ML18139C136: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/01/1982
| issue date = 12/01/1982
| title = Application for Amend to Licenses DPR-32 & DPR-37.Amend Revises Tech Specs Re Hours Staff Will Be Performing safety-related Functions & Audit Frequency of Station Emergency Plan
| title = Application for Amend to Licenses DPR-32 & DPR-37.Amend Revises Tech Specs Re Hours Staff Will Be Performing safety-related Functions & Audit Frequency of Station Emergency Plan
| author name = STEWART W L
| author name = Stewart W
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name = DENTON H R, VARGA S A
| addressee name = Denton H, Varga S
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 3
| page count = 3
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:----------------.--,. ... e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEW.A.RT VICE PBESXDENT Nuc:r.EAB OPERATIONS December 1, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
{{#Wiki_filter:--- -.--       ,.
Serial No. 567 NO/GSS:acm Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNIT NO. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit No. 1 and 2. The proposed changes are enclosed.
          ...                               e                                 e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEW.A.RT VICE PBESXDENT                         December 1, 1982 Nuc:r.EAB OPERATIONS Mr. Harold R. Denton, Director                               Serial No. 567 Office of Nuclear Reactor Regulation                         NO/GSS:acm Attn: Mr. Steven A. Varga, Chief                             Docket Nos. 50-280 Operating Reactors Branch No. 1                               50-281 Division of Licensing                             License Nos. DPR-32 U. S. Nuclear Regulatory Commission                                       DPR-37 Washington, D. C. 20555 Gentlemen:
The proposed changes are to (i) add the specification regarding the working hours of unit staff performing safety-related functions, to comply with the requirements of the NRC letter dated September 20, 1982 regarding NUREG-0737 Technical Specifications (Generic Letter No. 82-16); (ii) revise the audit frequency of the Station Emergency Plan to 12 months to comply with the NUREG-0654 and 10 CFR 50.54(t); (iii) revise the audit frequency of the Station Security Plan to 12 months to comply with the requirements of 10 CFR 73.40(d) as per the NRC letter dated October 30, 1982 (Generic Letter No. 82-23). The requested change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question.
AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNIT NO. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit No. 1 and 2. The proposed changes are enclosed.
We have evaluated this request in accordance with the criteria in 10 CFR 170. 22 and it has been determined that a class II license amendment fee is required.
The proposed changes are to (i) add the specification regarding the working hours of unit staff performing safety-related functions, to comply with the requirements of the NRC letter dated September 20, 1982 regarding NUREG-0737 Technical Specifications (Generic Letter No. 82-16); (ii) revise the audit frequency of the Station Emergency Plan to 12 months to comply with the NUREG-0654 and 10 CFR 50.54(t); (iii) revise the audit frequency of the Station Security Plan to 12 months to comply with the requirements of 10 CFR 73.40(d) as per the NRC letter dated October 30, 1982 (Generic Letter No.
A voucher check in the amount of $1,600 is enclosed in payment of the required fee. ----er:212060300 021201 PDR ADOCK 05000280 P PDR Very truly yours, W. L. Stewart e VIRGINIA ELECTRIC AND PowER COMPANY TO Harold R. Denton Attachments:
82-23).
: 1. Proposed Technical Specification Change. 2. Voucher Check No. 89587 for $1,600. cc: Mr. James P. O'Reilly Regional Administrator Region II
The requested change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.
' ,/,{'/[,, I ._J.., .I * ..1 ) 'r I ;_ . i. / / C .\.-n-1'1  
It has been determined that this request does not involve an unreviewed safety question.
)/( J' *~-\ -*~ & ti ---------*-ti 0-J a} ;}1 :-<10-8/lr U.S. NUCLEAR REGULATORY COM 1. FEE FORM TYPE (Check one) ELIMINARY REACTOR FACILITY FEE DETERMINATION INSTRUCTIONS.
We have evaluated this request in accordance with the criteria in 10 CFR 170. 22 and it has been determined that a class II license amendment fee is required. A voucher check in the amount of $1,600 is enclosed in payment of the required fee.
Fill-in items 1 through 14, as applicable, and send the original copy to the License Fee Management Branch. 2. DOCKET NUMBER(S)
Very truly yours, W. L. Stewart
: 3. ACCESSION NUMBER ~z 12.tJ&,03 t) 5 4. LICENSEE 5. PLANT NAME AND UNIT(S) Soi'R ,_ 6. DATE OF APPLICATION
      ----er:212060300 021201 PDR ADOCK 05000280 P                         PDR
: 8. LICENSEE FEE DETERMINATION , ,_/ c, Jr 2-CLASS Ill CLASS IV CLASSV CLASS VI EXEMPT NONE 9. SUBJECT !. UJ\l~fC LETTetl. lfuD ;J-qJUMB ASSIGNED(llavai/abr
 
: 11. APPROVAL DATE OF ISSUANCE t-~-LE_TT_E_R_~~-0-R-DE_R_  
e VIRGINIA ELECTRIC AND PowER COMPANY TO Harold R. Denton Attachments:
~R I 3-~;; AMENDMENT NUMBER(SI
: 1. Proposed Technical Specification Change.
(/"* f}/~ 9 (.i ,_',) The above application has been reviewed in accordance with Section 170.22 of Part 170 and is properly categorized.
: 2. Voucher Check No. 89587 for $1,600.
t2,a d The above application has been reviewed in accordance with Section 170.22 of Part 170 and is incorrectly classified.
cc:   Mr. James P. O'Reilly Regional Administrator Region II
 
                                                ' ,/,{'/[,, I ._J.., .I * ..1 )     'r I         ;_ .             i. /
                                                /           C   .\.-n-1'1             )/( J' *~-\ -*~ & ti
<10-8/lr
        ---------*-ti                                                       0-J         a} ;}1           :-
U.S. NUCLEAR REGULATORY COM                                             1. FEE FORM TYPE (Check one)
ELIMINARY REACTOR FACILITY FEE DETERMINATION INSTRUCTIONS. Fill-in items 1 through 14, as applicable, and send the original copy to the License Fee Management Branch.
: 2. DOCKET NUMBER(S)                                                                                                                               3. ACCESSION NUMBER
: 4. LICENSEE
                                                                                                                                                  ~z 12.tJ&,03 t) 5
: 5. PLANT NAME AND UNIT(S)
Soi'R                                 ,_
  ,,_/c, Jr
: 6. DATE OF APPLICATION                                                                                       8. LICENSEE FEE DETERMINATION 2-                                                                       CLASS Ill         CLASS IV         CLASSV           CLASS VI         EXEMPT         NONE
: 9. SUBJECT                                                                                                                     ;J-qJUMB            ASSIGNED(llavai/abr
  !. UJ\l~fC LETTetl. ~                                                                    lfuD
: 11. APPROVAL               DATE OF ISSUANCE t-~-LE_TT_E_R_~~-0-R-DE_R_             ~R ~ I ~ 3-~;;
AMENDMENT NUMBER(SI
(/"* i<?*-
f}/~ 9       (.i ,_',)
The above application has been reviewed in accordance with Section 170.22 of Part 170 and is properly categorized.                       t2,a   d The above application has been reviewed in accordance with Section 170.22 of Part 170 and is incorrectly classified.
Fee should be class(es):
Fee should be class(es):
JUSTIFICATION FOR CLASSIFICATION OR RECLASSIFICATION:
JUSTIFICATION FOR CLASSIFICATION OR RECLASSIFICATION:
This application is a Class Filed by a Government agency and is not for a power reactor. For a Class I, II, or Ill amendment which results from an NRG request dated application and the amendment is to simplify or clarify License or Technical Specifications; has only minor safety significanc'ei.-'and is beihg issued'..lor the convenience of NRG (must meet all of the criteria).
This application is a Class Filed by a Government agency and is not for a power reactor.
C;:: --Other (State reason therefor)
For a Class I, II, or Ill amendment which results from an NRG request dated                                                   application and the amendment is to simplify or clarify License or Technical Specifications; has only minor safety significanc'ei.-'and is beihg issued'..lor the convenience of NRG (must meet all of the criteria).
DATE 3 DL Branch Chief LFMB Exemption File LFMB Reactor FIie}}
Other (State reason therefor)
C;::
DATE 3
DL Branch Chief                         LFMB Exemption File                   LFMB Reactor FIie}}

Latest revision as of 00:54, 3 February 2020

Application for Amend to Licenses DPR-32 & DPR-37.Amend Revises Tech Specs Re Hours Staff Will Be Performing safety-related Functions & Audit Frequency of Station Emergency Plan
ML18139C136
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/01/1982
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18139C137 List:
References
567, NUDOCS 8212060303
Download: ML18139C136 (3)


Text

--- -.-- ,.

... e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEW.A.RT VICE PBESXDENT December 1, 1982 Nuc:r.EAB OPERATIONS Mr. Harold R. Denton, Director Serial No. 567 Office of Nuclear Reactor Regulation NO/GSS:acm Attn: Mr. Steven A. Varga, Chief Docket Nos. 50-280 Operating Reactors Branch No. 1 50-281 Division of Licensing License Nos. DPR-32 U. S. Nuclear Regulatory Commission DPR-37 Washington, D. C. 20555 Gentlemen:

AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNIT NO. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit No. 1 and 2. The proposed changes are enclosed.

The proposed changes are to (i) add the specification regarding the working hours of unit staff performing safety-related functions, to comply with the requirements of the NRC letter dated September 20, 1982 regarding NUREG-0737 Technical Specifications (Generic Letter No. 82-16); (ii) revise the audit frequency of the Station Emergency Plan to 12 months to comply with the NUREG-0654 and 10 CFR 50.54(t); (iii) revise the audit frequency of the Station Security Plan to 12 months to comply with the requirements of 10 CFR 73.40(d) as per the NRC letter dated October 30, 1982 (Generic Letter No.

82-23).

The requested change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.

It has been determined that this request does not involve an unreviewed safety question.

We have evaluated this request in accordance with the criteria in 10 CFR 170. 22 and it has been determined that a class II license amendment fee is required. A voucher check in the amount of $1,600 is enclosed in payment of the required fee.

Very truly yours, W. L. Stewart


er:212060300 021201 PDR ADOCK 05000280 P PDR

e VIRGINIA ELECTRIC AND PowER COMPANY TO Harold R. Denton Attachments:

1. Proposed Technical Specification Change.
2. Voucher Check No. 89587 for $1,600.

cc: Mr. James P. O'Reilly Regional Administrator Region II

' ,/,{'/[,, I ._J.., .I * ..1 ) 'r I ;_ . i. /

/ C .\.-n-1'1 )/( J' *~-\ -*~ & ti

<10-8/lr


*-ti 0-J a} ;}1  :-

U.S. NUCLEAR REGULATORY COM 1. FEE FORM TYPE (Check one)

ELIMINARY REACTOR FACILITY FEE DETERMINATION INSTRUCTIONS. Fill-in items 1 through 14, as applicable, and send the original copy to the License Fee Management Branch.

2. DOCKET NUMBER(S) 3. ACCESSION NUMBER
4. LICENSEE

~z 12.tJ&,03 t) 5

5. PLANT NAME AND UNIT(S)

Soi'R ,_

,,_/c, Jr

6. DATE OF APPLICATION 8. LICENSEE FEE DETERMINATION 2- CLASS Ill CLASS IV CLASSV CLASS VI EXEMPT NONE
9. SUBJECT ;J-qJUMB ASSIGNED(llavai/abr

!. UJ\l~fC LETTetl. ~ lfuD

11. APPROVAL DATE OF ISSUANCE t-~-LE_TT_E_R_~~-0-R-DE_R_ ~R ~ I ~ 3-~;;

AMENDMENT NUMBER(SI

(/"* i<?*-

f}/~ 9 (.i ,_',)

The above application has been reviewed in accordance with Section 170.22 of Part 170 and is properly categorized. t2,a d The above application has been reviewed in accordance with Section 170.22 of Part 170 and is incorrectly classified.

Fee should be class(es):

JUSTIFICATION FOR CLASSIFICATION OR RECLASSIFICATION:

This application is a Class Filed by a Government agency and is not for a power reactor.

For a Class I, II, or Ill amendment which results from an NRG request dated application and the amendment is to simplify or clarify License or Technical Specifications; has only minor safety significanc'ei.-'and is beihg issued'..lor the convenience of NRG (must meet all of the criteria).

Other (State reason therefor)

C;::

DATE 3

DL Branch Chief LFMB Exemption File LFMB Reactor FIie