ML18142A411: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/13/1985
| issue date = 05/13/1985
| title = Application for Amends to Licenses DPR-32 & DPR-37,changing Tech Specs to Allow Reconstituted Assemblies to Be Placed in Core.Fee Paid
| title = Application for Amends to Licenses DPR-32 & DPR-37,changing Tech Specs to Allow Reconstituted Assemblies to Be Placed in Core.Fee Paid
| author name = STEWART W L
| author name = Stewart W
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name = DENTON H R, VARGA S A
| addressee name = Denton H, Varga S
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:'* WU.I.MM L STEWART Vice President  
{{#Wiki_filter:WU.I.MM L STEWART                                                     Nuclear Operations Department
~1_,1_cf~ar.Operations  
'*      Vice President                                                         Post Office Box 26666
------, Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
        ~1_,1_cf~ar.Operations ------,                                         OneJames River Plaza Richmond, Virginia 23261 May 13,  1985 VIRGINIA POWER Mr. Harold R. Denton, Director                                   Serial No.: 85-307 Office of Nuclear Reactor Regulation                             E&C/NPW:klh:2013N Attn: Mr. Steven A. Varga, Chief                                 Docket Nos.: 50-280 Operating Reactors Branch No. 1                                         50-281 Division of Licensing                                   License Nos.: DPR-32 U.S. Nuclear Regulatory Commission                                               DPR-37 Washington, D.C.               20555 Gentlemen:
May 13, 1985 VIRGINIA POWER Nuclear Operations Department Post Office Box 26666 One James River Plaza Richmond, Virginia 23261
VIRGINIA POWER SURRY POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES As discussed with members of your staff in a meeting on October 11, 1984, Virginia Power is actively pursuing fuel assembly reconstitution as a means to enable us to utilize the remaining energy in fuel assemblies which contain small numbers of leaking fuel rods. Virginia Power and the reconstitution vendor have performed evaluations to verify that fuel rod removal and dummy rod replacement meet all existing fuel assembly design requirements and safety criteria.
* VIRGINIA POWER Serial No.: 85-307 E&C/NPW:klh:2013N Docket Nos.: 50-280 50-281 License Nos.: DPR-32 DPR-37 SURRY POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES As discussed with members of your staff in a meeting on October 11, 1984, Virginia Power is actively pursuing fuel assembly reconstitution as a means to enable us to utilize the remaining energy in fuel assemblies which contain small numbers of leaking fuel rods. Virginia Power and the reconstitution vendor have performed evaluations to verify that fuel rod removal and dummy rod replacement meet all existing fuel assembly design requirements and safety criteria.
Calculations were performed to determine the impact of the reconstituted assemblies on future core reload analyses. These calculations indicate that there will be a minor change in local power peaking. Other effects are negligible. All core reload designs will explicitly incorporate the impact of any reconstituted assemblies and ensure that the effects are conservatively treated.
Calculations were performed to determine the impact of the reconstituted assemblies on future core reload analyses.
Pursuant to 10CFR50.90, Virginia Power requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2. The proposed changes will allow reconstituted assemblies to be placed in the Surry core. This change, included as Attachment 1, modifies the description in Section 5.3 of the Surry Technical Specifications of the fuel assemblies in the Surry 1 & 2 cores. Included as Attachment 2 is a discussion of the proposed Technical Specification change.
These calculations indicate that there will be a minor change in local power peaking. Other effects are negligible.
This request has been reviewed by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question as defined in                                 .d>
All core reload designs will explicitly incorporate the impact of any reconstituted assemblies and ensure that the effects are conservatively treated. Pursuant to 10CFR50.90, Virginia Power requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2. The proposed changes will allow reconstituted assemblies to be placed in the Surry core. This change, included as Attachment 1, modifies the description in Section 5.3 of the Surry Technical Specifications of the fuel assemblies in the Surry 1 & 2 cores. Included as Attachment 2 is a discussion of the proposed Technical Specification change. This request has been reviewed by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question as defined in .d> lOCF~~~g or a si~~-~-!_!_':~n}
lOCF~~~g or a si~~-~-!_!_':~n}__ ~_azards_____<:_onsideration as defined in 10CFR50.92.             ... 11.11&
__ ~_azards _ ____<:_onsideration as defined in 10CFR50.92. . .. 11.11& , 8505170023 850513 ~cM"" PDR ADOCK 05000280 ,\ \Y\ P PDR ~e.o
      ,     8505170023 850513                                                                     ~cM""
---------* VIRGINIA POWER We have evaluated this request in accordance with the criteria in 10CFR170.12~
PDR         ADOCK 05000280                                                       ,\ \Y\
A check in the amount of $150 is enclosed as an application fee. We request your approval of the Technical Specification changes by August 1, 1985 in order to ensure that the revised Technical Specifications are in place in time for use with the Surry 2 Cycle 9 reload design analysis which will commence approximately a year prior to cycle operation.
P                         PDR                                               ~e.o
 
VIRGINIA POWER We have evaluated this request in accordance with the criteria in 10CFR170.12~ A check in the amount of $150 is enclosed as an application fee.
We request your approval of the Technical Specification changes by August 1, 1985 in order to ensure that the revised Technical Specifications are in place in time for use with the Surry 2 Cycle 9 reload design analysis which will commence approximately a year prior to cycle operation.
Very truly yours, L)(fq W. L. Stewart Attachments:
Very truly yours, L)(fq W. L. Stewart Attachments:
: 1. Proposed Technical Specification Changes 2. Discussion of Proposed Technical Specification Changes 3. Voucher Check for $150 cc: Dr. J. Nelson Grace Regional Administrator Region II Mr. J. Don Neighbors NRC Project Manager -Surry Operating Reactors Branch No. 1 Division of Licensing Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219
: 1. Proposed Technical Specification Changes
---------COMMONWEALTH OF VIRGINIA) ) CITY OF RICHMOND ) The foregoing document was acknowledged before me, in and for the City and Commonweal th aforesaid, today by W. L. Stewart who is Vice President  
: 2. Discussion of Proposed Technical Specification Changes
-Nuclear Operations, of Virginia Power. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief. Acknowledged before me this ~"? day of---~------~..,,..,.__~~'
: 3. Voucher Check for $150 cc: Dr. J. Nelson Grace Regional Administrator Region II Mr. J. Don Neighbors NRC Project Manager - Surry Operating Reactors Branch No. 1 Division of Licensing Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219
19 My Commission expires: ;;&#xa3;<:'e!-n-r./hr--1//:3*
 
19 78"" . / ., N'otary Pulilic -(SEAL) S/001
COMMONWEALTH OF VIRGINIA)
-----------
                          )
CITY OF RICHMOND         )
The foregoing document was acknowledged before me, in and for the City and Commonweal th aforesaid, today by W. L. Stewart who is Vice President -
Nuclear Operations, of Virginia Power. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this     ~"? day of---~------~..,,..,.__~~' 19 My Commission expires: ;;&#xa3;<:'e!-n-r./hr--1//:3* 19 78"" .
                              /
                                                  .,     N'otary Pulilic   -
(SEAL)
S/001
 
ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGES 73-NPW-2013N-4}}
ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGES 73-NPW-2013N-4}}

Latest revision as of 00:40, 3 February 2020

Application for Amends to Licenses DPR-32 & DPR-37,changing Tech Specs to Allow Reconstituted Assemblies to Be Placed in Core.Fee Paid
ML18142A411
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/13/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18142A412 List:
References
85-307, NUDOCS 8505170023
Download: ML18142A411 (4)


Text

WU.I.MM L STEWART Nuclear Operations Department

'* Vice President Post Office Box 26666

~1_,1_cf~ar.Operations ------, OneJames River Plaza Richmond, Virginia 23261 May 13, 1985 VIRGINIA POWER Mr. Harold R. Denton, Director Serial No.: 85-307 Office of Nuclear Reactor Regulation E&C/NPW:klh:2013N Attn: Mr. Steven A. Varga, Chief Docket Nos.: 50-280 Operating Reactors Branch No. 1 50-281 Division of Licensing License Nos.: DPR-32 U.S. Nuclear Regulatory Commission DPR-37 Washington, D.C. 20555 Gentlemen:

VIRGINIA POWER SURRY POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES As discussed with members of your staff in a meeting on October 11, 1984, Virginia Power is actively pursuing fuel assembly reconstitution as a means to enable us to utilize the remaining energy in fuel assemblies which contain small numbers of leaking fuel rods. Virginia Power and the reconstitution vendor have performed evaluations to verify that fuel rod removal and dummy rod replacement meet all existing fuel assembly design requirements and safety criteria.

Calculations were performed to determine the impact of the reconstituted assemblies on future core reload analyses. These calculations indicate that there will be a minor change in local power peaking. Other effects are negligible. All core reload designs will explicitly incorporate the impact of any reconstituted assemblies and ensure that the effects are conservatively treated.

Pursuant to 10CFR50.90, Virginia Power requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2. The proposed changes will allow reconstituted assemblies to be placed in the Surry core. This change, included as Attachment 1, modifies the description in Section 5.3 of the Surry Technical Specifications of the fuel assemblies in the Surry 1 & 2 cores. Included as Attachment 2 is a discussion of the proposed Technical Specification change.

This request has been reviewed by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question as defined in .d>

lOCF~~~g or a si~~-~-!_!_':~n}__ ~_azards_____<:_onsideration as defined in 10CFR50.92. ... 11.11&

, 8505170023 850513 ~cM""

PDR ADOCK 05000280 ,\ \Y\

P PDR ~e.o

VIRGINIA POWER We have evaluated this request in accordance with the criteria in 10CFR170.12~ A check in the amount of $150 is enclosed as an application fee.

We request your approval of the Technical Specification changes by August 1, 1985 in order to ensure that the revised Technical Specifications are in place in time for use with the Surry 2 Cycle 9 reload design analysis which will commence approximately a year prior to cycle operation.

Very truly yours, L)(fq W. L. Stewart Attachments:

1. Proposed Technical Specification Changes
2. Discussion of Proposed Technical Specification Changes
3. Voucher Check for $150 cc: Dr. J. Nelson Grace Regional Administrator Region II Mr. J. Don Neighbors NRC Project Manager - Surry Operating Reactors Branch No. 1 Division of Licensing Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219

COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and Commonweal th aforesaid, today by W. L. Stewart who is Vice President -

Nuclear Operations, of Virginia Power. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ~"? day of---~------~..,,..,.__~~' 19 My Commission expires: ;;£<:'e!-n-r./hr--1//:3* 19 78"" .

/

., N'otary Pulilic -

(SEAL)

S/001

ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGES 73-NPW-2013N-4