesel Fuel Leak, EDG 1 Day Tank;

05/06/2019

71111.04

Drawings

M-017A

Diesel Generators

71111.04

Drawings

OS-003

Operational Schematic High Pressure Injection System

71111.04

Procedures

DB-OP-06011

HPI Train 1 Valve Checklist

71111.04

Procedures

DB-OP-06316

EDG 1 Valve Checklist

71111.04S

Corrective Action

Documents

CR 2018-04538

BACC: DH Pump 2 Outboard Seal Boric Acid

06/14/2018

71111.04S

Corrective Action

Documents

CR 2018-11174

BACC: Small Deposits on DH1A Stem

2/21/2018

71111.04S

Corrective Action

Documents

CR 2019-00643

Time Between DH1A MOV Closed Seat Contact to Control

Switch Trip Greater than 0.15 Seconds

01/22/2019

71111.04S

Corrective Action

Documents

CR 2019-02380

CCW Leak from DH Pump 2 Bearing Cooling Connection

03/15/2019

71111.04S

Corrective Action

Documents

CR 2019-04402

NRC Identified Suspect Weld

05/15/2019

71111.04S

Drawings

OS-003

High Pressure Injection System

71111.04S

Drawings

OS-004-SH 1

Decay Heat Removal/Low Pressure Injection System

71111.04S

Procedures

DB-OP-06012

Decay Heat and Low Pressure Injection System Operating

Procedure

71111.04S

Procedures

DB-PF-000

Preservice/In-Service Weld Preparation, Identification and

Data Recording

71111.04S

Procedures

DB-SP-03213

ECCS Flow Path Verification

71111.04S

Procedures

NA-QC-00252

Quality Control Review of Brazing and Weld Travelers

71111.04S

Procedures

NA-QC-00253

ASME/ANSI Visual Weld Inspection

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04S

Work Orders

200635686

Perform Filling and Venting DH Train 1 Post-Maintenance

MODEs 1 to 3 in Accordance with DB-OP-06012

10/10/2016

71111.04S

Work Orders

200678232

Operation and Control of Locked Valves - Decay Heat

Pump 2

2/22/2018

71111.04S

Work Orders

200686502

Locked Valve Verification Test

03/19/2018

71111.04S

Work Orders

200693246

Capped Valve Verification

03/20/2018

71111.05Q Drawings

24F

Fire Protection General Floor Plan Elevation 6030

71111.05Q Miscellaneous

Davis-Besse Unit

Fire Hazard

Analysis Report

Fire Hazards Analysis

71111.05Q Miscellaneous

Davis-Besse Unit

Fire Hazard

Analysis Report

Fire Area Evaluation

71111.05Q Procedures

DB-EP-04023

Fire Rated Barrier Visual Inspection

71111.05Q Procedures

PFP-AB-303

No. 3 Mechanical Penetration Room, Rooms 303 and 303PC

71111.05Q Procedures

PFP-AB-304

Risk Significant Area

71111.05Q Procedures

PFP-AB-402

No. 1 Electrical Penetration Room, Room 402

71111.05Q Procedures

PFP-B-250

Service Water Pipe Tunnel, Room 250, Fire Area BG

71111.05Q Procedures

PFP-IS-52

Service Water Pump Room, Room 52, Fire Area BF

71111.06

Drawings

C-53

Yard Utilities Plan - Sheet 7

71111.06

Drawings

C-55

Yard Utilities - Details Oil Separators

71111.06

Drawings

M-172

Drainage Systems Auxiliary Building 585-0

71111.06

Procedures

PFP-AB-318

Pre-Fire Plan Diesel Generator 1-1 Room

07/22/2010

71111.06

Procedures

PFP-AB-321A

Pre-Fire Plan Diesel Fuel Oil Day Tank 1-1 Room

07/22/2010

71111.06

Procedures

RA-EP-02880

Internal Flooding

71111.11Q Miscellaneous

FENOC Simulator

Guide

OTLC 2019SA DBS102 CSRO Drill

71111.11Q Procedures

DB-SC-03272

Control Rod Exercising Test

71111.11Q Procedures

NOP-OP-1002

Conduct of Operations

71111.12

Calculations

C-ICE-048.01-

004

SFAS BWST Low Level Setpoint

71111.12

Calculations

C-NSA-011.01-26 Calculation Computation

R00

71111.12

Corrective Action

CR 2016-03466

Liner Torn in SW37

03/15/2016

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

71111.12

Corrective Action

Documents

CR 2018-11015

SFAS Channel 3 BWST LT125C Indicating Erratically

2/16/2018

71111.12

Corrective Action

Documents

CR 2019-00579

BWST Level Transmiter for Channel 4 is Failed

01/20/2019

71111.12

Corrective Action

Documents

CR 2019-00596

Water Found in LT1525D

01/21/2019

71111.12

Corrective Action

Documents

CR 2019-01625

SW38 Excessive Leakage Most Likely due to a Degraded

Valve Liner

2/22/2019

71111.12

Corrective Action

Documents

CR 2019-02906

Incomplete Mounting Details on Drawings for BWST Level

Transmitters

03/28/2019

71111.12

Corrective Action

Documents

CR 2019-03616

Perform Performance GAP Analysis to Determine if There is

a GAP in Skills and Knowledge Regarding EDG PM Scope

04/18/2019

71111.12

Corrective Action

Documents

CR 2019-03884

NRC 1Q2019 Integrated Exit - Minor Violation of 10 CR 50

App B Crit III, Design Control

04/26/2019

71111.12

Drawings

M-041B

Primary Service Water System

71111.12

Miscellaneous

LER 2018-001

Borated Water Storage Tank Level Transmitter Out of

Tolerance Due to Reaching End of Expected Life

71111.12

Miscellaneous

NOP-CC-2007-01 BWST Level Transmitter Replacement

71111.12

Procedures

DB-MI-03147

Functional Test/Calibration of LT-12C BWST Level

Transmitter of SFAS Channel 3

71111.12

Procedures

NOP-OP-1001

Clearance Tagging Program

71111.13

Drawings

E-1 SH.1

A.C. Electrical System One Line Diagram

71111.13

Drawings

E-1 SH.2

A.C. Electrical System One Line Diagram

71111.13

Drawings

OS-041A SH 2

Operational Schematic Emergency Diesel Generator

Systems

71111.13

Drawings

OS-057 SH.2

Operational Schematic 13 BKV System

71111.13

Procedures

DB-OP-06311

345 KV Switchyard No. 1 (Main) Transformer, No. 11

(Auxiliary) Transformer, and Startup Transformers

(01 and 02)

71111.13

Procedures

DB-SC-03023

Off-Site AC Sources Lined up and Available

71111.13

Procedures

DBBP-OPS-0011

Protected Equipment Posting

71111.13

Procedures

NOP-OP-1007

Risk Management

71111.13

Work Orders

200788640

Turbine Shaft/ Station Ground Volts > 1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Calculations

C-ICE-048.01-

004

SFAS BWST Low Level Setpoint

71111.15

Calculations

C-ME-099.16-010 Service Water System Check Valves

71111.15

Corrective Action

Documents

CR 2017-02906

Incomplete Mounting Details on Drawings for BWST Level

Transmitters

03/28/2019

71111.15

Corrective Action

Documents

CR 2018-11015

SFAS Channel 3 BWST LT125C Indicating Erratically

2/16/2018

71111.15

Corrective Action

Documents

CR 2019-00579

BWST Level Transmiter for Channel 4 is Failed

01/20/2019

71111.15

Corrective Action

Documents

CR 2019-00596

Water Found in LT1525D

01/21/2019

71111.15

Corrective Action

Documents

CR 2019-03884

NRC 1Q2019 Integrated Exit - Minor Violation of 10 CR 50

App B Crit III, Design Control

04/26/2019

71111.15

Corrective Action

Documents

CR 2019-04242

SW280 Leaking by Closed Seat

05/09/2019

71111.15

Corrective Action

Documents

CR 2019-04973

EDG 2 184 Day Test, Speed and Voltage Variations

06/06/2019

71111.15

Drawings

M-041C

Service Water System for Containment Air Coolers

71111.15

Miscellaneous

LER 2018-001

Borated Water Storage Tank Level Transmitter Out of

Tolerance Due to Reaching End of Expected Life

71111.15

Miscellaneous

NOP-CC-2007-01 BWST Level Transmitter Replacement

71111.15

Procedures

DB-MI-03147

Functional Test/Calibration of LT-12C BWST Level

Transmitter of SFAS Channel 3

71111.15

Procedures

DB-OP-06316

Starting EDG 2

71111.15

Procedures

DB-PF-03027

Service Water Train 2 Valve Test

71111.15

Work Orders

200715992

PF3027-032 05.000 SW279/SW280 Forward Flow and

Closure

05/08/2019

71111.18

Corrective Action

Documents

2017-04079

OTSG Monitoring - Operating Range Level

04/10/2017

71111.18

Corrective Action

Documents

2018-01897

All SG Operate Levels Not Tracking Actual SG Levels

03/04/2018

71111.18

Corrective Action

Documents

2018-03130

S/G Operate Levels for both Steam Generator Margin to Tech

Spec Limit Lower-Than-Normal Following Refueling

04/04/2018

71111.18

Engineering

15-0269-01

SG Operate Range Indication Adjusted Down 3%

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Changes

71111.18

Engineering

Changes

17-0397-001

SG Operate Range Indication Adjusted Down 3%

71111.18

Work Orders

200734969

SG 2 Operate Range Level

04/22/2019

71111.19

Corrective Action

Documents

CR 2018-07377

Found Pressurizer Heater that did not Meet Acceptance

Criteria

08/20/2018

71111.19

Corrective Action

Documents

CR 2019-04847

Pressurizer Essential Heater Bank 1 Breaker BE1213 Tripped

During Rod Testing

06/02/2019

71111.19

Corrective Action

Documents

CR 2019-04973

EDG 2 184-Day Test, Speed and Voltage Variations

06/06/2019

71111.19

Corrective Action

Documents

CR 2019-05150

Pressurizer Heater Readings Slightly Out-of-Acceptance

Criteria Limits

06/12/2019

71111.19

Procedures

DB-OP-01101

Containment Entry

71111.19

Procedures

DB-OP-03006

Miscellaneous Instrument Shift Checks

71111.19

Procedures

DB-OP-03013

Containment Daily Inspection and Containment Closeout

Inspection

71111.19

Procedures

DB-OP-06316

Starting EDG 2

71111.19

Procedures

DB-PF-04813

Miscellaneous Periodic Valve Test

71111.19

Procedures

DB-SC-03110

SFAS Chanel 1 Functional Test

71111.19

Work Orders

200767617

Order Walkdown/Preparation

06/19/2019

71111.22

Calculations

C-NSA-052.01-

003

HPI Pump Acceptance Criteria

71111.22

Corrective Action

Documents

CR 2019-04429

Suspect M& TE Readings for HPI Pump 2 Flow During

Performance of DB-SP-03219

05/16/2019

71111.22

Corrective Action

Documents

CR 2019-04429-

ATA-01

Follow-Up to not Being Able to Obtain a Zero No-Flow

Reading on M& TE Used for Testing

05/24/2019

71111.22

Drawings

E-65B SH.13A

Control Rod Drive Mechanism Control System CRDM Trip

Breaker B (Channel 1)

71111.22

Drawings

OS-017A SH 1

Operational Schematic Auxiliary Feedwater System

71111.22

Procedures

DB-MI-03011

Channel Functional Test of Reactor Trip Breaker B, RPS

Channel 1 Reactor Trip Module Logic, and Arts Channel 1

Output Logic

71111.22

Procedures

DB-MI-09024

Installation and Removal of Foxboro I/A Series Differential

Pressure Transducers

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.22

Procedures

DB-PF-03291

Containment Personnel and Emergency Airlocks Seal

Leakage Test

71111.22

Procedures

DB-SP-03152

Surveillance Test Procedure

71111.22

Procedures

DB-SP-03218

HPI Train 1 Pump and Valve Test

71111.22

Procedures

DB-SP-03219

HPI Train 2 Pump and Valve Test

71111.22

Procedures

DB-SP-03506

AFP 2 Monthly Test

71111.22

Work Orders

200695772

HPI Pump 1 Quarterly

10/16/2018

71111.22

Work Orders

200704314

HPI Pump 1 Quarterly

01/07/2019

71111.22

Work Orders

200706426

AW Train 1 Level Control, Interlock and Flow Transmitter

Test

01/31/2019

71111.22

Work Orders

200707472

Perform DB-SP3219-003 HPI Pump 2 Quarterly FA Norm

2/18/2019

71111.22

Work Orders

200712534

HPI Pump 1 Quarterly FA Norm

04/23/2019

71111.22

Work Orders

200714753

Channel 1 RTB TRM/ARTS Logic Breaker B

04/23/2019

71111.22

Work Orders

200715403

Inlet Isolation FA Norm

04/26/2019

71111.22

Work Orders

200716610

HP31 Forward Flow Valve Test

05/14/2019

71111.22

Work Orders

200716619

AFP 2 Monthly Test

05/07/2019

71124.05

Calibration

Records

DB-0125-4

Calibration Data Sheet - Small Article Monitor; LI 2.12.59

10/03/2017

71124.05

Calibration

Records

DB-0141-3

Frisker Calibration Data Sheet; LI 2.7.539

05/03/2018

71124.05

Calibration

Records

DB-0178-3

AMS-4 Calibration Record; LI 2.8.171

07/24/2018

71124.05

Calibration

Records

DB-0199-3

Calibration Data Sheet: AMP - 50/100/200; LI 2.7.510

04/19/2018

71124.05

Calibration

Records

DB-0395-2

Model 89 Standardization Check

10/30/2018

71124.05

Calibration

Records

DB-0432-1

Counting System QC Report; LI 2.12.57

05/22/2018

71124.05

Calibration

Records

DB-0516-3

Ion Chamber Calibration Data Sheet; LI 2.7.314E

04/27/2018

71124.05

Calibration

Records

DB-0556-3

Calibration Data Sheet - MG Telepole; LI 2.7.346

07/18/2018

71124.05

Calibration

Records

DB-0558-0

Calibration Data Sheet: ASP-1 NRD; LI 2.7.233

03/02/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.05

Calibration

Records

DB-0560-2

Calibration Data Sheet: Air Sampler; LI ECP.0.36

04/23/2018

71124.05

Calibration

Records

DB-0561-1

Calibration Data Sheet: Lapel Sample Pump; LI 2.8.456

07/17/2018

71124.05

Calibration

Records

DB-0774-0

ARGOS Calibration Record; LI 2.12.107

1/26/2018

71124.05

Calibration

Records

DB-0787-0

Calibration Data Sheet - Cronos-4; LI 2.12.98

2/26/2018

71124.05

Calibration

Records

DB-0788-0

Calibration Data Sheet - GEM-5; LI 2.12.117

08/22/2018

71124.05

Calibration

Records

DB-HP-01322

FASCTSCAN Efficiency Calibration Verification; LI 2.12.42

05/22/2018

71124.05

Calibration

Records

DB-HP-01324

ACCUSCAN Efficiency Calibration Verification; LI 2.12.71

01/17/2018

71124.05

Calibration

Records

LI 2.12.19

Gamma Spectrometer Calibration

07/20/2018

71124.05

Calibration

Records

NOP-OP-4410-01 Fluke 451B Calibration Record; LI 2.7.518

2/08/2018

71124.05

Corrective Action

Documents

CR-2019-00858

Radiochemistry Cross Check Program in Disagreement for

Annual Gas Sample

01/28/2019

71124.05

Corrective Action

Documents

CR-2019-01866

Davis Besse QAQC Cross Check Program Performance

Declining Trend

2/28/2019

71124.05

Miscellaneous

Results of Radiochemistry Cross Check Program

01/12/2018

71124.05

Miscellaneous

Results of Radiochemistry Cross Check Program

01/28/2019

71124.05

Miscellaneous

Results of Radiochemistry Cross Check Program

11/01/2018

71124.05

Miscellaneous

Results of Radiochemistry Cross Check Program

01/30/2018

71124.05

Miscellaneous

Results of Radiochemistry Cross Check Program

04/06/2018

71124.05

Procedures

DB-HP-00010

Radiation Measuring and Test Equipment Calibration and

Control Program

71124.05

Procedures

DB-HP-00011

Quality Control for Radiation Protection Counting Equipment

71124.05

Procedures

DB-HP-01112

Calibration of the Gamma Spectrometer System

71124.05

Procedures

DB-HP-01320

Operation of Whole Body Counters

71124.05

Procedures

DB-HP-01322

Body Counter Calibration and Performance Testing

71124.05

Procedures

DB-HP-01324

ACCUSCAN-II Whole Body Counter Calibration and

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Performance Checks

71124.05

Procedures

DB-HP-01325

Operation of the ABACOS 2000 ACCUSCAN II Whole Body

Counting System

71124.05

Procedures

DB-HP-01407

Calibration and Use of the J.L. Shepherd Model 89

71124.05

Procedures

DB-HP-01418

Air Vented Ion Chamber Calibration

71124.05

Procedures

DB-HP-01432

ASP-1 Calibration and Use

71124.05

Procedures

DB-HP-01438

Frisker Calibration

71124.05

Procedures

DB-HP-01442

MGP Telepole Calibration and Use

71124.05

Procedures

DB-HP-01447

Small Article Monitor Calibration

71124.05

Procedures

DB-HP-01454

Calibration and Use of Lapel Air Samplers

71124.05

Procedures

DB-HP-01456

Calibration of the Eberline AMS-4

71124.05

Procedures

DB-HP-01457

MGP AMP-50/100/200 Calibration and Use

71124.05

Procedures

DB-HP-01463

GEM-5 Gamma Exit Monitor Calibration and Use

71124.05

Procedures

DB-HP-01464

Cronos-4 Object/Tool Monitor Calibration and Use

71124.05

Procedures

DB-HP-01465

ARGOS-5 Personnel Contamination Monitor Calibration and

Use

71124.05

Procedures

DB-HP-01466

AVS-20T Constant Flow Air Sampler Calibration

71124.05

Procedures

DB-HP-06024

Calibration and Use of Tennelec S5XLB Low Background

Counting System

71124.05

Procedures

NOP-OP-4206

Bioassay Program

71124.05

Procedures

NOP-OP-4410

Fluke 451B Calibration and Use

71124.05

Work Orders

DB-MI3408-001

RE4596B Channel Calibration

03/14/2018

71124.05

Work Orders

DB-MI4508-002

RE2389 Channel Check

03/18/2018

71151

Miscellaneous

LER 2017-002

Auxiliary Feed Water Pump Turbine Bearing Damaged Due

to Improperly Marked Lubricating Oil Sight Glass

71151

Miscellaneous

LER 2017-002-01

Auxiliary Feed Water Pump Turbine Bearing Damaged Due

to Improperly Marked Lubricating Oil Sight Glass

71151

Miscellaneous

LER 2018-001

Borated Water Storage Tank Level Transmitter Out-of-

Tolerance Due to Reaching End of Expected Life

71151

Miscellaneous

NEI 99-02

Regulator Assessment Performance Indicator Guideline

71152

Corrective Action

Documents

CR 2018-05767

Emergency Diesel Generator 2 Water Jacket Monthly Sample

is Brown and Cloudy in Appearance

06/22/2018

71152

Corrective Action

CR 2018-10927

EDG 1 Cylinder 19 Injector Linkage

2/13/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

71152

Corrective Action

Documents

CR 2019-03346

Misposition: Unexpected Annunciator 7-6-C, RAD Monitoring

System Trouble, Channel 1

04/09/2019

71152

Procedures

DB-SC-03212

Monthly Functional Test of RE 4597AA, CTMT Vessel (East)

Normal Range Radiation Monitor

71152

Procedures

DB-SC-03213

Monthly Functional Test of RE 4597BA, CTMT Vessel (West)

Normal Range Radiation Monitor

71152

Procedures

NOP-OP-1007

Risk Management

29