{{#Wiki_filter:October 29, 2013  
{{#Wiki_filter:October 29, 2013 Mr. Raymond A. Lieb Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760
 
Mr. Raymond A. Lieb Site Vice President  
 
FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2  
 
Oak Harbor, OH 43449-9760  


==SUBJECT:==
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - REVIEW   OF THE SPRING 2012 STEAM GENERATOR TUBE INSPECTIONS   (TAC NO. MF0316)(L-12-274)  
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - REVIEW OF THE SPRING 2012 STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MF0316)(L-12-274)


==Dear Mr. Lieb:==
==Dear Mr. Lieb:==


By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).  
By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).
 
The NRC staff has completed its review of the submittals pertaining to the DBNPS, Unit No. 1, SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.
The NRC staff has completed its review of the submi ttals pertaining to the DBNPS, Unit No. 1, SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.  
Sincerely,
 
                                              / RA /
Sincerely,         / RA / Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
 
Docket No. 50-346  


==Enclosure:==
==Enclosure:==
Steam Generator Review Summary
cc w/encl:  Distribution via Listserv 
ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).


The NRC staff has completed its review of the submi ttals pertaining to the DBNPS, Unit No. 1,  SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.
Steam Generator Review Summary cc w/encl: Distribution via Listserv


Sincerely,       / RA / Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346  
ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).
The NRC staff has completed its review of the submittals pertaining to the DBNPS, Unit No. 1, SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.
Sincerely,
                                                    / RA /
Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346


==Enclosure:==
==Enclosure:==
Steam Generator Review Summary
cc w/encl:  Distribution via Listserv
DISTRIBUTION:
PUBLIC    LPLIII-2 R/F  RidsNrrDorlLplIII-2 RidsNrrPMDavis-Besse  AJohnson, NRR  RidsNrrLASRohrer    RidsRgn3MailCenter Resource RidsOgcRp  RidsNrrDeEsgb RidsAcrsAcnw_MailCTR  KKarwoski, NRR     
ADAMS Accession No. ML13280A907
* via memo OFFICE  NRR/DORL/LPLIII-2/PM NRR/DORL/LPLIII-2/LA NRR/DE/ESGB*
NRR/DORL/LPLIII-2/BC
NAME EBrown SRohrer GKulesa TTate DATE 10/ 21 /13 10/ 8 /13 8/27/2013 10/ 29 /13                   
STAFF EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE STEAM GENERATOR TUBE INSPECTIONS PERFORMED DURING THE 2012 REFUELING OUTAGE NO. 17 DAVIS-BESSE NUCLEAR POWER STATION FIRSTENERGY NUCLEAR OPERATING COMPANY UNIT NO. 1 DOCKET NO. 50-346 By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).
There are two Babcock and Wilcox once-through steam generators (OTSG), designated 1-B and 2-A, at DBNPS. Each SG has approximately 15,500 Alloy 600 tubes in the mill-annealed condition. The tubes have a nominal outside diameter of 0.625 inches and a nominal wall thickness of 0.037 inches. Both OTSG 1-B and 2-A contain tubes with sleeves and tubes with
shop re-rolls.
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions, e.g., tube plugging, taken in response to the inspection findings.


Steam Generator Review Summary cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC                            LPLIII-2 R/F              RidsNrrDorlLplIII-2 RidsNrrPMDavis-Besse              AJohnson, NRR              RidsNrrLASRohrer RidsRgn3MailCenter Resource      RidsOgcRp                  RidsNrrDeEsgb RidsAcrsAcnw_MailCTR              KKarwoski, NRR ADAMS Accession No. ML13280A907
* via memo OFFICE      NRR/DORL/LPLIII-2/PM        NRR/DORL/LPLIII-2/LA      NRR/DE/ESGB*            NRR/DORL/LPLIII-2/BC EBrown                      SRohrer                  GKulesa                TTate NAME 10/ 21 /13                  10/ 8 /13                8/27/2013              10/ 29 /13 DATE STAFF EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE STEAM GENERATOR TUBE INSPECTIONS PERFORMED DURING THE 2012 REFUELING OUTAGE NO. 17 DAVIS-BESSE NUCLEAR POWER STATION FIRSTENERGY NUCLEAR OPERATING COMPANY UNIT NO. 1 DOCKET NO. 50-346 By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).
There are two Babcock and Wilcox once-through steam generators (OTSG), designated 1-B and 2-A, at DBNPS. Each SG has approximately 15,500 Alloy 600 tubes in the mill-annealed condition. The tubes have a nominal outside diameter of 0.625 inches and a nominal wall thickness of 0.037 inches. Both OTSG 1-B and 2-A contain tubes with sleeves and tubes with shop re-rolls.
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions, e.g.,
tube plugging, taken in response to the inspection findings.
As a result of the review of the information provided by the licensee, the NRC staff has the following comments/observations:
As a result of the review of the information provided by the licensee, the NRC staff has the following comments/observations:
* In a conference call with the NRC on May 9, 2013, the licensee confirmed that the equivalent plugging percentage in SG-2A is 937 tubes, and that all tubes in the 2012 inspections with detected indications attributed to corrosion were plugged during the 2012 outage.
* In a conference call with the NRC on May 9, 2013, the licensee confirmed that the equivalent plugging percentage in SG-2A is 937 tubes, and that all tubes in the 2012 inspections with detected indications attributed to corrosion were plugged during the 2012 outage.
* The 2012 inspections were the last scheduled inspections for these SGs, which are scheduled to be replaced in the spring of 2014.  
* The 2012 inspections were the last scheduled inspections for these SGs, which are scheduled to be replaced in the spring of 2014.
 
ENCLOSURE
ENCLOSURE  
 
Based on a review of the information provided, the staff concludes that the licensee provided the information required by their technical specifications. In general, the SG tube inspections at DBNPS appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly-designed and operated units. 


The NRC staff's review did not reveal any issues warranting follow-up action.}}
Based on a review of the information provided, the staff concludes that the licensee provided the information required by their technical specifications. In general, the SG tube inspections at DBNPS appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly-designed and operated units.
The NRC staffs review did not reveal any issues warranting follow-up action.}}

Latest revision as of 02:19, 6 February 2020

Review of the Spring 2012 Steam Generator Tube Inspections (TAC No. MF0316)(L-12-274)
ML13280A907
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/29/2013
From: Ellen Brown
Plant Licensing Branch III
To: Lieb R
FirstEnergy Nuclear Operating Co
Eva Brown, NRR/DORL 415-2315
References
L-12-274, TAC MF0316
Download: ML13280A907 (4)


Text

October 29, 2013 Mr. Raymond A. Lieb Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - REVIEW OF THE SPRING 2012 STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MF0316)(L-12-274)

Dear Mr. Lieb:

By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).

The NRC staff has completed its review of the submittals pertaining to the DBNPS, Unit No. 1, SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.

Sincerely,

/ RA /

Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

Steam Generator Review Summary cc w/encl: Distribution via Listserv

ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).

The NRC staff has completed its review of the submittals pertaining to the DBNPS, Unit No. 1, SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.

Sincerely,

/ RA /

Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

Steam Generator Review Summary cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPLIII-2 R/F RidsNrrDorlLplIII-2 RidsNrrPMDavis-Besse AJohnson, NRR RidsNrrLASRohrer RidsRgn3MailCenter Resource RidsOgcRp RidsNrrDeEsgb RidsAcrsAcnw_MailCTR KKarwoski, NRR ADAMS Accession No. ML13280A907

  • via memo OFFICE NRR/DORL/LPLIII-2/PM NRR/DORL/LPLIII-2/LA NRR/DE/ESGB* NRR/DORL/LPLIII-2/BC EBrown SRohrer GKulesa TTate NAME 10/ 21 /13 10/ 8 /13 8/27/2013 10/ 29 /13 DATE STAFF EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE STEAM GENERATOR TUBE INSPECTIONS PERFORMED DURING THE 2012 REFUELING OUTAGE NO. 17 DAVIS-BESSE NUCLEAR POWER STATION FIRSTENERGY NUCLEAR OPERATING COMPANY UNIT NO. 1 DOCKET NO. 50-346 By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).

There are two Babcock and Wilcox once-through steam generators (OTSG), designated 1-B and 2-A, at DBNPS. Each SG has approximately 15,500 Alloy 600 tubes in the mill-annealed condition. The tubes have a nominal outside diameter of 0.625 inches and a nominal wall thickness of 0.037 inches. Both OTSG 1-B and 2-A contain tubes with sleeves and tubes with shop re-rolls.

The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions, e.g.,

tube plugging, taken in response to the inspection findings.

As a result of the review of the information provided by the licensee, the NRC staff has the following comments/observations:

  • In a conference call with the NRC on May 9, 2013, the licensee confirmed that the equivalent plugging percentage in SG-2A is 937 tubes, and that all tubes in the 2012 inspections with detected indications attributed to corrosion were plugged during the 2012 outage.
  • The 2012 inspections were the last scheduled inspections for these SGs, which are scheduled to be replaced in the spring of 2014.

ENCLOSURE

Based on a review of the information provided, the staff concludes that the licensee provided the information required by their technical specifications. In general, the SG tube inspections at DBNPS appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly-designed and operated units.

The NRC staffs review did not reveal any issues warranting follow-up action.