| {{#Wiki_filter:From: Tobin, Jennifer To: "Helker, David P:(GenCo-Nuc)" Cc: "Gropp Jr, Richard W:(GenCo-Nuc)"; "Loomis, Thomas R:(GenCo-Nuc)" | | {{#Wiki_filter:From: Tobin, Jennifer To: "Helker, David P:(GenCo-Nuc)" |
| | Cc: "Gropp Jr, Richard W:(GenCo-Nuc)"; "Loomis, Thomas R:(GenCo-Nuc)" |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Peach Bottom Units 2 and 3 - Request for Additional Information FINAL - Relief Request I5R-04 (EPID L-2018-LLR-0057) | | Peach Bottom Units 2 and 3 - Request for Additional Information FINAL - Relief Request I5R-04 (EPID L-2018-LLR-0057) |
| Date: Monday, August 27, 2018 10:00:00 AM | | Date: Monday, August 27, 2018 10:00:00 AM |
|
| |
|
| ==Dear Mr. Helker,== | | ==Dear Mr. Helker,== |
| By letter dated April 19, 2018 (Accession No. ML18109A116), Exelon Generation Company, LLC requested relief from the requirements of the American Society of the Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Peach Bottom Atomic Power Station, Units 2 and 3. | | |
| The licensee proposed alternative, I5R-04, allows for examination of nozzle-to-vessel welds and inner radii in accordance with the requirements of ASME BPV Code Case N-702 in lieu of Table IWB-2500-1 during the fifth inservice inspection (ISI) interval at Peach Bottom, Units 2 and 3. | | By letter dated April 19, 2018 (Accession No. ML18109A116), Exelon Generation Company, LLC requested relief from the requirements of the American Society of the Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Peach Bottom Atomic Power Station, Units 2 and 3. The licensee proposed alternative, I5R-04, allows for examination of nozzle-to-vessel welds and inner radii in accordance with the requirements of ASME BPV Code Case N-702 in lieu of Table IWB-2500-1 during the fifth inservice inspection (ISI) interval at Peach Bottom, Units 2 and 3. |
| The Nuclear Regulatory Commission's (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. | | The Nuclear Regulatory Commissions (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAI) questions are provided below. These questions are being sent to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. A clarification phone call to discuss the draft RAI was held August 20, 2018 and it remains unchanged. The licensee committed to supplying a response by September 19, 2018. |
| The specific request for additional information (RAI) questions are provided below. | | If you have any questions, please contact me at (301) 415-2328. A copy of this e-mail will be made publicly available in ADAMS. |
| These questions are being sent to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. | | : Thanks, Jenny Jenny Tobin Project Manager NRR/DORL/LPL-1 Office O9-C12 Phone 301-415-2328 REQUEST FOR ADDITIONAL INFORMATION (FINAL) |
| A clarification phone call to discuss the draft RAI was held August 20, 2018 and it remains unchanged. | | BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE NO. I5R-04 FIFTH 10-YEAR INTERVAL INSERVICE INSPECTIONS EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 EPID: L-2018-LLR-0057 By letter dated April 19, 2018 (Agencywide Documents Access and Management System (ADAMS) |
| The licensee committed to supplying a response by September 19, 2018. | | Accession No. ML18109A116), Exelon Generation Company, LLC (the licensee) requested relief from the requirements of the American Society of the Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Peach Bottom Atomic Power Station, Units 2 and 3. The licensee proposed alternative, I5R-04, allows for examination of nozzle-to-vessel welds and inner radii in accordance with the requirements of ASME BPV Code Case N-702 in lieu of Table IWB-2500-1 during the fifth inservice inspection (ISI) interval at Peach Bottom, Units 2 and 3. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50.55a(z)(1), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety. |
| If you have any questions, please contact me at (301) 415-2328. | | |
| A copy of this e-mail will be made publicly available in ADAMS. | | The NRC staff has determined that additional information is necessary to complete its review of the licensee proposed alternative. The NRC staffs request for additional information (RAI) is provided below. |
| Thanks, Jenny Jenny Tobin Project Manager NRR/DORL/LPL-1 Office O9-C12 Phone 301-415-2328 | | RAl-1 Code Case N-702 was conditionally approved in Regulatory Guide (RG) 1.147, Revision 18, "lnservice Inspection Code Case Acceptability, Section XI, Division 1," dated March 2017, requiring the applicants to address the evaluation criteria in the safety evaluation (SE) for BWRVIP-108, "Technical Basis for the Reduction of Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Inner Radii" (ADAMS Accession No. ML073600374) or BWRVIP-241, "Probabilistic Fracture Mechanics [PFM] Evaluation for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii" (ADAMS Accession No. ML13071A240). Both reports are for 40 years of operation. On April 26, 2017, the SE for BWRVIP-241-A, Appendix A (ADAMS Accession No. ML17114A096) for the period of extended operation was issued, which extends the application of BWRVIP-108 and BWRVIP-241, and, therefore, ASME Code Case N-702, from 40 years to 60 years. |
| *****************************************************************************************************************************
| |
| REQUEST FOR ADDITIONAL INFORMATION (FINAL) | |
| BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE NO. | |
| I5R-04 FIFTH 10-YEAR INTERVAL INSERVICE INSPECTIONS EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 EPID: L-2018-LLR-0057 By letter dated April 19, 2018 (Agencywide Documents Access and Management System (ADAMS) | |
| Accession No. ML18109A116), Exelon Generation Company, LLC (the licensee) requested relief from the requirements of the American Society of the Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Peach Bottom Atomic Power Station, Units 2 and 3. | |
| The licensee proposed alternative, I5R-04, allows for examination of nozzle-to-vessel welds and inner radii in accordance with the requirements of ASME BPV Code Case N-702 in lieu of Table IWB-2500-1 during the fifth inservice inspection (ISI) interval at Peach Bottom, Units 2 and 3. | |
| Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50.55a(z)(1), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety. | |
| The NRC staff has determined that additional information is necessary to complete its review of the licensee proposed alternative. The NRC staff's request for additional information (RAI) is provided below. | |
| RAl-1 Code Case N-702 was conditionally approved in Regulatory Guide (RG) 1.147, Revision 18, "lnservice Inspection Code Case Acceptability, Section XI, Division 1," dated March 2017, requiring the applicants to address the evaluation criteria in the safety evaluation (SE) for BWRVIP-108, "Technical Basis for the Reduction of Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Inner Radii" (ADAMS Accession No. ML073600374) or BWRVIP-241, "Probabilistic Fracture Mechanics [PFM] Evaluation for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii" (ADAMS Accession No. ML13071A240). Both reports are for 40 years of operation. | |
| On April 26, 2017, the SE for BWRVIP-241-A, Appendix A (ADAMS Accession No. ML17114A096) for the period of extended operation was issued, which extends the application of BWRVIP-108 and BWRVIP-241, and, therefore, ASME Code Case N-702, from 40 years to 60 years. | |
| Proposed Alternative I5R-04 used the evaluation criteria from the 2013 SE for BWRVIP-241, but did not explain why the evaluation criteria for 40 years can be used beyond 40 years during the period of extended operation. NRC staff requests the licensee provide justification for using Code Case N-702 during the period of extended operation. The licensee may perform a plant-specific PFM analysis, with results considering low temperature overpressurization (LTOP) and normal operation. Alternatively, the licensee may reference BWRVIP-241-A, Appendix A, and address the required demonstrations under A.3 and A.4 of Appendix A.}} | | Proposed Alternative I5R-04 used the evaluation criteria from the 2013 SE for BWRVIP-241, but did not explain why the evaluation criteria for 40 years can be used beyond 40 years during the period of extended operation. NRC staff requests the licensee provide justification for using Code Case N-702 during the period of extended operation. The licensee may perform a plant-specific PFM analysis, with results considering low temperature overpressurization (LTOP) and normal operation. Alternatively, the licensee may reference BWRVIP-241-A, Appendix A, and address the required demonstrations under A.3 and A.4 of Appendix A.}} |
Letter Sequence RAI |
---|
EPID:L-2018-LLR-0057, Relief Requests Associated with the Fifth Inservice Inspection Interval (Approved, Closed) |
|
MONTHYEARML18109A1162018-04-19019 April 2018 Relief Requests Associated with the Fifth Inservice Inspection Interval Project stage: Request ML18128A3072018-05-0707 May 2018 Acceptance Review for Peach Bottom - Relief Requests from ASME Section XI Code - 5th ISI Interval Project stage: Acceptance Review ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 Project stage: Draft RAI ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 Project stage: RAI ML18337A1962018-11-29029 November 2018 Submittal of the Fifth Ten-Year Interval Inservice Testing Program Plan Project stage: Request ML18331A2162018-12-21021 December 2018 Issuance of Alternative Requests Related to the Fifth Inservice Inspection Interval Project stage: Approval 2018-04-19
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1782024-07-0303 July 2024 NRC Email Response to Peach Bottoms Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24163A3522024-05-15015 May 2024 Meeting Feedback from May 14, 2024, Meeting with Constellation on Peach Bottom Atomic Power Station Units Nos. 2 and 3 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24088A3192024-03-28028 March 2024 Audit Plan Associated with Peach Bottom, Unit 1 - 10 CFR 50.82(a)(3) Alternate Decommissioning Schedule ML24002A7132023-12-29029 December 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference (EPID L-2023-LLE-0032) (Updated) (Email) ML23352A3242023-12-18018 December 2023 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) ML23331A9112023-11-22022 November 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference ML23304A0182023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule (L-2023-LLE-0032) ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21134A0152021-05-14014 May 2021 Acceptance Ventilation Filter Testing LAR ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20343A3492020-12-0707 December 2020 Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle ML20324A6472020-11-19019 November 2020 Acceptance of Requested Licensing Action: Peach Bottom One-time Exemption App. B Sect. VI.C.3.(I)(1) Force on Force (COVID-19) ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20276A0762020-10-0202 October 2020 Acceptance of Requested Licensing Action, One-Time Acceptance for Review - Peach Bottom of Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20217L3462020-08-0404 August 2020 Audit Plan Regarding License Amendment Request to Implement Riskinformed Extended Completion Times (L-2020-LLA-0120) ML20191A0182020-07-0101 July 2020 NRR E-mail Capture - Exelon Fleet RR for SPI for Appendix J Valves ML20178A1392020-06-26026 June 2020 Acceptance Review for Peach Bottom - License Amendment Request for TSTF-505 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 IR 05000277/20224032022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 ML19108A4282019-04-10010 April 2019 RAIs SLRA Set 1_ERO(Rev 1) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19058A2902019-02-27027 February 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML19037A4832019-02-0606 February 2019 NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Peach Bottom Seismic Probabilistic Risk Assessment Report Dated August 28, 2018 ML19028A0062019-01-25025 January 2019 Secondary Containment LAR Requests for Additional Information ML19017A0472019-01-16016 January 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review ML18324A6742018-11-15015 November 2018 Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure ML18312A4072018-11-0808 November 2018 Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18240A1742018-08-28028 August 2018 Request for Additional Information (Final) - Adopt TSTF-500 Battery TS Changes LAR ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 ML18228A6762018-08-14014 August 2018 Request for Additional Information - Adopt TSTF-500 Battery TS Changes LAR ML18226A2012018-08-14014 August 2018 Request for Additional Information - Relief Request I5R-05 ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17317B5502017-11-0909 November 2017 Licensed Operator Positive Fitness-For-Duty Test 2024-07-03
[Table view] |
Text
From: Tobin, Jennifer To: "Helker, David P:(GenCo-Nuc)"
Cc: "Gropp Jr, Richard W:(GenCo-Nuc)"; "Loomis, Thomas R:(GenCo-Nuc)"
Subject:
Peach Bottom Units 2 and 3 - Request for Additional Information FINAL - Relief Request I5R-04 (EPID L-2018-LLR-0057)
Date: Monday, August 27, 2018 10:00:00 AM
Dear Mr. Helker,
By letter dated April 19, 2018 (Accession No. ML18109A116), Exelon Generation Company, LLC requested relief from the requirements of the American Society of the Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Peach Bottom Atomic Power Station, Units 2 and 3. The licensee proposed alternative, I5R-04, allows for examination of nozzle-to-vessel welds and inner radii in accordance with the requirements of ASME BPV Code Case N-702 in lieu of Table IWB-2500-1 during the fifth inservice inspection (ISI) interval at Peach Bottom, Units 2 and 3.
The Nuclear Regulatory Commissions (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAI) questions are provided below. These questions are being sent to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. A clarification phone call to discuss the draft RAI was held August 20, 2018 and it remains unchanged. The licensee committed to supplying a response by September 19, 2018.
If you have any questions, please contact me at (301) 415-2328. A copy of this e-mail will be made publicly available in ADAMS.
- Thanks, Jenny Jenny Tobin Project Manager NRR/DORL/LPL-1 Office O9-C12 Phone 301-415-2328 REQUEST FOR ADDITIONAL INFORMATION (FINAL)
BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE NO. I5R-04 FIFTH 10-YEAR INTERVAL INSERVICE INSPECTIONS EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 EPID: L-2018-LLR-0057 By letter dated April 19, 2018 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML18109A116), Exelon Generation Company, LLC (the licensee) requested relief from the requirements of the American Society of the Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code for Peach Bottom Atomic Power Station, Units 2 and 3. The licensee proposed alternative, I5R-04, allows for examination of nozzle-to-vessel welds and inner radii in accordance with the requirements of ASME BPV Code Case N-702 in lieu of Table IWB-2500-1 during the fifth inservice inspection (ISI) interval at Peach Bottom, Units 2 and 3. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50.55a(z)(1), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety.
The NRC staff has determined that additional information is necessary to complete its review of the licensee proposed alternative. The NRC staffs request for additional information (RAI) is provided below.
RAl-1 Code Case N-702 was conditionally approved in Regulatory Guide (RG) 1.147, Revision 18, "lnservice Inspection Code Case Acceptability,Section XI, Division 1," dated March 2017, requiring the applicants to address the evaluation criteria in the safety evaluation (SE) for BWRVIP-108, "Technical Basis for the Reduction of Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Inner Radii" (ADAMS Accession No. ML073600374) or BWRVIP-241, "Probabilistic Fracture Mechanics [PFM] Evaluation for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii" (ADAMS Accession No. ML13071A240). Both reports are for 40 years of operation. On April 26, 2017, the SE for BWRVIP-241-A, Appendix A (ADAMS Accession No. ML17114A096) for the period of extended operation was issued, which extends the application of BWRVIP-108 and BWRVIP-241, and, therefore, ASME Code Case N-702, from 40 years to 60 years.
Proposed Alternative I5R-04 used the evaluation criteria from the 2013 SE for BWRVIP-241, but did not explain why the evaluation criteria for 40 years can be used beyond 40 years during the period of extended operation. NRC staff requests the licensee provide justification for using Code Case N-702 during the period of extended operation. The licensee may perform a plant-specific PFM analysis, with results considering low temperature overpressurization (LTOP) and normal operation. Alternatively, the licensee may reference BWRVIP-241-A, Appendix A, and address the required demonstrations under A.3 and A.4 of Appendix A.