ML17303A548: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-NOTdCE-THE ATTACHED FILES ARE OFFICIAL RECORDS OF THE DIVISION OF DOCUMENT CONTROL.THEY HAVE BEEN CHARGED TO YOU FOR A LIMITED TIME PERIOD AND MUST Bf Rf TURNED TO THE RECORDS FACILITY BRANCH 016.PLEASE DO NOT SEND DOCUMENTS CHARGED OUT THROUGH THE MAIL.REMOVAL OF ANY PAGE{S)FROM DOCUMENT FOR REPRODUCTION MUST BE REFERRED TO FILE PERSONNEL.
{{#Wiki_filter:NOTdCE THE ATTACHED FILES ARE OFFICIAL RECORDS OF THE DIVISION OF DOCUMENT CONTROL. THEY HAVE BEEN CHARGED TO YOU FOR A LIMITED TIME PERIOD AND MUST Bf Rf TURNED TO THE RECORDS FACILITY BRANCH 016. PLEASE DO NOT SEND DOCUMENTS CHARGED OUT THROUGH THE MAIL. REMOVAL OF ANY PAGE{S) FROM DOCUMENT FOR REPRODUCTION MUST BE REFERRED TO FILE PERSONNEL.
DEADLINE RETURN DATE RECORDS FACILITY BRANCH S7O9X70iW 86~~~~~8 PDR ADOCK OMOOMB I I  
DEADLINE RETURN DATE RECORDS FACILITYBRANCH S7O9X70iW 86~~~~~8 OMOOMB PDR ADOCK           I I


===Background===
===Background===
Purpose of Salt River Project: Provide a reliable and adequate supply of water and electricity at the lowest reasonable cost~~<hvt~~SALT RIVER PROJECT PUIILISIIER SRP Communications i'ublic Affairs Department EDIIR Heather Cllsby DESICJI Larry i~tacLcan PHO?OGRIt PHV Chet Snellback, Ed'tbllmr, Jere Grms and Joe Qulhuls COhtPUTER CRrlPHICS Jeff Stanley On the couer-Another beautiful Arizona sunset silhouettes part of SRP's Eyrene Receiving Station in'ibmpe.S alt River Project is named for the major river which supplies water to the Phoenix metropolitan area.SRP plays a significant part in the growth of the Salt River Valley, providing water and power to residents through bw organizations
River Project is named S for  alt the major river which supplies water to the Phoenix metropolitan area. SRP plays a significant part in the growth of the Salt River Valley, providing water and power to residents through bw organizations the Salt River Valley Water (the Association) and Users'ssociation the        Salt    River    Project Agricultural Improvement and Purpose of Salt River Project:                                              Poiver District (the District).
-the Salt River Valley Water Users'ssociation (the Association) and the Salt River Project Agricultural Improvement and Poiver District (the District).
The Association is a private Provide a reliable and adequate supply of water and                        Arizona corporation. It ad-electricity at the lowest reasonable cost                                  ministers water rights of SRP's 240,000-acre area and operates and maintains the irrigation transmission and distribution
The Association is a private Arizona corporation.
                                                                                  ~
It ad-ministers water rights of SRP's 240,000-acre area and operates and maintains the irrigation transmission and distribution system which carries water to municipal, industrial, agricultural and residential users.In coopera-tion with the U.S.Forest Service, it participates in the management of the 13,000-square-mile water-sheds of the Salt and Verde rivers.The District is a public power utility and a political subdivision of Arizona.It operates under contracts with the United States and provides electricity to residential, commercial, in-dustrial and agricultural power users in a 2,900-square-mile ser-vice area in parts of Maricopa, Gila and Pinal counties.In line with the long-standing reclamation principle, SRP uses a portion of its electric revenues to help support its water opera-tions.This practice helps keep waterdelivery charges to cities, farmers and homeowners at reasonable levels.At the same time, SRP maintains electric rates that are competitive with those of other utilities in the area.
system which carries water to municipal, industrial, agricultural and residential users. In coopera-
Contents Message from Management
                                                          ~~<hvt~                        tion with the U.S. Forest Service, it participates in the management of the 13,000-square-mile water-sheds of the Salt and Verde SALTRIVER PROJECT                rivers.
.......................
PUIILISIIER SRP Communications      The District is a public power i'ublic Affairs Department    utility and a political subdivision EDIIR Heather Cllsby DESICJI Larry i~tacLcan    of Arizona. It operates under PHO?OGRIt PHV Chet Snellback, Ed contracts with the United States
2 ower o~o~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~o 4 P ater.......................................8 W C~~ommumty...................................12 F manctal....................
                                                            'tbllmr, Jere Grms and Joe    and provides electricity to Qulhuls                              commercial, in-residential, COhtPUTER CRrlPHICS Jeff Stanley dustrial and agricultural power users in a 2,900-square-mile ser-vice area in parts of Maricopa, Gila and Pinal counties.
~~..............
In line with the long-standing reclamation principle, SRP uses a portion of its electric revenues to help support its water opera-tions. This practice helps keep waterdelivery charges to cities, farmers and homeowners at reasonable levels. At the same time, SRP maintains electric rates that are competitive with those of other utilities in the area.
16 Combined Financial Statements...................18 Notes to Combined Financial Statements............22 Statistical Review...'...........................
On the couer-Another beautiful Arizona sunset silhouettes part of SRP's Eyrene Receiving Station in 'ibmpe.
26 Board Members and Council Members..............28 Highlights REVENUES/EXPENSES (See Page 20)Total operating revenues ($000)Total operating expenses ($000)Net operating revenues ($000)Financing costs (less AFUDC)($000)Other expenses, net ($000).Reinvested
 
($000).POWER OPERATIONS (See Page 27)Energy customers at year end.Total kilowatt-hour sales (000).Average annual kWh usage per res.customer Avg.annual kWh revenue/res.
Contents Message from Management                      .......................                     2 P ower     o ~   o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o 4 Water      .......................................8 C ommumty
customer (cents)WATER OPERATIONS (See Page 26)Assessed water accounts.............
              ~ ~
Water runoff (acre-feet)
                      ...................................12 F manctal....................                           ~ ~.............. 16 Combined Financial               Statements...................18 Notes to Combined Financial                   Statements............22 Statistical Review...               '...........................                         26 Board Members and Council                     Members..............28 Highlights REVENUES/EXPENSES                 (See Page 20)                                                 Fiscal 1987              Fiscal 1986 Total operating revenues ($ 000)                                                                     888,506            848,618 Total operating expenses ($ 000)                                                                     706,377            642,963 Net operating revenues ($ 000)                                                                   182,129            205,655 Financing costs (less AFUDC) ($ 000)                                                                 105,293              42,337 Other expenses, net ($ 000) .                                                                           2,075            5,002 Reinvested ($ 000)   .                                                                           74,761            158,316 POWER OPERATIONS                 (See Page 27)
Water in storage, Dec.31 (acre-feet)
Energy customers at year end .                                                                     487,321              457,489 Total kilowatt-hour sales (000).                                                               15,566,478            14,503,982 Average annual kWh usage per res. customer                                                             12,440            12,175 Avg. annual kWh revenue/res. customer (cents)                                                               7.54            7.56 WATER OPERATIONS               (See Page 26)                                                 Calendar 1986            Calendar 1985 Assessed water accounts       .............                                                         181,894            181,645 Water runoff (acre-feet)                                                                                               1,774,667 1,070,214',691,741 Water in storage, Dec. 31 (acre-feet)     .                                                                           1,671,535 Water deliveries (acre-feet) .                                                                     870,658            1,016,612 SELECTED OTHER DATA (See Page 26)                                                               Fiscal 1987              Fiscal 1986 Gross plant investment ($ 000) .                                                                 4,814,087            4,481,667 Long-term debt ($ 00(hSee Page 19) .                                                             2,986,737            2,880,407 Taxes 6 tax equivalents ($ 000) .                                                                   103,097              83,864 Electric-revenue contributions to support water operations ($ 000)                                                                   15,9?5            12,384 Employees at year end.                                                                                   5,735"            5,468"
.Water deliveries (acre-feet)
'ased
.SELECTED OTHER DATA (See Page 26)Gross plant investment
"      on V.S.G.S. provisional records and subject to adjustment.
($000).Long-term debt ($00(hSee Page 19).Taxes 6 tax equivalents
Does not include temporary employees.
($000).Electric-revenue contributions to support water operations
 
($000)Employees at year end.'ased on V.S.G.S.provisional records and subject to adjustment.
To Our Shareholders                                    and Bondholders:
" Does not include temporary employees.
a small amount of capital for in-T      his past year we witnessed our 50th anniversary as the Salt River Project Agricultural Im-headquarters will consist of five buildings on 40 acres est of the present headquarters. The first quality and institute practices to ensure that SRP water meets all applicable standards. We initiated vestment.
Fiscal 1987 888,506 706,377 182,129 105,293 2,075 74,761 487,321 15,566,478 12,440 7.54 Calendar 1986 181,894 1,070,214',691,741 870,658 Fiscal 1987 4,814,087 2,986,737 103,097 15,9?5 5,735" Fiscal 1986 848,618 642,963 205,655 42,337 5,002 158,316 457,489 14,503,982 12,175 7.56 Calendar 1985 181,645 1,774,667 1,671,535 1,016,612 Fiscal 1986 4,481,667 2,880,407 83,864 12,384 5,468" To Our Shareholders and Bondholders:
After the end of the fiscal year, provement and Power District.          component,       the Information      meetings with all cities we serve to    approximately $ 22.3 million in We'e seen a lot of changes in the      Systems Building, is scheduled for    seek solutions to mutual water          mini-bonds were sold. Some were past 50 years. Through it all we'e    completion in late 1988. In addi-      problems. As population increases,     interest-bearing mini-bonds for continued to supply a reliable        tion to the corporate headquarters,   the cities will be faced with an in-    $ 500 each and, for the first time, source of energy and water at the      484 surrounding acres of SRP-          creasing demand for water. By          we sold capital appreciation bonds lowest reasonable cost.              .owned land will be available for      working with the cities, we can        for $ 200 each. These bonds vvill lease and development by others        share information and avoid cost-Research shows our custom-                                                                                       pay $ 488.05 if held to maturity in and will be called Papago Park        ly duplication of efforts.             2002.
T his past year we witnessed our 50th anniversary as the Salt River Project Agricultural Im-provement and Power District.We'e seen a lot of changes in the past 50 years.Through it all we'e continued to supply a reliable source of energy and water at the lowest reasonable cost.Research shows our custom-ers are happy with our service.One of last year's goals was to achieve an overall quality of service rating of 90 percent from our customers.
ers are happy with our service. One Center. Income from this develop-          Under the Safety of Dams Act, of last year's goals was to achieve                                                                                       Our employees were the ment will be used to supplement        preliminary engineering and ex-an overall quality of service rating                                                                                 strength of this year's corporate electric revenues, offset operating    cavation work began on Theodore of 90 percent from our customers.                                                                                     theme, "The People Behind the expenses and hold down electric        Roosevelt Dam and Stewart Moun-We received a 97 percent rating.                                                                                     Spirit." Their commitment to ex-bills.                                tain Dam. During 1986, we entered Customers saw a small decrease                                                                                   cellence was shown in their work Water supplies were sufficient    into agreements with the U.S.          and in their many volunteer ac-in their electric bills as we passed                                          Bureau of Reclamation to add and remarkably well managed.                                                  tivities in their communities.
We received a 97 percent rating.Customers saw a small decrease in their electric bills as we passed on a decrease in fuel costs.For residential customers, the average cost per kilowatt-hour (kWh)was 7.54 cents compared to 7.56 cents per kWh in the previous year.During the year, we added 29,832 new electric customers for a total of 487,321 customers in all classes.The new customers con-tributed to a new system peak of 2,785 megawatts (MW)on August 20.However, plenty of power is available.
on a decrease in fuel costs. For                                             several maintenance items to residential customers, the average     Although inflows from the Salt and Verde rivers were only 87 percent      necessary dam safety modifications          Their efforts are, in large cost per kilowatt-hour (kWh) was                                                                                     measure, the reason this past year of average, heavy summer rains        scheduled at Stewart Mountain 7.54 cents compared to 7.56 cents                                                                                     was successful for Salt River Pro-kept reservoirs fuller than normal. Dam. The proposed changes will per kWh in the previous year.                                                 enhance operating and main-            ject. Through      our Storage at the end of 1986 totaled                                                                      employees'alents, During the year, we added         1,691,741 acre-feet (a0 or 84 per-    tenance facilities at the dam.                    expertise and dedication, 29,832 new electric customers for     cent of capacity. This was 139 per-                                           we expect to be able to meet the Financially, it vvas another good  challenges of the coming year.
The first two units of the Palo Verde Nuclear Generating Sta-tion have begun commercial opera-tion, providing SRP with 444 MW of generating capacity.Future power supplies are being deeloped at St.Johns, where the third 350 MW unit of the coal-fired Cor-onado Generating Station is under contruction.
a total of 487,321 customers in all    cent of normal.                        year for SRP. Careful management classes. The new customers con-                                                                                           Challenges will include meeting tributed to a new system peak of            For the third time in four years, of SRP resources, healthy financ-plenty of water in storage reduced    ing opportunities and a strong          financial capital requirements 2,785 megawatts (MW) on August                                                                                        caused by new construction. These groundwater pumping to less than      local economy contributed to the
On a per-customer basis, our operations and maintenance costs dropped to$1,422.That is$114 less than our Project goal of$1,536.As the number of customers in-creased, many located near the outer edges of the SRP service area.To better accommodate customers on the east and est sides of the Valley, we opened the Tolleson Service Center and broke ground for the Mesa Service Center.Regional service centers enhance operations by reducing travel time and expense of reaching the customer.In an effort to eliminate use of leased office space and to con-solidate administrative functions, we broke ground for a new corpo-rate headquarters.
: 20.                                                                                                                  capital requirements are expected 7 percent of deliveries. Project      success. Our debt service coverage However, plenty of power is      groundwater pumping totaled on-        increased from 1.85 to 2.0, aided      to cause our debt ratio to rise.
Eventually, the headquarters will consist of five buildings on 40 acres est of the present headquarters.
available. The first two units of the ly 65,538 af, aiding our efforts to    by a 4.7 percent increase in gross          However, through all of the Palo Verde Nuclear Generating Sta-    conserve this essential resource.      revenues. Hot weather and the          year's activities i~e'll be working tion have begun commercial opera-                                             almost 30,000 new customers            closely with Valley communities
The first component, the Information Systems Building, is scheduled for completion in late 1988.In addi-tion to the corporate headquarters, 484 surrounding acres of SRP-.owned land will be available for lease and development by others and will be called Papago Park Center.Income from this develop-ment will be used to supplement electric revenues, offset operating expenses and hold down electric bills.Water supplies were sufficient and remarkably well managed.Although inflows from the Salt and Verde rivers were only 87 percent of average, heavy summer rains kept reservoirs fuller than normal.Storage at the end of 1986 totaled 1,691,741 acre-feet (a0 or 84 per-cent of capacity.This was 139 per-cent of normal.For the third time in four years, plenty of water in storage reduced groundwater pumping to less than 7 percent of deliveries.
                                            'Ibtal water deliveries hit a tion, providing SRP with 444 MW                                              helped to build an increase in gross    and all levels of government, con-10-year low of only 870,658 af, of generating      capacity. Future                                          revenues to $ 888.5 million, up        tinuing to be a strong presence in compared to 1,016,612 in 1985.
Project groundwater pumping totaled on-ly 65,538 af, aiding our efforts to conserve this essential resource.'Ibtal water deliveries hit a 10-year low of only 870,658 af, compared to 1,016,612 in 1985.Agricultural use was less than nor-mal due to land sales and govem-ment set-aside programs which reduced the quantity of crops grown.Municipal use was less due to summer rains which curtailed the usual amount of lawn watering.Land and vvater use continued to shift.A total of 7,165 acres was converted from agricultural use to urban use.By year's end, 68.6 per-cent of the 238,170 acres in SRP was urbanized, while 31.4 percent remained in agriculture.
power supplies are being deeloped                                            from the previous year's revenues      the Valley we serve. We'l be here, Agricultural use was less than nor-at St. Johns, where the third 350                                            of $ 848.6 million.                     providing a reliable supply of water mal due to land sales and govem-MW unit of the coal-fired Cor-                                                                      totaled $ 74.8  and electricity for our customers, ment set-aside programs which              Net revenues onado Generating Station is under                                                                                    for another 50 years to come.
SRP's Water Group faced a ma-jor reorganization.
reduced the quantity of crops        million during fiscal year 198M7.
Reid W.lteples retired as head of the Water Group after 39 years with SRP.He was succeeded by D.S.Wilson, Jr.A reorganization of three depart-ments was completed to increase eficiency and to provide better ser-vice to customers.
contruction.
A new department was formed, the Water Quality and Geohydrology Department.
grown. Municipal use was less due     As a public power utility, our net On a per-customer basis, our      to summer rains which curtailed      revenues are reinvested to replace operations and maintenance costs      the usual amount of lawn watering. equipment and to help finance dropped to $ 1,422. That is $ 114                                            construction of new facilities.
SRP staff will monitor water quality and institute practices to ensure that SRP water meets all applicable standards.
Land and vvater use continued less than our Project goal of to shift. A total of 7,165 acres was       Maintaining a healthy financial
We initiated meetings with all cities we serve to seek solutions to mutual water problems.As population increases, the cities will be faced with an in-creasing demand for water.By working with the cities, we can share information and avoid cost-ly duplication of efforts.Under the Safety of Dams Act, preliminary engineering and ex-cavation work began on Theodore Roosevelt Dam and Stewart Moun-tain Dam.During 1986, we entered into agreements with the U.S.Bureau of Reclamation to add several maintenance items to necessary dam safety modifications scheduled at Stewart Mountain Dam.The proposed changes will enhance operating and main-tenance facilities at the dam.Financially, it vvas another good year for SRP.Careful management of SRP resources, healthy financ-ing opportunities and a strong local economy contributed to the success.Our debt service coverage increased from 1.85 to 2.0, aided by a 4.7 percent increase in gross revenues.Hot weather and the almost 30,000 new customers helped to build an increase in gross revenues to$888.5 million, up from the previous year's revenues of$848.6 million.Net revenues totaled$74.8 million during fiscal year 198M7.As a public power utility, our net revenues are reinvested to replace equipment and to help finance construction of new facilities.
$ 1,536.
Maintaining a healthy financial status resulted in our bonds con-tinuing to receive high investment.
                                                                                                                                            ~
grade ratings of AA and Aa by the nation's leading rating services.We have sold investment-grade bonds for more than 20 years.For the first time in ffive years, we sold bonds on a competitive bid basis.In October 1986, SRP sold$100 million in tax-free electric system revenue bonds.The bonds were sold in$5,000 denominations at an effective interest rate of 7.34 percent.Mini-bonds retained their popularity.
converted from agricultural use to   status resulted in our bonds con-As the number of customers in-    urban use. By year's end, 68.6 per-   tinuing to receive high investment.                          John R. Lassen creased, many located near the        cent of the 238,170 acres in SRP     grade ratings of AA and Aa by the outer edges of the SRP service          was urbanized, while 31.4 percent     nation's leading rating services. We area. To better accommodate customers on the east and est sides of the Valley, we opened the remained in agriculture.
Mini-bonds are bonds sold for$500 or less, which makes them appealing to the investor with a small amount of capital for in-vestment.After the end of the fiscal year, approximately
SRP's Water Group faced a ma-jor reorganization. Reid W. lteples have sold investment-grade bonds for more than 20 years.
$22.3 million in mini-bonds were sold.Some were interest-bearing mini-bonds for$500 each and, for the first time, we sold capital appreciation bonds for$200 each.These bonds vvill pay$488.05 if held to maturity in 2002.Our employees were the strength of this year's corporate theme,"The People Behind the Spirit." Their commitment to ex-cellence was shown in their work and in their many volunteer ac-tivities in their communities.
For the first time in ffive years,
Their efforts are, in large measure, the reason this past year was successful for Salt River Pro-ject.Through our employees'alents, expertise and dedication, we expect to be able to meet the challenges of the coming year.Challenges will include meeting financial capital requirements caused by new construction.
                                                                                                                      &i~g.                Marcel J. Boulais Tolleson Service Center and broke      retired as head of the Water Group   we sold bonds on a competitive bid ground for the Mesa Service            after 39 years with SRP. He was       basis. In October 1986, SRP sold Center. Regional service centers      succeeded   by D.S. Wilson, Jr. A     $ 100 million in tax-free electric enhance operations by reducing        reorganization of three depart-       system revenue bonds. The bonds travel time and expense of reaching    ments was completed to increase       were sold in $ 5,000 denominations the customer.                          eficiency and to provide better ser- at an effective interest rate of 7.34                        A.J. Pfister vice to customers.                    percent.
These capital requirements are expected to cause our debt ratio to rise.However, through all of the year's activities i~e'll be working closely with Valley communities and all levels of government, con-tinuing to be a strong presence in the Valley we serve.We'l be here, providing a reliable supply of water and electricity for our customers, for another 50 years to come.John R.Lassen&i~g.~Marcel J.Boulais A.J.Pfister (From left)Salt River Project General Manager A.J.Pfister, President John R.Lassen and VIce President Marcel J.Boulais.Officers Elected Officers John R.Lassen President Marcel J.Boulais Vice President Principal Officers and Other Executives A J.Pfister General h1anager John R.NcNamara Associate Ceneral h1anager, Corporate Engineering and Ibiver Group Robert J.Conlon Assistant General Nanager, Corporate Engineering Trent O.Neacham Assistant General h1anager, lbwer Construction
In an effort to eliminate use of leased office space and to con-              A new department was                 Mini-bonds retained          their solidate administrative functions,      formed, the Water Quality and         popularity. Mini-bonds are bonds we broke ground for a new corpo-        Geohydrology          Department. sold for $ 500 or less, which makes rate headquarters. Eventually, the      SRP staff will monitor water         them appealing to the investor with
&Naintenance John O.Rich Assistant General hlanager, Power Operations D.S.Wilson, Jr.Associate General Nanager, IVater Croup Richard Juet ten Assistant General Nanager, IVater Resources&Services Robert W.Mason Director, Water Croup Nanagement Staff Don G.Parlett Associate General hlanager, Corporate Services Croup Paul G.Ahler Assistant Ceneral h1anager, Human Resources James L.Swartz Assistant General h1anager, Operations Services Carroll N.Perkins Associate Ceneral Nanager, Customer, Financial&Information Services Group John D.Jacobs Assistant General Manager, Information S>stems Oren D.Thompson Assistant General hlanager, Customer Services Mark B.Bonsall Corporate 71easurer, Financial Services Leroy Michael Jr.Associate Ceneralh1anager, Planning&Resources Arnold L.Schwalb Director, Corporate Planning Darrell E.Smith Director, Resource Planning Stanley E.Hancock Assistant General h1anager, Communications
 
&Public Affairs D.Michael Rappoport Assistant Ceneral h1anager, Government Affairs Richard H.Silverman Assistant General h1anager, Law&Land C.A.Howlett Assistant Ceneral Nanager, Special Rejects Paul D.Rice Corporate Secretary Consultants LegalAdvisers Jennings, Strouss 4 Salmon Auditors Arthur Andersen 6 Co.Bond Counsel Nudge Rose Guthrie Alexander 4 Ferdon Financial Consultant Lazard Freres 6 Co.3 SRP linemen continually upgrade and repair SRP's power lines, such as this high voltage line between H'yrene and Silver King receiving stations.
(From left) Salt River Project General Manager A.J. Pfister, President John R. Lassen and VIce President Marcel J. Boulais.
Electric customers benefit from decreased fuel costs, increased power i t was a golden year for SRP's Power District.In the 50th year since the for-mation of the Salt River Project Agricultural Improvement and Power District, the District:~Added nearly 30,000 new electric customers, including several major industrial customers~Passed on a slight decrease in fuel costs to customers, reduc-ing their cost of electricity
Officers Elected Officers John R. Lassen President                        Don G. Parlett Associate General hlanager,     Stanley  E. Hancock Assistant General Marcel J. Boulais Vice President              Corporate Services Croup                      h1anager, Communications  & Public Affairs Paul G. Ahler Assistant Ceneral h1anager,    D. Michael Rappoport Assistant Ceneral Principal Officers and Other Executives            Human Resources                              h1anager, Government Affairs AJ. Pfister General h1anager                      James L. Swartz Assistant General h1anager, Richard H. Silverman Assistant General John R. NcNamara Associate Ceneral                Operations Services                          h1anager, Law & Land h1anager, Corporate Engineering and Ibiver      Carroll N. Perkins Associate Ceneral          C.A. Howlett Assistant Ceneral Nanager, Group                                          Nanager, Customer, Financial &Information      Special Rejects Robert J. Conlon Assistant General Nanager,   Services Group                                Paul D. Rice Corporate Secretary Corporate Engineering                          John D. Jacobs Assistant General Manager, Trent O. Neacham Assistant General              Information S>stems h1anager, lbwer Construction &Naintenance      Oren D. Thompson        Assistant General John O. Rich Assistant General hlanager,      hlanager, Customer Services Power Operations                                Mark B. Bonsall Corporate 71easurer, D.S. Wilson, Jr. Associate General Nanager,     Financial Services                          Consultants IVater Croup                                  Leroy Michael Jr. Associate Ceneralh1anager,    LegalAdvisers Jennings, Strouss 4 Salmon Richard Juet ten Assistant General Nanager,  Planning & Resources                            Auditors Arthur Andersen 6 Co.
~Began receiving low-cost power from the second unit of Palo Verde Nuclear Generating Station~Completed the Palo Verde transmission system to the Phoenix Metropolitan area, on-time and under budget~Brought on-line a new com-puter, the Energy Management System, to control SRP's electric system~And continued construc-tion of the third coal-fired unit of the Coronado Generating Station.Further luster was added to the golden jubilee when SRP's District improved service to our customers by building a new regional service center;esta-blished a demand side implemen-tation program;and formulated a balanced strategy approach to resource planning.SRP's service area remains a high-growth area The number of SRP customers continued to grow.Electric customers, totaled 487,321 at year's end, compared to 457,489 the year before.SRP has added about 30,000 customers in each of the past four years including a record 34,715 customers in fiscal year 1985-86.Because of continuing growth, the number of customers by the end of the next fiscal year is expected to easily surpass the 500,000 mark.Of the increase in last year'customers, 27,153 were residen-tial and 2,245 were commercial and industrial.
IVater Resources & Services                    Arnold L. Schwalb Director, Corporate          Bond Counsel Nudge Rose Guthrie Robert W. Mason Director, Water Croup          Planning                                      Alexander 4 Ferdon Nanagement Staff                              Darrell E. Smith Director, Resource Planning  Financial Consultant Lazard Freres 6 Co.
Other electric users, including municipal street light contracts and irrigation pumps, increased by 434.Several new industrial customers, including B.F.Goodrich, Hamilton-Avnet, Parker Hannifin and Hexcel, ac-counted for about 8,000 kilowatts (kW)in new load, nearly 800,000 square feet of manufacturing space and more than 1,000 new jobs in the area.Each new customer increased demand on the electric system.Electric customer use reached a peak of 2,785 megawatts (MW)on August 20, 1986.This peak demand surpassed the previous high of 2,658 MW reached on August 29, 1985.'Ibtal kilowatt-hour (kWh)sales to customers during the year increased by 1.06 billion kWh to 15.56 billion kWh from 14.50 billion kWh the previous fiscal year.Electric bills drop slightly During the)mr, SRP was able to pass on to customers a slight decrease in fuel costs, thereby lowering the cost of electricity.
3
For residential customers, the average cost per kWh was 7.54 cents, compared to 7.56 cents per kWh the previous year.The reduction was due to a decrease in the fuel cost adjustment fac-tor applied to bills.SRP's electric Transmission system completed under budget SRP's work on the Palo Verde Nuclear Generating Station's transmission system was com-pleted ahead of schedule and$3 million under budget.The 13-year project was completed in October 1986, at a cost of$95 million.The high-voltage transmission system includes 165 miles of 500 kilovolt (kV)power lines which Generating Sta-tion.Both began commercial opera-tion in calendar year 1986, the first unit on January 30, 1986 and the second unit on September 20, 1986.SRP is one of Year Ending April 30 Hpb'o Gas 1984 15.8 3.9 1985 12.8 8.9 1986 11.0 103 1987 10.0 8.6 1992 63'1$prnjeded)'inc&As bybo purchases bill numbers m prnraroprsl busc Oil Cnal Nuclear Purch.0.5 78.6 0 1.2 0.4 76.2 0 1.7 0 683 1.0 9.4 0 58.4 12.4 10.6 0 67.6 21.0 0 seven owners of the nuclear powered station 50 miles west of Phoenix.SRP owns 17.49 per-cent of Palo Verde's three 1,270 MW units.With the commercial operation of the first two units, SRP gained 444 MW of generating capacity.The third unit of Palo Verde.Nuclear Generating Station is ex-pected to be in commercial operation by the end of 1987.This unit will provide another 222 MW of capacity to SRP.The U.S.Nuclear Regulatory Commis-sion issued an operating license for the unit in March 1987.That license allows plant operator Arizona Public Service Company to load nuclear fuel and begin the prescribed testing process.link Palo Verde Nuclear Gener-ating Station with Phoenix and other moor cities and the elec-trical grid connecting the Western states.Meanwhile, construction began on the Papago Buttes-Pinnacle Peak 230-kV transmis-sion line.The line will strengthen SRP's transmission system and increase electric reliability to the growing number of customers in the Scottsdale and Tempe area.The line is expected to be com-pleted in early 1989.During the fiscal year, SRP added a total of 15 miles of 69 kV subtransmission line and 39 miles of overhead distribution lines.SRP also installed 1,403 miles of primary underground rates contain a basic amount for fuel, but fuel costs can change on a daily basis.Fluctuations be-tween the amount paid for fuel and the amount collected from customers are refunded or recovered on bills through periodic fuel cost adjustments.
 
SRP starts receiving low cost power from Unit 2 of Palo Verde Some of the power re-quirements of customers were met with electrici-ty from the first hvo units of Palo Verde Nuclear PROJECT ENERGY SOURCES distribution lines and 513 miles of secondary underground distri-bution lines.Also, five new residential distribution substation sites were opened and 15 new substations were installed.
SRP linemen continually upgrade and repair SRP's power lines, such as this high voltage line between H'yrene and Silver King receiving stations.
Energy Management System is installed SRP's ability to control its power nebvork increased dramat-ically with the arrival and instal-lation of the Energy Management System (EMS), a new computer system installed in February 1987.EMS is a power network control system with which dis-patchers monitor and direct the flow of power from generating fa-cilities to customers.
 
Thus far, about 70 SRP substations are operated by the new system.All 170 substations in the SRP elec-tric system are projected to be on EMS by late 1987.The new system is far more advanced and efficient in every respect from the old control sys-tem, which SRP had outgrown.In addition to features of the old system, the EMS has powerful statecf-the-art computer analysis capabilities designed to help pow-er dispatchers react faster to sys-tem disturbances and make better decisions regarding alloca-tion of generation resources.
Electric customers benefit from decreased fuel costs, increased power i    t was a golden year SRP's Power District.
Besides the ability to quickly identify, analyze and determine the cause of power outages, EMS'ther advantages include an in-creased ability to analyze the best time to buy and sell electricity, and to quickly analyze demand on the system.As a result, the new system increases SRP's relia-bility and cost effectiveness.
for In the 50th year since the for-customers in each of the past four years including a record 34,715 customers in fiscal year rates contain a basic amount for fuel, but fuel costs can change on a daily basis. Fluctuations be-Transmission system completed under budget SRP's work on the Palo Verde mation of the Salt River Project      1985-86. Because of continuing      tween the amount paid for fuel Nuclear      Generating Station's Agricultural Improvement and           growth, the number of customers      and the amount collected from transmission system was com-Power District, the District:          by the end of the next fiscal year  customers are refunded or is expected to easily surpass the                                                  pleted ahead of schedule and $ 3 recovered on bills through
SRP sent nine engineers and their families to Minneapolis for three years to supervise the build-ing of the computer and its soft-ware.Including installation, the new system cost$28 million.Construction continues on Coronado 3 In January 1986, construction resumed on the third 350 MW unit of the Coronado Generating Station at St.Johns, Arizona.By the end of May 1987, construc-tion was 8 percent complete.The 6 unit is expected to begjn com-mercial operation by 1991.SRP expects to spend about$670 million in direct costs for the unit, about$50 million less than the 1985 estimate.SRP is one of a few U.S.utility compa-nies building a generating unit of this size and is benefitting from competitive prices for equipment and materials.
      ~                                500,000 mark.
Supervision of Generating Station.SRP completed the first phase of its statewide study of potential locations for a new coal-fired generating station.However, since current projections show that another large, coal-fired generating station won't be needed until aiter the year 2000, and it takes about 10 years to plan and build a large coal-fired areas are evaluating the potential benefits, including deferral of new generating units, improved effi-ciency, enhanced reliability and better system coordination.
million under budget.           The Added nearly 30,000 new                                              periodic fuel cost adjustments.
Regional service centers provide faster service to customers Regional service centers, new-ly opened or now under con-~A C~0~E Phoenix~F~G 8/vga APACHE J FNREIICE JCT.fflfVf8 oP MIAMI~~GNBE~SUPERIOR~H O Electric Service Area Served Exclusively by Salt River Project.D Salt River Project Provides Full PoNer Requirements of Arizona Public Service for Resale.Project Makes Direct Sales to Customers for All Mining Loads.Salt River Project Provides Full Po>>vr Requirements of Arizona Public Service for Resale.i Electric Service Areas Not Semd by Salt River Project contruction by SRP engineers also is keeping costs down.Meanwhile, SRP is testing a potential source of new coal for Coronado Generating Station.SRP has acquired leases for coal-bearing properties in western New Mexico.lhsting of 100,000 tons of coal will help SRP decide if that coal could be a future source of fuel for Coronado station, the study probably won'be resumed until the early 1990s.SRP will continue to study sever-al options for meeting its cus-tomers'lectric demand.One option under study is a high voltage transmission line to connect the Desert Southwest and the Pacific Northwest.
13-year project was completed in electric customers, including              Of the increase in last year'          SRP starts receiving                  October 1986, at a cost of $ 95 several      major    industrial    customers, 27,153 were residen-            low cost power from                    million.
SRP and 26 other utilities in the bvo struction, are bringing SRP closer to its customers.
customers                            tial and 2,245 were commercial              Unit 2 of Palo Verde
Service centers in the western and eastern part of the Salt River Val-ley enhance operations by reduc-ing travel time and expenses.When customers need service, construction or repair, crews are able to respond quickly because they are closer to the work site.SALT RIVER PROJECT ELECTRIC SERVICE AREA The new Tolleson Service Center, opened in January 1987, is headquarters for 300 employees who serve the growing west Valley.By 1995, SRP pro-jects that it will be serving 200,000 electric customers in that area.SRP is building a similar regional service center in east Mesa to serve the growing east Valley.About 350 SRP employees will work at the center when it opens in 1988, with ap-proximately 150,000 electric customers expected to benefit.Customer service centers in Glendale and in the southeast Valley are also planned.SRP opened its first service center in Tempe in September 1983.SRP emphasizes demand-side planning SRP continually is looking for ways to reduce its costs and pass along its savings in the form of lower electric bills to its cus-tomers.'Ib provide customers with more opportunities to reduce their electric bills and to bring about beneficial changes to the pattern of system demand, SRP established the Demand-Side Implementation Department last year.Demand-side programs can moderate the rate of growth in peak demand and bring about a more constant demand for elec-tricity throughout the year.This lower rate of growth means SRP does not have to build as many new generating plants, thus keep-ing down rising costs associated with new construction.
      ~ Passed                          and industrial. Other electric The high-voltage transmission on a slight decrease Some of the power re-                    system includes 165 miles of 500 in fuel costs to customers, reduc-    users, including municipal street quirements of customers were                  kilovolt (kV) power lines which ing their cost of electricity        light contracts and irrigation        met with electrici-
More constant demand means SRP can make more efficient use of its existing generating system.Last year the new department, in cooperation with other depart-ments, continued a program evaluating customers'esponses to the time-of-day program.Within the time-of-day program, begun in March 1980, par-ticipating customers pay lower rates during off-peak hours.Con-versely, they pay higher rates dur-ing on-peak hours, when electricity demand is great.Results from the study will help SRP plan rate alternatives that t I,'/))allow customers to take greater control over the cost of their elec-tricity.SRP's Board of Directors voted in March 1987 to allow an additional 10,000 SRP customers to participate in the time-of-day program, increasing the number of potential customers in the pro-gram from 3,000 to 13,000.Other demand-side programs include a cash incentive program for businesses, schools, or chur-ches which install thermal energy storage systems, rather than con-ventional air conditioners.
      ~                                pumps, increased by 434.
A thermal energy storage system uses electricity at night to form ice or liquid which is used to cool the building during the day, in-stead of a conventional refrigera-tion system.Customers who replaced gas furnaces with high efficiency heat pumps last year received$200 ELECTRI from SRP for the (ALL switch.The$200 incentive was boosted from a$100 incentive of-fered when the program began in 4oo,ooo March 1985.2pp ppp Another incentive offered was to customers who replaced old, inef-ficient air condi-tioners or heat pumps with new high<fficiency air conditioners or heat pumps.SRP offered cash in-centives of between$50 and$100 a ton for the new equipment.
Began receiving low-cost                                            ty from the first power from the second unit of            Several      new    industrial  hvo units of Palo Palo Verde Nuclear Generating        customers,      including B.F.     Verde      Nuclear PROJECT ENERGY SOURCES Station                                Goodrich,       Hamilton-Avnet,     Generating Sta- Year Parker Hannifin and Hexcel, ac-      tion. Both began April  Ending                                                busc
SRP's Energy Efficient Home (EEH)program achieved new heights in market penetration last year.Currently, six out of 10 new homes in SRP's service area are built by contractors in the EEH program.The program requires builders to meet 12 building specifications for a total-electric home.EEH homes are more energy efficient and thus cost less to operate for the owner.Resource planning aimed at reducing cost During the fiscal year, SRP used a new approach, called C CUSTOMERS CLASSES)1977 1987 1982 balanced strategy planning, to plan methods of meeting pro-jected electric demand.This ap-proach reflects SRP's least-cost planning philosophy.
      ~  Completed the Palo Verde                                                                            30 Hpb'o Gas            Oil    Cnal    Nuclear Purch.
Its goal is to find the best combination of demand-side load reductions and future power additions resulting in the lowest possible cost, while maintaining SRP's high level of customer service.The balanced strategy plan calls for commercial operation of the third unit of Coronado Generating Station by 1991, a 200 MW purchase and a sales contract recapture, plus a reduc-tion in projected peak load up to 400 MW by the year 2006 through demand-side programs This plan allows SRP to delay construction of additional un-committed coal units until after the turn of the century.1992 1997 2001 New electric customers, such as Westcourt In the Buttes hotel manager (right), receive personal assistance about the/r power needs from an SRP commercial customer representative.
counted for about 8,000 kilowatts    commercial opera-transmission system to the Phoenix Metropolitan area, on-        (kW) in new load, nearly 800,000    tion in calendar 1984                15.8      3.9    0.5    78.6      0      1.2 time and under budget                  square feet of manufacturing        year 1986, the first 1985            12.8      8.9    0.4    76.2      0      1.7 space and more than 1,000 new        unit on January 1986                11.0      103      0    683      1.0      9.4
    ~ Brought on-line a new com-                                                                    1987        10.0        8.6      0  58.4    12.4    10.6 jobs in the area.                    30, 1986 and the 1992                63' puter, the Energy Management                                                                                                  1      0    67.6    21.0      0 Each new customer increased      second unit on $prnjeded)
System, to control SRP's electric                                           September        20, 'inc&As bybo purchases demand on the electric system.
system                                                                      1986.                  bill numbers m prnraroprsl Electric customer use reached a
    ~   And continued construc-        peak of 2,785 megawatts (MW)              SRP is one of tion of the third coal-fired unit of   on August 20, 1986. This peak        seven owners of the nuclear                  link Palo Verde Nuclear Gener-the Coronado Generating               demand surpassed the previous        powered station 50 miles west of ating Station with Phoenix and Station.                              high of 2,658 MW reached on           Phoenix. SRP owns 17.49 per-                 other moor cities and the elec-August 29, 1985. 'Ibtal kilowatt-     cent of Palo Verde's three 1,270              trical grid connecting the Further luster was added to       hour (kWh) sales to customers        MW units. With the commercial                Western states.
the golden jubilee when SRP's         during the year increased by          operation of the first two units, District improved service to our                                             SRP gained 444            MW of Meanwhile,        construction 1.06 billion kWh to 15.56 billion                                                began on the Papago Buttes-customers by building a new            kWh from 14.50 billion kWh the        generating capacity.                        Pinnacle Peak 230-kV transmis-regional service center; esta-        previous fiscal year.                                                              sion line. The line will strengthen blished a demand side implemen-                                                 The third unit of Palo Verde        . SRP's transmission system and tation program; and formulated            Electric bills drop slightly      Nuclear Generating Station is ex-            increase electric reliability to the a balanced strategy approach to             During the )mr, SRP was able    pected to be in commercial growing number of customers in resource planning.                     to pass on to customers a slight    operation by the end of 1987.                the Scottsdale and Tempe area.
decrease in fuel costs, thereby      This unit will provide another SRP's service area                                                                                                The line is expected to be com-lowering the cost of electricity. 222 MW of capacity to SRP. The remains a high-growth area                                                                                              pleted in early 1989.
For residential customers, the  U.S. Nuclear Regulatory Commis-The number of SRP                  average cost per kWh was 7.54        sion issued an operating license                  During the fiscal year, SRP customers      continued to grow.      cents, compared to 7.56 cents per    for the unit in March 1987. That              added a total of 15 miles of 69 Electric customers, totaled            kWh the previous year. The          license allows plant operator                kV subtransmission line and 39 487,321 at year's end, compared        reduction was due to a decrease      Arizona Public Service Company                miles of overhead distribution to 457,489 the year before. SRP        in the fuel cost adjustment fac-     to load nuclear fuel and begin the           lines. SRP also installed 1,403 has added          about 30,000        tor applied to bills. SRP's electric prescribed testing process.                 miles of primary underground
 
distribution lines and 513 miles        unit  is expected to begjn com-          Generating Station.                    areas are evaluating the potential of secondary underground distri-        mercial operation by 1991.                                                       benefits, including deferral of new SRP completed the first phase bution lines. Also, five new                                                                                            generating units, improved effi-SRP expects to spend about            of its statewide study of potential residential distribution substation                                                                                      ciency, enhanced reliability and
                                        $ 670 million in direct costs for        locations for a new coal-fired        better system coordination.
sites were opened and 15 new            the unit, about $ 50 million less        generating station. However, substations were installed.            than the 1985 estimate. SRP is           since current projections show Regional service centers one of a few U.S. utility compa-          that another large, coal-fired provide faster service Energy Management System              nies building a generating unit of        generating station won't be is installed                                                        needed until aiter the year 2000, to customers this size and is benefitting from SRP's ability to control its      competitive prices for equipment          and it takes about 10 years to              Regional service centers, new-power nebvork increased dramat-        and materials. Supervision of            plan and build a large coal-fired      ly opened or now under con-ically with the arrival and instal-lation of the Energy Management System (EMS), a new computer system installed in February                    SALT RIVER PROJECT ELECTRIC SERVICE AREA 1987. EMS is a power network control system with which dis-patchers monitor and direct the flow of power from generating fa-cilities to customers. Thus far, about 70 SRP substations are                                                                                                          fflfVf8 operated by the new system. All                                                                                              oP
                                                                          ~A 170 substations in the SRP elec-tric system are projected to be on                                                    C APACHE J
                                                                                      ~0 ~
EMS by late 1987.                                                           Phoenix E
MIAMI ~  ~ GNBE
                                                                                          ~ F The new system is far more                                                          ~G                      ~ SUPERIOR advanced and efficient in every                                                    8/vga      FNREIICE JCT.
respect from the old control sys-tem, which SRP had outgrown.                                                                                              ~ H In addition to features of the old system, the EMS has powerful statecf-the-art computer analysis capabilities designed to help pow-er dispatchers react faster to sys-tem disturbances and make i
better decisions regarding alloca-tion of generation resources.
Besides the ability to quickly identify, analyze and determine the cause of power outages, advantages include an in-EMS'ther creased ability to analyze the best time to buy and sell electricity, and to quickly analyze demand O              Electric Service Area Served Exclusively by Salt River Project.
Salt River Project Provides Full Po>>vr Requirements of Arizona D
Public Service for Resale.
on the system. As a result, the new system increases SRP's relia-                           Salt River Project Provides Full                        Electric Service Areas Not Semd by PoNer Requirements of Arizona                            Salt River Project bility and cost effectiveness.                              Public Service for Resale. Project Makes Direct Sales to Customers for SRP sent nine engineers and                           All Mining Loads.
their families to Minneapolis for three years to supervise the build-ing of the computer and its soft-ware. Including installation, the      contruction by SRP engineers              station, the study probably won'        struction, are bringing SRP new system cost $ 28 million.         also is keeping costs down.              be resumed until the early 1990s.      closer to its customers. Service SRP will continue to study sever-      centers in the western and Meanwhile, SRP is testing a Construction continues                                                      al options for meeting its cus-        eastern part of the Salt River Val-potential source of new coal for on Coronado 3                                                          tomers'lectric demand.                  ley enhance operations by reduc-Coronado Generating Station.
ing travel time and expenses.
In January 1986, construction    SRP has acquired leases for coal-When customers need service, resumed on the third 350 MW            bearing properties in western                One option under study is a construction or repair, crews are unit of the Coronado Generating      New Mexico. lhsting of 100,000            high voltage transmission line to able to respond quickly because Station at St. Johns, Arizona. By      tons of coal will help SRP decide          connect the Desert Southwest they are closer to the work site.
the end of May 1987, construc-       if that coal could be a future            and the Pacific Northwest. SRP tion was 8 percent complete. The      source of fuel for Coronado                and 26 other utilities in the bvo 6
 
The new Tolleson Service Center, opened in January 1987, is    headquarters      for 300 I,'/)
employees who serve the growing west Valley. By 1995, SRP pro-jects that it will be serving 200,000 electric customers in that area.
SRP    is building a similar regional    service center in east Mesa to   serve the growing east t
                                                                                                            )
Valley.     About    350 SRP employees will work at the center when it opens in 1988, with ap-proximately 150,000 electric customers expected to benefit.
Customer service centers in Glendale and in the southeast Valley are also planned. SRP opened its first service center in    New electric customers, such as Westcourt In the Buttes hotel manager (right), receive personal Tempe in September 1983.              assistance about the/r power needs from an SRP commercial customer representative.
SRP emphasizes demand-side planning            allow customers to take greater          tioners or heat pumps with new      balanced strategy planning, to SRP continually is looking for  control over the cost of their elec-     high<fficiency air conditioners or  plan methods of meeting pro-ways to reduce its costs and pass    tricity.                                heat pumps. SRP offered cash in-    jected electric demand. This ap-along its savings in the form of          SRP's Board of Directors            centives of between $ 50 and         proach reflects SRP's least-cost lower electric bills to its cus-      voted in March 1987 to allow an        $ 100 a ton for the new             planning philosophy. Its goal is to tomers. 'Ib provide customers        additional 10,000 SRP customers        equipment.                          find the best combination of with more opportunities to            to participate in the time-of-day          SRP's Energy Efficient Home    demand-side load reductions and reduce their electric bills and to    program, increasing the number          (EEH) program achieved new          future power additions resulting bring about beneficial changes to      of potential customers in the pro-      heights in market penetration last  in the lowest possible cost, while the pattern of system demand,        gram from 3,000 to 13,000.              year. Currently, six out of 10 new  maintaining SRP's high level of SRP established the Demand-                                                    homes in SRP's service area are    customer service.
Side Implementation Department Other demand-side programs include a cash incentive program built by contractors in the EEH        The balanced strategy plan last year.                                                                     program. The program requires      calls for commercial operation Demand-side programs can for businesses, schools, or chur-ches which install thermal energy builders to meet 12 building        of the third unit of Coronado moderate the rate of growth in                                                specifications for a total-electric Generating Station by 1991, a storage systems, rather than con-peak demand and bring about a                                                  home.                              200 MW purchase and a sales ventional air conditioners. A more constant demand for elec-                                                    EEH homes are more energy      contract recapture, plus a reduc-thermal energy storage system tricity throughout the year. This                                              efficient and thus cost less to    tion in projected peak load up to uses electricity at night to form lower rate of growth means SRP                                               operate for the owner.               400 MW by the year 2006 ice or liquid which is used to cool does not have to build as many                                                                                    through demand-side programs the building during the day, in-             Resource planning aimed new generating plants, thus keep-                                                                                  This plan allows SRP to delay stead of a conventional refrigera-                at reducing cost ing down rising costs associated                                                                                    construction of additional un-tion system.
with new construction. More                                                        During the fiscal year, SRP     committed coal units until after constant demand means SRP                 Customers who replaced gas          used a new approach, called          the turn of the century.
can make more efficient use of its   furnaces with high existing generating system.           efficiency      heat pumps      last year Last year the new department, received        $ 200    ELECTRIC CUSTOMERS in cooperation with other depart-    from SRP for the                 (ALL CLASSES) ments, continued a program            switch. The $ 200 evaluating customers'esponses        incentive        was to the time-of-day program.          boosted from a Within the time-of-day program,      $ 100 incentive of-begun in March 1980, par-             fered when the ticipating customers pay lower        program began in            4oo,ooo rates during off-peak hours. Con-    March          1985.       2pp ppp versely, they pay higher rates dur-   Another incentive ing on-peak hours, when              offered was to electricity demand is great.         customers who Results from the study will help      replaced old, inef-                   1977            1982          1987        1992         1997       2001 SRP plan rate alternatives that      ficient air condi-
 
SRP demonstrates a vital interest in hydraulic engineering projects at Arizona State University's SRP Hydraulic Engineering Laboratory.
SRP demonstrates a vital interest in hydraulic engineering projects at Arizona State University's SRP Hydraulic Engineering Laboratory.
Water Group reorganization reflects changing needs of the Salt River Valley S RP's Water Group under-went major changes last year to satisfy changes in laws, community attitudes and the needs of water customers.
Water Group reorganization reflects changing needs of the Salt River Valley RP's Water Group under-S      went major changes last year to satisfy changes in laws, practices of industry, agriculture and municipalities.
Last year, SRP's Water Group:~saw retirement of its top ex-ecutive~formed a new department and reorganized three others~participated in several city and SRP long-range water plan-ning forums~completed canal mainte-nance work to decrease water losses~and worked with Valley cities to build an intertie between SRP canals and the Central Arizona Project canal.Urban land use increases in water service area The character of the area served by SRP continued to change during the past year.A total of 7,165 acres was converted from agricultural use to urban use.By year's end, 68.6 percent of the 238,170 acres of SRP member lands was urbanized while 31.4 percent was used for agriculture.
determine the relative water rights of all lands within the Gila In response to the act and        River basin, including SRP community attitudes and the                                                                                    member lands, and the land on other laws and regulations needs of water customers.                                                                                      the watersheds of the Salt and relating to water quality, SRP formed its Water Quality and         Verde rivers.
SRP estimates that essential-ly all acreage within SRP bound-aries will be out of agricultural production by the>mr 2015.Water deliveries also have reflected the changes in land use.During the past year deliveries for urban uses totaled 395,158 acre-feet (ao while deliveries for agricultural purposes totaled 290,572 af.During the previous year, urban use totaled 396,228 af and agricultural use was 381,341 af.Reid M%epics Reid Teeples retires In January, Reid W.Teeples retired after 15 years as the head of the Project's Water Group.Tt.epics, who joined SRP in 1948, was replaced by D.S.Wilson, Jr.During his tenure, Teeples coordinated the largest well-drilling program in SRP's history and established the Project's Groundwater Department.
Last year, SRP's Water Group:
He also was responsible for standar-dizing many of SRP's practices while heading the Civil Engineer-ing Department.
Geohydrology          Department.         One of SRP's primary duties
In addition to his work at SRP, he served in various leader-ship capacities with the Colorado River Water Users'ssociation, the National Water Reclamation Association and various other groups.Wilson joined SRP in 1967.He was manager of Water Resource Operations for eight years before being named to suc-ceed'keples.New department formed Arizona's Environmental Quality Act, passed last year, placed stringent water quality re-quirements on the water use practices of industry, agriculture and municipalities.
      ~ saw  retirement of its top ex-                                    Members of the department will      is to ensure protection of water ecutive                                                                  monitor the quality of SRP's         rights for lands within the SRP
In response to the act and other laws and regulations relating to water quality, SRP formed its Water Quality and Geohydrology Department.
      ~ formed a new department                                            water resources and institute        water service territory. Those and reorganized three others                                              practices to ensure water man-      rights were established under the
Members of the department will monitor the quality of SRP's water resources and institute practices to ensure water man-aged by SRP meets all applicable standards.
      ~ participated in several city                                      aged by SRP meets all applicable    Kent Decree in 1910 and other and SRP long-range water plan-                          Reid  M %epics    standards.                          court actions. By protecting the ning forums                                                                  SRP's Water Group also           water rights, lands in the SRP
SRP's Water Group also reorganized three departments to provide better service related to water rights administration and water construction and maintenance.
      ~ completed canal mainte-                                           reorganized three departments to    water service area are assured a nance work to decrease water                                              provide better service related to    portion of the water in SRP Reid Teeples retires                                               reservoirs. As a result, the water losses                                                                    water rights administration and
Water rights administration is expected to be particularly im-portant during coming years as the Gila River Water Rights Ad-judication progresses through the courts.The adjudication will determine the relative water rights of all lands within the Gila River basin, including SRP member lands, and the land on the watersheds of the Salt and Verde rivers.One of SRP's primary duties is to ensure protection of water rights for lands within the SRP water service territory.
    ~                                    In January, Reid W. Teeples   water        construction        and  supply of lands within SRP and worked with Valley retired after 15 years as the head maintenance.                        boundaries is more secure than cities to build an intertie between SRP canals and the Central of the Project's Water Group.                                            the water supply for many other Tt.epics, who joined SRP in 1948,     Water rights administration is    portions of the Valley.
Those rights were established under the Kent Decree in 1910 and other court actions.By protecting the water rights, lands in the SRP water service area are assured a portion of the water in SRP reservoirs.
Arizona Project canal.                                                  expected to be particularly im-was replaced by D.S. Wilson, Jr.
As a result, the water supply of lands within SRP boundaries is more secure than the water supply for many other portions of the Valley.The Project also was involved in discussions over a potential joint groundwater storage and recovery project, meeting with 1986 PLANNING CASE 2005'RBAN IRRIGATION 111,000 ABYR SYSTE>1 LOSSES 122.900 ABYR ll'Yo 12%1244 URBAV IRRIGATION 97700 ABYR SYSTE'V LOSSES 121~AF/YR OTHER VALLEY CONTRACIS 184~AF/YR AGRICULTURE 290.800 AF/YR 29%2494 OTHER VALLEY CONTRACIS 90900 AF/YR AGRICULTURE 252,900 AF/YR NlMCIPAL 4 INDUSTRIAL 284200 AF/YR 29%46%0HMCIPAL 4 Bil)USTRIAL 470.000 AF/YR TOTAL DE41AND 993,600 AFIYR'IIAL DEbfAND 1.033.000AFIYR AF (ACR&F0071
portant during coming years as            The Project also was involved Urban land use increases                                              the Gila River Water Rights Ad-During his tenure, Teeples                                         in discussions over a potential in water service area                                              judication progresses through the coordinated the largest well-                                           joint groundwater storage and The character of the area        drilling program in SRP's history courts. The adjudication will        recovery project, meeting with served by SRP continued to            and established the Project's change during the past year. A        Groundwater Department. He total of 7,165 acres was converted    also was responsible for standar-     COMPONENTS OF SRP WATER DEMAND from agricultural use to urban        dizing many of SRP's practices use. By year's end, 68.6 percent      while heading the Civil Engineer-of the 238,170 acres of SRP            ing Department.                                 1986                    PLANNING CASE member lands was urbanized In addition to his work at                                                                         2005'RBAN while 31.4 percent was used for SRP, he served in various leader-                 IRRIGATION    ll'Yo              URBAV IRRIGATION agriculture.                                                                        111,000 ABYR                              97700 ABYR ship capacities with the Colorado 1244 SRP estimates that essential-    River Water Users'ssociation,               SYSTE>1 LOSSES      12%                  SYSTE'V LOSSES the National Water Reclamation               122.900 ABYR                              121~ AF/YR ly all acreage within SRP bound-aries will be out of agricultural      Association and various other                   OTHER                                      OTHER VALLEYCONTRACIS                          VALLEYCONTRACIS production by the >mr 2015.            groups.                                      184~ AF/YR                  2494          90900 AF/YR Wilson joined SRP in 1967.
%$880 CALLOVS COMPONENTS OF SRP WATER DEMAND the City of Mesa and the Arizona Municipal Water Users Associa-tion (AMWUA).SRP is consider-ing groundwater storage to recharge Salt and Verde river waters during above-normal runoff years.The underground stored water would then be recovered for use during below-normal runoff years.SRP increases efforts to assist cities with water planning As the number of people living in the Valley continues to grow, the cities here are faced with an increasing demand for water.During the past year, SRP continued its meetings with the City of Phoenix and expanded those meetings to include other cities in its water service area to seek solu-tions to mutual problems.By working ivith the cities, individually and as a group, all involved can share information and avoid costly duplication of ef-forts in planning ways to meet water demand.Among the ef-forts worked on by of adequate supplies now and in the future throughout the Valley.Also, the cities and other pro-viders will find it easier to comply with the conservation requirements of Arizona's Groundwater Management Act.During the year SRP organ-ized a regional water planning forum with the cities it serves, to identify and address long-range water planning issues.Four water planning groups were established, each led by an SRP facilitator, to inform each other about the cities'nd SRP's needs and limitations and to avoid duplication of efforts.years, an abundance of surface water allowed SRP to keep groundwater pumping to less than 7 percent of deliveries.
Water deliveries also have        He was manager of Water                     AGRICULTURE        29%
lbtal Project groundwater use was 65,538 af.Combined surface and groundwater produced for Pro-ject use totaled 993,591 af, which was 90 percent of the median for the last 10 years.Depending on surface water supplies, ground-water historically has satisfied between 5 percent and 40 per-cent of SRP customers'nnual water demand, or 55,000 af to 440,000 af each year.Reduced pumping helps eliminate over-SRP was institu-tion of a Valley-wide water conser-vation effort.SRP, along with other members of AMWUA encour-aged the cooperation of local broadcasters, under the leader-ship of KPHO'klevision, on an extensive campaign called Water Wise." Each month a water con-servation tip is communicated through public service an-nouncements carried by local television and radio stations.A printed version of the tip is distributed through ABCO Markets Inc., Bashas and Lucky grocery stores.drafting supplies.The Arizona Groundwater Management Act calls for pumping to be limited to the quantity recharged by January 1, 2025.Water storage above normal SRP began the year with 1,671,535 af of water in storage.Inflows from the 13,000-square-mile watershed to the SRP reser-voirs totaled 1,070,214 af during the year, which was 87.0 percent of average.Inflows during 1985 totaled 1,7?4,667 af.Unusually heavy summer rainfall on the Salt and Verde watersheds contri-buted to runoff that kept reser-voirs fuller than normal.Storage at year-end totaled 1,691,741 af or 84 percent of capacity.This'otal was 139 percent of normal.For the third time in four Tbtai water deliveries hit a 10-year low.Deliveries totaled 870,658 af compared to 1,016,612 af in 1985 and 881,009 in 1984.Agricultural use was less than usual due to government set-aside programs which re-duced the quantity of crops grown.Summertime municipal use declined because of greater than normal summer rainfall which reduced laivn irrigation.
AGRICULTURE 252,900 AF/YR reflected the changes in land use. Resource Operations for eight 290.800 AF/YR During the past year deliveries for    years before being named to suc-urban uses totaled 395,158 acre-      ceed 'keples.                                                             46%            0HMCIPAL feet (ao while deliveries for                                                                                                4  Bil)USTRIAL New department formed                       NlMCIPAL          29%                    470.000 AF/YR agricultural purposes totaled                                                      4 INDUSTRIAL 284200 AF/YR 290,572 af. During the previous          Arizona's    Environmental year, urban use totaled 396,228        Quality Act, passed last year,       TOTAL DE41AND 993,600 AFIYR            'IIALDEbfAND      1.033.000AFIYR af and agricultural use was            placed stringent water quality re-                                         AF (ACR&F0071 %$ 880 CALLOVS 381,341 af.                            quirements on the water use
By working together toward the common goal of conserving water, customers can be assured 10 SRP Is a recognized world authority on water systems.These Egyptians were among nearly 600 visitors from 58 countries who toured SRP facilities In 1986, During SRP visits, Egyptian participants received handswn training In the operations, maintenance and management of the Project's irrigation system.Tbtal water deliveries to the cities during the year totaled 284,192 af, an increase of slight-ly less than one percent from 1985's total of 281,464 af.SRP coordinates construction with cities As more and more streets and freeways are built, the rights of way often conflict with those of SRP wateiways.
 
In 1986 SRP met with Valley cities, the Arizona Department of itansportation, and the Maricopa County Highway Department to discuss ongoing design and construction projects.More than 30 meetings were held resulting in improved coordination behveen SRP and the agencies on irrigation-related projects where facilifles of bvo or more entities are involved.Interagency coordination saved time and money by reduc-ing the impact of residential and freeway construction on SRP's ability to supply water to homes, businesses, municipalities and farms.SRP continued its commit-ment to water conservation by lining 7.4 miles of canals and in-stalling 98 lateral structures last year.Lining canals decreases water system losses for a savings of thousands of acre-feet of water each year.SRP also completed a beautification project along part of the Arizona Canal which in-cluded improving the appearance of the canal by extensive brush and tree removal, and tree trim-ming.Similar projects are planned for other canals.Congress funds dam improvements Under the Safety of Dams Act, Congress appropriated
the City of Mesa and the Arizona    of adequate supplies now and in          years, an abundance    of surface        Tbtal water deliveries to the Municipal Water Users Associa-      the future throughout the Valley.        water allowed SRP to keep            cities during the year totaled tion (AMWUA).SRP is consider-      Also, the cities and other pro-          groundwater pumping to less          284,192 af, an increase of slight-ing groundwater storage to          viders will find it easier to            than 7 percent of deliveries. lbtal  ly less than one percent from recharge Salt and Verde river        comply with the conservation            Project groundwater use was          1985's total of 281,464 af.
$3 1 million for safety improvements at Theodore Roosevelt Dam and$3.9 million for work at Stewart Mountain Dam.Shortly after the end of the fiscal year, Arizona's congres-sional delegation negotiated an agreement with environmental groups concerning Plan 6.Under the agreement, Cliff Dam will not be built.In return, environmen-tal groups agreed not to oppose the remaining elements of Plan 6.The plan will provide Central Arizona Project water storage and regional flood control and dam-safety modifications.
waters during above-normal          requirements      of Arizona's          65,538 af.
Other elements are an enlarged Theo-dore Roosevelt Dam and modifi-cations to Stewart Mountain Dam on the Salt River.Construction outside the SRP reservoir system included New Waddell Dam on the Agua Fria River.During 1986 SRP entered into agreements with the U.S.Bureau of Reclamation to add several maintenance items to necessary dam safety modifica-tions scheduled at Stewart Moun-tain Dam.The proposed changes will enhance operating and maintenance facilities at the dam.For 1987 SRP contributed about$1.5 million in safety modifications.
runoff years. The underground        Groundwater Management Act.                                                           SRP coordinates stored water would then be                                                      Combined      surface    and        construction with cities recovered for use during below-        During the year SRP organ-          groundwater produced for Pro-              As more and more streets and normal runoff years.               ized a regional water planning          ject use totaled 993,591 af, which    freeways are built, the rights of forum with the cities it serves,      was 90 percent of the median for      way often conflict with those of SRP increases efforts to assist      to identify and address long-            the last 10 years. Depending on      SRP wateiways. In 1986 SRP met cities with water planning        range water planning issues. Four      surface water supplies, ground-      with Valley cities, the Arizona As the number of people          water planning groups were              water historically has satisfied      Department of itansportation, living in the Valley continues to    established, each led by an SRP         between 5 percent and 40 per-       and the Maricopa County grow, the cities here are faced      facilitator, to inform each other      cent of SRP customers'nnual            Highway Department to discuss with an increasing demand for        about the cities'nd SRP's needs        water demand, or 55,000 af to         ongoing design and construction water. During the past year, SRP     and limitations and to avoid            440,000 af each year. Reduced        projects. More than 30 meetings continued its meetings with the     duplication of efforts.                pumping helps eliminate over-        were held resulting in improved City of Phoenix                                                                                                   coordination behveen SRP and and      expanded                                                                                                 the agencies on irrigation-related those meetings to                                                                                                 projects where facilifles of bvo or include other cities                                                                                               more entities are involved.
SRP is prepared to contribute an additional
in its water service Interagency    coordination area to seek solu-saved time and money by reduc-tions to mutual ing the impact of residential and problems.         By                                                                                               freeway construction on SRP's working ivith the                                                                                                 ability to supply water to homes, cities, individually businesses, municipalities and and as a group, all farms.
$5 million to the U.S.Treasury in fiscal 1988.The Project's involve-ment is through a local cost-share agreement for completion of Plan 6.The federal government has accepted$371 million in local funds in exchange for a federal commitment to complete all elements of Plan 6 by 1997.SRP pledged$52 million of the local funds as its share of dam-safety modifications.
involved can share information and                                                                                                       SRP continued its commit-avoid         costly                                                                                               ment to water conservation by duplication of ef-                                                                                                lining 7.4 miles of canals and in-forts in planning                                                                                                 stalling 98 lateral structures last ways to meet water                                                                                                 year. Lining canals decreases demand.                                                                                                           water system losses for a savings of thousands of acre-feet of water Among the ef-                                                                                                  each year.
The federal government is responsible for the balance.Work to be performed on Theodore Roosevelt Dam in-cludes raising the overall height of the dam by 77 feet.The modifications to the dam will enable it to provide flood control, dam safety and additional water conservation storage on the Salt River.Modifications to Theodore Roosevelt and Stewart Mountain dams are included in the Plan 6 agreement.
forts worked on by SRP was institu-                                                                                                      SRP also completed a tion of a Valley-                                                                                                 beautification project along part wide water conser-      SRP Is a recognized world authority on water systems. These Egyptians were                of the Arizona Canal which in-vation effort. SRP,     among nearly 600 visitors from 58 countries who toured SRP facilities In                  cluded improving the appearance 1986, During SRP visits, Egyptian participants received handswn training In              of the canal by extensive brush along with other      the operations, maintenance and management of the Project's irrigation system.
The Arizona Department of Transportation will begin con-structing a bridge on the upstream side of Roosevelt dam in 1987 to be finished by 1990.The bridge will remove the Ql Imk Q~~~o&O 13,000 Sq.&tile Project Watershed The Central Arizona Project is a water-delivery system being constructed by the Bureau of Reclamation to deliver water from Lake Havasu on Arizona's western border to Maricopa, Pinal, and Pima counties in cen-tral and southern Arizona.Cur-rently, construction is complete to just north of'Ittcson.Although SRP hasn't con-tracted for CAP water, SRP may need the intertie to receive CAP water for use when Roosevelt Lake is drawn down for construc-tion of the federally mandated safety modifications.
members          of                                                                                              and tree removal, and tree trim-AMWUA encour-                                                                                                     ming. Similar projects are aged the cooperation of local        Water storage above normal              drafting supplies. The Arizona        planned for other canals.
CAP received record levels of funding from the 99th Congress, despite the pressure of the Gramm-Rudman deficit reduc-tion law.For fiscal year 1987, CAP received$202.8 million.ASU dedicates student laboratory Continuing its longtime tradi-tion of supporting higher educa-tion, SRP provided grants to Arizona State University's SRP Hydraulic Engineering Labor-atory.The joint endeavor between SRP and ASU's College DOMESTIC WATER DELIVERIES Chandler Gilbert Glendale Mesa Peoria Phoenix Scottsdale Tempe Total il it numtpers are 1986 1985 7,936 6,700 4,357 3,125 25,222 23,982 44,391 41,476 4,028 4,351 156,412 160,876 3,478 3,843 38,367 37,172 284,192 281,464 in acre feet, crcept percents of change change+10.39%+39.44%5.17%+7.03%+7.47%2.77%9.50%+3.38%+1.00%of Engineering and Applied Science exemplifies the business-education partnership SRP strives to maintain.The new equipment in the laboratory will be used by students to study the mechanics and engineering pro-blems associated with water and other fluids.Work with representatives from countries around the world was continued through SRP's Office of International Affairs.The office hosted nearly 600 visitors from 58 countries, held 20 on-the-job training programs and conducted seminars for 160 representatives of 15 nations.Through efforts coordinated by the office, SRP helped install four radial gate structures in Egypt.The installation was part of the ongoing Professional Employee Exchange Program (PEEP)with Egypt's Ministry of Irrigation.
broadcasters, under the leader-         SRP began the year with Groundwater Management Act ship of KPHO 'klevision, on an                                              calls for pumping to be limited to            Congress funds 1,671,535 af of water in storage.
Also, a seminar on telemetry was presented to the Ministry of Irrigation by SRP personnel.
extensive campaign called Water                                              the    quantity recharged by                dam improvements Inflows from the 13,000-square-Wise." Each month a water con-       mile watershed to the SRP reser-       January  1, 2025.                        Under the Safety of Dams Act, servation tip is communicated       voirs totaled 1,070,214 af during                                            Congress appropriated $ 3 1 through public service an- the year, which was 87.0 percent                      Tbtai water deliveries hit a million for safety improvements nouncements carried by local of average. Inflows during 1985                10-year low. Deliveries totaled at Theodore Roosevelt Dam and television and radio stations. A totaled 1,7?4,667 af. Unusually            870,658 af compared to                $ 3.9 million for work at Stewart printed version of the tip is heavy summer rainfall on the Salt 1,016,612 af in 1985 and 881,009                  Mountain Dam.
Also under PEEP, tm Cairo University students completed a 15-week summer study program.One student worked in SRP's Civil Engineering Department and the other in Water Resources and Services'ydrology Division.baffic from the to SALT RIVER PRO JECT IRRIGATED AREA of the dam.Intertie will link SRP canals and CAP@+LE Locally, SRP worked with six ecoOl Valley cities to ob-tain agreement on a plan to build a$3.1 million struc-ture that would link SRP's canal system with the Central Arizona Project (CAP)aqueduct.The in-tertie, which will carry up to 800 cubic-feet-per-second of water, will transport water from the CAP aqueduct near Granite Reef Diver-sion Dam to SRP's main canals for Salt Riwr Project delivery to CAP Irrigated Area users.
distributed through ABCO and Verde watersheds contri- in 1984. Agricultural use was less Markets Inc., Bashas and Lucky buted to runoff that kept reser-               than usual due to government              Shortly after the end of the grocery stores.                                                              set-aside  programs which re-        fiscal year, Arizona's congres-voirs fuller than normal. Storage        duced the quantity of crops          sional delegation negotiated an at year-end totaled 1,691,741 af grown. Summertime municipal                  agreement with environmental By working together toward      or  84 percent of capacity. This        use declined because of greater      groups concerning Plan 6. Under the common goal of conserving              was 139 percent of normal. 'otal than normal summer rainfall          the agreement, CliffDam will not water, customers can be assured          For the third time in four which reduced laivn irrigation.                be built. In return, environmen-10
a f~I~~'1 46 erat..~I",1 I I t ,t.+'4y;-:.I'~, j~;p IE.P The Salt River Pete water safety program teaches water safety to school children.The award-winning program has reached more than half a million children in 2D years.
 
Salt River Project's service extends beyond water and power S RP employees-'The People Behind the Spirit''ontinued to put their customers and their communities first.And it showed.In fiscal year 1986-87:~97 percent of customers rated SRP service as"good" or"excellent"~Volunteer work by SRP employees reached new heights~Business offices were moved, improving customer service~And SRP's Better Way and Quality Circle programs meant savings for SRP and its customers.
tal groups agreed not to oppose      baffic from the to   SALT RIVER PRO JECT IRRIGATED AREA the remaining elements of            of the dam.
SRP receives high marks"The People Behind the Spirit" kept up SRP's tradition of giving first-rate customer service.Nearly all of SRP's electric and~ater customers polled last year were very satisfied with the quali-ty of service they received from the Project, according to monthly surveys.SRP's goal was for 90 percent of its customers to rate overall quality of service good or excellent.
Plan 6.
The Project exceeded that goal with the 97 percent rating.Employees'ommunity involvement remains high SRP employees showed pride in their communities by donating their time, money and energy to community-related projects.Pro-ject employees pledged a total of$326,772 to 52 non-profit agen-cies.And Project employees donated approximately 480 pints of blood last year to a statewide blood service.Thanks to the volunteer ef-forts of SRP employees, Valley teenagers last year learned more about the free-enterprise system through SRP-sponsored Junior Achievement companies.
Intertie will link The plan will provide Central SRP canals and CAP Arizona Project water storage                                                                    @+LE and regional flood control and            Locally, SRP dam-safety modifications. Other      worked with six                                            ecoOl elements are an enlarged Theo-        Valley cities to ob-dore Roosevelt Dam and modifi-        tain agreement on cations to Stewart Mountain Dam on the Salt River. Construction a plan to build a
Employees helped raise$106,000 during February 1987's Junior Achievement Telephone Campaign.A total of 97 volunteers, representing 33 com-panies, called area businesses requesting donations for Junior Achievement.
                                        $ 3.1 million struc-                                                                           Ql outside the SRP reservoir system included New Waddell Dam on ture that would link SRP's canal                                                                              Imk the Agua Fria River.                   system    with the Central Arizona During 1986 SRP entered          Project                                                                                          Q~~~o&
SRP volunteers raised$12,242, the second highest amount of any business during the telephone campaign.The money went toward pro-grams and operational support for the organization.
(CAP) into agreements with the U.S.
In a joint effort, SRP and Arizona Public Service Company (APS)raised more than$8,700 for needy citizens in the fourth annual S.H.A.R.E.
aqueduct. The in-Bureau of Reclamation to add tertie, which will several maintenance items to carry up to 800 necessary dam safety modifica-cubic-feet-per-tions scheduled at Stewart Moun-second of water, tain Dam. The proposed changes        will transport water will enhance      operating and       from the        CAP maintenance facilities at the dam.
Affair 10-kilometer run January 10.A record 835 people participated in the fund-raising event, which also included a two-mile fun run and a five-mile walk.Proceeds were donated to the Salvation Army, which ad-ministers the Service to Help Arizonans with Relief on Energy (S.H.A.R.E.).
aqueduct        near For 1987 SRP contributed        Granite Reef Diver-about $ 1.5 million in safety modifications. SRP is prepared to contribute an additional $ 5 million to the U.S. Treasury in fiscal 1988. The Project's involve-ment is through a local cost-share sion Dam to SRP's main canals for delivery to CAP users.
Formed by SRP and APS in 1982, Project S.H.A.R.E.
Salt Riwr Project Irrigated Area O                13,000 Sq. &tile Project Watershed The Central Arizona Project agreement for completion of         is a water-delivery system being Plan 6.                                                                          DOMESTIC WATER DELIVERIES constructed by the Bureau of The federal government has      Reclamation to deliver water                                                1986              1985          change Chandler                      7,936            6,700      + 10.39%
provides funds through the Salvation Army for energy-related bills and home repairs of needy families.SRP customers donated$114,313 to the S.H.A.R.E.
accepted $ 371 million in local      from Lake Havasu on Arizona's Gilbert                      4,357            3,125      + 39.44%
pro-gram last year.Customers donate through their monthly electric bills.Meamvhile at St.Johns, the seventh annual Coronado Generating Station benefit run attracted 440 participants and resulted in a donation of$1,640 to the St.Johns Senior Citizens Association.
funds in exchange for a federal      western border to Maricopa,                  Glendale                    25,222            23,982          5.17%
The annual Page Attacks'fhsh program received first place in the statewide'hke Pride in America" competition spon-sored by the Commission on Arizona's Environment and se-cond place in the national com-petition sponsored by the U.S.Department of Interior.Each>m;the community effort has in-volved more than 75 percent of Page's 6,500 residents.
commitment to complete all            Pinal, and Pima counties in cen-            Mesa tral and southern Arizona. Cur-44,391            41,476      +  7.03%
Page Attacks%ash started in 1981 as a city-wide cleanup pro-gram sponsored by SRP's Nava-jo Generating Station (NGS)and the Glen Canyon National Recreational Area.The Page Kiwanis Club and Elks Lodge have helped to coordinate the event in recent years with help from NGS employees.
elements of Plan 6 by 1997. SRP                                                    Peoria                        4,028            4,351      + 7.47%
Last year'participants collected 212 tons of trash.SRP's organizational and monetary involvement in Page At-tacks Thrash, along with other anti-litter efforts, was honored by an award from Arizona Clean and Beautiful, the state arm of the na-tional Keep America Beautiful campaign.SRP was distin-guished as the most outstanding business in the state with regard to its anti-litter efforts.The Delta Gamma National Foundation for the Blind honored SRP with an award recognizing the Project's support of the Foundation for Blind Children.The award recognized SRP as a long-time supporter of the organization through employee volunteering, financial donations and in-kind services.Employees also hold key posi-tions on the foundation board.SRP recognizes the value of excellence in education.
pledged $ 52 million of the local    rently, construction is complete            Phoenix                    156,412          160,876            2.77%
Last year, SRP honored 61 seniors during its fifth annual Spotlight on Excellence program.Honored students were graduating seniors from Maricopa County, Page and St.Johns-areas in which 8RP has electric facilities.
funds as its share of dam-safety      to just north of 'Ittcson.                 Scottsdale                    3,478            3,843          9.50%
Honorees.were selected by their school principals for academic achieve-ment and all-around excellence.
modifications.     The federal            Although SRP hasn't con-               Tempe                        38,367            37,172      + 3.38%
For younger students, SRP and APS co-sponsored the an-nual Ener@Fair.The fair at-tracted 200 entries for"Energy Changes and Challenges." Kindergarten through 12th grade students participated.
government is responsible for the     tracted for CAP water, SRP may              Total                    284,192          281,464          + 1.00%
Russell Moreland of Willis Junior High School, Chandler, made the win-ning entry.Ten outstanding employees and one retiree were honored for their service to civic and com-munity organizations in Arizona with SRP's Karl F.Abel Volunteer awards.Named for SRP's im-mediate past president, these awards are presented each year to employees who devote their time and energy to their com-munities.Saundra Reedy, administrative assistant at Coronado Generating Station, was named St.John'Outstanding Chamber of Com-merce member in 1986.She was honored for her efforts in several Chamber of Commerce activities promoting the St.Johns area.SRP honored for two safety programs SRP received two moor safe-ty awards last year.They were 13 Ittdta$I'd IO StttOO>$tt, ttttt~t i I tlt tttl IO n II I grams include SRP's Speakers'ureau, where employees volunteer to make presentations to organizations or groups.'lbpics range from the early beginning of the Project through the most up-to4ate activities of the utility.During fiscal year 1986-87, SRP made about 2,300 presen-tations to audiences totaling 87,343 persons.SRP also conducted programs about microwave cooking, com-puter equipment safety, and energy conservation, SRP's Power Saver Store opened last year at Westridge Mall.Nothing is for sale.Instead, employs offered fire, expert ad-vice about the efficient use of water and power.third place in the American Public Power Association's (APPA)Electric Safety Award contest and the Arizona Safety Association's Howaid Pyle Award.APPA is a national organiza-tion representing more than 1,750 publicly owned electric utilities.
balance.                             need the intertie to receive CAP            ilit numtpers are in acre feet, crcept percents  of change Work to be performed on        water for use when Roosevelt Theodore Roosevelt Dam in-           Lake is drawn down for construc-cludes raising the overall height    tion of the federally mandated        of Engineering and Applied                        Through efforts coordinated of the dam by 77 feet. The           safety modifications.                Science exemplifies the business-              by the office, SRP helped install modifications to the dam will              CAP received record levels of education        partnership        SRP      four radial gate structures in enable it to provide flood control,  funding from the 99th Congress, strives to maintain. The new                    Egypt. The installation was part dam safety and additional water       despite the pressure of the           equipment in the laboratory will              of the ongoing Professional conservation storage on the Salt      Gramm-Rudman deficit reduc-          be used by students to study the                Employee Exchange Program River.                               tion law. For fiscal year 1987,      mechanics and engineering pro-                 (PEEP) with Egypt's Ministry of blems associated with water and                Irrigation. Also, a seminar on Modifications to Theodore        CAP received $ 202.8 million.
APPA conducts the an-nual safety contest to draw atten-tion to the importance of safe working habits in the electric utility industry, and to recognize excellence in that area.The Arizona Safety Associa-tion is a chapter of the National Safety Council.The Howanl Pyle Award recognizes safety promo-OOO~O IM$$$ICr tion in the community.
other fluids.                                  telemetry was presented to the Roosevelt and Stewart Mountain                  ASU dedicates                                                            Ministry of Irrigation by SRP dams are included in the Plan 6                                                Work with representatives student laboratory          from countries around the world                personnel.
SRP is the first utility to receive this honor.SRP's public safety programs extend to construction workers, school children, professional law enforcement officers, firefighters and others.Additional public service pro-Customer service representative Elaine Spencer is one of several SRP employees who volunteer their time to needy organizations throughout the state.//An SRP employee shows the tools of his trade to his son during an open house at the new'Iblleson Regional Service Center.The regional service center Is designed to speed servIce to customers.
agreement.
Continuing its longtime tradi- was continued through SRP's                        Also under PEEP, tm Cairo The Arizona Department of        tion of supporting higher educa-     Office of International Affairs.                University students completed a Transportation will begin con-       tion, SRP provided grants to         The office hosted nearly 600                    15-week summer study program.
structing a bridge on the            Arizona State University's SRP       visitors from 58 countries, held                One student worked in SRP's upstream side of Roosevelt dam        Hydraulic Engineering Labor-         20 on- the-job training programs                Civil Engineering Department in 1987 to be finished by 1990.      atory. The joint endeavor            and conducted seminars for 160                  and the other in Water Resources The bridge will remove the            between SRP and ASU's College       representatives      of  15 nations.          and Services'ydrology Division.
 
a f  ~ I~
                                                        ~'
1 t
46  erat
                                                                                                          ,t
                                                                                            . +'4y;:.I '~
                                                                                                      , j~;p I
        ~ I",1 I                                                                                            IE .
P The Salt River Pete water safety program teaches half a million children in 2D years.            water safety to school children. The award-winning program has reached more than
 
Salt River Project's service extends beyond water and power S Behind putthe 'TheSpirit' RP employees to People their customers forts of SRP employees, Valley teenagers last year learned more attracted 440 participants and resulted in a donation of $ 1,640 donations and in-kind services.
Employees also hold key posi-
                                  'ontinued about the free-enterprise system    to the St. Johns Senior Citizens    tions on the foundation board.
and their communities first. And            through SRP-sponsored Junior        Association.
it showed.                                                                                                               SRP recognizes the value of Achievement companies.
The annual Page Attacks        excellence in education. Last In fiscal year 1986-87:                                                      'fhsh program received first        year, SRP honored 61 seniors Employees helped raise
      ~  97 percent of customers              $ 106,000  during February 1987's  place in the statewide 'hke Pride  during its fifth annual Spotlight rated SRP service as "good" or              Junior Achievement Telephone        in America" competition spon-      on Excellence program. Honored "excellent"                                  Campaign. A total of 97            sored by the Commission on          students were graduating seniors
      ~ Volunteer work by SRP                  volunteers, representing 33 com-    Arizona's Environment and se-      from Maricopa County, Page and employees reached new heights                panies, called area businesses      cond place in the national com-    St. Johns    areas in which 8RP
      ~ Business                              requesting donations for Junior    petition sponsored by the U.S.      has electric facilities. Honorees .
offices were                                                Department of Interior. Each Achievement. SRP volunteers                                            were selected by their school moved, improving customer service                                      raised $ 12,242, the second        >m; the community effort has in-   principals for academic achieve-volved more than 75 percent of      ment and all-around excellence.
      ~ And SRP's Better Way and              highest amount of any business Page's 6,500 residents.
Quality Circle programs meant                during the telephone campaign.                                             For younger students, SRP savings for SRP and its                      The money went toward pro-            Page Attacks %ash started in    and APS co-sponsored the an-customers.                                   grams and operational support      1981 as a city-wide cleanup pro-  nual Ener@ Fair. The fair at-for the organization.             gram sponsored by SRP's Nava-       tracted 200 entries for "Energy SRP receives high marks                                                      jo Generating Station (NGS) and    Changes      and    Challenges."
In a joint effort, SRP and     the    Glen Canyon National        Kindergarten through 12th grade "The People Behind the                 Arizona Public Service Company      Recreational Area. The Page        students participated. Russell Spirit" kept up SRP's tradition of          (APS) raised more than $ 8,700      Kiwanis Club and Elks Lodge        Moreland of Willis Junior High giving first-rate customer service.         for needy citizens in the fourth    have helped to coordinate the      School, Chandler, made the win-Nearly all of SRP's electric and            annual      S.H.A.R.E. Affair  event in recent years with help    ning entry.
~ater customers polled last year            10-kilometer run January 10. A      from NGS employees. Last year' were very satisfied with the quali-         record 835 people participated in                                          Ten outstanding employees participants collected 212 tons of and one retiree were honored for ty of service they received from             the fund-raising event, which also  trash.
the Project, according to monthly           included a two-mile fun run and                                        their service to civic and com-surveys. SRP's goal was for 90               a five-mile walk.                      SRP's organizational and        munity organizations in Arizona percent of its customers to rate                                                monetary involvement in Page At-    with SRP's Karl F. Abel Volunteer Proceeds were donated to the                                      awards. Named for SRP's im-overall quality of service good or                                             tacks Thrash, along with other Salvation    Army, which ad-      anti-litter efforts, was honored by  mediate past president, these excellent. The Project exceeded ministers the Service to Help                                          awards are presented each year that goal with the 97 percent                                                   an award from Arizona Clean and Arizonans with Relief on Energy                                        to employees who devote their rating.                                                                        Beautiful, the state arm of the na-(S.H.A.R.E.). Formed by SRP        tional Keep America Beautiful      time and energy to their com-Employees'ommunity                      and APS in 1982, Project                                               munities.
campaign. SRP was distin-involvement remains high                  S.H.A.R.E. provides        funds  guished as the most outstanding          Saundra Reedy, administrative through the Salvation Army for     business in the state with regard SRP employees showed pride                                                                                      assistant at Coronado Generating energy-related bills and home in their communities by donating                                                to its anti-litter efforts.        Station, was named St. John' repairs of needy families.
their time, money and energy to                                                                                      Outstanding Chamber of Com-SRP   customers donated            The Delta Gamma National      merce member in 1986. She was community-related projects. Pro-
                                            $ 114,313 to the S.H.A.R.E. pro-Foundation for the Blind            honored for her efforts in several ject employees pledged a total of honored SRP with an award          Chamber of Commerce activities
$ 326,772 to 52 non-profit agen-             gram last year. Customers donate through their monthly electric      recognizing the Project's support  promoting the St. Johns area.
cies. And Project employees bills.                             of the Foundation for Blind donated approximately 480 pints                                                                                              SRP honored for Children. The award recognized of blood last year to a statewide                Meamvhile at St. Johns, the                                              two safety programs SRP as a long-time supporter of blood service.
seventh      annual    Coronado    the    organization        through     SRP received two moor safe-Thanks to the volunteer ef-             Generating Station benefit run      employee volunteering, financial    ty awards last year. They were 13
 
grams include SRP's where Speakers'ureau, employees volunteer to make presentations to organizations or groups.
                                                                                                                  'lbpics range from the early beginning of the Project through the most up-to4ate activities of the utility.
During fiscal year 1986-87, Ittdta $I
                                                'd IO StttOO SRP made about 2,300 presen-
                                                > $ tt, ttttt tlt tttl                          tations to audiences totaling
                                    ~t                          i I
IO n II I                        87,343 persons.
SRP also conducted programs about microwave cooking, com-puter equipment safety, and energy conservation, SRP's Power Saver Store opened last year at Westridge Mall. Nothing is for sale. Instead, employs offered fire, expert ad-vice about the efficient use of water and power.
Customer business offices moved for greater convenience
Customer business offices moved for greater convenience
'le customer business offices were moved for greater speed and more ease in helping customers.
                                                                                                                        'le customer business offices An SRP employee shows the tools of his trade to his son during an open house at the new 'Iblleson                  were moved for greater speed and Regional Service Center. The regional service center Is designed to speed servIce to customers.                    more ease in helping customers.
The Mesa Business office was moved in May to a larger facility, and customers in the Fountain Hills area found it more con-venient to receive help at the Fountain Hills office's new location.Courteous, helpful and quick replies to customer inquiries are goals at SRP.Tb increase the number of calls handled, SRP's phone center began opening at 7:00 a.m.instead of 7:30 a.m.The phone center was remod-eled and expanded to provide 12 additional work positions.
The Mesa Business office was third place in the American          nual safety contest to draw atten-        tion in the community. SRP is        moved in May to a larger facility, Public Power Association's          tion to the importance of safe            the first utility to receive this    and customers in the Fountain (APPA) Electric Safety Award        working habits in the electric            honor.                                Hills area found it more con-contest and the Arizona Safety      utility industry, and to recognize              SRP's public safety programs  venient to receive help at the Association's Howaid Pyle Award. excellence in that area.                  extend to construction workers,      Fountain Hills office's new school children, professional law    location.
By rescheduling existing personnel to work during peak periods, an additional 90,437 calls were answered without hiring addi-tional people.Last year Project employees received more than 1.2 million calls.A major billing system change was implemented in February 1987 to bill accounts by route in-stead of by billing districts.
APPA is a national organiza-        The Arizona Safety Associa-enforcement officers, firefighters      Courteous, helpful and quick tion representing more than          tion is a chapter of the National and others.                          replies to customer inquiries are 1,750 publicly owned electric        Safety Council. The Howanl Pyle Award recognizes safety promo-                Additional public service pro-  goals at SRP. Tb increase the utilities. APPA conducts the an-OOO~                                              number of calls handled, SRP's O IM$$ $ ICr                                      phone center began opening at 7:00 a.m. instead of 7:30 a.m.
Regionalized billing has leveled the flow of customer traffic into the business offices, reducing customer lines and thereby pro-viding faster service.Reduced travel time to customers'eters also has resulted in increased SRP's newly remodeled History Center appeals to all ages.Through displays and vIdeos, the Center depicts the development of water usage In the Phoenix area from prehlstorlc times to the present.productivity and reduction of cur-rent and future costs.Continuation of that excellent customer service was enhanced last year when SRP and Local Union 266 of the International Brotherhood of Electrical Workers signed a three->mr labor agreement.
The phone center was remod-Customer service representative Elaine Spencer is one of                                                                                eled and expanded to provide several SRP employees who                                                                                12 additional work positions. By volunteer their time to                                                                                  rescheduling existing personnel needy organizations throughout                                                                          to work during peak periods, an the state.                                                                                              additional 90,437 calls were answered without hiring addi-tional people. Last year Project employees received more than 1.2 million calls.
This longer-term con-tract enables management to more accurately predict future labor costs, provides employees with greater stability in wages and benefits, and provides SRP customers with reduced exposure to a work stoppage.Counties get monetary boost from SRP SRP contributed
A major billing system change was implemented       in February 1987 to bill accounts by route in-stead of by billing districts.
$35.8 million of in-lieu property taxes to seven Arizona counties during fiscal year 198687.In effect, SRP is the state's third-largest property taxpayer.Under special legislation passed in 1963, SRP, as a political subdivision of the state, makes voluntary contributions in lieu of property taxes to school districts, cities, special districts, counties and the state.Employee programs save money Sixty-seven ideas from entre-preneurial employees saved the Project$423,000 in first-year sav-ings through the Better Way pro-gram.The Better Way program uses employee suggestions that deliver real dollar savings to SRP.Once a dollar savings is esta-blished, a percentage of the sav-ings is paid to the employee who submitted the idea.Last year employees received$34,000 in awards.The potential for savings to SRP and its customers is virtual-ly unlimited through the Better Way program.As long as SRP employees continue to think creatively and submit sugges-tions, the Project will continue to realize greater savings and employees will be rewarded for their creativity.
Regionalized billing has leveled the flow of customer traffic into the business offices, reducing customer lines and thereby pro-
SRP's Quality Circle program uses a group approach to pro-blem solving.Employee groups develop consensus and report to management.
                                                              //                                                    viding faster service. Reduced travel time to customers'eters also has resulted in increased
Since 1983, SRP's Quality Circle program has saved$3 million and improved service to customers.
 
Also, the program helps develop problem-solving skills and an enhanced sense of value for individual employees.
SRP's newly remodeled History Center appeals to all ages. Through displays and vIdeos, the Center depicts the development             of water usage In the Phoenix area from prehlstorlc times to the present.
Research and development projects at SRP provide technical information that could benefit SRP's customers.
productivity and reduction of cur-       Under special legislation          ly unlimited through the Better    million in research activity, involv-rent and future costs.               passed    in 1963, SRP, as a          Way program. As long as SRP        ing dozens of SRP employees Continuation of that excellent   political subdivision of the state,    employees continue to think        went toward 29 major research customer service was enhanced       makes voluntary contributions in        creatively and submit sugges-      and development products. Pro-last year when SRP and Local         lieu of property taxes to school      tions, the Project will continue to jects included studies of thermal Union 266 of the International      districts, cities, special districts,  realize greater savings and          energy storage and solar Brotherhood         of Electrical   counties and the state.                employees will be rewarded for      resources, which could help Workers signed a three->mr labor           Employee programs                their creativity.                    customers save on their electric agreement. This longer-term con-                  save money                                                      bills. Projects also included im-tract enables management to                                                     SRP's Quality Circle program    proved precipitation forecasting, more accurately predict future           Sixty-seven ideas from entre-    uses a group approach to pro-        which could help assure ade-labor costs, provides employees       preneurial employees saved the        blem solving. Employee groups        quate water supplies and reduce with greater stability in wages and  Project $ 423,000 in first-year sav-  develop consensus and report to      potential for floods.
More than$3 million in research activity, involv-ing dozens of SRP employees went toward 29 major research and development products.Pro-jects included studies of thermal energy storage and solar resources, which could help customers save on their electric bills.Projects also included im-proved precipitation forecasting, which could help assure ade-quate water supplies and reduce potential for floods.A program at Arizona State University has meant multiple benefits for SRP and the com-munity.SRP sponsors the Elec-tric Pope Research Laboratory (EPRL), which is in its third year at ASU.SRP contributes
benefits, and provides SRP           ings through the Better Way pro-      management. Since 1983, SRP's gram. The Better Way program                                                  A program at Arizona State customers with reduced exposure                                             Quality Circle program has          University has meant multiple to a work stoppage.                   uses employee suggestions that        saved $ 3 million and improved deliver real dollar savings to SRP.                                       benefits for SRP and the com-service to customers. Also, the      munity. SRP sponsors the Elec-Counties get monetary            Once a dollar savings is esta-        program helps develop problem-blished, a percentage of the sav-                                         tric Pope Research Laboratory boost from SRP                                                    solving skills and an enhanced ings is paid to the employee who                                          (EPRL), which is in its third year SRP contributed $ 35.8                                                  sense of value for individual submitted the idea. Last year                                              at ASU. SRP contributes million of in-lieu property taxes                                          employees.                           $ 100,000 per year to EPRL to employees received $ 34,000 in to seven Arizona counties during      awards.                                    Research and development        fund research for power genera-fiscal year 198687. In effect, SRP                                          projects at SRP provide technical    tion projects conducted by ASU is the state's third-largest property    The potential for savings to     information that could benefit      students, professors and SRP taxpayer.                            SRP and its customers is virtual-     SRP's customers. More than $ 3      engineers.
$100,000 per year to EPRL to fund research for power genera-tion projects conducted by ASU students, professors and SRP engineers.
15
15 SRP mini.bonds are proving to be popular investments.
 
Some bonds can be purchased for only S200.Management, economy combine to produce strong financial position areful management of Salt River Project resources, healthy financing opportunities and a strong local economy con-tributed to another good finan-cial year for SRP.During fiscal year 1986-87:~The debt service coverage ratio increased from 1.85 to 2.00~SRP bonds maintained their AA and Aa ratings~Gross revenues increased; but net revenues fell reflecting ac-counting transactions related to the start-up of Palo Verde Nuclear Generating Station.Debt service coverage rises A 4.70 percent increase in gross revenues in fiscal year 1986-87 raised SRP's debt ser-vice coverage to 2.00.That com-pares with last year's ratio of 1.85.The debt service coverage ratio measures the number of times the sum of principal and interest due on outstanding debt during the year is covered by revenues available after payment of operating expenses.Keeping healthy financially allows SRP bonds to continue to be rated highly by the nation's leading rating agencies.SRP first issued Electric System Revenue Bonds in 1973.The bonds have been rated investment grade-those suitable for purchase by prudent investors-ever since.Currently, the bonds are rated AA by Standard 6 Poor's and Aa by Moody's Investor Services, Inc.
SRP mini.bonds are proving to be popular investments. Some bonds can be purchased for only S200.
Gross revenues increase Hot weather and nearly 30,000 new customers increased enerib sales, helping to build a 4.7 percent increase in gross revenues to$888.5 million, up from the previous year's revenues of$848.6 million.Average an-nual use for residential customers increased from 12,175 kilowatt-hours (kWh)to 12,440 kWh.Although gross revenues in-creased, so did the cost of doing business.Operating expenses in-creased 9.9 percent to$706.4 million from$643.0 million the previous year.SRP produced$74.8 million in net revenues during fiscal year 1986-87.That was a substantial decrease from the$158.3 million in fiscal year 198546.The decrease resulted from account-ing transactions related to the start-up, of the Palo Verde Nuclear Generating Station.Specifically, when the first unit of the Palo Verde Nuclear Generating Station began com-mercial operation in January 1986, SRP stopped making en-tries to record the allowance for funds used during construction.
Management, economy combine to produce strong financial position
Instead, these finance costs were listed as expenses.At the same time, SRP began recording depreciation, operating and maintenance expenses for the unit.System sales did not in-crease commensurate with the commercial operation of the first unit, resulting in a decrease in net revenues.Palo Verde's second unit was treated the same way when it began commercial operation.
                                    ~  SRP    bonds    maintained    1986-87 raised SRP's debt ser-        allows SRP bonds to continue to areful management of Salt                                        vice coverage to 2.00. That com-      be rated highly by the nation's River Project resources, their AA and Aa ratings pares with last year's ratio of 1.85. leading rating agencies. SRP first healthy financing opportunities
The same format will follow for the third unit when it goes into commercial operation.
                                    ~  Gross revenues increased; The debt service coverage ratio      issued Electric System Revenue and a strong local economy con-  but net revenues fell reflecting ac-measures the number of times          Bonds in 1973. The bonds have tributed to another good finan-   counting transactions related to the sum of principal and interest    been rated investment grade-cial year for SRP.               the start-up of Palo Verde due on outstanding debt during        those suitable for purchase by Nuclear Generating Station.
Commercial operation of the first Palo Verde unit also trig-gered an exchange of capacity with the Ias Angeles Deparbnent of Water and Power (LADWP).In 1977, LADWP purchased 30 per-cent of SRP's Coronado Generating Station near St.Johns, Arizona.LADWP agreed to trade its share of the station for 5.70 percent of Palo Verde Nuclear Generating Station when its first unit went into commer-cial operation.
the year is covered by revenues      prudent investors    ever since.
With commercial operation of the first unit in January 1986, the, trade took place.SRP reduced its share of Palo Verde to 17.49 per-cent and regained 100 percent ownership of Coronado Gener-ating Station.At that time, LADWP also paid SRP a partial payment of$90.65 million in recognition of the greater cost of Palo Verde.A second payment of$74.75 million (including in-terest)was received during fiscal 198647.Despite the decline in net revenues, SRP's debt ratio dipped slightly from 68.06 percent in the previous fiscal year to 67.67 percent.The time was right for a com-petitive sale because interest rates were relatively low and stable and the then<urrent sup-ply of municipal bonds was limited.Salomon Brothers, Inc., of New York placed the winning bid.Three other groups also of-fered bids.SRP, as a special-purpose im-provement district, sells tax-exempt revenue bonds to finance new construction and im-provements to its electric system.Tax-exempt financing and SRP's solid credit ratings help keep financing costs relatively low.This, in turn, can help delay rate increases.
During fiscal year 1986-87:    Debt service coverage rises        available after payment of            Currently, the bonds are rated operating expenses.                   AA by Standard 6 Poor's and Aa
Low financing costs could also minimize rate in-creases.DEBT SERVICE COVERAGE RATIO As a public power utility, SRP does not issue stock or pay dividends.
    ~ The debt service coverage      A 4.70 percent increase in by Moody's Investor Services, Inc.
Net revenues are reinvested in SRP to help replace equipment and finance construc-tion of new facilities.
ratio increased from 1.85 to 2.00 gross revenues in fiscal year           Keeping healthy financially
Such reinvestment reduces the need to issue bonds, thus keeping rates Iow.Bonds sold on competitive basis For the first time since 1981, SRP sold bonds on a competitive bid basis.For the past five years, SRP has used negotiated sales.In October 1986, SRP sold$100 million in tax-free electric system revenue bonds.The bonds were sold in$5,000 denominations at an effective interest rate of 7.34 percent.SRP sold approximately
 
$18.70 million in interest-bearing mini-bonds for$500 each and$3.60 million in capital apprecia-tion bonds.The capital apprecia-tion bonds were purchased for$200 per bond and will pay$488.05 if held'to maturity in 2002.The sale closed May 15, 1987.Construction begins on corporate headquarters In January 1987, SRP began construction on the first building of a planned five-building cor-porate headquarters in north Tt.mpe.The corporate head-quarters, on 40 acres, is ex-pected to be completed by 2010.SRP expects to invest about 984==85 1986-87=1983 84==2:=={)
Gross revenues increase            its first unit went into commer-          The time was right for a com-    $ 290 million by 1992 on the                    first Hot weather      and    nearly    cial operation.                       petitive sale because interest      two of the five buildings. The 30,000 new customers increased              With commercial operation of      rates were relatively low and       corporate headquarters will be enerib sales, helping to build a        the first unit in January 1986, the,  stable and the then<urrent sup-     the focal point of Papago Park 4.7 percent increase in gross           trade took place. SRP reduced its      ply of municipal bonds was          Center, a business park on the revenues to $ 888.5 million, up        share of Palo Verde to 17.49 per-       limited. Salomon Brothers, Inc.,    adjacent 484 acres. SRP will from the previous year's revenues      cent and regained 100 percent          of New York placed the winning      coordinate development of the of $ 848.6 million. Average an-        ownership of Coronado Gener-            bid. Three other groups also of-     center which will be opened to nual use for residential customers    ating Station. At that time,           fered bids.                          private and commercial develop-increased from 12,175 kilowatt-        LADWP also paid SRP a partial              SRP, as a special-purpose im-    ment. Revenues from the sale or hours (kWh) to 12,440 kWh.            payment of $ 90.65 million in          provement district, sells tax-      lease of facilities in the center will recognition of the greater cost of      exempt revenue bonds to finance      help offset the costs of providing Although gross revenues in-       Palo Verde. A second payment of        new construction and im-            electricity to SRP customers.
9M988 86==-2:=-00==-92:=-=1===.85=-===1:==:.85::=-
creased, so did the cost of doing    $ 74.75 million (including in-         provements to its electric system.        In May, SRP estimated savings business. Operating expenses in-      terest) was received during fiscal     Tax-exempt financing and SRP's      of $ 30 million over a 20-year creased 9.9 percent to $ 706.4        198647.                                solid credit ratings help keep million from $ 643.0 million the                                                                                  period due to the operating effi-Despite the decline in net        financing costs relatively low.      ciencies gained through central-previous year.
$290 million by 1992 on the first two of the five buildings.
revenues, SRP's debt ratio dipped      This, in turn, can help delay rate izing administrative operations.
The corporate headquarters will be the focal point of Papago Park Center, a business park on the adjacent 484 acres.SRP will coordinate development of the center which will be opened to private and commercial develop-ment.Revenues from the sale or lease of facilities in the center will help offset the costs of providing electricity to SRP customers.
SRP produced $ 74.8 million        slightly from 68.06 percent in the      increases. Low financing costs in net revenues during fiscal year    previous fiscal year to 67.67          could also minimize rate in-1986-87. That was a substantial        percent.                                creases.
In May, SRP estimated savings of$30 million over a 20-year period due to the operating effi-ciencies gained through central-izing administrative operations.
Compensation funds set aside decrease from the $ 158.3 million                                                                                          for APS customers in fiscal year 198546. The SRP set aside $ 3 milhon last decrease resulted from account-       DEBT SERVICE COVERAGE RATIO                                                  year to compensate certain ing transactions related to the                                                                                      Arizona Public Service Company start-up, of the Palo Verde                                                984==85 1986-87            (APS) electric customers who are Nuclear Generating Station.
Compensation funds set aside for APS customers SRP set aside$3 milhon last year to compensate certain Arizona Public Service Company (APS)electric customers who are SRP shareholders.
                                                              =1983 84==2:=={) 9M988 86==-2:=                      SRP shareholders. Qualified SRP Specifically, when the first unit               ==92:= =1===.85= =          ==1:==:.85::=
Qualified SRP shareholders are those in-dividuals who own and live on land within the boundaries of the Salt River Valley Water Users'ssociation.
00            shareholders are those in-of the Palo Verde Nuclear                                                                                            dividuals who own and live on Generating Station began com-                                                                                        land within the boundaries of the mercial operation in January                                                                                         Salt River Valley Water 1986, SRP stopped making en-                                                                                                        Some receive elec-Users'ssociation.
Some receive elec-tricity from APS.A comparison of 1986 electric bills from SRP and APS in-dicated that some SRP shareholders paid APS at least 15 percent more than they would have paid SRP for the same amount of electricity.
tries to record the allowance for                                                                                    tricity from APS.
SRP's obligation to make payments to some APS cus-tomers is the result of a 1928 SRP bylaw which protects residential landowners residing within SRP boundaries, but served by APS, from paying sub-stantially more for electricity than if they were served by SRP.In 1967, the courts defined substan-tial as 15 percent or more.SRP shareholders in 1984 voted to grandfather the right to compensation to those share-holders who received electric ser-vice on or before Dec.31, 1984, and also voted to end the com-pensation program in 1994.17 Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Balance Sheets As of April 30, l987 and 1986 Assets UTILITY PLANT, at historical cost (bootes 1, 2, 3 and 4): Plant in service-Electric Irrigation General Less-Accumulated depreciation on plant in service Construction work in progress.Nuclear fuel, net of amortization
funds used during construction.                                                                                         A comparison of 1986 electric Instead, these finance costs were                                                                                    bills from SRP and APS in-listed as expenses. At the same                                                                                    dicated that some SRP time, SRP began recording                                                                                          shareholders paid APS at least 15 depreciation, operating and                                                                                        percent more than they would maintenance expenses for the                                                                                        have paid SRP for the same unit. System sales did not in-                                                                                      amount of electricity.
(&#xb9;te 1)1987$3,721,898 92;127 166,559 3,980,584 861,043 3,119,541 740,767 92,736 3,953,044 ($000)1986$3,132,867 87,503 143,021 3,363,391 738,283 2,625,108 1,025,680 92,596 3,743,384 SEGREGATED FUNDS, consisting of cash and U.S.Government obligations set aside in accordance with resolutions of bond issues: Debt service funds, excluding$61,916,000 in 1987 and$51,032,000 in 1986 for payment of accrued interest (&#xb9;te 5).Construction fund.99,318 49,652 148,970 94,769 23,000 117,769 CURRENTASSETS:
crease commensurate with the                                                                                             SRP's obligation to make commercial operation of the first          As a public power utility, SRP        SRP sold approximately          payments to some APS cus-unit, resulting in a decrease in      does not issue stock or pay            $ 18.70 million in interest-bearing tomers is the result of a 1928 net revenues.                         dividends. Net revenues are            mini-bonds for $ 500 each and      SRP bylaw which protects Palo Verde's second unit was      reinvested in SRP to help replace      $ 3.60 million in capital apprecia- residential landowners residing treated the same way when it            equipment and finance construc-         tion bonds. The capital apprecia-  within SRP boundaries, but began commercial operation.            tion of new facilities. Such           tion bonds were purchased for      served by APS, from paying sub-The same format will follow for        reinvestment reduces the need to       $ 200 per bond and will pay        stantially more for electricity than the third unit when it goes into        issue bonds, thus keeping rates         $ 488.05 if held 'to maturity in    if they were served by SRP. In commercial operation.                  Iow.                                   2002. The sale closed May 15,      1967, the courts defined substan-Bonds sold on               1987.                              tial as 15 percent or more.
Cash and temporary investments, at cost Deposit in debt service fund for payment of accrued interest on bonds.Trade and other accounts receivable, less reserves of$1,207,000 in l987 and$1,120,000 in 1986 for doubtful accounts...
Commercial operation of the first Palo Verde unit also trig-                competitive basis                  Construction begins on              SRP shareholders in 1984 gered an exchange of capacity                For the first time since 1981,         corporate headquarters          voted to grandfather the right to with the Ias Angeles Deparbnent        SRP sold bonds on a competitive             In January 1987, SRP began      compensation to those share-of Water and Power (LADWP). In          bid basis. For the past five years,     construction on the first building  holders who received electric ser-1977, LADWP purchased 30 per-          SRP has used negotiated sales.                                             vice on or before Dec. 31, 1984, of a planned five-building cor-cent      of SRP's Coronado            In October 1986, SRP sold $100                                             and also voted to end the com-porate headquarters in north Generating Station near St.            million in tax-free electric system                                         pensation program in 1994.
Note receivable (Arote 4)Fuel stocks, at last-in, firstwut cost Materials and supplies, at average cost Prepayments, interest receivable and other.111,412 61,916 46,754 28,969 81,144 69,297 13,433 412,925 108,967 51,032 61,071 90,653 55,522 4?,095 8,119 422,459 DEFERRED CHARGES AND OTHER ASSETS (&#xb9;tes 1 and 57 l86,181$4,701,120 169,60?$4,453,219 The accompanying notes are an inlegrai part of these combined balance sheets.18 Capitalization and Liabilities LONGTERM DEBT (Pote g: Electric system revenue bonds Commercial paper and other (h'ote 8)1987$2,626,709 360,028 2,986,737 ($000)1986$2,541,383 339,024 2,880,407 ACCUMULATED NET REVENUES: Balance, beginning of year Net revenues for the year Balance, end of year 1,351,904 74,761 1,426,665 4,413,402 1,193,588 156,316 1,351,904 4,232,311 CURRENT LIABILITIES, excluding$26,140,000 in 1987 and$17,775,000 in 1986, representing current portion of long-term debt which is to be paid from segregated funds: Accounts payable....
Tt.mpe. The corporate head-Johns, Arizona. LADWP agreed            revenue bonds. The bonds were           quarters, on 40 acres, is ex-to trade its share of the station      sold in $ 5,000 denominations at       pected to be completed by 2010.
Accrued taxes and tax equivalents Accrued interest..Customers'eposits Other liabilities.
for 5.70 percent of Palo Verde          an effective interest rate of 7.34 Nuclear Generating Station when        percent.                                   SRP expects to invest about 17
85,428 41,434 63,761 21,462 24,881 236,966 66,657 36,142 52,628'17,619 24,223 197,269 DEFERRED CREDITS AND RESERVES (&#xc3;ote 7).50,752 23,639 COMMITMENTS AND CONTINGENCIES (Notes 3, 5 and 7j$4,701,120$4,453,219 Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Statements of Net Revenues For the Years Ended April 30, 1987 and 1986 1987 ($000)1986 OPERATING REVENUES (Note 2): Electric Water and irrigation Total operating revenues..$881,340 7,166 888,506$841,936 6,682 848,618 OPERATING EXPENSES: Purchased power.Fuel used in efectric generation
 
.Other operating expenses~...........
Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Balance Sheets As of April 30,    l987 and 1986 Assets                                                                                                        ($ 000) 1987                  1986 UTILITYPLANT,            at historical cost (bootes 1, 2, 3 and 4):
Maintenance....
Plant in service-Electric                                                                                $ 3,721,898          $ 3,132,867 Irrigation                                                                                    92;127                87,503 General                                                                                    166,559              143,021 3,980,584            3,363,391 Less - Accumulated depreciation on plant in service                                              861,043              738,283 3,119,541            2,625,108 Construction work in progress .                                                                  740,767            1,025,680 Nuclear fuel, net of amortization    (&#xb9;te  1)                                                    92,736                92,596 3,953,044            3,743,384 SEGREGATED FUNDS, consisting of cash and                    U.S.
, Depreciation and amortization (Note 1).Taxes and tax equivalents.
Government obligations set aside in accordance with resolutions of bond issues:
Total operating expenses...
Debt service funds, excluding $ 61,916,000 in 1987 and $ 51,032,000 in 1986 for payment 94,769 of accrued interest (&#xb9;te 5) .                                                                 99,318 Construction fund.                                                                           49,652                23,000 148,970              117,769 CURRENTASSETS:
Net: operating revenues., 49,086 181,331 151,308 88,231 133,324 103,097 706,377 182,129 49,151 216,083 122,304 80,985 90,576 83,864 642,963 205,655 FINANCING COFIS: Interest on bonds.Amortization of bond discount, issue and refinancing expenses (Note 1).....,...........
Cash and temporary investments, at cost                                                          111,412              108,967 Deposit in debt service fund for payment of accrued interest on bonds    .                                                               61,916                51,032 Trade and other accounts receivable, less reserves of $ 1,207,000 in l987 and
Interest on other obligations...
        $ 1,120,000 in 1986 for doubtful accounts...                                                     46,754                61,071 Note receivable (Arote 4)                                                                        28,969                90,653 Fuel stocks, at last-in, firstwut cost                                                            81,144                55,522 Materials and supplies, at average cost                                                            69,297              4?,095 Prepayments, interest receivable and other .                                                       13,433                8,119 412,925              422,459 DEFERRED CHARGES AND OTHER ASSETS
Interest earned on investments, deposits and other.Net financing cos(sLess-Allowance for funds used during construction (AFUDC)state 1)~6 v~~~~~~e~~~~i r w~~~~~~~~~~~6~~~~w~Financing costs less AFUDC..............
(&#xb9;tes    1 and 57                                                                                l86,181              169,60?
.....179,109 6,089 16,081 (36,08()165,195 (59,902)105,293 179,928 2,387 17,864 (37,681)162,498 (120,161)42,337 OTHER EXPENSES, net 2,075 5,002 NET REVENUES$74,761$158,316 The accompanying notes ar)e an integral part'f these combined statements 20 Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Statements of Cash Flows For the Years Ended April 30, 1987 and 1986 1987 ($000)1986 NET CASH FLOWS FROM OPERATING ACTIVITIES:
                                                                                                    $ 4,701,120          $ 4,453,219 The accompanying notes are an inlegrai part  of these combined balance sheets.
Net revenues.Noncash items included in income: Depreciation and amortization.
18
Amortization of bond related expenses.Increase in fuel stocks and materials and supplies Increase in other assets, net Increase (decrease) in accounts payable.Increase in accrued taxes and tax equivalents Increase (decrease) in accrued interest Increase in other liabilities, net~.Gain on sale of property Net cash provided from operating activities NET CASH FLOWS FROM INVESTING ACTIVITIES:
 
Gross additions to utility plant, net of AFUDC.Allowance for funds usia during construction
Capitalization and Liabilities                                                  ($ 000) 1987                1986 LONGTERM DEBT              (Pote g:
.Gross additions to nonutility plant Proceeds from sale of plant Decrease (increase) in note receivable
Electric system revenue bonds                                    $ 2,626,709          $ 2,541,383 Commercial paper and other (h'ote 8)                                  360,028              339,024 2,986,737            2,880,407 ACCUMULATED NET REVENUES:
.Contributions in aid of construction Net cash used by investing activities.
Balance, beginning of year                                          1,351,904            1,193,588 Net revenues for the year                                              74,761              156,316 Balance, end of year                                              1,426,665            1,351,904 4,413,402            4,232,311 CURRENT LIABILITIES,excluding              $ 26,140,000 in 1987 and
$ 17,775,000 in 1986, representing  current portion of long-term debt which is to be paid from segregated funds:
Accounts payable....                                                  85,428              66,657 Accrued taxes and tax equivalents                                      41,434              36,142 Accrued interest ..                                                    63,761              52,628 Customers'eposits                                                      21,462              '17,619 Other liabilities.                                                     24,881              24,223 236,966              197,269 DEFERRED CREDITS AND RESERVES                        (&#xc3;ote 7).            50,752              23,639 COMMITMENTS AND CONTINGENCIES (Notes 3,  5 and   7j
                                                                    $ 4,701,120          $ 4,453,219
 
Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Statements of Net Revenues For the Years Ended April 30, 1987 and 1986
($ 000) 1987                  1986 OPERATING REVENUES                    (Note 2):
Electric                                                                                                          $  881,340          $  841,936 Water and irrigation                                                                                                    7,166                  6,682 Total operating revenues      ..                                                                                 888,506              848,618 OPERATING EXPENSES:
Purchased power .                                                                                                     49,086 181,331 49,151 216,083 Fuel used in efectric generation      .
Other operating expenses ~        ...........                                                                         151,308              122,304 Maintenance....    ,                                                                                                 88,231 133,324 80,985 90,576 Depreciation and amortization (Note 1)          .
Taxes and tax equivalents.                                                                                            103,097                  83,864 Total operating expenses...                                                                                      706,377              642,963 Net: operating revenues    .,                                                                                   182,129              205,655 FINANCING COFIS:
Interest on bonds.                                                                                                    179,109                179,928 Amortization of bond discount, issue and refinancing expenses (Note 1)                          ....., ...........      6,089                  2,387 Interest on other obligations...                                                                                        16,081                17,864 Interest earned on investments, deposits and other.                                                                    (36,08()              (37,681)
Net financing cos(s                                                                                              165,195                162,498 Less - Allowance for funds used during construction ir                                                              (59,902)            (120,161)
(AFUDC) state 1)    ~  6 v ~ ~ ~ ~  ~ ~ e ~ ~ ~ ~    w ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 ~ ~ ~ ~ w ~
Financing costs less AFUDC        ..............          .....                                                105,293                  42,337 OTHER EXPENSES, net                                                                                                        2,075                  5,002 NET REVENUES                                                                                                            $ 74,761            $    158,316 The accompanying notes ar)e an integral    part'f these    combined statements 20
 
Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Statements of Cash Flows For the Years Ended April 30, 1987 and 1986
($ 000) 1987                      1986 NET CASH FLOWS FROM OPERATING ACTIVITIES:
Net revenues .                                                                              $    74,761              $  158,316 Noncash items included in income:
Depreciation and amortization.                                                              133,324                      90,576 Amortization of bond related expenses.                                                          6,089                    2,38?
Increase in fuel stocks and materials and supplies                                            (47,824)                 (14,234}
Increase in other assets, net                                                                  (8,897)                (21,967)
Increase (decrease) in accounts payable .                                                      18,771                        (67)
Increase in accrued taxes and tax equivalents                                                    5,292                    1,781 Increase (decrease) in accrued interest                                                        ll;133                    (9,587)
Increase in other liabilities, net .
                                          ~
9,317                    6,375 Gain on sale of property                                                                            (96)                  (4,268)
Net cash provided from operating activities                                                    201,870                  209,312 NET CASH FLOWS FROM INVESTING ACTIVITIES:
Gross additions to utility plant, net of AFUDC      .                                          (309,356)                (352,993)
Allowance for funds usia during construction .                                                  (59,902)                (120,161)
Gross additions to nonutility plant                                                              (10,812)                      (658)
Proceeds from sale of plant                                                                            972                194,192 Decrease (increase) in note receivable .                                                          61,684                  (90,653)
Contributions in aid of construction                                                              25,395                    19,181 Net cash used by investing activities.                                                         (292,016)                (351,092)
NET CASH FLOWS FROM FINANCING ACTIVITIES:
NET CASH FLOWS FROM FINANCING ACTIVITIES:
Proceeds of bond issues Other long-term borrowings, net of repayment.Repayment of principal on bonds and U.S.debt.Defeasance of revenue bonds Deferred loss on defeasance of bonds Net cash provided by financing activities........
Proceeds of bond issues                                                                        120,814                  596,143 Other long-term borrowings, net of repayment .                                                    21,845                    30,318 Repayment of principal on bonds and U.S. debt.                                                  (18,867)                  (18,917)
NET INCREASE (DECREASE)
Defeasance of revenue bonds                                                                                              (472,692)
IN CASH AND TEMPORARY INVESTMENTS AND SEGREGATED FUNDS......
Deferred loss on defeasance of bonds                                                                                        (81,168)
BALANCE AT BEGINNING OF YEAR IN CASH AND TEMPORARY INVESTMENTS AND SEGREGATED FUNDS....~........BALANCE AT END OF YEAR IN CASH AND TEMPORARY INVESTMENTS AND SEGREGATED FUNDS.......
Net cash provided by financing      activities........                                          123,792                      53,684 NET INCREASE (DECREASE) IN CASH AND TEMPORARY INVESTMENTS AND SEGREGATED FUNDS......                                                            33,646                    (88,096)
$74,
BALANCE AT BEGINNING OF YEAR IN CASH AND TEMPORARY INVESTMENTS AND SEGREGATED FUNDS....                                    ~...

Latest revision as of 05:33, 4 February 2020

Salt River Project,1986-87 Annual Rept.
ML17303A548
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/31/1987
From: Boulais M, Lassen J, Pfister A
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT & POWER
To:
Shared Package
ML17303A547 List:
References
NUDOCS 8709170199
Download: ML17303A548 (32)


Text

NOTdCE THE ATTACHED FILES ARE OFFICIAL RECORDS OF THE DIVISION OF DOCUMENT CONTROL. THEY HAVE BEEN CHARGED TO YOU FOR A LIMITED TIME PERIOD AND MUST Bf Rf TURNED TO THE RECORDS FACILITY BRANCH 016. PLEASE DO NOT SEND DOCUMENTS CHARGED OUT THROUGH THE MAIL. REMOVAL OF ANY PAGE{S) FROM DOCUMENT FOR REPRODUCTION MUST BE REFERRED TO FILE PERSONNEL.

DEADLINE RETURN DATE RECORDS FACILITYBRANCH S7O9X70iW 86~~~~~8 OMOOMB PDR ADOCK I I

Background

River Project is named S for alt the major river which supplies water to the Phoenix metropolitan area. SRP plays a significant part in the growth of the Salt River Valley, providing water and power to residents through bw organizations the Salt River Valley Water (the Association) and Users'ssociation the Salt River Project Agricultural Improvement and Purpose of Salt River Project: Poiver District (the District).

The Association is a private Provide a reliable and adequate supply of water and Arizona corporation. It ad-electricity at the lowest reasonable cost ministers water rights of SRP's 240,000-acre area and operates and maintains the irrigation transmission and distribution

~

system which carries water to municipal, industrial, agricultural and residential users. In coopera-

~~<hvt~ tion with the U.S. Forest Service, it participates in the management of the 13,000-square-mile water-sheds of the Salt and Verde SALTRIVER PROJECT rivers.

PUIILISIIER SRP Communications The District is a public power i'ublic Affairs Department utility and a political subdivision EDIIR Heather Cllsby DESICJI Larry i~tacLcan of Arizona. It operates under PHO?OGRIt PHV Chet Snellback, Ed contracts with the United States

'tbllmr, Jere Grms and Joe and provides electricity to Qulhuls commercial, in-residential, COhtPUTER CRrlPHICS Jeff Stanley dustrial and agricultural power users in a 2,900-square-mile ser-vice area in parts of Maricopa, Gila and Pinal counties.

In line with the long-standing reclamation principle, SRP uses a portion of its electric revenues to help support its water opera-tions. This practice helps keep waterdelivery charges to cities, farmers and homeowners at reasonable levels. At the same time, SRP maintains electric rates that are competitive with those of other utilities in the area.

On the couer-Another beautiful Arizona sunset silhouettes part of SRP's Eyrene Receiving Station in 'ibmpe.

Contents Message from Management ....................... 2 P ower o ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o 4 Water .......................................8 C ommumty

~ ~

...................................12 F manctal.................... ~ ~.............. 16 Combined Financial Statements...................18 Notes to Combined Financial Statements............22 Statistical Review... '........................... 26 Board Members and Council Members..............28 Highlights REVENUES/EXPENSES (See Page 20) Fiscal 1987 Fiscal 1986 Total operating revenues ($ 000) 888,506 848,618 Total operating expenses ($ 000) 706,377 642,963 Net operating revenues ($ 000) 182,129 205,655 Financing costs (less AFUDC) ($ 000) 105,293 42,337 Other expenses, net ($ 000) . 2,075 5,002 Reinvested ($ 000) . 74,761 158,316 POWER OPERATIONS (See Page 27)

Energy customers at year end . 487,321 457,489 Total kilowatt-hour sales (000). 15,566,478 14,503,982 Average annual kWh usage per res. customer 12,440 12,175 Avg. annual kWh revenue/res. customer (cents) 7.54 7.56 WATER OPERATIONS (See Page 26) Calendar 1986 Calendar 1985 Assessed water accounts ............. 181,894 181,645 Water runoff (acre-feet) 1,774,667 1,070,214',691,741 Water in storage, Dec. 31 (acre-feet) . 1,671,535 Water deliveries (acre-feet) . 870,658 1,016,612 SELECTED OTHER DATA (See Page 26) Fiscal 1987 Fiscal 1986 Gross plant investment ($ 000) . 4,814,087 4,481,667 Long-term debt ($ 00(hSee Page 19) . 2,986,737 2,880,407 Taxes 6 tax equivalents ($ 000) . 103,097 83,864 Electric-revenue contributions to support water operations ($ 000) 15,9?5 12,384 Employees at year end. 5,735" 5,468"

'ased

" on V.S.G.S. provisional records and subject to adjustment.

Does not include temporary employees.

To Our Shareholders and Bondholders:

a small amount of capital for in-T his past year we witnessed our 50th anniversary as the Salt River Project Agricultural Im-headquarters will consist of five buildings on 40 acres est of the present headquarters. The first quality and institute practices to ensure that SRP water meets all applicable standards. We initiated vestment.

After the end of the fiscal year, provement and Power District. component, the Information meetings with all cities we serve to approximately $ 22.3 million in We'e seen a lot of changes in the Systems Building, is scheduled for seek solutions to mutual water mini-bonds were sold. Some were past 50 years. Through it all we'e completion in late 1988. In addi- problems. As population increases, interest-bearing mini-bonds for continued to supply a reliable tion to the corporate headquarters, the cities will be faced with an in- $ 500 each and, for the first time, source of energy and water at the 484 surrounding acres of SRP- creasing demand for water. By we sold capital appreciation bonds lowest reasonable cost. .owned land will be available for working with the cities, we can for $ 200 each. These bonds vvill lease and development by others share information and avoid cost-Research shows our custom- pay $ 488.05 if held to maturity in and will be called Papago Park ly duplication of efforts. 2002.

ers are happy with our service. One Center. Income from this develop- Under the Safety of Dams Act, of last year's goals was to achieve Our employees were the ment will be used to supplement preliminary engineering and ex-an overall quality of service rating strength of this year's corporate electric revenues, offset operating cavation work began on Theodore of 90 percent from our customers. theme, "The People Behind the expenses and hold down electric Roosevelt Dam and Stewart Moun-We received a 97 percent rating. Spirit." Their commitment to ex-bills. tain Dam. During 1986, we entered Customers saw a small decrease cellence was shown in their work Water supplies were sufficient into agreements with the U.S. and in their many volunteer ac-in their electric bills as we passed Bureau of Reclamation to add and remarkably well managed. tivities in their communities.

on a decrease in fuel costs. For several maintenance items to residential customers, the average Although inflows from the Salt and Verde rivers were only 87 percent necessary dam safety modifications Their efforts are, in large cost per kilowatt-hour (kWh) was measure, the reason this past year of average, heavy summer rains scheduled at Stewart Mountain 7.54 cents compared to 7.56 cents was successful for Salt River Pro-kept reservoirs fuller than normal. Dam. The proposed changes will per kWh in the previous year. enhance operating and main- ject. Through our Storage at the end of 1986 totaled employees'alents, During the year, we added 1,691,741 acre-feet (a0 or 84 per- tenance facilities at the dam. expertise and dedication, 29,832 new electric customers for cent of capacity. This was 139 per- we expect to be able to meet the Financially, it vvas another good challenges of the coming year.

a total of 487,321 customers in all cent of normal. year for SRP. Careful management classes. The new customers con- Challenges will include meeting tributed to a new system peak of For the third time in four years, of SRP resources, healthy financ-plenty of water in storage reduced ing opportunities and a strong financial capital requirements 2,785 megawatts (MW) on August caused by new construction. These groundwater pumping to less than local economy contributed to the

20. capital requirements are expected 7 percent of deliveries. Project success. Our debt service coverage However, plenty of power is groundwater pumping totaled on- increased from 1.85 to 2.0, aided to cause our debt ratio to rise.

available. The first two units of the ly 65,538 af, aiding our efforts to by a 4.7 percent increase in gross However, through all of the Palo Verde Nuclear Generating Sta- conserve this essential resource. revenues. Hot weather and the year's activities i~e'll be working tion have begun commercial opera- almost 30,000 new customers closely with Valley communities

'Ibtal water deliveries hit a tion, providing SRP with 444 MW helped to build an increase in gross and all levels of government, con-10-year low of only 870,658 af, of generating capacity. Future revenues to $ 888.5 million, up tinuing to be a strong presence in compared to 1,016,612 in 1985.

power supplies are being deeloped from the previous year's revenues the Valley we serve. We'l be here, Agricultural use was less than nor-at St. Johns, where the third 350 of $ 848.6 million. providing a reliable supply of water mal due to land sales and govem-MW unit of the coal-fired Cor- totaled $ 74.8 and electricity for our customers, ment set-aside programs which Net revenues onado Generating Station is under for another 50 years to come.

reduced the quantity of crops million during fiscal year 198M7.

contruction.

grown. Municipal use was less due As a public power utility, our net On a per-customer basis, our to summer rains which curtailed revenues are reinvested to replace operations and maintenance costs the usual amount of lawn watering. equipment and to help finance dropped to $ 1,422. That is $ 114 construction of new facilities.

Land and vvater use continued less than our Project goal of to shift. A total of 7,165 acres was Maintaining a healthy financial

$ 1,536.

~

converted from agricultural use to status resulted in our bonds con-As the number of customers in- urban use. By year's end, 68.6 per- tinuing to receive high investment. John R. Lassen creased, many located near the cent of the 238,170 acres in SRP grade ratings of AA and Aa by the outer edges of the SRP service was urbanized, while 31.4 percent nation's leading rating services. We area. To better accommodate customers on the east and est sides of the Valley, we opened the remained in agriculture.

SRP's Water Group faced a ma-jor reorganization. Reid W. lteples have sold investment-grade bonds for more than 20 years.

For the first time in ffive years,

&i~g. Marcel J. Boulais Tolleson Service Center and broke retired as head of the Water Group we sold bonds on a competitive bid ground for the Mesa Service after 39 years with SRP. He was basis. In October 1986, SRP sold Center. Regional service centers succeeded by D.S. Wilson, Jr. A $ 100 million in tax-free electric enhance operations by reducing reorganization of three depart- system revenue bonds. The bonds travel time and expense of reaching ments was completed to increase were sold in $ 5,000 denominations the customer. eficiency and to provide better ser- at an effective interest rate of 7.34 A.J. Pfister vice to customers. percent.

In an effort to eliminate use of leased office space and to con- A new department was Mini-bonds retained their solidate administrative functions, formed, the Water Quality and popularity. Mini-bonds are bonds we broke ground for a new corpo- Geohydrology Department. sold for $ 500 or less, which makes rate headquarters. Eventually, the SRP staff will monitor water them appealing to the investor with

(From left) Salt River Project General Manager A.J. Pfister, President John R. Lassen and VIce President Marcel J. Boulais.

Officers Elected Officers John R. Lassen President Don G. Parlett Associate General hlanager, Stanley E. Hancock Assistant General Marcel J. Boulais Vice President Corporate Services Croup h1anager, Communications & Public Affairs Paul G. Ahler Assistant Ceneral h1anager, D. Michael Rappoport Assistant Ceneral Principal Officers and Other Executives Human Resources h1anager, Government Affairs AJ. Pfister General h1anager James L. Swartz Assistant General h1anager, Richard H. Silverman Assistant General John R. NcNamara Associate Ceneral Operations Services h1anager, Law & Land h1anager, Corporate Engineering and Ibiver Carroll N. Perkins Associate Ceneral C.A. Howlett Assistant Ceneral Nanager, Group Nanager, Customer, Financial &Information Special Rejects Robert J. Conlon Assistant General Nanager, Services Group Paul D. Rice Corporate Secretary Corporate Engineering John D. Jacobs Assistant General Manager, Trent O. Neacham Assistant General Information S>stems h1anager, lbwer Construction &Naintenance Oren D. Thompson Assistant General John O. Rich Assistant General hlanager, hlanager, Customer Services Power Operations Mark B. Bonsall Corporate 71easurer, D.S. Wilson, Jr. Associate General Nanager, Financial Services Consultants IVater Croup Leroy Michael Jr. Associate Ceneralh1anager, LegalAdvisers Jennings, Strouss 4 Salmon Richard Juet ten Assistant General Nanager, Planning & Resources Auditors Arthur Andersen 6 Co.

IVater Resources & Services Arnold L. Schwalb Director, Corporate Bond Counsel Nudge Rose Guthrie Robert W. Mason Director, Water Croup Planning Alexander 4 Ferdon Nanagement Staff Darrell E. Smith Director, Resource Planning Financial Consultant Lazard Freres 6 Co.

3

SRP linemen continually upgrade and repair SRP's power lines, such as this high voltage line between H'yrene and Silver King receiving stations.

Electric customers benefit from decreased fuel costs, increased power i t was a golden year SRP's Power District.

for In the 50th year since the for-customers in each of the past four years including a record 34,715 customers in fiscal year rates contain a basic amount for fuel, but fuel costs can change on a daily basis. Fluctuations be-Transmission system completed under budget SRP's work on the Palo Verde mation of the Salt River Project 1985-86. Because of continuing tween the amount paid for fuel Nuclear Generating Station's Agricultural Improvement and growth, the number of customers and the amount collected from transmission system was com-Power District, the District: by the end of the next fiscal year customers are refunded or is expected to easily surpass the pleted ahead of schedule and $ 3 recovered on bills through

~ 500,000 mark.

million under budget. The Added nearly 30,000 new periodic fuel cost adjustments.

13-year project was completed in electric customers, including Of the increase in last year' SRP starts receiving October 1986, at a cost of $ 95 several major industrial customers, 27,153 were residen- low cost power from million.

customers tial and 2,245 were commercial Unit 2 of Palo Verde

~ Passed and industrial. Other electric The high-voltage transmission on a slight decrease Some of the power re- system includes 165 miles of 500 in fuel costs to customers, reduc- users, including municipal street quirements of customers were kilovolt (kV) power lines which ing their cost of electricity light contracts and irrigation met with electrici-

~ pumps, increased by 434.

Began receiving low-cost ty from the first power from the second unit of Several new industrial hvo units of Palo Palo Verde Nuclear Generating customers, including B.F. Verde Nuclear PROJECT ENERGY SOURCES Station Goodrich, Hamilton-Avnet, Generating Sta- Year Parker Hannifin and Hexcel, ac- tion. Both began April Ending busc

~ Completed the Palo Verde 30 Hpb'o Gas Oil Cnal Nuclear Purch.

counted for about 8,000 kilowatts commercial opera-transmission system to the Phoenix Metropolitan area, on- (kW) in new load, nearly 800,000 tion in calendar 1984 15.8 3.9 0.5 78.6 0 1.2 time and under budget square feet of manufacturing year 1986, the first 1985 12.8 8.9 0.4 76.2 0 1.7 space and more than 1,000 new unit on January 1986 11.0 103 0 683 1.0 9.4

~ Brought on-line a new com- 1987 10.0 8.6 0 58.4 12.4 10.6 jobs in the area. 30, 1986 and the 1992 63' puter, the Energy Management 1 0 67.6 21.0 0 Each new customer increased second unit on $prnjeded)

System, to control SRP's electric September 20, 'inc&As bybo purchases demand on the electric system.

system 1986. bill numbers m prnraroprsl Electric customer use reached a

~ And continued construc- peak of 2,785 megawatts (MW) SRP is one of tion of the third coal-fired unit of on August 20, 1986. This peak seven owners of the nuclear link Palo Verde Nuclear Gener-the Coronado Generating demand surpassed the previous powered station 50 miles west of ating Station with Phoenix and Station. high of 2,658 MW reached on Phoenix. SRP owns 17.49 per- other moor cities and the elec-August 29, 1985. 'Ibtal kilowatt- cent of Palo Verde's three 1,270 trical grid connecting the Further luster was added to hour (kWh) sales to customers MW units. With the commercial Western states.

the golden jubilee when SRP's during the year increased by operation of the first two units, District improved service to our SRP gained 444 MW of Meanwhile, construction 1.06 billion kWh to 15.56 billion began on the Papago Buttes-customers by building a new kWh from 14.50 billion kWh the generating capacity. Pinnacle Peak 230-kV transmis-regional service center; esta- previous fiscal year. sion line. The line will strengthen blished a demand side implemen- The third unit of Palo Verde . SRP's transmission system and tation program; and formulated Electric bills drop slightly Nuclear Generating Station is ex- increase electric reliability to the a balanced strategy approach to During the )mr, SRP was able pected to be in commercial growing number of customers in resource planning. to pass on to customers a slight operation by the end of 1987. the Scottsdale and Tempe area.

decrease in fuel costs, thereby This unit will provide another SRP's service area The line is expected to be com-lowering the cost of electricity. 222 MW of capacity to SRP. The remains a high-growth area pleted in early 1989.

For residential customers, the U.S. Nuclear Regulatory Commis-The number of SRP average cost per kWh was 7.54 sion issued an operating license During the fiscal year, SRP customers continued to grow. cents, compared to 7.56 cents per for the unit in March 1987. That added a total of 15 miles of 69 Electric customers, totaled kWh the previous year. The license allows plant operator kV subtransmission line and 39 487,321 at year's end, compared reduction was due to a decrease Arizona Public Service Company miles of overhead distribution to 457,489 the year before. SRP in the fuel cost adjustment fac- to load nuclear fuel and begin the lines. SRP also installed 1,403 has added about 30,000 tor applied to bills. SRP's electric prescribed testing process. miles of primary underground

distribution lines and 513 miles unit is expected to begjn com- Generating Station. areas are evaluating the potential of secondary underground distri- mercial operation by 1991. benefits, including deferral of new SRP completed the first phase bution lines. Also, five new generating units, improved effi-SRP expects to spend about of its statewide study of potential residential distribution substation ciency, enhanced reliability and

$ 670 million in direct costs for locations for a new coal-fired better system coordination.

sites were opened and 15 new the unit, about $ 50 million less generating station. However, substations were installed. than the 1985 estimate. SRP is since current projections show Regional service centers one of a few U.S. utility compa- that another large, coal-fired provide faster service Energy Management System nies building a generating unit of generating station won't be is installed needed until aiter the year 2000, to customers this size and is benefitting from SRP's ability to control its competitive prices for equipment and it takes about 10 years to Regional service centers, new-power nebvork increased dramat- and materials. Supervision of plan and build a large coal-fired ly opened or now under con-ically with the arrival and instal-lation of the Energy Management System (EMS), a new computer system installed in February SALT RIVER PROJECT ELECTRIC SERVICE AREA 1987. EMS is a power network control system with which dis-patchers monitor and direct the flow of power from generating fa-cilities to customers. Thus far, about 70 SRP substations are fflfVf8 operated by the new system. All oP

~A 170 substations in the SRP elec-tric system are projected to be on C APACHE J

~0 ~

EMS by late 1987. Phoenix E

MIAMI ~ ~ GNBE

~ F The new system is far more ~G ~ SUPERIOR advanced and efficient in every 8/vga FNREIICE JCT.

respect from the old control sys-tem, which SRP had outgrown. ~ H In addition to features of the old system, the EMS has powerful statecf-the-art computer analysis capabilities designed to help pow-er dispatchers react faster to sys-tem disturbances and make i

better decisions regarding alloca-tion of generation resources.

Besides the ability to quickly identify, analyze and determine the cause of power outages, advantages include an in-EMS'ther creased ability to analyze the best time to buy and sell electricity, and to quickly analyze demand O Electric Service Area Served Exclusively by Salt River Project.

Salt River Project Provides Full Po>>vr Requirements of Arizona D

Public Service for Resale.

on the system. As a result, the new system increases SRP's relia- Salt River Project Provides Full Electric Service Areas Not Semd by PoNer Requirements of Arizona Salt River Project bility and cost effectiveness. Public Service for Resale. Project Makes Direct Sales to Customers for SRP sent nine engineers and All Mining Loads.

their families to Minneapolis for three years to supervise the build-ing of the computer and its soft-ware. Including installation, the contruction by SRP engineers station, the study probably won' struction, are bringing SRP new system cost $ 28 million. also is keeping costs down. be resumed until the early 1990s. closer to its customers. Service SRP will continue to study sever- centers in the western and Meanwhile, SRP is testing a Construction continues al options for meeting its cus- eastern part of the Salt River Val-potential source of new coal for on Coronado 3 tomers'lectric demand. ley enhance operations by reduc-Coronado Generating Station.

ing travel time and expenses.

In January 1986, construction SRP has acquired leases for coal-When customers need service, resumed on the third 350 MW bearing properties in western One option under study is a construction or repair, crews are unit of the Coronado Generating New Mexico. lhsting of 100,000 high voltage transmission line to able to respond quickly because Station at St. Johns, Arizona. By tons of coal will help SRP decide connect the Desert Southwest they are closer to the work site.

the end of May 1987, construc- if that coal could be a future and the Pacific Northwest. SRP tion was 8 percent complete. The source of fuel for Coronado and 26 other utilities in the bvo 6

The new Tolleson Service Center, opened in January 1987, is headquarters for 300 I,'/)

employees who serve the growing west Valley. By 1995, SRP pro-jects that it will be serving 200,000 electric customers in that area.

SRP is building a similar regional service center in east Mesa to serve the growing east t

)

Valley. About 350 SRP employees will work at the center when it opens in 1988, with ap-proximately 150,000 electric customers expected to benefit.

Customer service centers in Glendale and in the southeast Valley are also planned. SRP opened its first service center in New electric customers, such as Westcourt In the Buttes hotel manager (right), receive personal Tempe in September 1983. assistance about the/r power needs from an SRP commercial customer representative.

SRP emphasizes demand-side planning allow customers to take greater tioners or heat pumps with new balanced strategy planning, to SRP continually is looking for control over the cost of their elec- high<fficiency air conditioners or plan methods of meeting pro-ways to reduce its costs and pass tricity. heat pumps. SRP offered cash in- jected electric demand. This ap-along its savings in the form of SRP's Board of Directors centives of between $ 50 and proach reflects SRP's least-cost lower electric bills to its cus- voted in March 1987 to allow an $ 100 a ton for the new planning philosophy. Its goal is to tomers. 'Ib provide customers additional 10,000 SRP customers equipment. find the best combination of with more opportunities to to participate in the time-of-day SRP's Energy Efficient Home demand-side load reductions and reduce their electric bills and to program, increasing the number (EEH) program achieved new future power additions resulting bring about beneficial changes to of potential customers in the pro- heights in market penetration last in the lowest possible cost, while the pattern of system demand, gram from 3,000 to 13,000. year. Currently, six out of 10 new maintaining SRP's high level of SRP established the Demand- homes in SRP's service area are customer service.

Side Implementation Department Other demand-side programs include a cash incentive program built by contractors in the EEH The balanced strategy plan last year. program. The program requires calls for commercial operation Demand-side programs can for businesses, schools, or chur-ches which install thermal energy builders to meet 12 building of the third unit of Coronado moderate the rate of growth in specifications for a total-electric Generating Station by 1991, a storage systems, rather than con-peak demand and bring about a home. 200 MW purchase and a sales ventional air conditioners. A more constant demand for elec- EEH homes are more energy contract recapture, plus a reduc-thermal energy storage system tricity throughout the year. This efficient and thus cost less to tion in projected peak load up to uses electricity at night to form lower rate of growth means SRP operate for the owner. 400 MW by the year 2006 ice or liquid which is used to cool does not have to build as many through demand-side programs the building during the day, in- Resource planning aimed new generating plants, thus keep- This plan allows SRP to delay stead of a conventional refrigera- at reducing cost ing down rising costs associated construction of additional un-tion system.

with new construction. More During the fiscal year, SRP committed coal units until after constant demand means SRP Customers who replaced gas used a new approach, called the turn of the century.

can make more efficient use of its furnaces with high existing generating system. efficiency heat pumps last year Last year the new department, received $ 200 ELECTRIC CUSTOMERS in cooperation with other depart- from SRP for the (ALL CLASSES) ments, continued a program switch. The $ 200 evaluating customers'esponses incentive was to the time-of-day program. boosted from a Within the time-of-day program, $ 100 incentive of-begun in March 1980, par- fered when the ticipating customers pay lower program began in 4oo,ooo rates during off-peak hours. Con- March 1985. 2pp ppp versely, they pay higher rates dur- Another incentive ing on-peak hours, when offered was to electricity demand is great. customers who Results from the study will help replaced old, inef- 1977 1982 1987 1992 1997 2001 SRP plan rate alternatives that ficient air condi-

SRP demonstrates a vital interest in hydraulic engineering projects at Arizona State University's SRP Hydraulic Engineering Laboratory.

Water Group reorganization reflects changing needs of the Salt River Valley RP's Water Group under-S went major changes last year to satisfy changes in laws, practices of industry, agriculture and municipalities.

determine the relative water rights of all lands within the Gila In response to the act and River basin, including SRP community attitudes and the member lands, and the land on other laws and regulations needs of water customers. the watersheds of the Salt and relating to water quality, SRP formed its Water Quality and Verde rivers.

Last year, SRP's Water Group:

Geohydrology Department. One of SRP's primary duties

~ saw retirement of its top ex- Members of the department will is to ensure protection of water ecutive monitor the quality of SRP's rights for lands within the SRP

~ formed a new department water resources and institute water service territory. Those and reorganized three others practices to ensure water man- rights were established under the

~ participated in several city aged by SRP meets all applicable Kent Decree in 1910 and other and SRP long-range water plan- Reid M %epics standards. court actions. By protecting the ning forums SRP's Water Group also water rights, lands in the SRP

~ completed canal mainte- reorganized three departments to water service area are assured a nance work to decrease water provide better service related to portion of the water in SRP Reid Teeples retires reservoirs. As a result, the water losses water rights administration and

~ In January, Reid W. Teeples water construction and supply of lands within SRP and worked with Valley retired after 15 years as the head maintenance. boundaries is more secure than cities to build an intertie between SRP canals and the Central of the Project's Water Group. the water supply for many other Tt.epics, who joined SRP in 1948, Water rights administration is portions of the Valley.

Arizona Project canal. expected to be particularly im-was replaced by D.S. Wilson, Jr.

portant during coming years as The Project also was involved Urban land use increases the Gila River Water Rights Ad-During his tenure, Teeples in discussions over a potential in water service area judication progresses through the coordinated the largest well- joint groundwater storage and The character of the area drilling program in SRP's history courts. The adjudication will recovery project, meeting with served by SRP continued to and established the Project's change during the past year. A Groundwater Department. He total of 7,165 acres was converted also was responsible for standar- COMPONENTS OF SRP WATER DEMAND from agricultural use to urban dizing many of SRP's practices use. By year's end, 68.6 percent while heading the Civil Engineer-of the 238,170 acres of SRP ing Department. 1986 PLANNING CASE member lands was urbanized In addition to his work at 2005'RBAN while 31.4 percent was used for SRP, he served in various leader- IRRIGATION ll'Yo URBAV IRRIGATION agriculture. 111,000 ABYR 97700 ABYR ship capacities with the Colorado 1244 SRP estimates that essential- River Water Users'ssociation, SYSTE>1 LOSSES 12% SYSTE'V LOSSES the National Water Reclamation 122.900 ABYR 121~ AF/YR ly all acreage within SRP bound-aries will be out of agricultural Association and various other OTHER OTHER VALLEYCONTRACIS VALLEYCONTRACIS production by the >mr 2015. groups. 184~ AF/YR 2494 90900 AF/YR Wilson joined SRP in 1967.

Water deliveries also have He was manager of Water AGRICULTURE 29%

AGRICULTURE 252,900 AF/YR reflected the changes in land use. Resource Operations for eight 290.800 AF/YR During the past year deliveries for years before being named to suc-urban uses totaled 395,158 acre- ceed 'keples. 46% 0HMCIPAL feet (ao while deliveries for 4 Bil)USTRIAL New department formed NlMCIPAL 29% 470.000 AF/YR agricultural purposes totaled 4 INDUSTRIAL 284200 AF/YR 290,572 af. During the previous Arizona's Environmental year, urban use totaled 396,228 Quality Act, passed last year, TOTAL DE41AND 993,600 AFIYR 'IIALDEbfAND 1.033.000AFIYR af and agricultural use was placed stringent water quality re- AF (ACR&F0071 %$ 880 CALLOVS 381,341 af. quirements on the water use

the City of Mesa and the Arizona of adequate supplies now and in years, an abundance of surface Tbtal water deliveries to the Municipal Water Users Associa- the future throughout the Valley. water allowed SRP to keep cities during the year totaled tion (AMWUA).SRP is consider- Also, the cities and other pro- groundwater pumping to less 284,192 af, an increase of slight-ing groundwater storage to viders will find it easier to than 7 percent of deliveries. lbtal ly less than one percent from recharge Salt and Verde river comply with the conservation Project groundwater use was 1985's total of 281,464 af.

waters during above-normal requirements of Arizona's 65,538 af.

runoff years. The underground Groundwater Management Act. SRP coordinates stored water would then be Combined surface and construction with cities recovered for use during below- During the year SRP organ- groundwater produced for Pro- As more and more streets and normal runoff years. ized a regional water planning ject use totaled 993,591 af, which freeways are built, the rights of forum with the cities it serves, was 90 percent of the median for way often conflict with those of SRP increases efforts to assist to identify and address long- the last 10 years. Depending on SRP wateiways. In 1986 SRP met cities with water planning range water planning issues. Four surface water supplies, ground- with Valley cities, the Arizona As the number of people water planning groups were water historically has satisfied Department of itansportation, living in the Valley continues to established, each led by an SRP between 5 percent and 40 per- and the Maricopa County grow, the cities here are faced facilitator, to inform each other cent of SRP customers'nnual Highway Department to discuss with an increasing demand for about the cities'nd SRP's needs water demand, or 55,000 af to ongoing design and construction water. During the past year, SRP and limitations and to avoid 440,000 af each year. Reduced projects. More than 30 meetings continued its meetings with the duplication of efforts. pumping helps eliminate over- were held resulting in improved City of Phoenix coordination behveen SRP and and expanded the agencies on irrigation-related those meetings to projects where facilifles of bvo or include other cities more entities are involved.

in its water service Interagency coordination area to seek solu-saved time and money by reduc-tions to mutual ing the impact of residential and problems. By freeway construction on SRP's working ivith the ability to supply water to homes, cities, individually businesses, municipalities and and as a group, all farms.

involved can share information and SRP continued its commit-avoid costly ment to water conservation by duplication of ef- lining 7.4 miles of canals and in-forts in planning stalling 98 lateral structures last ways to meet water year. Lining canals decreases demand. water system losses for a savings of thousands of acre-feet of water Among the ef- each year.

forts worked on by SRP was institu- SRP also completed a tion of a Valley- beautification project along part wide water conser- SRP Is a recognized world authority on water systems. These Egyptians were of the Arizona Canal which in-vation effort. SRP, among nearly 600 visitors from 58 countries who toured SRP facilities In cluded improving the appearance 1986, During SRP visits, Egyptian participants received handswn training In of the canal by extensive brush along with other the operations, maintenance and management of the Project's irrigation system.

members of and tree removal, and tree trim-AMWUA encour- ming. Similar projects are aged the cooperation of local Water storage above normal drafting supplies. The Arizona planned for other canals.

broadcasters, under the leader- SRP began the year with Groundwater Management Act ship of KPHO 'klevision, on an calls for pumping to be limited to Congress funds 1,671,535 af of water in storage.

extensive campaign called Water the quantity recharged by dam improvements Inflows from the 13,000-square-Wise." Each month a water con- mile watershed to the SRP reser- January 1, 2025. Under the Safety of Dams Act, servation tip is communicated voirs totaled 1,070,214 af during Congress appropriated $ 3 1 through public service an- the year, which was 87.0 percent Tbtai water deliveries hit a million for safety improvements nouncements carried by local of average. Inflows during 1985 10-year low. Deliveries totaled at Theodore Roosevelt Dam and television and radio stations. A totaled 1,7?4,667 af. Unusually 870,658 af compared to $ 3.9 million for work at Stewart printed version of the tip is heavy summer rainfall on the Salt 1,016,612 af in 1985 and 881,009 Mountain Dam.

distributed through ABCO and Verde watersheds contri- in 1984. Agricultural use was less Markets Inc., Bashas and Lucky buted to runoff that kept reser- than usual due to government Shortly after the end of the grocery stores. set-aside programs which re- fiscal year, Arizona's congres-voirs fuller than normal. Storage duced the quantity of crops sional delegation negotiated an at year-end totaled 1,691,741 af grown. Summertime municipal agreement with environmental By working together toward or 84 percent of capacity. This use declined because of greater groups concerning Plan 6. Under the common goal of conserving was 139 percent of normal. 'otal than normal summer rainfall the agreement, CliffDam will not water, customers can be assured For the third time in four which reduced laivn irrigation. be built. In return, environmen-10

tal groups agreed not to oppose baffic from the to SALT RIVER PRO JECT IRRIGATED AREA the remaining elements of of the dam.

Plan 6.

Intertie will link The plan will provide Central SRP canals and CAP Arizona Project water storage @+LE and regional flood control and Locally, SRP dam-safety modifications. Other worked with six ecoOl elements are an enlarged Theo- Valley cities to ob-dore Roosevelt Dam and modifi- tain agreement on cations to Stewart Mountain Dam on the Salt River. Construction a plan to build a

$ 3.1 million struc- Ql outside the SRP reservoir system included New Waddell Dam on ture that would link SRP's canal Imk the Agua Fria River. system with the Central Arizona During 1986 SRP entered Project Q~~~o&

(CAP) into agreements with the U.S.

aqueduct. The in-Bureau of Reclamation to add tertie, which will several maintenance items to carry up to 800 necessary dam safety modifica-cubic-feet-per-tions scheduled at Stewart Moun-second of water, tain Dam. The proposed changes will transport water will enhance operating and from the CAP maintenance facilities at the dam.

aqueduct near For 1987 SRP contributed Granite Reef Diver-about $ 1.5 million in safety modifications. SRP is prepared to contribute an additional $ 5 million to the U.S. Treasury in fiscal 1988. The Project's involve-ment is through a local cost-share sion Dam to SRP's main canals for delivery to CAP users.

Salt Riwr Project Irrigated Area O 13,000 Sq. &tile Project Watershed The Central Arizona Project agreement for completion of is a water-delivery system being Plan 6. DOMESTIC WATER DELIVERIES constructed by the Bureau of The federal government has Reclamation to deliver water 1986 1985 change Chandler 7,936 6,700 + 10.39%

accepted $ 371 million in local from Lake Havasu on Arizona's Gilbert 4,357 3,125 + 39.44%

funds in exchange for a federal western border to Maricopa, Glendale 25,222 23,982 5.17%

commitment to complete all Pinal, and Pima counties in cen- Mesa tral and southern Arizona. Cur-44,391 41,476 + 7.03%

elements of Plan 6 by 1997. SRP Peoria 4,028 4,351 + 7.47%

pledged $ 52 million of the local rently, construction is complete Phoenix 156,412 160,876 2.77%

funds as its share of dam-safety to just north of 'Ittcson. Scottsdale 3,478 3,843 9.50%

modifications. The federal Although SRP hasn't con- Tempe 38,367 37,172 + 3.38%

government is responsible for the tracted for CAP water, SRP may Total 284,192 281,464 + 1.00%

balance. need the intertie to receive CAP ilit numtpers are in acre feet, crcept percents of change Work to be performed on water for use when Roosevelt Theodore Roosevelt Dam in- Lake is drawn down for construc-cludes raising the overall height tion of the federally mandated of Engineering and Applied Through efforts coordinated of the dam by 77 feet. The safety modifications. Science exemplifies the business- by the office, SRP helped install modifications to the dam will CAP received record levels of education partnership SRP four radial gate structures in enable it to provide flood control, funding from the 99th Congress, strives to maintain. The new Egypt. The installation was part dam safety and additional water despite the pressure of the equipment in the laboratory will of the ongoing Professional conservation storage on the Salt Gramm-Rudman deficit reduc- be used by students to study the Employee Exchange Program River. tion law. For fiscal year 1987, mechanics and engineering pro- (PEEP) with Egypt's Ministry of blems associated with water and Irrigation. Also, a seminar on Modifications to Theodore CAP received $ 202.8 million.

other fluids. telemetry was presented to the Roosevelt and Stewart Mountain ASU dedicates Ministry of Irrigation by SRP dams are included in the Plan 6 Work with representatives student laboratory from countries around the world personnel.

agreement.

Continuing its longtime tradi- was continued through SRP's Also under PEEP, tm Cairo The Arizona Department of tion of supporting higher educa- Office of International Affairs. University students completed a Transportation will begin con- tion, SRP provided grants to The office hosted nearly 600 15-week summer study program.

structing a bridge on the Arizona State University's SRP visitors from 58 countries, held One student worked in SRP's upstream side of Roosevelt dam Hydraulic Engineering Labor- 20 on- the-job training programs Civil Engineering Department in 1987 to be finished by 1990. atory. The joint endeavor and conducted seminars for 160 and the other in Water Resources The bridge will remove the between SRP and ASU's College representatives of 15 nations. and Services'ydrology Division.

a f ~ I~

~'

1 t

46 erat

,t

. +'4y;:.I '~

, j~;p I

~ I",1 I IE .

P The Salt River Pete water safety program teaches half a million children in 2D years. water safety to school children. The award-winning program has reached more than

Salt River Project's service extends beyond water and power S Behind putthe 'TheSpirit' RP employees to People their customers forts of SRP employees, Valley teenagers last year learned more attracted 440 participants and resulted in a donation of $ 1,640 donations and in-kind services.

Employees also hold key posi-

'ontinued about the free-enterprise system to the St. Johns Senior Citizens tions on the foundation board.

and their communities first. And through SRP-sponsored Junior Association.

it showed. SRP recognizes the value of Achievement companies.

The annual Page Attacks excellence in education. Last In fiscal year 1986-87: 'fhsh program received first year, SRP honored 61 seniors Employees helped raise

~ 97 percent of customers $ 106,000 during February 1987's place in the statewide 'hke Pride during its fifth annual Spotlight rated SRP service as "good" or Junior Achievement Telephone in America" competition spon- on Excellence program. Honored "excellent" Campaign. A total of 97 sored by the Commission on students were graduating seniors

~ Volunteer work by SRP volunteers, representing 33 com- Arizona's Environment and se- from Maricopa County, Page and employees reached new heights panies, called area businesses cond place in the national com- St. Johns areas in which 8RP

~ Business requesting donations for Junior petition sponsored by the U.S. has electric facilities. Honorees .

offices were Department of Interior. Each Achievement. SRP volunteers were selected by their school moved, improving customer service raised $ 12,242, the second >m; the community effort has in- principals for academic achieve-volved more than 75 percent of ment and all-around excellence.

~ And SRP's Better Way and highest amount of any business Page's 6,500 residents.

Quality Circle programs meant during the telephone campaign. For younger students, SRP savings for SRP and its The money went toward pro- Page Attacks %ash started in and APS co-sponsored the an-customers. grams and operational support 1981 as a city-wide cleanup pro- nual Ener@ Fair. The fair at-for the organization. gram sponsored by SRP's Nava- tracted 200 entries for "Energy SRP receives high marks jo Generating Station (NGS) and Changes and Challenges."

In a joint effort, SRP and the Glen Canyon National Kindergarten through 12th grade "The People Behind the Arizona Public Service Company Recreational Area. The Page students participated. Russell Spirit" kept up SRP's tradition of (APS) raised more than $ 8,700 Kiwanis Club and Elks Lodge Moreland of Willis Junior High giving first-rate customer service. for needy citizens in the fourth have helped to coordinate the School, Chandler, made the win-Nearly all of SRP's electric and annual S.H.A.R.E. Affair event in recent years with help ning entry.

~ater customers polled last year 10-kilometer run January 10. A from NGS employees. Last year' were very satisfied with the quali- record 835 people participated in Ten outstanding employees participants collected 212 tons of and one retiree were honored for ty of service they received from the fund-raising event, which also trash.

the Project, according to monthly included a two-mile fun run and their service to civic and com-surveys. SRP's goal was for 90 a five-mile walk. SRP's organizational and munity organizations in Arizona percent of its customers to rate monetary involvement in Page At- with SRP's Karl F. Abel Volunteer Proceeds were donated to the awards. Named for SRP's im-overall quality of service good or tacks Thrash, along with other Salvation Army, which ad- anti-litter efforts, was honored by mediate past president, these excellent. The Project exceeded ministers the Service to Help awards are presented each year that goal with the 97 percent an award from Arizona Clean and Arizonans with Relief on Energy to employees who devote their rating. Beautiful, the state arm of the na-(S.H.A.R.E.). Formed by SRP tional Keep America Beautiful time and energy to their com-Employees'ommunity and APS in 1982, Project munities.

campaign. SRP was distin-involvement remains high S.H.A.R.E. provides funds guished as the most outstanding Saundra Reedy, administrative through the Salvation Army for business in the state with regard SRP employees showed pride assistant at Coronado Generating energy-related bills and home in their communities by donating to its anti-litter efforts. Station, was named St. John' repairs of needy families.

their time, money and energy to Outstanding Chamber of Com-SRP customers donated The Delta Gamma National merce member in 1986. She was community-related projects. Pro-

$ 114,313 to the S.H.A.R.E. pro-Foundation for the Blind honored for her efforts in several ject employees pledged a total of honored SRP with an award Chamber of Commerce activities

$ 326,772 to 52 non-profit agen- gram last year. Customers donate through their monthly electric recognizing the Project's support promoting the St. Johns area.

cies. And Project employees bills. of the Foundation for Blind donated approximately 480 pints SRP honored for Children. The award recognized of blood last year to a statewide Meamvhile at St. Johns, the two safety programs SRP as a long-time supporter of blood service.

seventh annual Coronado the organization through SRP received two moor safe-Thanks to the volunteer ef- Generating Station benefit run employee volunteering, financial ty awards last year. They were 13

grams include SRP's where Speakers'ureau, employees volunteer to make presentations to organizations or groups.

'lbpics range from the early beginning of the Project through the most up-to4ate activities of the utility.

During fiscal year 1986-87, Ittdta $I

'd IO StttOO SRP made about 2,300 presen-

> $ tt, ttttt tlt tttl tations to audiences totaling

~t i I

IO n II I 87,343 persons.

SRP also conducted programs about microwave cooking, com-puter equipment safety, and energy conservation, SRP's Power Saver Store opened last year at Westridge Mall. Nothing is for sale. Instead, employs offered fire, expert ad-vice about the efficient use of water and power.

Customer business offices moved for greater convenience

'le customer business offices An SRP employee shows the tools of his trade to his son during an open house at the new 'Iblleson were moved for greater speed and Regional Service Center. The regional service center Is designed to speed servIce to customers. more ease in helping customers.

The Mesa Business office was third place in the American nual safety contest to draw atten- tion in the community. SRP is moved in May to a larger facility, Public Power Association's tion to the importance of safe the first utility to receive this and customers in the Fountain (APPA) Electric Safety Award working habits in the electric honor. Hills area found it more con-contest and the Arizona Safety utility industry, and to recognize SRP's public safety programs venient to receive help at the Association's Howaid Pyle Award. excellence in that area. extend to construction workers, Fountain Hills office's new school children, professional law location.

APPA is a national organiza- The Arizona Safety Associa-enforcement officers, firefighters Courteous, helpful and quick tion representing more than tion is a chapter of the National and others. replies to customer inquiries are 1,750 publicly owned electric Safety Council. The Howanl Pyle Award recognizes safety promo- Additional public service pro- goals at SRP. Tb increase the utilities. APPA conducts the an-OOO~ number of calls handled, SRP's O IM$$ $ ICr phone center began opening at 7:00 a.m. instead of 7:30 a.m.

The phone center was remod-Customer service representative Elaine Spencer is one of eled and expanded to provide several SRP employees who 12 additional work positions. By volunteer their time to rescheduling existing personnel needy organizations throughout to work during peak periods, an the state. additional 90,437 calls were answered without hiring addi-tional people. Last year Project employees received more than 1.2 million calls.

A major billing system change was implemented in February 1987 to bill accounts by route in-stead of by billing districts.

Regionalized billing has leveled the flow of customer traffic into the business offices, reducing customer lines and thereby pro-

// viding faster service. Reduced travel time to customers'eters also has resulted in increased

SRP's newly remodeled History Center appeals to all ages. Through displays and vIdeos, the Center depicts the development of water usage In the Phoenix area from prehlstorlc times to the present.

productivity and reduction of cur- Under special legislation ly unlimited through the Better million in research activity, involv-rent and future costs. passed in 1963, SRP, as a Way program. As long as SRP ing dozens of SRP employees Continuation of that excellent political subdivision of the state, employees continue to think went toward 29 major research customer service was enhanced makes voluntary contributions in creatively and submit sugges- and development products. Pro-last year when SRP and Local lieu of property taxes to school tions, the Project will continue to jects included studies of thermal Union 266 of the International districts, cities, special districts, realize greater savings and energy storage and solar Brotherhood of Electrical counties and the state. employees will be rewarded for resources, which could help Workers signed a three->mr labor Employee programs their creativity. customers save on their electric agreement. This longer-term con- save money bills. Projects also included im-tract enables management to SRP's Quality Circle program proved precipitation forecasting, more accurately predict future Sixty-seven ideas from entre- uses a group approach to pro- which could help assure ade-labor costs, provides employees preneurial employees saved the blem solving. Employee groups quate water supplies and reduce with greater stability in wages and Project $ 423,000 in first-year sav- develop consensus and report to potential for floods.

benefits, and provides SRP ings through the Better Way pro- management. Since 1983, SRP's gram. The Better Way program A program at Arizona State customers with reduced exposure Quality Circle program has University has meant multiple to a work stoppage. uses employee suggestions that saved $ 3 million and improved deliver real dollar savings to SRP. benefits for SRP and the com-service to customers. Also, the munity. SRP sponsors the Elec-Counties get monetary Once a dollar savings is esta- program helps develop problem-blished, a percentage of the sav- tric Pope Research Laboratory boost from SRP solving skills and an enhanced ings is paid to the employee who (EPRL), which is in its third year SRP contributed $ 35.8 sense of value for individual submitted the idea. Last year at ASU. SRP contributes million of in-lieu property taxes employees. $ 100,000 per year to EPRL to employees received $ 34,000 in to seven Arizona counties during awards. Research and development fund research for power genera-fiscal year 198687. In effect, SRP projects at SRP provide technical tion projects conducted by ASU is the state's third-largest property The potential for savings to information that could benefit students, professors and SRP taxpayer. SRP and its customers is virtual- SRP's customers. More than $ 3 engineers.

15

SRP mini.bonds are proving to be popular investments. Some bonds can be purchased for only S200.

Management, economy combine to produce strong financial position

~ SRP bonds maintained 1986-87 raised SRP's debt ser- allows SRP bonds to continue to areful management of Salt vice coverage to 2.00. That com- be rated highly by the nation's River Project resources, their AA and Aa ratings pares with last year's ratio of 1.85. leading rating agencies. SRP first healthy financing opportunities

~ Gross revenues increased; The debt service coverage ratio issued Electric System Revenue and a strong local economy con- but net revenues fell reflecting ac-measures the number of times Bonds in 1973. The bonds have tributed to another good finan- counting transactions related to the sum of principal and interest been rated investment grade-cial year for SRP. the start-up of Palo Verde due on outstanding debt during those suitable for purchase by Nuclear Generating Station.

the year is covered by revenues prudent investors ever since.

During fiscal year 1986-87: Debt service coverage rises available after payment of Currently, the bonds are rated operating expenses. AA by Standard 6 Poor's and Aa

~ The debt service coverage A 4.70 percent increase in by Moody's Investor Services, Inc.

ratio increased from 1.85 to 2.00 gross revenues in fiscal year Keeping healthy financially

Gross revenues increase its first unit went into commer- The time was right for a com- $ 290 million by 1992 on the first Hot weather and nearly cial operation. petitive sale because interest two of the five buildings. The 30,000 new customers increased With commercial operation of rates were relatively low and corporate headquarters will be enerib sales, helping to build a the first unit in January 1986, the, stable and the then<urrent sup- the focal point of Papago Park 4.7 percent increase in gross trade took place. SRP reduced its ply of municipal bonds was Center, a business park on the revenues to $ 888.5 million, up share of Palo Verde to 17.49 per- limited. Salomon Brothers, Inc., adjacent 484 acres. SRP will from the previous year's revenues cent and regained 100 percent of New York placed the winning coordinate development of the of $ 848.6 million. Average an- ownership of Coronado Gener- bid. Three other groups also of- center which will be opened to nual use for residential customers ating Station. At that time, fered bids. private and commercial develop-increased from 12,175 kilowatt- LADWP also paid SRP a partial SRP, as a special-purpose im- ment. Revenues from the sale or hours (kWh) to 12,440 kWh. payment of $ 90.65 million in provement district, sells tax- lease of facilities in the center will recognition of the greater cost of exempt revenue bonds to finance help offset the costs of providing Although gross revenues in- Palo Verde. A second payment of new construction and im- electricity to SRP customers.

creased, so did the cost of doing $ 74.75 million (including in- provements to its electric system. In May, SRP estimated savings business. Operating expenses in- terest) was received during fiscal Tax-exempt financing and SRP's of $ 30 million over a 20-year creased 9.9 percent to $ 706.4 198647. solid credit ratings help keep million from $ 643.0 million the period due to the operating effi-Despite the decline in net financing costs relatively low. ciencies gained through central-previous year.

revenues, SRP's debt ratio dipped This, in turn, can help delay rate izing administrative operations.

SRP produced $ 74.8 million slightly from 68.06 percent in the increases. Low financing costs in net revenues during fiscal year previous fiscal year to 67.67 could also minimize rate in-1986-87. That was a substantial percent. creases.

Compensation funds set aside decrease from the $ 158.3 million for APS customers in fiscal year 198546. The SRP set aside $ 3 milhon last decrease resulted from account- DEBT SERVICE COVERAGE RATIO year to compensate certain ing transactions related to the Arizona Public Service Company start-up, of the Palo Verde 984==85 1986-87 (APS) electric customers who are Nuclear Generating Station.

1983 84==2:=={) 9M988 86==-2:= SRP shareholders. Qualified SRP Specifically, when the first unit ==92:= =1===.85= = ==1:==:.85::

00 shareholders are those in-of the Palo Verde Nuclear dividuals who own and live on Generating Station began com- land within the boundaries of the mercial operation in January Salt River Valley Water 1986, SRP stopped making en- Some receive elec-Users'ssociation.

tries to record the allowance for tricity from APS.

funds used during construction. A comparison of 1986 electric Instead, these finance costs were bills from SRP and APS in-listed as expenses. At the same dicated that some SRP time, SRP began recording shareholders paid APS at least 15 depreciation, operating and percent more than they would maintenance expenses for the have paid SRP for the same unit. System sales did not in- amount of electricity.

crease commensurate with the SRP's obligation to make commercial operation of the first As a public power utility, SRP SRP sold approximately payments to some APS cus-unit, resulting in a decrease in does not issue stock or pay $ 18.70 million in interest-bearing tomers is the result of a 1928 net revenues. dividends. Net revenues are mini-bonds for $ 500 each and SRP bylaw which protects Palo Verde's second unit was reinvested in SRP to help replace $ 3.60 million in capital apprecia- residential landowners residing treated the same way when it equipment and finance construc- tion bonds. The capital apprecia- within SRP boundaries, but began commercial operation. tion of new facilities. Such tion bonds were purchased for served by APS, from paying sub-The same format will follow for reinvestment reduces the need to $ 200 per bond and will pay stantially more for electricity than the third unit when it goes into issue bonds, thus keeping rates $ 488.05 if held 'to maturity in if they were served by SRP. In commercial operation. Iow. 2002. The sale closed May 15, 1967, the courts defined substan-Bonds sold on 1987. tial as 15 percent or more.

Commercial operation of the first Palo Verde unit also trig- competitive basis Construction begins on SRP shareholders in 1984 gered an exchange of capacity For the first time since 1981, corporate headquarters voted to grandfather the right to with the Ias Angeles Deparbnent SRP sold bonds on a competitive In January 1987, SRP began compensation to those share-of Water and Power (LADWP). In bid basis. For the past five years, construction on the first building holders who received electric ser-1977, LADWP purchased 30 per- SRP has used negotiated sales. vice on or before Dec. 31, 1984, of a planned five-building cor-cent of SRP's Coronado In October 1986, SRP sold $100 and also voted to end the com-porate headquarters in north Generating Station near St. million in tax-free electric system pensation program in 1994.

Tt.mpe. The corporate head-Johns, Arizona. LADWP agreed revenue bonds. The bonds were quarters, on 40 acres, is ex-to trade its share of the station sold in $ 5,000 denominations at pected to be completed by 2010.

for 5.70 percent of Palo Verde an effective interest rate of 7.34 Nuclear Generating Station when percent. SRP expects to invest about 17

Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Balance Sheets As of April 30, l987 and 1986 Assets ($ 000) 1987 1986 UTILITYPLANT, at historical cost (bootes 1, 2, 3 and 4):

Plant in service-Electric $ 3,721,898 $ 3,132,867 Irrigation 92;127 87,503 General 166,559 143,021 3,980,584 3,363,391 Less - Accumulated depreciation on plant in service 861,043 738,283 3,119,541 2,625,108 Construction work in progress . 740,767 1,025,680 Nuclear fuel, net of amortization (¹te 1) 92,736 92,596 3,953,044 3,743,384 SEGREGATED FUNDS, consisting of cash and U.S.

Government obligations set aside in accordance with resolutions of bond issues:

Debt service funds, excluding $ 61,916,000 in 1987 and $ 51,032,000 in 1986 for payment 94,769 of accrued interest (¹te 5) . 99,318 Construction fund. 49,652 23,000 148,970 117,769 CURRENTASSETS:

Cash and temporary investments, at cost 111,412 108,967 Deposit in debt service fund for payment of accrued interest on bonds . 61,916 51,032 Trade and other accounts receivable, less reserves of $ 1,207,000 in l987 and

$ 1,120,000 in 1986 for doubtful accounts... 46,754 61,071 Note receivable (Arote 4) 28,969 90,653 Fuel stocks, at last-in, firstwut cost 81,144 55,522 Materials and supplies, at average cost 69,297 4?,095 Prepayments, interest receivable and other . 13,433 8,119 412,925 422,459 DEFERRED CHARGES AND OTHER ASSETS

(¹tes 1 and 57 l86,181 169,60?

$ 4,701,120 $ 4,453,219 The accompanying notes are an inlegrai part of these combined balance sheets.

18

Capitalization and Liabilities ($ 000) 1987 1986 LONGTERM DEBT (Pote g:

Electric system revenue bonds $ 2,626,709 $ 2,541,383 Commercial paper and other (h'ote 8) 360,028 339,024 2,986,737 2,880,407 ACCUMULATED NET REVENUES:

Balance, beginning of year 1,351,904 1,193,588 Net revenues for the year 74,761 156,316 Balance, end of year 1,426,665 1,351,904 4,413,402 4,232,311 CURRENT LIABILITIES,excluding $ 26,140,000 in 1987 and

$ 17,775,000 in 1986, representing current portion of long-term debt which is to be paid from segregated funds:

Accounts payable.... 85,428 66,657 Accrued taxes and tax equivalents 41,434 36,142 Accrued interest .. 63,761 52,628 Customers'eposits 21,462 '17,619 Other liabilities. 24,881 24,223 236,966 197,269 DEFERRED CREDITS AND RESERVES (Ãote 7). 50,752 23,639 COMMITMENTS AND CONTINGENCIES (Notes 3, 5 and 7j

$ 4,701,120 $ 4,453,219

Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Statements of Net Revenues For the Years Ended April 30, 1987 and 1986

($ 000) 1987 1986 OPERATING REVENUES (Note 2):

Electric $ 881,340 $ 841,936 Water and irrigation 7,166 6,682 Total operating revenues .. 888,506 848,618 OPERATING EXPENSES:

Purchased power . 49,086 181,331 49,151 216,083 Fuel used in efectric generation .

Other operating expenses ~ ........... 151,308 122,304 Maintenance.... , 88,231 133,324 80,985 90,576 Depreciation and amortization (Note 1) .

Taxes and tax equivalents. 103,097 83,864 Total operating expenses... 706,377 642,963 Net: operating revenues ., 182,129 205,655 FINANCING COFIS:

Interest on bonds. 179,109 179,928 Amortization of bond discount, issue and refinancing expenses (Note 1) ....., ........... 6,089 2,387 Interest on other obligations... 16,081 17,864 Interest earned on investments, deposits and other. (36,08() (37,681)

Net financing cos(s 165,195 162,498 Less - Allowance for funds used during construction ir (59,902) (120,161)

(AFUDC) state 1) ~ 6 v ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ w ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 ~ ~ ~ ~ w ~

Financing costs less AFUDC .............. ..... 105,293 42,337 OTHER EXPENSES, net 2,075 5,002 NET REVENUES $ 74,761 $ 158,316 The accompanying notes ar)e an integral part'f these combined statements 20

Salt River Project Agricultural Improvement and Power District and its agent, Salt River Valley Water Users'ssociation Combined Statements of Cash Flows For the Years Ended April 30, 1987 and 1986

($ 000) 1987 1986 NET CASH FLOWS FROM OPERATING ACTIVITIES:

Net revenues . $ 74,761 $ 158,316 Noncash items included in income:

Depreciation and amortization. 133,324 90,576 Amortization of bond related expenses. 6,089 2,38?

Increase in fuel stocks and materials and supplies (47,824) (14,234}

Increase in other assets, net (8,897) (21,967)

Increase (decrease) in accounts payable . 18,771 (67)

Increase in accrued taxes and tax equivalents 5,292 1,781 Increase (decrease) in accrued interest ll;133 (9,587)

Increase in other liabilities, net .

~

9,317 6,375 Gain on sale of property (96) (4,268)

Net cash provided from operating activities 201,870 209,312 NET CASH FLOWS FROM INVESTING ACTIVITIES:

Gross additions to utility plant, net of AFUDC . (309,356) (352,993)

Allowance for funds usia during construction . (59,902) (120,161)

Gross additions to nonutility plant (10,812) (658)

Proceeds from sale of plant 972 194,192 Decrease (increase) in note receivable . 61,684 (90,653)

Contributions in aid of construction 25,395 19,181 Net cash used by investing activities. (292,016) (351,092)

NET CASH FLOWS FROM FINANCING ACTIVITIES:

Proceeds of bond issues 120,814 596,143 Other long-term borrowings, net of repayment . 21,845 30,318 Repayment of principal on bonds and U.S. debt. (18,867) (18,917)

Defeasance of revenue bonds (472,692)

Deferred loss on defeasance of bonds (81,168)

Net cash provided by financing activities........ 123,792 53,684 NET INCREASE (DECREASE) IN CASH AND TEMPORARY INVESTMENTS AND SEGREGATED FUNDS...... 33,646 (88,096)

BALANCE AT BEGINNING OF YEAR IN CASH AND TEMPORARY INVESTMENTS AND SEGREGATED FUNDS.... ~........ 226,736 314,832 BALANCE AT END OF YEAR IN CASH AND TEMPORARY INVESTMENTS AND SEGREGATED FUNDS....... $ 260,382 $ 226,736 The accompanying notes are an integrai part of these combined stalemenls.

21

Salt River Project Agricultural Improvement 6 Power District and its agent, Salt River Valley Water Users'ssociation Notes to Combined Financial Statements For The Years Ended April 30, 1987 and 1986 Summary of Significant Accounting are adjusted periodically for changes in costs of fuel and (1) purchased power. Revenues from water and irrigation operations Policies: are recorded when earned.

(a) Principles of Combination The combined financial statements include the accounts of (I) Electric Rates the Salt River Project Agricultural Improvement and Power Under Arizona laiv, the District's Board of Directors has the District (the District) and the accounts of its agent, the Salt exclusive authority to establish electric rates. The District is River Valley Water Users'ssociation (the Association) and a required to follow certain procedures, including certain public wholly-owned subsidiary, Salt River Generating Company, notice requirements and holding a special Board meeting, before together referred to as the Salt River Project (the Project). All implementing any changes in the standard electric rate significant intercompany transactions have been eliminated. The schedules. The District is currently studying the need for an Project follows the accounting principles promulgated by the additional rate increase to be effective in October 1987. Such Financial Accounting Standards Board. increase is anticipated to be approximately 6e/o. The current rates have been in place since October 1985.

(b) Regulatory Agency The District's Board of Directors serves as its regulatory (g) Nuclear Fuel The District amortizes nuclear fuel to fuel expense on a unit agency.

of production method.

Utility Plant, Depreciation and Maintenance Under the provisions of the Nuclear Waste Act of 1982, the (c)

The accounting records of the Project are maintained District is charged one mill per kilowatt-hour (kWh) on its share substantially in accordance with the Uniform System of Accounts of electricity produced by Palo Verde Nuclear Generating Station prescribed for electric utilities by the Federal Energy Regulatory (PVNGS) Units 1 and 2. The District records this charge as a Commission. Utility plant is stated at the historical cost of current year expense.

construction. Construction costs include labor, materials, services (h) Decommissioning purchased under contract, and allocations of indirect charges for The District began reserving for the cost of decommissioning engineering, supervision, transportation, and administrative PVNGS Units 1 and 2 commencing with their dates of expenses. commercial operation. The estimate to decommission the An allowance for funds used to finance construction work in District's share of PVNGS Units 1 and 2 of $108 million is progress (AFUDC) is capitalized as a part of the electric and based upon an outside engineer's study. The estimated costs will general plant. This allowance is deducted from net financing be reviewed and adjusted periodically. Decommissioning funds costs in the combined statements of net revenues and added to collected from the ratepayers will be deposited in a separate utility plant. Capitalization rates of 10.7/o and 9.7/o were used bank account which is classified as part of the general fund.

in 1987 and 1986, respectively.

Depreciation expense is computed on the straight-line basis (i) Income ihxes over estimated useful liam of the various classes of plant. Rates The District is exempt from federd and state income taxes.

in erect resulted in provisions approximating 3.37'/o and 3.31/e (j) Reclassifications for 1987 and 1986, respectively, on the average cost of Certain 1986 amounts have been reclassified to conform to depreciable electric plant, and 1.42'/o and 1.39/o for 1987 and the current year presentation.

1986, respectively, for depreciable irrigation plant. When property representing a retirement unit is replaced, removed, or abandoned, the cost of such property is credited to the (2) Possession and use of utility plant:

appropriate utility plant account, and such cost, together with The United States of America retains a paramount right or removal costs less salvage, is charged to accumulated claim in the Project which arises from the original construction depreciation. and operation of the Project's facilities as a Federal Reclamation The Project charges to maintenance expense the cost of Project. The Project's right to the possession and use of, and to labor, materials, and other expenses incurred in the repair and all revenues produced by, these facilities is evidenced by replacement of minor items of property. contractual arrangements with the United States.

(d) Bond Expense Bond discount, issue and refinancing expenses are being (3) Construction program:

amortized over the terms of the related bond issues. Balances shown for construction work in progress (CWIP) represent expenditures for new facilities required to service (e) Revenues anticipated customer needs, and consist of:

Meters for residential, commercial and small industrial Plillions) customers are read cyclically and sales recorded only when 1987 1986 billed. This system of billing results in estimated earned but unbilled revenues which amounted to $ 20,273,000 and Electric generating facilities ............., .. $ 529 $ 873

$ 22,100,000 at April 30, 1987 and 1986, respectively. For large Transmission and distribution Irrigation plant 124 16 80 12 industrial customers, meters are read near month-end and Other construction . 72 61 billings recorded on the accrual basis. Electric revenue billings Total S741 S1,026 22

Construction expenditures planned for fiscal years 1988 On January 29, 1986 the District exchanged 5.7% interest in through 1992 are shown below. PVNGS for the Los Angeles Department of Water and Power's (LADWP) 30% share of the Coronado Generating Station Units (hlilllons) 1 and 2. Of the net cash settlement, $ 162.4 million has been Construction AFUDC Total received by the District. The remaining due from LADWP of

$ 28.9 million (including accrued interest) has been withheld.

1988 $ 404 $ 47 $ 451 1989 629 LADWP claims that the amount of AFUDC charged to PVNGS 34 663 1990 491 39 530 construction is excessive. It is the opinion of management and 1991 360 39 399 legal counsel that the AFUDC amount is in agreement with the 1992 296 14 310 contract exchange agreement, Federal Energy Regulatory Regulations and past and current practices. At this time These expenditures will be financed primarily by funds negotiations are continuing; however, legal action may be currently on hand, future net revenues and the sale of revenue required to settle the matter.

bonds. The District acts as the operating agent for the participants Construction of PVNGS Unit 3 is proceeding on a schedule in the Navajo Project. As operating agent, the District utilizes for commercial operation in late 1987. PVNGS Units 1 and 2 advanced billings to the participants, based on ownership were placed into commercial operation in January and Sept- percentage, to pay the cost of operations. A separate operating ember of 1986, respectively. fund is maintained by the District to process Navajo Construction of Coronado Unit 3, a planned 350,000 kw transactions.

coal-fired unit is proceeding on a schedule for commercial The District's share of direct. expenses of the jointl~wned operation in the spring of 1991. The total estimated plants is included in operating expenses in the combined construction costs for Unit 3, including AFUDC, is approx- statements of net revenues.

imately $ 790 million.

Projected construction expenditures include contingency allowances to reflect potential cost increases. (5) Long-term debt:

At April 30, 1987, commitments had been entered into for (Millions) delivery of materials and services on construction projects. In Interest Rate 1987 1986 Maturitles

~

addition, various firm commitments exist under coal and fuel oil supply contracts. Electric System The Project had committed to spend approximately $ 50 Revenue Bonds..... 4.7-11.5% $ 2,716 $ 2,633 1988-2025 Unamortized Bond million over the next eight years for its share of a project to Discount ...,...... (89) (92) build or modify dams on the Salt, Verde and Agua Fria rivers Total Revenue for flood control, to ensure dam safety and provide water Bonds Outstanding 2,627 2,541 storage associated with the Central Arizona Project. Recent U.S. Government actions by legislators will result in significant changes to the Non Interest Bearing Debt....... 8 9 1987-2004 project. Management has not yet been able to determine the Commercial Paper... 350 325 impact upon the construction program, however it is not 6.5-7.7%

3.44.9'ther,............

2 5 1988-1989 believed the previously committed amount will increase Total Long-Term significantly. Debt........... $ 2,987 $ 2,880 (4) Interests in jointly-owned electric Electric system revenue bonds are secured by a pledge of, utility plants: and a lien on, the revenues of the electric system after The District has entered into various agreements with other deducting operating expenses, as defined by the bond electric utilities for the joint ownership of electric generating resolution, subject to amounts due the United States of and transmission facilities. Each participating owner in these $ 7,768,532.

facilities must provide for the cost of its ownership share. The The debt service coverage ratio, as defined in the bond following schedule reflects the District's ownership interest (at resolution is used by bond rating agencies to help determine the cost) in jointly-owned electric utility plants at April 30, 1987: financial health of the District and other bond issuers. For the years ended April 30, 198?, and 1986, debt service coverage was (Millions) as follows:

Ownership Plant Share In Accumulated Plant Name Percent Service Depreciation (Millions, except for ratios)

Four Corners 1987 1986 (New Mexico) ...........10.00Yo $ 81 $ 16 $ 4 Mohave (Nevada) ........10.00 43 16 1 Revenues Available for Debt Service.......: $ 399 $ 365 Navaio (Arizona) ........21.?0 212 77 7 Total Debt Seince Requirements 200 197 Hasten (Colorado).......50.00 67 24 Craig (Colorado) ........29.00 225 50 Debt Service Coverage Ratio ~..... 2.00 1.85 Palo Verde (Arizona) .. ..17.49

~ 1,106 42 414

$ 1,734 $ 225 $ 426 23

The annual maturities of long-term debt (excluding The discount rate used in determining the actuarial present commercial paper) as of April 30, 1987, due in the fiscal years value of the projected benefit obligation was 9.0%. The rate of ending April 30, are as follows: increase in future compensation levels used varies from 9.0% to 5.5%, on a graded scale, based on the age of the participant (Millions) The expected long-term rate of return on assets is 9.75%.

1988 $ 26 The following schedule reconciles the funded status of the 1989 29 Plan with amounts reported in the Project's combined financial 1990 32 statements as of April 30, 1987:

1991 31 1992 37 (Millions)

Thereafter 2,571 82,726 Plan assets at fair value $ 259 Actuarial present value of projected benefit obligation:

Vested bendit obligation. (111)

Interest and amortization of discount on the various issues Nomested benefit obligation .. (12) results in an effective rate of approximately 7.18% over the Accumulated benefit obligation.......,............ (123) remaining terms of the bonds. Excess of projected benefit obligation At April 30, 1987, The Project has authority to issue over accumulated benefit obligation,............., . (45) additional electric system revenue bonds totaling $ 131,426,260 Projected benefit obligation . 068) principal amount and electric system refunding revenue bonds Plan assets in excess of projected totaling $ 806,840,000 principal amount. benefit obligation 91 On April 1, 1986, the District defeased $ 486,150,000 of Unrecognized net assets . (65)

Unrecognized net gain (21) electric system revenue bonds, resulting in lower future debt Prior service cost not )et recognized service requirements as well as a loss of $ 81,168,089. The in net periodic pension cost.

District's Board of Directors determined that such loss should be s 6 recovered from the ratepayers during the period of reduced debt Prepaid Pension Cost .

service requirements. Accordingly, under the provisions of Statement of Financial Accounting Standards (SFAS) No. 71, the loss is being amortized on a monthly basis over the life of the In addition to providing pension benefits, the Project provides Electric System Refunding Revenue Bond Issue, 1986 Series C. certain health care and life insurance bendits for retired On February 9, 1984, the District refunded its then persons. Substantially all of the Project's employees may become outstanding General Obligation Bonds. Although the refunding eligible for those benefits if they reach normal retirement age constituted a legal defeasance of the prior lien on revenues while working for the Project, retire from the Project, are which secured said bonds, the General Obligation Bonds eligible for pension benefits, and have completed a minimum of continue to be general obligations of the District, secured by a 5 years regular employment. The cost of retiree health care and lien upon the real property included in the District, a guarantee life insurance benefits is recognized as expense as the premiums by the Salt River Valley Water Users'ssociation, and by the and/or deposits to the mustee are paid. For 1987 and 1986, District's taxing authority. As of April 30, 1987 the amount of those costs totaled $ 1,361,170 and $ 1,172,077, respectively.

defeased general obligation bonds outstanding was $ 129,705,000.

(7) Litigation and other contingencies:

(6) Employees'etirement Plan Environmental:

The Project has a retirement plan covering substantially all Various pending litigation or administrative proceedings employees. The Plan is funded entirely from Project involving environmental matters could affect the Project and its contributions and the income earned on invested assets. present and proposed generating facilities. In general, these Contributions to the Plan were $ 2,181,799 and $ 9,515,491 in lawsuits seek to impose higher air quality standards for fiscal years 1987 and 1986, respectively. The Project recorded generating plants. If ultimately decided adversely to the interest income of $ 4,098,777 for fiscal year 1987 and expense of of the Project, the lawsuits could result in increased

$ 6,264,699 for 1986 related to the Plan. Plan assets consist construction costs, increased future operating costs or possible primarily of common stocks, U.S. obligations and corporate loss in the operational reliability of certain generating plants.

bonds. Such increased costs would be passed on to customers through In '1987, the Project adopted Statement of Financial increased electric rates.

Accounting Standards No. 87, Employers'ccounting for Pensions. Net periodic pension cost under that statement is Other Litigation:

In the normal course of business, the Project is a defendant made up of the components listed below as determined using the projected unit credit actuarial cost method. (No comparable in various litigation matters. In management's opinion, the analysis is required to be made for 1986): ultimate resolution of these matters will not have a significant adverse effect on the Project's financial position or results of (Millions) operations.

Service cost .....,.................... $ 8 Payments to Certain Property Owners in the Association's Interest cost...,............,...,..... 13 Actual return on assets... ~ ~..... ~ . . (45) Service Areas Now Provided Electric Power by Others:

Net amortization and deferral .... ...,. 20 The Articles of Incorporation of the Association provide for the indemnification of certain property owners in the Net periodic pension income......... S (4)

Association's service areas now provided electric power by others 24

4 if they are required to pay substantially more for power than liquidity support for the Promissory Notes. Under the terms of they would if they were furnished electric power by the the Agreement, the District may borrow up to $ 350,000,000 Association. A reserve for these payments has been established until October 14, 1988. If the agreement is not: renewed prior which, in the opinion of management, adequately covers the to,October 15, 1987, the District may continue to borrow but Project's liability as of April 30, 1987. must reduce its outstanding borrowings to not more than Navajo taxes; $ 250,000,000 by October 14, 1988 and to not more than In 1977 and 1978 the Nav@o Thbal Council promulgated $ 150,000,000 by October 14, 1989. Following October 14, 1989, three tax resolutions affecting electric generating stations, in the District may not make additional borrowings and must repay which the District has an interest. The District and other all outstanding borrowings by October 15, 1990. As of April 30, participants in the affected generating stations filed lawsuits 1987, the District had no borrowings outstanding under the challenging the resolutions on grounds the 1Nbal Council had Agreement.

previously approved generating station leases containing The indebtedness of the District evidenced by the Promissory covenants not to tax. In 1981 the lawsuits were mooted by the Notes and/or borrowings under the Agreement is an unsecured enactment of a Thbal Council Advisory Committee resolution obligation of the District payable from the general funds of the reaffirming the convenant not to tax. District lawfully available therefore, subject in all respects to the In the fall of 1984 the Navajo Ve Commission notified the prior lien of the United States, the Revenue Bonds, and other District of its enactment of amended tax resolutions, which indebtedness of the District secured by revenues or assets of the contained provisions purporting to repeal any prior waiver of the District. The Promissory Notes and borrowings under the power to tax. The District responded by reminding the Agreement are not payable from taxes, Commission of the prior resolution, reaffirming its tax covenants. The District's Board has limited the total amount of The District has recently received a ruling by'he indebtedness evidenced by the borrowings under the Agreement Commission, denying the contractual claim of immunity from and Promissory Notes to an aggregate of $ 350,000,000.

taxation under the covenant not to tax contained in the Navajo Generating Station Lease. The District is unable to predict the ultimate outcome of this action. However, management believes (9) Irrigation and water operations:

that the District has a valid immunity from such taxation and if Irrigation and water operations expenses, including necessary will challenge the Nav@o Tax Commission ruling. In depreciation, exceeded the assessments, delivery fees, and other addition, the Board of Directors of the District has approved an revenues therefrom by approximately $ 15,975,000 for 1987 and action allowing it to recover from its customers the amounts of $ 12,384,000 for 1986. These amounts do not include such taxes if the payment thereof is ultimately required. expenditures for additions and improvements to irrigation plant and for repayment of long-term debt.

(8) Revolving credit agreement/commercial paper program: (10) Subsequent events:

On May 26, 1987, the District entered into a revolving credit The District's Board has authorized the issuance of up to agreement with Fuji Bank, Limited to provide support for the

$ 350,000,000 of short-tenn promissory notes (the Promissory District's mini-bond program. Under the terms of the agreement, Notes), which are sold in the tax-exempt commercial paper the District may borrow up to $ 30,000,000 at the Federal Funds market. The Promissory Notes will mature in no more than 270 Rate plus one-quarter to one-half percent, based on length of days from the date of issuance and in no event after October time outstanding. The agreement expires November 15, 1988.

15, 1990. As of April 30, 1987, the District had $ 350,000,000 On May 15, 1987, the District sold approximately of the Promissory Notes outstanding at an average interest rate

$ 22,300,000 of 1987 Series A and B Mini-Bonds. The proceeds to the District of 4.30/0.

were used to refund the costs of construction pursuant to the The District maintains a revolving credit agreement (the District's capital improvement program and to pay financing Agreement) with a consortium of bventy-two banks to provide expenses.

To the Board of Directors, Salt River Project Agricultural Improvement and Power District, and Board of Governors, Salt River Valley Water Users'ssociation:

We have examined the combined balance sheets of SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT (a political subdivision of the State of Arizona) and its agent, SALT RIVER VALLEY WATER together referred to as the SALT RIVER PROJECT, as of April 30, 1987 and 1986 and the related USERS'SSOCIATION, combined statements of net revenues and cash flows for the years then ended. Our examinations were made in accordance with generally accepted auditing standards and, accordingly, included such tests of the accounting records and such other auditing procedures as we considered necessary in the circumstances.

In our opinion, the financial statements referred to above present fairly the financial position of the Salt River Project as of April 30, 1987 and 1986 and the results of its operations and its cash flows for the years then ended, in conformity with generally accepted accounting principles applied on a consistent basis.

Arthur Andersen k, Co, Phoenix, Arizona, June 26, 1987.

25

Statistical Review

($ 000)

PROJECT GENERAL 12 Nonths Ended December 31 12 Months Ended April 30 1987 1986 1976

$ 888,506 $ 848,618 $ 539,669 $ 225,268 Operating revenues .

881,340 841,936 534,357 220,961 Electric 7,166 6,682 5,312 4,307 Water and irrigation.

706,3?7 642,963 400,323 182,662 Operating expenses interest....., .. 105,293 42,337 47,460 31,060 Net financing costs less capitalized Other deductions (revenues), net...,............. 2,075 5,002 (1,644) 259 11,287 Net revenues 74,761 158,316 93,530 Gross additions to plant, excluding allowances for funds used during construction Utility plant, gross .

309,356 4,814,087 5,468'981 352,993 4,481,667 302,702 2,843,247 234,012 1,229,617 Contributions of electric revenues to support water operations. .. 15,975 12,384 4,8?0 58,134 7,341 30,869 Taxes and tax equivalents 103,097 83,864 Employees at )mr-end. 5 735 4,580 3,325

'Does not include temporary employees.

KATER*

1986 1985 1981 1976 Total storage and pumping capacity (acre-feet) 2,889,725 2,863,769 2,891,177 2,841,818 Storage capacity (six reservoirs)................. 2,019,102 2,019,102 2,063,948 2,072,050 Installed pumping capacity 870,623 844,667 815,229 769,768 Water in storage Jan. 1 (acre-feet) ................. 1,671,535 1,781,671 1,480,332 1,040,000 Project storage only 1,445,710 1,543,5?1 1,227,055 771,440 Runoff (acre-feet) 1,070,214" 1,774,667 566,245 817,419 Water in storage Dec. 31 (acre-feet)................ 1,691,741 1,671,535 1,116,338 9?6,725 Project storage only 1,464,978 1,445,710 895,118 711,353 Sources of water for deliveriers (acre-feet)........... 993,591 1,136,429 1,222,376 1,190,720 Gravity supply . 928,053" 1,072,373 870,262 848,734 Groundwater supply (pumping by SRP)........... 50,482 46,593 337,424 335,988 Groundwater supply (pumping by others) ......... 15,056 17,463 14,690 5,998 Use of water (acre-feet) . 870,658 1,016,612 896,802 1,190,720 Agricultural 290,572 381,341 440,047 451,377 Urban . 395,158 396,228 381,457 295,123 City domestic 284,192 281,464 265,002 187,044 Subdivision irrigation. 60,877 60,263 62,908 56,753 Other non-agricultural irrigation (schools, parks, churches, etc.)................ 50,089 54,501 53,547 51,326 Decreed deliveries...... 47,963 52,410 64,431 58,464 Contract deliveries 136,965 186,634 108,358 82,467 Seepage and evapotranspiration ................ 122,933 119,817 240,326 315,632 Canals, total (miles) 133 133 131 131 Lined .. 91 892 87 890 70 884 59 878 Laterals, total (miles) .

Lined and piped 792 783 758 715 Drainage and waste ditches (miles)................. 240 240 243 251 Lined and piped 82 78 63 52 Assessed area (acres) . 238,170 238,170 238,221 238,266 Number of assessed accounts ... 181,894 181,645 178,796 166,048 Number of times water delivered to water users ...... 471,845 468,144 456,129 500,607

" Water on Based statistics are computed on a calendar year basis.

V.S.G.S. provisonal records and are subject to adjustment.

26

PolVER 12 Nonths Ended 12 Nonths Ended April 30 December 31 1987 1986 1981 1976 Energy Sources (kWh)

Net nuclear generation 1,955,479,000 149,186,614 i0 Net steam 9,667,574,000 10,957,903,000 10,385,225 F000 5,637,595,000 generation'et gas turbine generation..., ~.... 2,287,000 45,396,000 62,336,000 93,811,000 Net combined cycle generation ......,...,...... 991,739,000 813,684,000 4,110,000 459,155,000 Net run of river generation . 410,679,000 451,783,000 468,174,000 243,951,000 Pumped storage generation,.......,...,,...... 211 F088,000 236,545,000 118,324,000 89,536,000 1btal net 13,238,846,000 12,654,497,614 11,038,169,000 6,524,048,000 generation'urchased......,...........,............ .. 3,586,056,028

~ 3,207,390,046 2,098,800,868 2,561,076,900 Interchange receimd... 105,3 87'00 106,666,000 145,837,000 162,016,000 Wheeling received 15,091,962 11,912,340 9,793,314 13,389,100 Total energy 16,945,380,990 15,980,466,200 12,292,600,000 9,260,530,000 sources'nergy disposition (kWh)"

'esidential 5,333,601,362 4,889,987,668 3,674,758,035 2,931,444,260 Commercial R Industrial . 6,252,344,184 5,931,148,985 4,430,656,608 3,594,531,963 Irrigation pumping, .. ~...............,....... 233,684,815 248,577,084 243,257,760 282,916,839 Street Ei highway lighting............,......... 98,746,120 88,327,881 43,203,039 36,456,046 Public authorities . 270,239,264 257,127,813 351,055,276 288,417,414 Interdepartmental . 82,902,577 72,022,538 80,008,412 186,729,026 Sales for resale

'Ibtal sales.

... 3,294,959,549 3,016,789,686 3,205,534,954 818,405,306 15,566,477,871 14,503,981,655 12,028,474,084 8,138,900,854 Interchange delimred......................... 104,549,000 93,'772,000 245,224,000 384,440,000 Wheeling delivered, 13,887,031 10,891,950 9,024,579 12,643,696 Energy losses 958,912,088 1,033,899,395 840,845,337 598,785,450 .

Energy for pumped storage operation............ 301,555,000 337I921,000 169,032,000 125,760,000

'Ibtal disposition of energy 16,945,380,990 15,980,466,000 13,292,600,000 9c260i530i000 Peak omrall power system (kW) 3,264,000 2,9?1,000 2,386,000 2,089,000 Date and time (MST) ........,......,......,. Aug. 20, 5 p.m. July 9, 5 p.m. Aug. 11, 6 p.m. July 7, 6 p.m.

Peak Project customers (klV). 2,785,000 2,658,000 2,057,000 1,732,000 Date and time (MST) Aug. 20, 5 p.m. Aug. 29, 5 p.m. July 28, 5 p.m. July 7, 6 p.m.

Generating capability (kW)"

Nuclear Steam',

213,730 2,411,115 0.

2,201,115" " 1,919,250

.0.

1,548,250 Gas turbines . 393,000 393,000 393,000 378,000 Combined cycle................, 288,000 288,000 288,000 288,000 Hydroelectric conventional . 96,400 96,400 95,000 94,000 H>droelectric pumped storage..... 137,000 137,000 137,000 140,000 Total operating capability'. 3,539,245 3,329,245 2,832,000 2,448,250 Contract purchase at peak...,... 605,547 410,547 329,547 325,563 lbtal 4,144,792 3,739,792 3,'161,797 2,773,813 resources'lectric customers->ear end' Residential 441,293 414,140 305,870 238,989 Commercial R Industrial ........, 37,218 34,973 22,771 17,591 Other.......,...., .. 8,810 8,376 1,610 1,361

'Ibtal . 487,321 457,489 330,251 257,941 Average annual kWh use"

.......,,. ~.

'esidential 12,440 12,175 12,310 12,597 Average annual klVh revenue"'esidential (cents/kWh) 7.54 7.56 5.78 3.51

'ncludes

" Unit SRP participation in jointly owned projects capabilities during summer peak

"'nergy

"" disposition kWh through total sales, electric customers pear end, average kWh use, and average annual revenue are, estimated figures.

Decreased due to a rating change at Four Corners Units 4 and 5.

27

Board Members B oard members policies for establish management and conduct of Salt the Improvement and Power District consists of 14 members who serve four-year terms. One River Project's business affairs. District boanl member is elected The 10 members of the Board from each of the 10 SRP voting of Governors of the Salt River divisions, and four members are Valley Water Users'ssociation elected at-large.

are elected every tm years by the 'Iladitionally, members of the shareholders (property owners) of Association board are elected to the Association. similar positions on the District The Board of Directors of the board.

Salt River Project Agricultural Pictured at right are SRP Board Members (lop row from left)

Joe Bob Neely, John L. Burton Jr., William W. Arnett, (bollom mw from lefl) Olen Sharp and John M. Williams Jr.

Pictured below are SRP Board Members (lefl lo right) Fred J.

Ash, Rudolph Johnson and Thomas P. Hurley.

Salt River Project Board Members shown above are Pelt lo right) Clarence C. Pendergast Jr., Stanford F. Hartman and Gilbert R. Rogers.

Pictured at left are SRP Board Members aft lo right) William P. Schrader, Dwayne E. Dobson and Bruce B. Brooks.

District 1 District 7 Rudolph Johnson william P. Schrader District 2 District 8 Clarence C. Pendergast Jr. Joe Bob Neely District 3 District 9 Bruce B. Brooks Olen Sharp District 4 District 10 Gilbert R. Rogers Dwayne E. Dobson District 5 At-large John M. Williams Jr. lVilliam W. Arnett J District 6 Fred J. Ash Thomas P. Hurley John L. Burton Jr.

Stanford F. Hartman

Council Members J V iYQ T he councils enact and amend bylaws relating to the management and conduct of Water Users'ssociation. Three council members are elected to staggered four-~mr terms in each SRP's business affairs, and they of the 10 divisions of the Salt approve negotiated revenue bond River Project Agricultural sales. Improvement and Power District.

Three council members are '&aditionally, Association elected by SRP shareholders to council members seek identical two-year terms in each of the 10 positions on the District council.

areas of the Salt River Valley SRP Council Members pictured at left are aft io righi) Roy W.

  • ) ~t Cheatham, John A. Vanderwey, Carl E. Weiler (Chairman),

Jit Wayne A. Hart, James L. Diller, George B. Willmoth, Robert E.

Hurley and Levi H. Reed.

SRP Council Members pictured below are (iop row fiom iefl)

Martin Kempton (Vice-chairman), Lester R. Nowry, Wayne A.

Marietta, (botiom iow from left) Orland R. Hatch, C. Dale Willis, William P. Schrader Jr. and Larry D. Rovey.

V E

))I fi I i

~<<

.r/

f',

Q<<<<V'RP Council Members pictured above are (lop iow fiom lefi)

Dean W. Lewis, James R. Marshall, Edmund Navarro, Michael K. Gantzel, Mark V. Pace, (bottom iow from left) W. Curtis Dana, Emil M. Rovey and Lee L. Tregaskes. C 0

E District 1 District 5 District 8 Robert L. Cook Roy W. Cheatham Michael K. Gantzel Howard W. L>dic Edmund Navarro Martin Kempton, Emil M. Rowy Carl E. Weiler, Vice-chairman District 2 Chaiiman Mark V. Pace Wayne A. Hart District 6 District 9 Larry D. Rovey James L. Diller W. Curtis Dana John A. Vandemey Dean W. Lewis Robert E. Hurley District 3 James R. Marshall Lee L. Iiegaskes James M. Accomazzo District 7 District 10 John E. Anderson EVayne A. Marietta Orland R. Hatch Elvin E. Fleming Lester Mowry William P. Schrader Jr.

District 4 George B. Willmoth C. Dale Willis Lloyd Lee Banning SRP Council Members pictured above are (left to righi) James Levi H. Reed N. Accomazzo, Elvin E. Fleming, John E. Anderson, Robert L.

Cook, Byron IVilliams, Howard W. Lpllc and Lloyd Lee Byron G. Williams Banning.

SALT RIVER PROJECT BULK fA~~

Box 52025, Phoenix, AZ 85072-2025 U.S. POLI'AuE Return requested PAID PHOENIX, ARIZONA Permrt No. 395

~~EWTJ> ~

SALT RIVER PROJECT AN EQUAL OPPORTUIVITY EMPLOYER As a special service, SRP is making this Annual Report Annual Report information available do Salt River Project throru8r the Arizona State Library for Communications 6'r Public Affairs the Blind and Physically llandicapped, Box 52025 1030 N. 32nd St., Phoenix, AZ 85008 Phoenix, AZ 85072-2025 (602) 2554578. (602) 2368240