ML083510831: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 12/16/2008 | | issue date = 12/16/2008 | ||
| title = Notification of Inspection (NRC Inspection Report 05000445-09-002; 05000446-09-002) and Request for Information | | title = Notification of Inspection (NRC Inspection Report 05000445-09-002; 05000446-09-002) and Request for Information | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Blevins M | | addressee name = Blevins M | ||
Line 14: | Line 14: | ||
| page count = 6 | | page count = 6 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000445/2009002]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:December 16, 2008 | {{#Wiki_filter:UNITED STATES | ||
NUC LE AR RE G UL AT O RY C O M M I S S I O N | |||
P.O. Box 1002 Glen Rose, TX 76043 | R E GI ON I V | ||
612 EAST LAMAR BLVD , SU I TE 400 | |||
AR LI N GTON , TEXAS 76011-4125 | |||
December 16, 2008 | |||
modifications at Comanche Peak Steam Electric Station, using NRC Inspection Procedure 71111.17, | Mike Blevins, Executive Vice President | ||
documents needed for this inspection. | And Chief Nuclear Officer | ||
Luminant Generation Company LLC | |||
ATTN: Regulatory Affairs | |||
Comanche Peak Steam Electric Station | |||
P.O. Box 1002 | |||
Glen Rose, TX 76043 | |||
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - NOTIFICATION OF | |||
INSPECTION (NRC INSPECTION REPORT 05000445/2009002; | |||
05000446/2009002) AND REQUEST FOR INFORMATION | |||
Dear Mr. Blevins: | |||
From February 2 - 13, 2009, Reactor Inspectors from NRCs Region IV office will | |||
perform the baseline inspection of changes, tests, experiments, and permanent plant | |||
modifications at Comanche Peak Steam Electric Station, using NRC Inspection | |||
Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent | |||
Plant Modifications. Experience has shown that this inspection is resource intensive | |||
both for the NRC inspectors and your staff. In order to minimize the impact to your | |||
onsite resources and to ensure a productive inspection, we have enclosed a request for | |||
documents needed for this inspection. Upon review of these documents, the inspectors | |||
will select additional documentation for review upon arrival. It is important that all of | |||
these documents are up to date and complete in order to minimize the number of | |||
additional documents requested during the preparation and/or the onsite portions of the | |||
inspection. | |||
We have discussed the schedule for these inspection activities with your staff and | |||
understand that our regulatory contact for this inspection will be Mr. Merka of your | |||
licensing organization. If there are any questions about this inspection or the material | |||
requested, please contact the lead inspector Wayne Sifre at (817) 860-8193 | |||
(Wayne.Sifre@nrc.gov). | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter | |||
and its enclosure will be available electronically for public inspection in the NRC Public | |||
In accordance with 10 CFR 2.390 of the | Document Room or from the Publicly Available Records (PARS) component of NRC's | ||
document system (ADAMS). ADAMS is accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Thomas Farnholtz, Chief | |||
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Document Request | Engineering Branch 1 | ||
Division of Reactor Safety | |||
Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. | Dockets: 50-445; 50-446 | ||
Washington, DC 20004 County Judge P.O. Box 851 | Licenses: NPF-87; NPF-89 | ||
Glen Rose, TX 76043 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control | Enclosure: | ||
P.O. Box 12428 Austin, TX 78711-3189 | Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications | ||
Document Request | |||
Mr. Fred W. Madden, Director | |||
Regulatory Affairs | |||
Luminant Generation Company LLC | |||
P.O. Box 1002 | |||
Glen Rose, TX 76043 | |||
Timothy P. Matthews, Esq. | |||
Morgan Lewis | |||
1111 Pennsylvania Avenue, NW | |||
Washington, DC 20004 | |||
County Judge | |||
P.O. Box 851 | |||
Glen Rose, TX 76043 | |||
Mr. Richard A. Ratliff, Chief | |||
Bureau of Radiation Control | |||
Texas Department of Health | |||
1100 West 49th Street | |||
Austin, TX 78756-3189 | |||
Environmental and Natural | |||
Resources Policy Director | |||
Office of the Governor | |||
P.O. Box 12428 | |||
Austin, TX 78711-3189 | |||
Information Requested for the In-Office Preparation Week | Mr. Brian Almon | ||
Public Utility Commission | |||
week. | William B. Travis Building | ||
P.O. Box 13326 | |||
1701 North Congress Avenue | |||
2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment to NRC from April 1, 2007, to the present. | Austin, TX 78701-3326 | ||
Ms. Susan M. Jablonski | |||
Office of Permitting, Remediation | |||
and Registration | |||
Texas Commission on | |||
Environmental Quality | |||
MC-122 | |||
P.O. Box 13087 | |||
Austin, TX 78711-3087 | |||
817-860-8193 | Anthony Jones | ||
Chief Boiler Inspector | |||
Texas Department of Licensing | |||
and Regulation | |||
Mailing Address: US NRC Region IV Attn: W. Sifre 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 | Boiler Division | ||
E.O. Thompson State Office Building | |||
P.O. Box 12157 | |||
Austin, TX 78711 | |||
Electronic distribution by RIV: | |||
Regional Administrator (Elmo.Collins@nrc.gov) | |||
Deputy Regional Administrator (Chuck.Casto@nrc.gov ) | |||
DRP Director (Dwight.Chamberlain@nrc.gov) | |||
DRP Deputy Director (Anton.Vegel@nrc.gov ) | |||
DRS Director (Roy.Caniano@nrc.gov ) | |||
DRS Deputy Director (Troy.Pruett@nrc.gov) | |||
Senior Resident Inspector (John.Kramer@nrc.gov) | |||
Resident Inspector (Brian.Tindell@nrc.gov ) | |||
Branch Chief, DRP/A (Claude.Johnson@nrc.gov | |||
Senior Project Engineer, DRP/A (Nicholas.Hernandez@nrc.gov ) | |||
CP Site Secretary (Sue.Sanner@nrc.gov ) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov ) | |||
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov ) | |||
Only inspection reports to the following: | |||
DRS STA (Dale.Powers@nrc.gov) | |||
S. Williams, OEDO RIV Coordinator (Shawn.Williams@nrc.gov ) | |||
ROPreports | |||
S:DRS/REPORTS/CP2009002RFI ltr WCS: ML083510831 | |||
SUNSI Rev X Yes ADAMS X Yes No Reviewer Initials WCS | |||
Compl. WCS No | |||
Publicly Avail X Yes Sensitive Yes X No Sens. Type | |||
No Initials | |||
EB1 C:EB1 | |||
W. Sifre T. Farnholtz | |||
/RA/ /RA/ | |||
12/16/08 12/16 /08 | |||
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification | |||
Inspection Dates: February 2 - February 13, 2009 | |||
Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or | |||
Experiments and Permanent Plant Modifications | |||
Inspectors: W. Sifre, Senior Reactor Inspector, Lead Inspector | |||
M. Young, Reactor Inspector | |||
A. Fairbanks, Reactor Inspector | |||
Information Requested for the In-Office Preparation Week | |||
The following information should be sent to the Region IV office in hard copy or | |||
electronic format (ims.certrec.com preferred), in care of W. Sifre, by January 12, 2009, to | |||
facilitate the selection of specific items that will be reviewed during the onsite inspection | |||
week. The inspectors will select specific items from the information requested below | |||
and then request from your staff additional documents needed during the onsite | |||
inspection weeks. We ask that the specific items requested be available and ready for | |||
review on the first day of inspection. Also, we request that you categorize the | |||
documents in your response with the numbered list below. Please provide requested | |||
documentation electronically if possible. If requested documents are large and only hard | |||
copy formats are available, please inform the inspector(s), and provide subject | |||
documentation during the first day of the onsite inspection. If you have any questions | |||
regarding this information request, please call the lead inspector as soon as possible. | |||
1. A list with descriptions, of all 50.59 screenings performed since April 1, 2007, | |||
which did not result in an evaluation. Note: Description of screenings should be | |||
brief, but of sufficient detail so that inspectors can determine the significance of | |||
the issue. | |||
2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not | |||
result in an application for license amendment to NRC from April 1, 2007, to the | |||
present. Note: Description of evaluations should be brief, but of sufficient detail | |||
so that inspectors can determine the significance of the issue. | |||
3. Columbia Generating Station procedure for conducting 10 CFR 50.59 screenings | |||
and evaluations. | |||
4. A list with descriptions of all Corrective Action documents related to 10 CFR | |||
50.59 activities, including screenings and evaluations from April 1, 2007, to the | |||
present. | |||
5. A list with descriptions of all permanent plant modifications dating from April 1 | |||
2007. Include sufficient detail to enable the inspector to determine the | |||
significance of each modification. | |||
6. Columbia Generating Station procedure for implementing and controlling | |||
permanent plant modifications. | |||
7. A list with descriptions of all Corrective Action documents related to your | |||
permanent plant modification program and its implementation since April 1, 2007. | |||
Include sufficient detail to enable the inspector to determine the significance of | |||
each modification. | |||
8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, | |||
including qualification dates. | |||
9. A listing of personnel qualified to review and approve 50.59 screenings and/or | |||
evaluations, including qualification dates. | |||
Inspector Contact Information: | |||
W. Sifre M. Young A. Fairbanks | |||
Senior Reactor Inspector Reactor Inspector Reactor Inspector | |||
817-860-8193 817-276-6545 817-817-8158 | |||
Wayne.Sifre@nrc.gov Matt.Young@nrc.gov Abin.Fairbanks@nrc.gov | |||
Mailing Address: | |||
US NRC Region IV | |||
Attn: W. Sifre | |||
612 E. Lamar Blvd., Suite 400 | |||
Arlington, TX 76011-4125 | |||
}} | }} |
Latest revision as of 11:22, 14 November 2019
ML083510831 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 12/16/2008 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Blevins M Luminant Generation Co |
References | |
IR-09-002 | |
Download: ML083510831 (6) | |
See also: IR 05000445/2009002
Text
UNITED STATES
NUC LE AR RE G UL AT O RY C O M M I S S I O N
R E GI ON I V
612 EAST LAMAR BLVD , SU I TE 400
AR LI N GTON , TEXAS 76011-4125
December 16, 2008
Mike Blevins, Executive Vice President
And Chief Nuclear Officer
Luminant Generation Company LLC
ATTN: Regulatory Affairs
Comanche Peak Steam Electric Station
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - NOTIFICATION OF
INSPECTION (NRC INSPECTION REPORT 05000445/2009002;
05000446/2009002) AND REQUEST FOR INFORMATION
Dear Mr. Blevins:
From February 2 - 13, 2009, Reactor Inspectors from NRCs Region IV office will
perform the baseline inspection of changes, tests, experiments, and permanent plant
modifications at Comanche Peak Steam Electric Station, using NRC Inspection
Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent
Plant Modifications. Experience has shown that this inspection is resource intensive
both for the NRC inspectors and your staff. In order to minimize the impact to your
onsite resources and to ensure a productive inspection, we have enclosed a request for
documents needed for this inspection. Upon review of these documents, the inspectors
will select additional documentation for review upon arrival. It is important that all of
these documents are up to date and complete in order to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and
understand that our regulatory contact for this inspection will be Mr. Merka of your
licensing organization. If there are any questions about this inspection or the material
requested, please contact the lead inspector Wayne Sifre at (817) 860-8193
(Wayne.Sifre@nrc.gov).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-445; 50-446
Enclosure:
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
Document Request
Mr. Fred W. Madden, Director
Regulatory Affairs
Luminant Generation Company LLC
P.O. Box 1002
Glen Rose, TX 76043
Timothy P. Matthews, Esq.
Morgan Lewis
1111 Pennsylvania Avenue, NW
Washington, DC 20004
County Judge
P.O. Box 851
Glen Rose, TX 76043
Mr. Richard A. Ratliff, Chief
Bureau of Radiation Control
Texas Department of Health
1100 West 49th Street
Austin, TX 78756-3189
Environmental and Natural
Resources Policy Director
Office of the Governor
P.O. Box 12428
Austin, TX 78711-3189
Mr. Brian Almon
Public Utility Commission
William B. Travis Building
P.O. Box 13326
1701 North Congress Avenue
Austin, TX 78701-3326
Ms. Susan M. Jablonski
Office of Permitting, Remediation
and Registration
Texas Commission on
Environmental Quality
MC-122
P.O. Box 13087
Austin, TX 78711-3087
Anthony Jones
Chief Boiler Inspector
Texas Department of Licensing
and Regulation
Boiler Division
E.O. Thompson State Office Building
P.O. Box 12157
Austin, TX 78711
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov )
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov )
DRS Director (Roy.Caniano@nrc.gov )
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Brian.Tindell@nrc.gov )
Branch Chief, DRP/A (Claude.Johnson@nrc.gov
Senior Project Engineer, DRP/A (Nicholas.Hernandez@nrc.gov )
CP Site Secretary (Sue.Sanner@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
Only inspection reports to the following:
S. Williams, OEDO RIV Coordinator (Shawn.Williams@nrc.gov )
ROPreports
S:DRS/REPORTS/CP2009002RFI ltr WCS: ML083510831
SUNSI Rev X Yes ADAMS X Yes No Reviewer Initials WCS
Compl. WCS No
Publicly Avail X Yes Sensitive Yes X No Sens. Type
No Initials
EB1 C:EB1
W. Sifre T. Farnholtz
/RA/ /RA/
12/16/08 12/16 /08
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification
Inspection Dates: February 2 - February 13, 2009
Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or
Experiments and Permanent Plant Modifications
Inspectors: W. Sifre, Senior Reactor Inspector, Lead Inspector
M. Young, Reactor Inspector
A. Fairbanks, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or
electronic format (ims.certrec.com preferred), in care of W. Sifre, by January 12, 2009, to
facilitate the selection of specific items that will be reviewed during the onsite inspection
week. The inspectors will select specific items from the information requested below
and then request from your staff additional documents needed during the onsite
inspection weeks. We ask that the specific items requested be available and ready for
review on the first day of inspection. Also, we request that you categorize the
documents in your response with the numbered list below. Please provide requested
documentation electronically if possible. If requested documents are large and only hard
copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the onsite inspection. If you have any questions
regarding this information request, please call the lead inspector as soon as possible.
1. A list with descriptions, of all 50.59 screenings performed since April 1, 2007,
which did not result in an evaluation. Note: Description of screenings should be
brief, but of sufficient detail so that inspectors can determine the significance of
the issue.
2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not
result in an application for license amendment to NRC from April 1, 2007, to the
present. Note: Description of evaluations should be brief, but of sufficient detail
so that inspectors can determine the significance of the issue.
3. Columbia Generating Station procedure for conducting 10 CFR 50.59 screenings
and evaluations.
4. A list with descriptions of all Corrective Action documents related to 10 CFR
50.59 activities, including screenings and evaluations from April 1, 2007, to the
present.
5. A list with descriptions of all permanent plant modifications dating from April 1
2007. Include sufficient detail to enable the inspector to determine the
significance of each modification.
6. Columbia Generating Station procedure for implementing and controlling
permanent plant modifications.
7. A list with descriptions of all Corrective Action documents related to your
permanent plant modification program and its implementation since April 1, 2007.
Include sufficient detail to enable the inspector to determine the significance of
each modification.
8. A listing of personnel qualified to prepare 50.59 screenings and evaluations,
including qualification dates.
9. A listing of personnel qualified to review and approve 50.59 screenings and/or
evaluations, including qualification dates.
Inspector Contact Information:
W. Sifre M. Young A. Fairbanks
Senior Reactor Inspector Reactor Inspector Reactor Inspector
817-860-8193 817-276-6545 817-817-8158
Wayne.Sifre@nrc.gov Matt.Young@nrc.gov Abin.Fairbanks@nrc.gov
Mailing Address:
US NRC Region IV
Attn: W. Sifre
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4125