IR 05000346/2019011

From kanterella
Jump to navigation Jump to search
NRC Triennial Fire Protection Inspection; Inspection Report 05000346/2019011 (DRS-J.Robbins)
ML19149A599
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/28/2019
From: Robert Daley
NRC/RGN-III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR 2019011
Download: ML19149A599 (10)


Text

May 28, 2019

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1NRC TRIENNIAL FIRE PROTECTION INSPECTION; INSPECTION REPORT 05000346/2019011

Dear Mr. Bezilla:

On May 3, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Davis-Besse Nuclear Power Station, Unit 1. On May 2, 2019, the NRC inspectors discussed the results of this inspection with Mr. Mark Kanz, Senior Communications Representative, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3

Docket No.: 05000346 License No.: NPF-3

Enclosure:

IR 05000346/2019011

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2019011

Enterprise Identifier: I-2019-011-0037

Licensee:

FirstEnergy Nuclear Operating Co.

Facility:

Davis-Besse Nuclear Power Station

Location:

Oak Harbor, OH

Inspection Dates:

February 17, 2019, to June 1, 2019

Inspectors:

I. Hafeez, Reactor Inspector

J. Hanna, Senior Reactor Analyst

J. Robbins, Reactor Inspector

A. Shaikh, Senior Reactor Inspector

Approved By:

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Triennial Fire Protection Inspection at Davis-Besse Nuclear Power Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

No findings or violations were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.05T - Fire Protection B.5.b Inspection Activities (IP Section 02.03)

The inspectors evaluated the following B.5.b Mitigating Strategies:

Makeup to Condensate Storage Tank; Portable Sprays; and Command and Control.

Fire Protection Inspection Requirements (IP Section 02.02) (4 Samples)

The inspectors evaluated Fire Protection Program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:

(1) Fire Area AB - ECCS Pump Room 1-1 and Make Up Pump Room;
(2) Fire Area DF - No. 2 Electrical Penetration Room;
(3) Fire Area E - Auxiliary Feed Pump Room 1-1; and
(4) Fire Area Y - Low Voltage Switchgear Room E Bus.

Analyzed Circuits:

  • Pressurizer Pilot Operated Relief Valve, Block Valve RC11;
  • Circuit for Pressurizer Sample Containment Vent Header Valve RC200 and Pressurizer Vapor Sample Valve RC239A;
  • Power Feed to the Auxiliary Shutdown Panel; and

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 2, 2019, the inspector presented the Triennial Fire Protection Inspection results to Mr. Mark Kanz, Senior Communications Representative, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision

or Date

71111.05T

Calculations

C-FP-013.06-028

Four AFW Pump Ventilation Openings in Barriers

Calculation 15.12

Hydraulic Analysis for Fire Pump Sizing

07/27/1988

OPS-GOP-S119

Time Critical Operator Action Time Validation for Scenario:

Serious Control Room Fire

07/25/2018

OPS-GOP-S119

Time Critical Operator Action Time Validation for Scenario:

Serious Control Room Fire

09/27/2012

OTL-AOP-DBS101 Time Critical Operator Action Time Validation for Scenario:

Serious Station Fire #1 Electrical Penetration Room

08/17/2015

OTL-AOP-DBS102 Time Critical Operator Action Time Validation for Scenario:

Serious Station Fire #2 Electrical Penetration Room

08/07/2015

OTLC 2017SD

DBS103

Time Critical Operator Action Time Validation for Scenario:

TCOA (Five) Electrical Penetration Rooms 1 and 2

01/05/2018

OTLC-2013-04

Time Critical Operator Action Time Validation for Scenario:

Serious Station Fire #1 Electrical Penetration Room

09/06/2013

OTLC-DB-2013-04 Time Critical Operator Action Time Validation for Scenario:

Serious Station Fire #1 Electrical Penetration Room

09/09/2013

Corrective Action

Documents

CR 2017-05188

Rusting Fire Protection Piping

05/06/2017

CR 2017-09149

Fleet Oversight Evaluation - Fire Protection Program Resolution

Timeliness

09/05/2017

CR 2018-00488

Fire Suppression Pipe Joint Connector Separation Causes Leak

and Electric Fire Pump to Start

01/18/2018

CR 2018-05840

DBAI 2018 SA Post-Fire MOVs Not De-energized

06/26/2018

CR 2018-08868

Calculation C-NSA-011.01.016 Does Not Consider Loss of UHS

Inventory From TPCW Branch

10/09/2018

CR-2018-00579

Corrective Actions to Improve Timeliness of Writing Condition

Reports Ineffective

01/23/18

Inspection

Procedure

Type

Designation

Description or Title

Revision

or Date

CR-2018-03793

Additional Concerns Identified with Floor Settling on 585 Elev

Near Seal Oil Room

04/24/2018

CR-2019-03997

ACB 34564 Tripped Open

04/30/2019

Corrective Action

Documents

Resulting from

Inspection

CR 2019-03176

2019 NRC TriFP - B.5.b Hose Testing Documentation

04/04/2019

Drawings

28-53116

Job No. A173D-28644

DB-OP-02600

Operational Contingency Response Action Plan

Drawing E-892,

SH 4

Raceway-Fire Alarm System Auxiliary Building Plan EL. 603'-0" 12

Drawing E-892,

SH 6

Raceway-Fire Alarm System Auxiliary Building Plan EL. 565'-0" 9

Drawing E-892,

SH 7

Raceway-Fire Alarm System Auxiliary Building Plan EL. 545'-0" 6

E-52B Sh. 12

Elementary wiring Diagrams Reactor Cooling System RC PRZR

PWR RLF SHUTOFF VLV

E-699B

Connection Diagram Radio System

E631B Sh.9

Connection Diagram Misc. Instruments Aux. BLDG. & CTMT.

EL.545-0

M-030A

Piping & Instrument Diagram Reactor Coolant System

PFP-YD-STRAT

Protected Area Yard Strategy

Miscellaneous

FHAR

Fire Hazards Analysis Report

ML033490026

Safety Evaluation of Fire Protection Measures at the Davis-

Besse Nuclear Power Station, Unit No. 1, Per Appendix R to 10 CFR 50

05/30/1991

None

Staff Assignments and Fire Brigade Qualification Information for

Crews 1 and 3

05/01/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision

or Date

NDE Reports

Report No.

BOP-VT-15-035

Visual Examination (VT) of Floor Drains in Electrical Penetration

Room #1

05/06/2015

71111.05T

Procedures

DB-FP-00007

Control of Transient Combustibles

DB-FP-00009

Fire Protection Impairment And Fire Watch

DB-FP-00018

Control of Ignition Sources

DB-FP-04005

Fire Brigade Equipment Quarterly Inspection

DB-FP-04035

Year Flow Test

DB-ME-04100

Emergency Lighting System Test

DB-MM-09378

Limitorque Manual Actuator Installation When Fire Causes a

Motor Operated Valve to Fail (DH63, DH64, DH2733, and

DH2734)

DB-OP-02000

Emergency Procedure, RPS, SFAS, SFRCS TRIP, OR SG

TUBE RUPTURE

DB-OP-02501

Abnormal Procedure, Serious Station Fire

DB-OP-02508

Control Room Evacuation

DB-OP-02519

Abnormal Procedure, Serious Control Room Fire

DB-SP-03366

Surveillance Test Procedure for Reactor Coolant System Vent

Path Operability and PORV Test

DBBP-OPS-0036

B.5.b Equipment Inventory

ECP-16-0331

Make-up Flow Controller Valve Bailey RP1212 Converter

Replacement

NG-DB-00302

DBNPS Fire Protection Program

PFP-AB-237

Protected Area Pre-Fire Plan, Fire Area E

PFP-AB-427

Protected Area Pre-Fire Plan, Fire Area DF

PFP-AB-429

Protected Area Pre-Fire Plan, Fire Area Y

PFP-CB-A208

Protected Area Pre-Fire Plan, Fire Area AB

and 7

Inspection

Procedure

Type

Designation

Description or Title

Revision

or Date

Work Orders

WO 200704277

Encl 1 Emerge Light Emerg Lighting Sys Test

01/11/2019

WO 200459898

Year Flow Test

07/29/2014

WO 200499963

Tanks, Drains, and Basins Inspection

05/06/2015

WO 200655206

Damper Visual Inspection 18 Months

08/27/2018

WO 20084442

Door 119A Test

01/21/2019