NRC Emergency Preparedness Inspection Report 05000346/2019501 (Gph)
ML19143A409
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/23/2019
From: Dave Hills
Operations Branch III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR 2019501
Download: ML19143A409 (9)


Text

May 23, 2019

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1NRC EMERGENCY

PREPAREDNESS INSPECTION REPORT 05000346/2019501

Dear Mr. Bezilla:

On April 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Davis-Besse Nuclear Power Station, Unit 1 and discussed the results of this inspection with Mr. B. Blair and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA Gregory Roach Acting for/

David E. Hills, Acting Chief Operations Branch Division of Reactor Safety

Docket No. 05000346 License No. NPF-3

Enclosure:

Inspection Report 05000346/2019501

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2019501

Enterprise Identifier: I-2019-501-0015

Licensee:

FirstEnergy Nuclear Operating Co.

Facility:

Davis-Besse, Unit 1

Location:

Oak Harbor, OH 43449

Inspection Dates:

April 15, 2019, to April 18, 2019

Inspectors:

D. Chyu, Reactor Engineer

G. Hansen, Sr. Emergency Preparedness Inspector

S. Hedger, Emergency Preparedness Inspector

J. Rutkowski, Project Engineer

Approved By:

David E. Hills, Acting Chief

Operations Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Emergency Preparedness Inspection at Davis-Besse Nuclear Power Station, Unit 1 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

No findings or violations were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

The inspectors evaluated the Biennial Emergency Plan Exercise. The exercise scenario simulated an event at the Davis-Besse Nuclear Power Station, Unit 1 that initiated with the declaration and notification of an Alert in response to damage to a safety system due to tornado activity in the vicinity of the plant on April 16, 2019. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

The inspectors reviewed and evaluated the proposed scenario for Biennial Emergency Plan Exercise on March 13,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee Performance Indicators submittals listed below:

Alert & Notification System Reliability (IP Section 02.14)===

January 2018 - December 2018

Drill/Exercise Performance (IP Section 02.12) (1 Sample)

January 2018 - December 2018

ERO Drill Participation (IP Section 02.13) (1 Sample)

January 2018 - December

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 18, 2019, the inspectors presented the Emergency Preparedness inspection results to Mr. B. Blair and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.01

Corrective Action

Documents

CR-2017-04331

During the CANS Weekly Test conducted on 4/17/17,

all circuits are busy now messages were received

CR-2017-05010

2017 NRC Evaluated Exercise EP Drill Roll Up (Site Protection

Lessons Learned)

CR-2017-05030

EP-Drill: 2017 Evaluated Exercise TSC summary

CR-2017-06306

Continuing Trend in Site Protection for not Meeting Required

Timeline for ERO Pager Test

CR-2017-06382

NEI 99-01 Rev. 6 Bases document for HU3.2, CA6.1, and

SA9.1, Internal Flooding

CR-2017-06400

NEI 99-01 Rev. 6 Bases document information may result in

determination of Potential Loss of RCS, with RCS intact.

CR-2017-06973

Several individuals experienced issues calling into CANS

during June 27th call in drill.

CR-2017-07722

ERO on call responder did not call in for the weekly drill

CR-2017-08351

EP Drill 8-8-17 OSC performance summary

CR-2017-10357

EP Drill - Site protection performance

CR-2017-10537

EP Drill - Summary of dose assessment performance from

10/10/17 EP integrated drill

CR-2017-11279

MS-C-17-11-24: Emergency facility inventory issues

CR-2018-04604

EP Drill: May 15, 2018 Integrated Drill - TSC improvement

area for drill professionalism

CR-2018-04605

EP Drill: May 15, 2018, Integrated Drill - TSC improvement

area for critique performance

CR-2018-06805

Lessons learned when determining EAL applicability

CR-2019-01160

EP Drill - February 5, 2019, Integrated Drill Objective F.2 not

met for dose assessment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-2019-01161

EP Drill - February 5, 2019, Integrated Drill Objective F.5 not

met RMT air sampling

CR-2019-01162

EP Drill - February 5, 2019, Integrated Drill Objective F.10 not

met (RMT plume assessment)

CR-2019-01177

EP Drill - Failure to notify on-call ERO personnel within ten (10)

minutes of classification of an event that requires initial

activation

Procedures

DBNPS

Emergency Plan

Davis-Besse Nuclear Power Station Emergency Plan

DBRM-EMER-

1500B

Davis-Besse EAL Wallboards

NOP-LP-2001

Corrective Action Program

RA-EP-01500

Emergency Classification

RA-EP-01700

Alert

RA-EP-01800

Site Area Emergency

RA-EP-01900

General Emergency

RA-EP-02010

Emergency Management

RA-EP-02110

Emergency Notification

RA-EP-02220

Emergency Operations Facility Activation and Response

RA-EP-02240

Off Site Dose Assessment

RA-EP-02245

Protective Action Guidelines

RA-EP-02260

Radiological Controls in the DBAB

RA-EP-02320

Emergency Technical Assessment

Self-Assessments

SA-BN-2017-0547 May 2, 2017, Evaluated Exercise Report

05/22/2017

SA-BN-2018-1063 May 15, 2018, EP Integrated Drill Report

05/29/2018

SA-BN-2019-1344 September 25, 2018, Integrated Drill Report

01/31/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SA-BN-2019-1345 October 23, 2018, Integrated Drill Report

01/31/2019

SA-BN-2019-1381 February 5, 2019, EP Integrated Drill Performance

2/28/2019

SN-SA-2015-0037 May 5, 2015, Evaluated Exercise Self-Assessment

06/04/2015

71151

Miscellaneous

NOBP-LP-4012-54 Performance Indicator Data Sheets - Drill / Exercise

Performance

1st Quarter

2018 - 4th

Quarter 2018

NOBP-LP-4012-55 Performance Indicator Data Sheets - Emergency Response

Organization Participation

1st Quarter

2018 - 4th

Quarter 2018

NOBP-LP-4012-56 Performance Indicator Data Sheets - Alert Notification System

1st Quarter

2018 - 4th

Quarter 2018