| issue date = 11/05/2015 | | issue date = 11/05/2015 | ||
| title = IR 05000280/2015201 and 05000281/2015201, on 06/26/2015, Surry Power Station, Unit Nos. 1 and 2, NRC Security Inspection | | title = IR 05000280/2015201 and 05000281/2015201, on 06/26/2015, Surry Power Station, Unit Nos. 1 and 2, NRC Security Inspection | ||
| author name = Johnson R | | author name = Johnson R | ||
| author affiliation = NRC/NSIR/DSO | | author affiliation = NRC/NSIR/DSO | ||
| addressee name = Heacock D | | addressee name = Heacock D | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000280, 05000281 | | docket = 05000280, 05000281 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ber 5, 2015 | ||
==SUBJECT:== | |||
SURRY POWER STATION, UNIT 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000280/2015201 AND 05000281/2015201 | |||
==Dear Mr. Heacock:== | |||
On June 26, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Surry Power Station, Unit 1 and 2. On August 6, 2015, the NRC inspectors discussed results of this inspection with Mr. Roy Simmons, Plant Manager and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. | |||
The NRC inspectors documented two findings of very low security significance (Green) in this report. These findings were a violation of NRC requirements. The NRC is treating these violations as non-cited violations (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. | |||
If you contest these violations or the significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. | |||
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator Region II; Director, Office of Nuclear Security and Incident Response, and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Surry Power Station, Unit 1 and 2. | Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator Region II; Director, Office of Nuclear Security and Incident Response, and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Surry Power Station, Unit 1 and 2. | ||
If you disagree with a cross-cutting assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security, and Incident Response, and the NRC resident inspector at the Surry Power Station, Unit 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 | If you disagree with a cross-cutting assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security, and Incident Response, and the NRC resident inspector at the Surry Power Station, Unit 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
of the | |||
is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response | However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 Protection of Safeguards Information; Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - | ||
Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) | |||
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
Sincerely, | Sincerely, | ||
/RA D. Cardenas for/ | /RA D. Cardenas for/ | ||
Robert C. Johnson, Chief | Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Nonpublic Enclosure: Inspection Report 05000280/2015201 and 05000281/2015201 w/Attachment: Supplemental Information cc w/enclosure: Terry Rawls, Manager Site Security ML15240A048 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RII NSIR/DSO/SPEB NAME D. Hostetter J. Clark J. Berry B. Desai D. Cardenas for/C. Johnson DATE 08/24/2015 9/10/2015 8/26/2015 9/9/2015 11/05/2015 | ||
Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response | |||
Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 | |||
Nonpublic Enclosure: Inspection Report 05000280/2015201 and 05000281/2015201 w/Attachment: Supplemental Information | |||
cc w/enclosure: Terry Rawls, Manager Site Security | |||
ML15240A048 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RII NSIR/DSO/SPEB NAME D. Hostetter J. Clark J. Berry B. Desai D. Cardenas for/C. | |||
}} | }} |
Latest revision as of 07:14, 31 October 2019
ML15240A048 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 11/05/2015 |
From: | Rachel Johnson Division of Security Operations |
To: | Heacock D Virginia Electric & Power Co (VEPCO) |
Byre E | |
References | |
IR 2015201 | |
Download: ML15240A048 (3) | |
Text
ber 5, 2015
SUBJECT:
SURRY POWER STATION, UNIT 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000280/2015201 AND 05000281/2015201
Dear Mr. Heacock:
On June 26, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Surry Power Station, Unit 1 and 2. On August 6, 2015, the NRC inspectors discussed results of this inspection with Mr. Roy Simmons, Plant Manager and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
The NRC inspectors documented two findings of very low security significance (Green) in this report. These findings were a violation of NRC requirements. The NRC is treating these violations as non-cited violations (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest these violations or the significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator Region II; Director, Office of Nuclear Security and Incident Response, and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Surry Power Station, Unit 1 and 2.
If you disagree with a cross-cutting assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security, and Incident Response, and the NRC resident inspector at the Surry Power Station, Unit 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 Protection of Safeguards Information; Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -
Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA D. Cardenas for/
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Nonpublic Enclosure: Inspection Report 05000280/2015201 and 05000281/2015201 w/Attachment: Supplemental Information cc w/enclosure: Terry Rawls, Manager Site Security ML15240A048 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RII NSIR/DSO/SPEB NAME D. Hostetter J. Clark J. Berry B. Desai D. Cardenas for/C. Johnson DATE 08/24/2015 9/10/2015 8/26/2015 9/9/2015 11/05/2015