Line 3: Line 3:
| issue date = 03/20/2009
| issue date = 03/20/2009
| title = 2009-01-Draft Scenarios
| title = 2009-01-Draft Scenarios
| author name = Garchow S M
| author name = Garchow S
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:INSTRUCTIONAL COVER SHEET PROGRAM TITLE OPERATIONS TRAINING COURSE TITLE COLUMBIA GENERATING STATION SIMULATOR EXAMINATION LESSON TITLE Raise Power with Flow; Place MT into Gov. Valve Optimization; SLC-V-31 indication; HPCS-P-3 Fails; ASD Channel Fails; ASD Loss - Manual Scram; RFW &
{{#Wiki_filter:INSTRUCTIONAL COVER SHEET PROGRAM TITLE     OPERATIONS TRAINING COURSE TITLE     COLUMBIA GENERATING STATION SIMULATOR EXAMINATION Raise Power with Flow; Place MT into Gov. Valve Optimization; SLC-V-31 LESSON TITLE      indication; HPCS-P-3 Fails; ASD Channel Fails; ASD Loss - Manual Scram; RFW &
RCIC Loss; Lower Pressure For CBP Injection; EQ; SP Rupture: ED on Low SP/L LENGTH OF LESSON
RCIC Loss; Lower Pressure For CBP Injection; EQ; SP Rupture: ED on Low SP/L LENGTH OF LESSON   1.5 Hours INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code                                                        Rev. No.
Simulator Guide PQD Code      LO001625                                      Rev. No. 0 JPM PQD Code                                                                Rev. No.
Exam PQD Code                                                                Rev. No.
DIVISION TITLE    Nuclear Training DEPARTMENT        Operations Training PREPARED BY      Ron Hayden                                                DATE      6/12/08 REVISED BY                                                                  DATE VALIDATED BY                                                                DATE TECHNICAL REVIEW                                                            DATE INSTRUCTIONAL REVIEW                                                        DATE APPROVED                                                                    DATE Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use.


===1.5 Hours===
Appendix D                        NRC SCENARIO #1                                          FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Facility: Columbia                    NRC Scenario No: 1 Examiners: _______________              Operators: _______________
Initial conditions:        The plant is operating at approximately 94% power due to economic dispatch.
Turnover Information:      Immediately after shift turnover, reactor power is to be raised with RRC Flow until Generator Output reaches 1150 MWe. At that point stop the power increase and place the Main Turbine into Governor Valve Optimization.
When complete, resume power increase to 100%.
A reactivity brief for the power increase has been held. There are no pre-conditioning limits.
Event    Timeline  Event Type*    Event Description No.
: 1.        T=0          R        Increase power with flow.
(SRO/RO)
: 2.        T=10        N          Place Main Turbine into Governor Valve Optimization.
(BOP)
: 3.        T=12          I        SLC-V-31 Indication Failure (Tech Spec).
(SRO/RO)
: 4.        T=20          C        HPCS-P-3 Failure (HPCS Keepfill Pump) (Tech Spec).
(SRO/BOP)
: 5.        T=30          C        ASD Channel A2 alarm and fault.
(SRO/RO)
: 6.        T=35      C (ALL)      ASD UPS trouble simulating both inverters on battery power requiring RRC flow reduction and manual scram.
: 7.        T=40      C (ALL)      RCIC shaft coupling breaks on initiation. Both RFW Pumps trip and can not be reset.
: 8.        T=50      M (ALL)      OBE and RHR-B Suction Break.
: 9.        T=65                    Emergency Depressurization when SP Level cannot be maintained GT 192.
                      * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 19


INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code  Rev. No. Simulator Guide PQD Code LO001625 Rev. No.0 JPM PQD Code  Rev. No. Exam PQD Code  Rev. No.
Appendix D                           NRC SCENARIO #1                                         FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 The scenario starts with Columbia at 94% power.
DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY Ron Ha y den DATE  6/12/08  REVISED BY
 
DATE VALIDATED BY
 
DATE    TECHNICAL REVIEW DATE INSTRUCTIONAL REVIEW DATE APPROVED  DATE  Operations Training Manager    Verify materials current IAW SWP-TQS-01 prior to use.
 
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  1 of  19 Facility: Columbia                              NRC Scenario No: 1 Examiners:  _______________              Operators: _______________
 
_______________                                _______________
 
_______________                                _______________
Initial conditions:  The plant is operating at approximately 94% power due to economic dispatch. Turnover Information:  Immediately after shift turnove r, reactor power is to be raised with RRC Flow until Generator Output reaches 1150 MWe. At that point stop the power increase and place the Main Turbine into Governor Valve Optimization.
When complete, resume power increase to 100%. A reactivity brief for the power increase has been held. There are no pre-conditioning limits.
Event No. Timeline Event Type* Event Description 1. T=0 R (SRO/RO) Increase power with flow. 2. T=10 N  (BOP) Place Main Turbine into Governor Valve Optimization.
: 3. T=12 I  (SRO/RO)
SLC-V-31 Indication Failure (Tech Spec).
: 4. T=20 C (SRO/BOP) HPCS-P-3 Failure (HPCS Keepfill Pump) (Tech Spec).
: 5. T=30 C (SRO/RO) ASD Channel A2 alarm and fault.
: 6. T=35 C (ALL) ASD UPS trouble simula ting both inverters on battery power requiring RRC flow reduction and manual scram.
: 7. T=40 C (ALL) RCIC shaft coupling breaks on initiation. Both RFW Pumps trip and can not be reset.
: 8. T=50 M (ALL) OBE and RHR-B Suction Break. 9. T=65  Emergency Depressurization when SP Level cannot be maintained GT 19'2". * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  2 of  19 The scenario starts with Columbia at 94% power.
After turnover, the crew is to raise power to 1150 Mwe.
After turnover, the crew is to raise power to 1150 Mwe.
When 1150 MWe has been reached and the MT is to be placed into GV optimization.  
When 1150 MWe has been reached and the MT is to be placed into GV optimization.
 
The next event is SLC-V-31 losing position indication. This is a non-annunciated failure. If the crew does not discover the malfunction, OPS2 will prompt them from a report from the field. SLC-V-31 failure prevents SLC from auto starting. Tech Specs will be referenced. LCO 3.1.7 is applicable and requires SLC restoration in 8 hours.
The next event is SLC-V-31 losing position indication.
The next event is a failure of the HPCS keepfill pump, HPCS-P-3. The crew will take actions and pull the control power fuses for HPCS-P-1. A problem with re-installation of the fuses later in the scenario will render HPCS not available for the scenario.
This is a non-annunciated failure. If the crew does not discover the malfunction, OPS2 will prompt them from a report from the field. SLC-V-31 failure prevents SLC from auto starting. Tech Specs will be referenced. LCO 3.1.7 is applicable and requires SLC restoration in 8 hours. The next event is a failure of the HPCS keepfill pum p, HPCS-P-3. The crew will take actions and pull the control power fuses for HPCS-P-1. A problem with re-installation of the fuses later in the scenario will render HPCS not available for the scenario. The next event is a GTO Freeze alarm on ASD channel 1A/2. RRC-P-1A will run back to 51 Hz. The crew will take action to match loop flows. When flows are matched the next event is a failure of E-TR-ASD 1. An ASD UPS trouble alarm will be received and the crew will investigate. The transforme r failure puts both ASD inverters on battery power. The report from the field will indicate that normal power can not be restored to the inverters. Per ABN-ADS-INV, the crew should reduce RRC flow, scram the reactor and carry out the actions of PPM 3.3.1. PPM 5.1.1 will be entered on low RPV level. All rods will insert and as RPV level rises above +13", both RFW pumps will trip. When RFW pump resets are attempted they will not reset. RCIC will be initiated and a shaft shear will occur when turbine speed reaches 300 rpm. This effectively is a loss of HP injection sources.
The next event is a GTO Freeze alarm on ASD channel 1A/2. RRC-P-1A will run back to 51 Hz. The crew will take action to match loop flows.
The crew should lower RPV pressure with BPVs to facilitate feeding with condensate booster pumps. RPV level will be returned to +13 to +54 inch band. After level has been returned to normal band, an OBE will occur. Due to the earthquake the suppression pool will develop a crack in the B RHR pump room. The crew should pull the control power fuses for RHR-P-2B.  
When flows are matched the next event is a failure of E-TR-ASD 1. An ASD UPS trouble alarm will be received and the crew will investigate. The transformer failure puts both ASD inverters on battery power. The report from the field will indicate that normal power can not be restored to the inverters. Per ABN-ADS-INV, the crew should reduce RRC flow, scram the reactor and carry out the actions of PPM 3.3.1. PPM 5.1.1 will be entered on low RPV level.
All rods will insert and as RPV level rises above +13, both RFW pumps will trip. When RFW pump resets are attempted they will not reset. RCIC will be initiated and a shaft shear will occur when turbine speed reaches 300 rpm. This effectively is a loss of HP injection sources.
The crew should lower RPV pressure with BPVs to facilitate feeding with condensate booster pumps. RPV level will be returned to +13 to +54 inch band.
After level has been returned to normal band, an OBE will occur. Due to the earthquake the suppression pool will develop a crack in the B RHR pump room. The crew should pull the control power fuses for RHR-P-2B.
ABN-FLOODING will be entered along with EOP PPM 5.2.1 and EOP PPM 5.3.1.
When it is determined that suppression pool level cannot be maintained GT 192 the crew should anticipate Emergency Depressurization is required and per PPM 5.1.1 override, fully open the BPVs. When suppression pool level reaches 192, the crew should exit to PPM 5.1.3 and open 7 ADS SRVs to perform an emergency depressurization.
The scenario will be terminated when the ED is performed and RPV level is being returned to normal band.
Page 2 of 19


ABN-FLOODING will be entered along with EOP PPM 5.2.1 and EOP PPM 5.3.1. When it is determined that suppression pool level cannot be maintained GT 19'2" the crew should anticipate Emergency Depressurization is required and per PPM 5.1.1 override, fully open the BPVs. When
Appendix D                           NRC SCENARIO #1                                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 1
 
suppression pool level reaches 19'2", the crew should exit to PPM 5.1.3 and open 7 ADS SRV's to perform an emergency depressurization. The scenario will be terminated when the ED is performed and RPV level is being returned to normal band.
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  3 of  19 Event No. 1


==
==
Description:==
Description:==
Increase reactor power with flow to 100% power.
Increase reactor power with flow to 100% power.
This event is initiated by the turnover information. Time Position Applicants Actions or Behavior T=0 SRO Directs the RO to increase react or power to 100% power with RRC flow at the rate of 10 Mwe/minute.
This event is initiated by the turnover information.
RO Increases reactor power with RRC flow as directed at the rate directed.
Time           Position                           Applicants Actions or Behavior T=0             SRO         Directs the RO to increase reactor power to 100% power with RRC flow at the rate of 10 Mwe/minute.
BOP Monitors plant equipment and peer checks RO.
RO         Increases reactor power with RRC flow as directed at the rate directed.
COMMENTS:  
BOP         Monitors plant equipment and peer checks RO.
COMMENTS:
Page 3 of 19


Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  4 of  19 Event No. 2  
Appendix D                           NRC SCENARIO #1                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 2


==
==
Description:==
Description:==
Place the Main Turbine into Governor Valve Optimization This event is initiated by the turnover information and will take place when output reaches 1150 Mwe Time Position Applicants Actions or Behavior T= 5 SRO Directs BOP operator to place the Main Turbine into Governor Valve Optimization per SOP-MT-GV/OPTIMIZATION BOP Per SOP-MT-GV/OPTIMIZATION performs the following:
Place the Main Turbine into Governor Valve Optimization This event is initiated by the turnover information and will take place when output reaches 1150 Mwe Time           Position                           Applicants Actions or Behavior T= 5             SRO         Directs BOP operator to place the Main Turbine into Governor Valve Optimization per SOP-MT-GV/OPTIMIZATION BOP         Per SOP-MT-GV/OPTIMIZATION performs the following:
Step 5.1.1 Verifies SNE info, TDAS points not inop, DEH in Turbine follow Reactor Mode; MWe GE 1192 and Reactor Power and Pressure  
Step 5.1.1 Verifies SNE info, TDAS points not inop, DEH in Turbine follow Reactor Mode; MWe GE 1192 and Reactor Power and Pressure stable Step 5.1.2a Verifies LOAD TARGET at 1370 MW Step 5.1.2b Sets VPL demand to 100%
Step 5.1.2c Verifies OK TO SELECT light illuminated Step 5.1.2d Selects OPTIMIZED VALVE MODE Step 5.1.2e Selects yes Step 5.1.2f Verifies valve movement Step 5.1.2g Sets VPL demand 10% GT GV Demand Step 5.1.2h Verifies VPL Demand ramps to target value Step 5.1.2i Verifies VPL demand is 10% above GV Demand BOP        Informs SRO that the MT is in Governor Valve Optimization Mode of operation COMMENTS:
Page 4 of 19


stable Step 5.1.2a Verifies LOAD TARGET at 1370 MW Step 5.1.2b Sets VPL demand to 100%
Appendix D                         NRC SCENARIO #1                                         FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 3
Step 5.1.2c Verifies OK TO SELECT light illuminated
 
Step 5.1.2d Selects OPTIMIZED VALVE MODE
 
Step 5.1.2e Selects yes Step 5.1.2f Verifies valve movement Step 5.1.2g Sets VPL demand 10% GT GV Demand Step 5.1.2h Verifies VPL Demand ramps to target value Step 5.1.2i Verifies VPL demand is 10% above GV Demand  BOP Informs SRO that the MT is in Governor Valve Optimization Mode of operation COMMENTS:
 
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  5 of  19 Event No. 3  


==
==
Description:==
Description:==
SLC test tank outlet valve, SLC-V-31 loss of position indication.
SLC test tank outlet valve, SLC-V-31 loss of position indication.
This event is initiated by activating TRIGGER 1 and should be initiated when the MT is being placed into GV Optimization. Time Position Applicants Actions or Behavior ROLE-PLAY: If the loss of indication is not observed by the crew (no alarms occur), after 2 minutes call the control room on the phone and report as Ops 2 that, while doing your rounds, you discovered the leads to SLC-V-31 are disconnected from the valves closed limit switch. The cause was due to an NLO trainee stepping on the limit switch while tracing SLC system piping.
This event is initiated by activating TRIGGER 1 and should be initiated when the MT is being placed into GV Optimization.
SRO If crew detects SLC-V-31 loss of indication prior to the role-play, directs Ops 2 to investigate SLC-V-31 locally.
Time           Position                           Applicants Actions or Behavior ROLE-PLAY: If the loss of indication is not observed by the crew (no alarms occur), after 2 minutes call the control room on the phone and report as Ops 2 that, while doing your rounds, you discovered the leads to SLC-V-31 are disconnected from the valves closed limit switch. The cause was due to an NLO trainee stepping on the limit switch while tracing SLC system piping.
SRO         If crew detects SLC-V-31 loss of indication prior to the role-play, directs Ops 2 to investigate SLC-V-31 locally.
Cue: As OPS2 - if not already reported - wait two minutes and report that the leads to SLC-V-31 are disconnected from the valves closed limit switch. The cause was due to an NLO trainee stepping on the limit switch while tracing SLC system piping.
Cue: As OPS2 - if not already reported - wait two minutes and report that the leads to SLC-V-31 are disconnected from the valves closed limit switch. The cause was due to an NLO trainee stepping on the limit switch while tracing SLC system piping.
SRO/BOP Determines that neither SLC pump will initiate from the Control Room. (see Comments below).
SRO/BOP         Determines that neither SLC pump will initiate from the Control Room.
SRO Declares both SLC pumps inoperable.  
(see Comments below).
- T.S. LCO 3.1.7 B "Two SLC subsystems shall be OPERABLE" requires restoration of one SLC subsystem to operable status in 8  
SRO         Declares both SLC pumps inoperable.
                                    -   T.S. LCO 3.1.7 B Two SLC subsystems shall be OPERABLE requires restoration of one SLC subsystem to operable status in 8 hours.
                                    -  OR be in MODE 3 in 12 Hrs and MODE 4 in 36 Hrs.
Contacts Work Week Manager to initiate repairs of SLC-V-31.
Conducts brief.
COMMENTS:
SLC logic is such that with V-31 not indicating closed, SLC-V-1A and SLC-V-1B (SLC tank outlets) will not auto open following initiation from the control room. If SLC-V-1A and B do not open, the SLC pumps will not start.
Page 5 of 19


hours. - OR be in MODE 3 in 12 Hrs and MODE 4 in 36 Hrs.
Appendix D                           NRC SCENARIO #1                                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 4
-  Contacts Work Week Manager to initiate repairs of SLC-V-31.
 
Conducts brief.
 
COMMENTS:
 
SLC logic is such that with V-31 "not" indica ting closed, SLC-V-1A and SLC-V-1B (SLC tank outlets) will not auto open following initiation from the control room. If SLC-V-1A and B do not open, the SLC pumps will not start.
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  6 of  19 Event No. 4  


==
==
Description:==
Description:==
HPCS System Keepfill pump, HPCS-P-3, failure.
HPCS System Keepfill pump, HPCS-P-3, failure.
This event is initiated by activating TRIGGER 2 after Technical Specifications have been referenced and a brief has been .. Time Position Applicants Actions or Behavior T=15 BOP Acknowledges HPCS WATER LEG PUMP DISCH PRESS LOW and HPCS SYSTEM OUT OF SERVICE alarms.  
This event is initiated by activating TRIGGER 2 after Technical Specifications have been referenced and a brief has been ..
Time         Position                           Applicants Actions or Behavior T=15             BOP         Acknowledges HPCS WATER LEG PUMP DISCH PRESS LOW and HPCS SYSTEM OUT OF SERVICE alarms.
Observes HPCS system pressure and HPCS-P-3 not running.
Refers to ARP and informs SRO of condition.
Directs OPS 2 investigate pump and breaker for HPCS-P-3.
SRO        Per ARP, directs HPCS-P-1 start be inhibited by pulling the control power fuses.
Contacts Work Week Manager.
Refers to Tech Spec 3.5.1, condition B which requires RCIC operability verified immediately and restore HPCS within 14 days.
May direct LPCS, RCIC, and ADS be protected per OI-49.
Booth Operator: Three minutes after being sent, report back as OPS 2 that the shaft coupling on HPCS-P-3 is broken.
Booth Operator: Two minutes after request to pull control power fuses on HPCS-P-1 activate TRIGGER 10 and report completion to Control Room.
COMMENTS:
Page 6 of 19


Observes HPCS system pressure and HPCS-P-3 not running.
Appendix D                         NRC SCENARIO #1                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 5
 
Refers to ARP and informs SRO of condition. 
 
Directs OPS 2 investigate pump and breaker for HPCS-P-3.
 
SRO Per ARP, directs HPCS-P-1 start be inhibited by pulling the control power fuses. Contacts Work Week Manager.
Refers to Tech Spec 3.5.1, condition B which requires RCIC operability verified immediately and restore HPCS within 14 days.
 
May direct LPCS, RCIC, and ADS be protected per OI-49.
 
Booth Operator:  Three minutes after being sent, rep ort back as OPS 2 that the shaft coupling on HPCS-P-3 is broken. Booth Operator:  Two minutes after request to pull control power fuses on HPCS-P-1 activate
 
TRIGGER 10 and report completion to Control Room.
COMMENTS:
 
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  7 of  19 Event No. 5  


==
==
Description:==
Description:==
ASD Channel A2 alarm and fault.
ASD Channel A2 alarm and fault.
This event is initiated by activating TRIGGER 3 after brief is completed or as directed. Time Position Applicants Actions or Behavior T=25 RO Acknowledges LOOP A ASD CHANNEL FAILURE LIMIT alarm.  
This event is initiated by activating TRIGGER 3 after brief is completed or as directed.
 
Time         Position                             Applicants Actions or Behavior T=25             RO         Acknowledges LOOP A ASD CHANNEL FAILURE LIMIT alarm.
Reports trip of ASD 1A/2 alarm and Fault alarms and RECIRC A OR B HIGH FLOW DELTA alarm.  
Reports trip of ASD 1A/2 alarm and Fault alarms and RECIRC A OR B HIGH FLOW DELTA alarm.
 
Verifies trip of channel ASD1 A/2.
Verifies trip of channel ASD1 A/2.  
Ensures RRC-P-1A has runback to 51 Hz.
 
Reports power drop due to runback. Reports RPV power/level/pressure.
Ensures RRC-P-1A has runback to 51 Hz.  
Checks ASD video Display Unit for source of alarm.
 
Reports power drop due to runback. Reports RPV power/level/pressure.  
 
Checks ASD video Display Unit for source of alarm.  
 
Dispatches OPS1/4 to investigate at the ASD Building.
Dispatches OPS1/4 to investigate at the ASD Building.
SRO Directs actions per ARPs.
SRO         Directs actions per ARPs.
Cue: Call 2393 and report as OPS4 that there is a GTO freeze alarm on Channel 1A2. Also inform the RO that there is an 'electrical smell' in the building but you see nothing else wrong. SRO Per ARP for high delta flow (4.602.A6 6-2): Refers to ABN-POWER for the unplanned power change.  
Cue: Call 2393 and report as OPS4 that there is a GTO freeze alarm on Channel 1A2. Also inform the RO that there is an electrical smell in the building but you see nothing else wrong.
 
SRO         Per ARP for high delta flow (4.602.A6 6-2):
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 8 of 19 SRO Refers to Tech Spec 3.4.1, flow mismatch, which is applicable until flows are matched.
Refers to ABN-POWER for the unplanned power change.
 
Page 7 of 19
Contacts Work Week Manager for ASD Channel fault.


Appendix D              NRC SCENARIO #1                                      FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO    Refers to Tech Spec 3.4.1, flow mismatch, which is applicable until flows are matched.
Contacts Work Week Manager for ASD Channel fault.
Directs RO to match RRC loop flows by lowering RRC Loop B flow.
Directs RO to match RRC loop flows by lowering RRC Loop B flow.
RO Reduces RRC-P-1B speed as directed to match flows and clear High Flow Delta alarm.  
RO     Reduces RRC-P-1B speed as directed to match flows and clear High Flow Delta alarm.
 
COMMENTS:
COMMENTS:  
Page 8 of 19


Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  9 of  19 Event No. 6  
Appendix D                         NRC SCENARIO #1                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 6


==
==
Description:==
Description:==
ASD UPS trouble alarm which simulates the loss of E-PP-ASD1/4.
ASD UPS trouble alarm which simulates the loss of E-PP-ASD1/4.
This event is initiated by activating TRIGGER 4 and should be initiated after RRC loop flows are matched or as directed. Time Position Applicants Actions or Behavior Critical Task is to initiate a Manual Reactor Scram when it is determined both ASD inverters are on battery power T=30 RO Reports ASD UPS Trouble Alarm (P602.A13 3-5) and refers to ARP.
This event is initiated by activating TRIGGER 4 and should be initiated after RRC loop flows are matched or as directed.
SRO Refers to ARP and to ABN-ASD-INV.
Time         Position                           Applicants Actions or Behavior Critical Task is to initiate a Manual Reactor Scram when it is determined both ASD inverters are on battery power T=30             RO         Reports ASD UPS Trouble Alarm (P602.A13 3-5) and refers to ARP.
BOP Sends OPS4 to investigate.
SRO         Refers to ARP and to ABN-ASD-INV.
BOOTH OPERATOR: One minute after being sent to investigate, call on the radio and report that there are no lights on in the ASD building, you hear water running (not sure why or where) and are investigating cautiously. One minutes later call 2393 and report that it appears that there  
BOP         Sends OPS4 to investigate.
 
BOOTH OPERATOR: One minute after being sent to investigate, call on the radio and report that there are no lights on in the ASD building, you hear water running (not sure why or where) and are investigating cautiously. One minutes later call 2393 and report that it appears that there is a crack in the roof of the ASD building above transformer E-TR-ASD-1 and water is falling on the transformer. It looks like the main breaker supplying the AC input to E-PP-ASD 1/3 is opened and E-PP-ASD 1/3 is deenergized. You are exiting the building and taking the necessary electrical precautions.
is a crack in the roof of the ASD building above transformer E-TR-ASD-1 and water is falling on the transformer. It looks like the main brea ker supplying the AC input to E-PP-ASD 1/3 is opened and E-PP-ASD 1/3 is deenergized. You are exiting the building and taking the necessary electrical precautions. SRO Acknowledges report and refers to Attachment 7.1.  
SRO         Acknowledges report and refers to Attachment 7.1.
 
Determines that E-PP-ASD 1/3 is de-energized and that IN-ASD/1A and 1B panels are on battery power.
Determines that E-PP-ASD 1/3 is de-energized and that IN-ASD/1A and 1B panels are on battery power.
Determines that normal AC power is not going to be restored to the inverters and that flow reduction and scram are required  
Determines that normal AC power is not going to be restored to the inverters and that flow reduction and scram are required Page 9 of 19
 
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 10 of 19 SRO Conducts brief.
 
Directs that RRC flow be reduced to 60 Mlbm/hr.


Appendix D              NRC SCENARIO #1                                FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO    Conducts brief.
Directs that RRC flow be reduced to 60 Mlbm/hr.
Directs a manual scram of reactor.
Directs a manual scram of reactor.
RO Lowers Core Flow to 60 Mlbm/hr as directed.
RO     Lowers Core Flow to 60 Mlbm/hr as directed.
Announces Listen up for the scram report.
Performs immediate scram actions:
* Places Reactor Mode Switch in SHUTDOWN
* Monitors Power, Pressure, and Level
* Verifies all rods inserted
* Inserts IRMs and SRMs by depressing INSERT P/B Reports EOP entry on low RPV water level.
COMMENTS:
Page 10 of 19


Announces "Listen up for the scram report".
Appendix D                       NRC SCENARIO #1                                         FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 7
 
Performs immediate scram actions:
 
Places Reactor Mode Switch in SHUTDOWN Monitors Power, Pressure, and Level Verifies all rods inserted Inserts IRMs and SRMs by depressing INSERT P/B
 
Reports EOP entry on low RPV water level.
 
COMMENTS:
 
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  11 of  19 Event No. 7


==
==
Description:==
Description:==
RCIC Shaft Coupling breaks when 300 rpm is reached. RFW Pumps trip and can not be reset. The RCIC event is active from the start of the scenario. RFW pumps auto trip when mode switch is taken to shutdown.
RCIC Shaft Coupling breaks when 300 rpm is reached. RFW Pumps trip and can not be reset.
Time Position Applicants Actions or Behavior T=35 5T SRO Enters (and re-enters) PPM 5.1.1 and directs restoration of RPV level to +13 inches to +54 inches with RCIC and/or Reactor Feed Pump.
The RCIC event is active from the start of the scenario. RFW pumps auto trip when mode switch is taken to shutdown.
RO Reports both Reactor Feed Pumps tripped.
Time         Position                           Applicants Actions or Behavior T=355T        SRO         Enters (and re-enters) PPM 5.1.1 and directs restoration of RPV level to
SRO Directs that the second CRD pump be started.
                            +13 inches to +54 inches with RCIC and/or Reactor Feed Pump.
RO Starts second CRD pump when directed.
RO         Reports both Reactor Feed Pumps tripped.
 
SRO         Directs that the second CRD pump be started.
May direct ABN-CRD-MAXFLOW be performed.  
RO         Starts second CRD pump when directed.
 
May direct ABN-CRD-MAXFLOW be performed.
ROLE-PLAY - three minutes after request for ABN-CRD-MAXFLOW, activate TRIGGER 26 and when valves are finished re-positioning, report completion to control room.
ROLE-PLAY - three minutes after request for ABN-CRD-MAXFLOW, activate TRIGGER 26 and when valves are finished re-positioning, report completion to control room.
ROLE-PLAY - If sent to RCIC room to investigat e, report shaft coupling in pieces on the floor.
ROLE-PLAY - If sent to RCIC room to investigate, report shaft coupling in pieces on the floor.
RO/BOP When RCIC is initiated, reports that no discharge pressure/flow is observed on RCIC. May report that RPMs did rise but are zero now. When reset of RFW is attempted, reports they cannot be reset.  
RO/BOP       When RCIC is initiated, reports that no discharge pressure/flow is observed on RCIC. May report that RPMs did rise but are zero now.
When reset of RFW is attempted, reports they cannot be reset.
Performs actions of PPM 3.3.1.
Page 11 of 19


Performs actions of PPM 3.3.1.  
Appendix D              NRC SCENARIO #1                                        FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BOP    Reports +13 initiations and isolations sat and monitors pressure.
SRO    Directs the BOP to reduce RPV pressure to 500 psig to 600 psig with Bypass Valves to allow injection with the condensate booster pumps.
BOP    Reduces pressure as directed with BPVs, using quick card.
RO      Sets up feedwater level control for RFW-V-10A/B valve operation.
Injects with condensate booster pumps when pressure has been reduce to 500 psig to 600 psig.
Restores reactor level to +13 inches to + 54 inches.
Comments:
Page 12 of 19


Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  12 of  19 BOP Reports +13" initiations and isolations sat and monitors pressure.
Appendix D                         NRC SCENARIO #1                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 8
SRO Directs the BOP to reduce RPV pressure to 500 psig to 600 psig with Bypass Valves to allow injection with the condensate booster  pumps.
 
BOP Reduces pressure as directed with BPVs, using quick card.
 
RO Sets up feedwater level control for RFW-V-10A/B valve operation.
 
Injects with condensate booster pumps when pressure has been reduce to 500 psig to 600 psig.
 
Restores reactor level to  +13 inches to + 54 inches.
 
Comments:
 
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  13 of  19 Event No. 8


==
==
Description:==
Description:==
OBE and RHR-B Suction Break This event is initiated after RPV pressure has been lowered to 500 to 600 psig band and RPV level is being controlled +13 to +54.
BOOTH OPERATOR: During the remainder of the scenario, if asked to re-install the HPCS-P-1 control power fuses, report the fuse block broke and you have contacted the electricians to come help. HPCS-P-1 will NOT be returned to service during the scenario.
BOOTH OPERATOR: Start earthquake machine at low volume working quickly up to full volume and leave on for a 20 seconds total EQ. When full volume is reached, activate TRIGGER 5.
Time          Position                            Applicants Actions or Behavior Booth Operator: When EQ is completed, as OPS1, call the control room on the radio and report that you felt severe shaking and movement in the turbine building.
T=45            BOP        Reports OBE annunciator, pulls ARP and refers SRO to ABN-EARTHQUAKE.
Investigates and reports indications on Bd. L.
SRO        Directs actions for earthquake per ABN-EARTHQUAKE:
* Directs plant announcement
* Directs SAS repeat announcement RO          Reports:
* Reactor Sump R2 level Hi Hi alarm
* Suppression Pool level Hi/Low Suppression Pool level low alarm
* Reports lowering trend on Suppression Pool Water Level
* Reports EOP 5.2.1 entry at -2 when it occurs.
* Reports RHR B Room level Hi EOP entry into PPM 5.3.1.
Page 13 of 19


OBE and RHR-B Suction Break This event is initiated after RPV pressure has been lowered to 500 to 600 psig band and RPV level is being controlled +13" to +54". BOOTH OPERATOR: During the remainder of the scenar io, if asked to re-install the HPCS-P-1 control power fuses, report the fuse block broke and you have contacted the electricians to come help. HPCS-P-1 will NOT be returned to service during the scenario.
Appendix D                       NRC SCENARIO #1                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 ROLE-PLAY - If asked to investigate RHR room leak, wait two minutes and report water coming from a crack down the side of the suppression pool wall that EXTENDS INTO THE FLOOR. You have exited the room and closed the hatch behind you.
BOOTH OPERATOR: Start earthquake machine at low volume working quickly up to full volume and leave on for a 20 seconds total EQ. When full volume is reached, activate TRIGGER 5. Time Position Applicants Actions or Behavior Booth Operator:  When EQ is completed, as OP S1, call the control room on the radio and report that you felt severe shaking and movement in the turbine building. T=45 BOP Reports OBE annunciator, pulls ARP and refers SRO to ABN-EARTHQUAKE.
SRO       Enters PPM 5.2.1 on low SP level and directs actions per ABN-FLOODING.
Investigates and reports indications on Bd. L.
Enters PPM 5.3.1 on RHR B room level Hi.
 
Directs OPS2 to investigate water level in RHR B room.
SRO Directs actions for earthquake per ABN-EARTHQUAKE:  Directs plant announcement  Directs SAS repeat announcement RO Reports:  Reactor Sump R2 level Hi Hi alarm  Suppression Pool level Hi/Low Suppression Pool level low alarm  Reports lowering trend on Suppression Pool Water Level  Reports EOP 5.2.1 entry at -2" when it occurs. Reports RHR B Room level Hi EOP entry into PPM 5.3.1.
Determines that RHR B is not operational due to flooding.
 
May direct the RO to close RHR-V-4B in an attempt to isolate the leak.
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  14 of  19 ROLE-PLAY - If asked to investigate RHR room leak, wait two minutes and report water coming from a crack down the side of the suppression pool wall that EXTENDS INTO THE FLOOR. You have exited the room and closed the hatch behind you.
SRO Enters PPM 5.2.1 on low SP level and directs actions per ABN-FLOODING.  
 
Enters PPM 5.3.1 on RHR B room level Hi.  
 
Directs OPS2 to investigate water level in RHR B room.  
 
Determines that RHR B is not operational due to flooding.
 
May direct the RO to close RHR-V-4B in an attempt to isolate the leak.  
 
May direct pulling of RHR-P-2B control power fuses.
May direct pulling of RHR-P-2B control power fuses.
Cue: If directed, wait three minutes, then ACTIVATE TRIGGER 6 to pull RHR-P-2B fuses and report completion.
Cue: If directed, wait three minutes, then ACTIVATE TRIGGER 6 to pull RHR-P-2B fuses and report completion.
RO/BOP If directed, closes RHR-V-4B.  
RO/BOP       If directed, closes RHR-V-4B.
Reports continued lowering trend on Suppression Pool level.
Comments:
Page 14 of 19


Reports continued lowering trend on Suppression Pool level.
Appendix D                         NRC SCENARIO #1                                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 9
 
Comments:
 
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  15 of  19 Event No. 9


==
==
Description:==
Description:==
Emergency Depressurization due to low Suppression Pool level This event is initiated when SP level cannot be maintained GT 19'2". SP Level drops about 1 foot every 2 minutes.
Emergency Depressurization due to low Suppression Pool level This event is initiated when SP level cannot be maintained GT 192. SP Level drops about 1 foot every 2 minutes.
Time Position Applicants Actions or Behavior Critical Task is to initiate an Emergency Depressurization when Suppression Pool level cannot be maintained GT 19'2". Note: SRO may anticipate the ED on low suppression pool level and direct the bypass valves be opened to rapidly reduce pressure. BOP Continues to give Suppression Pool level reports as level drops.
Time         Position                           Applicants Actions or Behavior Critical Task is to initiate an Emergency Depressurization when Suppression Pool level cannot be maintained GT 192.
T=60 SRO Determines that Suppression Pool level will not be able to be maintained above 19'2".  
Note: SRO may anticipate the ED on low suppression pool level and direct the bypass valves be opened to rapidly reduce pressure.
 
BOP       Continues to give Suppression Pool level reports as level drops.
May take override in PPM 5.1.1 pressure leg and anticipate Emergency Depressurization.  
T=60               SRO       Determines that Suppression Pool level will not be able to be maintained above 192.
 
May take override in PPM 5.1.1 pressure leg and anticipate Emergency Depressurization.
May direct BPVs be rapidly opened.  
May direct BPVs be rapidly opened.
 
RO/BOP       If directed, takes manual control of the Bypass Valves and fully opens them.
RO/BOP If directed, takes manual control of the Bypass Valves and fully opens them. SRO When Emergency Depressurization is required due to low suppression pool level, (SP Level LE 19'2") exits pressure leg of PPM 5.1.1.  
SRO       When Emergency Depressurization is required due to low suppression pool level, (SP Level LE 192) exits pressure leg of PPM 5.1.1.
Enters PPM 5.1.3 and directs 7 ADS SRVs open.
RO/BOP        Opens 7 ADS SRVs to depressurize the reactor.
Page 15 of 19


Enters PPM 5.1.3 and directs 7 ADS SRVs open.
Appendix D                       NRC SCENARIO #1                                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO         Directs injection with systems to return RPV level to +13 to +54.
 
RO/BOP       Returns RPV level to band as directed.
RO/BOP Opens 7 ADS SRVs to depressurize the reactor.
 
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  16 of  19 SRO Directs injection with systems to return RPV level to +13" to +54".
RO/BOP Returns RPV level to band as directed.
This scenario will be terminated when the reactor has been emergency depressurized and RPV level is under control and stable/increasing.
This scenario will be terminated when the reactor has been emergency depressurized and RPV level is under control and stable/increasing.
Comments:  
Comments:
Page 16 of 19


Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  17 of  19 SRO TURNOVER INFORMATION Initial Conditions: The plant is operating at approximately 94% power due to economic dispatch.  
Appendix D                   NRC SCENARIO #1                                   FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO TURNOVER INFORMATION Initial Conditions:     The plant is operating at approximately 94% power due to economic dispatch.
Turnover Information: After shift turnover, reactor power is to be raised with RRC Flow until Generator Output reaches 1150 MWe. At that point stop the power increase and place the Main Turbine into Governor Valve Optimization.
When complete, resume power increase to 100%.
A reactivity brief for the power increase has been held and power is to be increased immediately following shift turnover. There are no pre-conditioning limits.
SIMULATOR SETUP INSTRUCTIONS Reset to IC-179 Set Up Earthquake Machine on Low Volume Page 17 of 19


Turnover Information:  After shift turnover, react or power is to be raised with RRC Flow until Generator Output reaches 1150 MWe. At that point stop the power
Appendix D                               NRC SCENARIO #1                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BAT FILE
 
>* Trigger list *
increase and place the Main Turbine in to Governor Valve Optimization. When complete, resume power increase to 100%. A reactivity brief for the power incr ease has been held and power is to be increased immediately following shift turnover. There are no pre-conditioning limits.
>Trigger 1 SLC-V-31 position indication loss
SIMULATOR SETUP INSTRUCTIONS Reset to IC-179 Set Up Earthquake Machine on Low Volume
>Trigger 2 HPCS-P-3 Shaft break
 
>Trigger 3 ASD CH A2 alarm/fault
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  18 of  19 BAT FILE >************************* >*  Trigger list *  
>Trigger 4 ASD UPS Trouble - Simulates loss of E-PP-ASD 1/4
 
>Trigger 5 EQ, Suppression Pool Leak, RHR B Suction break
>*************************
>Trigger 6 Pull control power fuses for RHR-P-2B
 
>Trigger 7 Conditional to Lock in ASD Annunciators
>
>Trigger 8 Conditional for RCIC Shaft Break (when 300 rpm is reached)
>Trigger 1 SLC-V-31 position indication loss  
>Trigger 9 Conditional for RFW A/B trip and cant be reset (on MODE SW in SD)
 
>Trigger 10 Pull Control Power Fuses for HPCS-P-1
>Trigger 2 HPCS-P-3 Shaft break  
>The following items are triggered in the scenario
>Trigger 3 ASD CH A2 alarm/fault  
> TRIGGER 1 - SLC-V-31 Loss of position indication
>Trigger 4 ASD UPS Trouble - Simulates loss of E-PP-ASD 1/4  
> SLC-V-31 TEST TANK OUTLET VALVE IRF LOA-SLC002 (1) 1
>Trigger 5 EQ, Suppression Pool Leak, RHR B Suction break  
> SLC-V-31 RED LAMP IOR IND-SLC003B (1) OFF
>Trigger 6 Pull control power fuses for RHR-P-2B  
> SLC-V-31 GREEN LAMP IOR IND-SLC003A (1) OFF
>Trigger 7 Conditional to Lock in ASD Annunciators  
> TRIGGER 2 - HPCS-P-3 Shaft Break & Low Press Alarm IRF LOA-EPS137 (2) DISCONNECT IRF PLP-CSS006 (2) 0.01 0 IRF PLP-CSS002 (2) 2.0 0 IOR STL-HPCS31 (2) ON
 
>Trigger 8 Conditional for RCIC Shaft Break (when 300 rpm is reached) >Trigger 9 Conditional for RFW A/B trip and can't be reset (on MODE SW in SD)  
 
>Trigger 10 Pull Control Power Fuses for HPCS-P-1  
 
>
>**********************************************************************
>The following items are triggered in the scenario  
 
>**********************************************************************
 
>
> TRIGGER 1 - SLC-V-31 Loss of position indication  
 
> SLC-V-31 TEST TANK OUTLET VALVE IRF LOA-SLC002 (1) 1  
> SLC-V-31 RED LAMP IOR IND-SLC003B (1) OFF
 
> SLC-V-31 GREEN LAMP IOR IND-SLC003A (1) OFF
 
>
> TRIGGER 2 - HPCS-P-3 Shaft Break & Low Press Alarm
 
IRF LOA-EPS137 (2) DISCONNECT IRF PLP-CSS006   (2)   0.01 0 IRF PLP-CSS002   (2)   2.0 0  
 
IOR STL-HPCS31 (2) ON  
 
>
> TRIGGER 3 - ASD CH A2 alarm and Fault IMF MAL-RFC002E (3)
> TRIGGER 3 - ASD CH A2 alarm and Fault IMF MAL-RFC002E (3)
IMF MAL-RFC006A (3)  
IMF MAL-RFC006A (3)
> TRIGGER 4 - ASD UPS Trouble Alarm IMF ANN-602A13C05 (4) 0 Page 18 of 19


>
Appendix D                                 NRC SCENARIO #1                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009
> TRIGGER 4 - ASD UPS Trouble Alarm IMF ANN-602A13C05 (4) 0
> TRIGGER 5 - SUPP CHAMBER LEVEL INDICATION
 
>
Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page  19 of  19
> TRIGGER 5 - SUPP CHAMBER LEVEL INDICATION
>SLOWLY DROPS TO BOTTOM OF SCALE (8"/MIN)
>SLOWLY DROPS TO BOTTOM OF SCALE (8"/MIN)
IMF XMT-PCN003A (5 5) -25 198 IMF XMT-PCN004A (5 5) -24.94 200 IMF XMT-PCN006A (5 5) 3 3000 IMF XMT-PCN007A (5 5) 2 2999  
IMF XMT-PCN003A (5 5) -25 198 IMF XMT-PCN004A (5 5) -24.94 200 IMF XMT-PCN006A (5 5) 3 3000 IMF XMT-PCN007A (5 5) 2 2999
 
> LINE BREAK AT RHR-P-2B SUCTION IMF MAL-RHR005 (5 10) 8000
>
> EARTHQUAKE IMF MAL-RWB001 (5) 0.3
> LINE BREAK AT RHR-P-2B SUCTION IMF MAL-RHR005 (5 10) 8000  
> TRIGGER 6 - PULLS CONTROL POWER FUSES FOR RHR-P-2B IRF LOA-EPS397 (6) 1
 
> TRIGGER 10 - PULLS CONTROL POWER FUSES FOR HPCS-P-1 IMF BKR-CSS001 (10) 5
>
>The following are conditionals to initiate triggers
> EARTHQUAKE IMF MAL-RWB001 (5) 0.3  
> Locks in annunciator window 602.A6 5-1 when both ASD annunciator
 
> and itself are actuated IMF ANN-602A6E01 (7) 0 TRGSET 7 "JN06E01.AND.JN13D03.GT.0"
>
>Causes the RCIC pump shaft to seize when speed exceeds 300 rpm.
> TRIGGER 6 - PULLS CONTROL POWER FUSES FOR RHR-P-2B IRF LOA-EPS397 (6) 1  
IMF PMP-RCI001S (8) TRUE TRGSET 8 "X01D066M.GT.300"
 
>Mode switch to shutdown causes RFW pumps to trip and cannot be reset TRGSET 9 "X03I102S.GT.0" IOR OVR-FPT002B (9) ON IOR OVR-FPT002C (9) OFF IOR OVR-FPT007B (9) ON IOR OVR-FPT007C (9) OFF
>
>Local Bat file loads generic triggers for local plant actions bat LOCAL.txt Page 19 of 19
> TRIGGER 10 - PULLS CONTROL POWER FUSES FOR HPCS-P-1 IMF BKR-CSS001 (10) 5  
 
>
>**********************************************************************
>The following are conditionals to initiate triggers  
 
>**********************************************************************
 
>
> Locks in annunciator window 602.A6 5-1 when both ASD annunciator  
 
> and itself are actuated IMF ANN-602A6E01 (7) 0  


TRGSET 7 "JN06E01.AND.JN13D03.GT.0"
INSTRUCTIONAL COVER SHEET PROGRAM              OPERATIONS TRAINING COURSE TITLE          COLUMBIA GENERATING STATION SIMULATOR EXAMINATION DG-3 Monthly Surveillance, Failure of HPCS-P-2, RFW-DPT-4B Failure, FWH-6B High Level Trip, DEH Leak Requiring Manual Scram, Loss of LESSON TITLE          TR-S, DG-1/2 Fails to Auto Start, LOCA, ED on RPV Level LENGTH OF LESSON 1.5 Hours INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code                                                        Rev. No.
>
Simulator Guide PQD Code      LO001626                                      Rev. No.      0 JPM PQD Code                                                                Rev. No.
>Causes the RCIC pump shaft to seize when speed exceeds 300 rpm. IMF PMP-RCI001S (8) TRUE TRGSET 8 "X01D066M.GT.300"
Exam PQD Code                                                              Rev. No.
>
DIVISION TITLE Nuclear Training DEPARTMENT        Operations Training PREPARED BY                            Ron Hayden                          DATE      06/16/08 REVISED BY                                                                DATE VALIDATED BY                                                              DATE TECHNICAL REVIEW                                                          DATE INSTRUCTIONAL REVIEW                                                      DATE APPROVED                                                                  DATE Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use.
>Mode switch to shutdown causes RFW pumps to trip and cannot be reset TRGSET 9 "X03I102S.GT.0" IOR OVR-FPT002B (9)  ON IOR OVR-FPT002C (9)  OFF IOR OVR-FPT007B (9)  ON IOR OVR-FPT007C (9)  OFF 


>
Appendix D                    NRC SCENARIO No. 2                                    FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Facility: Columbia                    NRC Scenario No: 2 Examiners: _______________                Operators: _______________
>Local Bat file loads generic triggers for local plant actions bat LOCAL.txt
Initial Conditions:    The reactor has been operating at 100% power for the last 131 days. This is a Division 3 work week. OSP-ELEC-M703, DG-3 Monthly Surveillance, is in progress. OPS 2 is standing by in the HPCS DG room. DG-3 is running and SM-2 is being powered from TR-S per OPS-ELEC-M703. PDIS signal X108 (DG3 voltage) is not available.
Turnover Information: Continue with DG-3 monthly surveillance which has been completed through step 7.5.49.
Time        Position                              Applicants Actions or Behavior
: 1.      N (BOP)    Synchronize DG-3 per monthly surveillance OSP-ELEC-M703 C (BOP)    Failure of HPCS-P-2 requiring manual trip of DG-3 2.
C (SRO)    SRO - Tech Spec C      Failure of RFW-DPT-4B - Narrow Range on H13-P603 3.
(SRO/RO)    SRO - Tech Spec R (RO)    High Level Trip of FWH-6B requiring reducing core flow to LE 92 Mlbm/hr 4.
Rod Line GT 100% requiring using Fast Shutdown Sequence to insert rods to lower the rod line Also required core flow be lowered to 75 Mlbm/hr C      DEH Leak eventually requires a manual scram and trip of MT and MG 5.
(SRO/BOP)
: 6.                  TR-S Lockout; MSIVs close, Initiate RCIC/CRD for level control
: 7.        C (RO)    DG-1 and DG-2 Fails to Auto Start
: 8.      M (All)    LOCA - Spray Wetwell and Drywell
: 9.                  LOCA - RPV level drops to TAF
: 10.                  Initiate Emergency Depressurization on low RPV Level and return level to normal with low pressure ECCS pumps
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 21


INSTRUCTIONAL COVER SHEET PROGRAM  OPERATIONS TRAINING COURSE TITLE COLUMBIA GENERATING STATION SIMULATOR EXAMINATION LESSON TITLE DG-3 Monthly Surveillance, Failure of HPCS-P-2, RFW-DPT-4B Failure, FWH-6B High Level Trip, DEH Leak Requiring Manual Scram, Loss of TR-S, DG-1/2 Fails to Auto Start, LOCA, ED on RPV Level LENGTH OF LESSON  1.5 Hours INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code  Rev. No. Simulator Guide PQD Code LO001626 Rev. No.0 JPM PQD Code  Rev. No. Exam PQD Code  Rev. No.
Appendix D                    NRC SCENARIO No. 2                                      FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SCENARIO DESCRIPTION The scenario begins with power at 100%. DG-3 is running and SM-2 is powered from Startup to support surveillance testing of DG-3.
DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY Ron Hayden DATE  06/16/08  REVISED BY DATE    VALIDATED BY DATE    TECHNICAL REVIEW DATE  INSTRUCTIONAL REVIEW DATE  APPROVED  DATE  Operations Training Manager    Verify materials current IAW SWP-TQS-01 prior to use.
Turnover information is that OSP-ELEC-M703, DG-3 Monthly Surveillance, is in progress and DG-3 is running and is ready to be synchronized. The BOP operator will continue with this surveillance and sync DG-3.
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 1 of 21 Facility: Columbia                              NRC Scenario No:  2 Examiners:  _______________              Operators: _______________
A short time after the DG-3 is synchronized, HPCS-P-2 will trip and Service Water to DG-3 will be lost.
Per the immediate actions of ABN-SW, DG-3 will be tripped locally. The SRO will review Tech Specs for HPCS DG being INOP.
The next event is RFW-DPT-4B (RFW-LI-606B RPV narrow range indication differential pressure transmitter) will fail and RFW-LI-606B will fail upscale causing a level 8 trip on 1 out of 3 instruments.
The crew will refer to technical specification 3.3.2.2 Action A which will give the crew 7 days to place the affected channel in Trip. The CRS will refer to ABN-INSTRUMENTATION.
The next event is a high level trip of High Pressure Feedwater Heater 6B. Feedwater temperature will drop by GT 6°F requiring entry into ABN-POWER. Reactor Power to rise requiring the RO to lower power with flow and to drive control rods to maintain LT the 100% rod line. When the fast shutdown sequence is used to insert control rods it requires core flow to be lowered to 75 Mlbm/hr.
The next event is a leak in the DEH system. ABN-DEH will be entered and the leak rate will require a reactor scram and trip of the Main Turbine and Main Generator.
When TR-S closes in it will lockout. TR-B will power SM-7 and SM-8.
When TR-S is lost the MSIVs will close causing a LOCA to develop. Manual pressure control on SRV will be required. RCIC will be initiated and CRD restarted to feed the RPV but RPV level will continue to drop.
On the High Drywell Pressure initiation signal, DG-1 and DG-2 will fail to auto start. When initiations are checked the RO will take actions and manually start both Diesel Generators.
RPV level will eventually drop to LT -161 and an Emergency Depressurization will be initiated to facilitate feeding with low pressure ECCS pumps.
Containment pressures will rise requiring the crew to spray the wetwell and the drywell. Sprays will be removed from service to allow RPV injection after the Emergency Depressurization occurs.
The scenario will be terminated when RPV level is being returned to normal band and sprays have been re-initiated as appropriate.
Page 2 of 21


_______________                                _______________
Appendix D                     NRC SCENARIO No. 2                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 1
 
_______________                                _______________
Initial Conditions:  The reactor has been operating at 100% power for the last 131 days. This is a Division 3 work week. OSP-ELEC-M703, DG-3 Monthly Surveillance, is in progress. OPS 2 is standing by in the HPCS DG room. DG-3 is running and SM-2 is being powered from TR-S per OPS-ELEC-M703. PDIS signal X108 (DG3
 
voltage) is not available. Turnover Information:  Continue with DG-3 monthly surveillance which has been completed through step 7.5.49. Time Position Applicants Actions or Behavior
: 1. N (BOP) Synchronize DG-3 per monthly surveillance OSP-ELEC-M703
: 2. C (BOP) C (SRO) Failure of HPCS-P-2 requiring manual trip of DG-3 SRO - Tech Spec
: 3. C (SRO/RO) Failure of RFW-DPT-4B - Narrow Range on H13-P603 SRO - Tech Spec
: 4. R (RO) High Level Trip of FWH-6B requiring reducing core flow to LE 92 Mlbm/hr Rod Line GT 100% requiring using Fast Shutdown Sequence to insert rods to lower the rod line Also required core flow be lowered to 75 Mlbm/hr
: 5. C (SRO/BOP) DEH Leak eventually requires a manual scram and trip of MT and MG
: 6. TR-S Lockout; MSIVs close, Initiate RCIC/CRD for level control
: 7. C (RO) DG-1 and DG-2 Fails to Auto Start
: 8. M (All) LOCA - Spray Wetwell and Drywell
: 9. LOCA - RPV level drops to TAF
: 10. Initiate Emergency Depressurization on low RPV Level and return level to normal with low pressure ECCS pumps * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 2 of  21 SCENARIO DESCRIPTION The scenario begins with power at 100%. DG-3 is running and SM-2 is powered from Startup to support surveillance testing of DG-3. Turnover information is that OSP-ELEC-M703, DG-3 Mont hly Surveillance, is in progress and DG-3 is running and is ready to be synchronized. The BOP operator will continue with this surveillance and sync
 
DG-3. A short time after the DG-3 is synchronized, HPCS-P-2 will trip and Service Water to DG-3 will be lost. Per the immediate actions of ABN-SW, DG-3 will be tripped locally. The SRO will review Tech Specs for HPCS DG being INOP. The next event is RFW-DPT-4B (RFW-LI-606B RP V narrow range indication differential pressure transmitter) will fail and RFW-LI-606B will fail upscale causing a level 8 trip on 1 out of 3 instruments.
The crew will refer to technical specification 3.3.2.2 Ac tion A which will give the crew 7 days to place the affected channel in Trip. The CRS will refer to ABN-INSTRUMENTATION.
The next event is a high level trip of High Pressure Feedwater Heater 6B. Feedwater temperature will drop by GT 6°F requiring entry into ABN-POWER. R eactor Power to rise requiring the RO to lower power with flow and to drive control rods to maintain LT the 100% rod line. When the fast shutdown sequence is used to insert control rods it requires core flow to be lowered to 75 Mlbm/hr. The next event is a leak in the DEH system. ABN-DEH will be entered and the leak rate will require a reactor scram and trip of the Main Turbine and Main Generator. When TR-S closes in it will lockout. TR-B will power SM-7 and SM-8.
When TR-S is lost the MSIVs will close causing a LOCA to develop. Manual pressure control on SRV will be required. RCIC will be initiated and CRD restarted to feed the RPV but RPV level will continue to
 
drop. On the High Drywell Pressure initiation signal, DG-1 and DG-2 will fail to auto start. When initiations are checked the RO will take actions and manually start both Diesel Generators. RPV level will eventually drop to LT -161" and an Emergency Depressurization will be initiated to facilitate feeding with low pressure ECCS pumps. Containment pressures will rise requiring the crew to spray the wetwell and the drywell. Sprays will be removed from service to allow RPV injection after the Emergency Depressurization occurs. The scenario will be terminated when RPV level is being returned to normal band and sprays have been re-initiated as appropriate.
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 3 of  21 Event No. 1


==
==
Description:==
Description:==
Synchronize DG-3 for monthly surveillance OSP-ELEC-M703.
Synchronize DG-3 for monthly surveillance OSP-ELEC-M703.
This event is initiated by the turnover sheet. Time Position Applicants Actions or Behavior T=0 SRO Directs the BOP to complete OSP-ELEC-M703 starting at step 7.5.50.
This event is initiated by the turnover sheet.
BOP (N) At H13-P601, places the CB-4DG3 Sync Selector Switch to D.
Time           Position                           Applicants Actions or Behavior T=0             SRO         Directs the BOP to complete OSP-ELEC-M703 starting at step 7.5.50.
BOP (N)       At H13-P601, places the CB-4DG3 Sync Selector Switch to D.
GEN/BUS.
GEN/BUS.
Raises voltage using Diesel Generator Voltage Reg Control switch until incoming voltage is slightly higher than running voltage.  
Raises voltage using Diesel Generator Voltage Reg Control switch until incoming voltage is slightly higher than running voltage.
 
Raises frequency with the Electric Governor control switch until sync scope is running slow in the fast (Clockwise) direction.
Raises frequency with the Electric Governor control switch until sync scope is running slow in the fast (Clockwise) direction.  
When the sync scope is about 5 minutes before the 12 oclock position, places CB-4DG3 control switch in the CLOSE position.
 
Verifies breaker closes.
When the sync scope is about 5 minutes before the 12 o'clock position, places CB-4DG3 control switch in the CLOSE position.  
Immediately verifies KVARs are zero or slightly positive.
 
Immediately loads DG-3 to GE 100 KW using the Electric Governor control switch.
Verifies breaker closes.  
 
Immediately verifies KVARs are zero or slightly positive.  
 
Immediately loads DG-3 to GE 100 KW using the Electric Governor control switch.  
 
Gradually loads DG-3 to 1300KW using the Electric Governor control switch.
Gradually loads DG-3 to 1300KW using the Electric Governor control switch.
Adjust reactive load to approximately 325 KVAR out (to the right) using Diesel Generator Voltage Regulator Control switch.  
Adjust reactive load to approximately 325 KVAR out (to the right) using Diesel Generator Voltage Regulator Control switch.
Page 3 of 21


Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 4 of  21 Places CB-4/DG3 Sync Selector Switch to OFF.  
Appendix D         NRC SCENARIO No. 2                           FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Places CB-4/DG3 Sync Selector Switch to OFF.
Wait 5 minutes.
COMMENTS:
Page 4 of 21


Wait 5 minutes.
Appendix D                   NRC SCENARIO No. 2                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 2
 
COMMENTS:   
 
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 5 of  21 Event No. 2  


==
==
Description:==
Description:==
Failure of HPCS-P-2 (DG-3 Service Water pump).. This event is initiated when the 5 minute wait step has been reached (Step 7.5.59) during operability test of DG-3 and is initiated by activating TRIGGER 1. Time Position Applicants Actions or Behavior T=10 BOP (C) Acknowledges alarms associated with the loss of HPCS-P-2.  
Failure of HPCS-P-2 (DG-3 Service Water pump)..
 
This event is initiated when the 5 minute wait step has been reached (Step 7.5.59) during operability test of DG-3 and is initiated by activating TRIGGER 1.
Time         Position                           Applicants Actions or Behavior T=10             BOP (C)       Acknowledges alarms associated with the loss of HPCS-P-2.
Scans panel and notes HPCS-P-2 is not running and SW-V-29 is going closed.
Scans panel and notes HPCS-P-2 is not running and SW-V-29 is going closed.
Informs SRO of loss of HPCS-P-2. May give ABN reference to SRO and that a trip of DG-3 is required.  
Informs SRO of loss of HPCS-P-2. May give ABN reference to SRO and that a trip of DG-3 is required.
 
May direct OPS 4 investigate loss of pump.
May direct OPS 4 investigate loss of pump.  
 
BOOTH OPERATOR - If requested, three minutes after request inform the Control Room that HPCS-P-2 is hot to the touch and the motor looks scorched.
BOOTH OPERATOR - If requested, three minutes after request inform the Control Room that HPCS-P-2 is hot to the touch and the motor looks scorched.
If required, the breaker is tripped for HPCS-P-2 on MC-4A.
If required, the breaker is tripped for HPCS-P-2 on MC-4A.
SRO (C) Announces entry into ABN-SW.  
SRO (C)       Announces entry into ABN-SW.
 
Directs BOP to have DG-3 tripped at the local panel (if BOP has not already performed).
Directs BOP to have DG-3 tripped at the local panel (if BOP has not already performed).
BOOTH OPERATOR - 30 seconds after reque st to trip DG-3, activate TRIGGER 20 and inform the control room when trip has occurred. SRO Contacts Work Week Manager.  
BOOTH OPERATOR - 30 seconds after request to trip DG-3, activate TRIGGER 20 and inform the control room when trip has occurred.
SRO       Contacts Work Week Manager.
Reviews Technical Specifications: TS 3.8.1B - One required DG inoperable requires: B1 - performance of SR 3.8.1.1 for OPERABLE offsite circuit within 1 hour; B2 - Declare required features associated with inop DG, inoperable (TS 3.5.1 B1 HPCS System inoperable -
Verify RCIC operable immediately and restore HPCS within 14 days);
AND B.3.1 Determine common cause within 24 hours ; AND B.4.1 -
Page 5 of 21


Reviews Technical Specifications: TS 3.8.1B - One required DG inoperable requires: B1 - performance of SR 3.8.1.1 for OPERABLE offsite circuit within 1 hour; B2 - Declare required features associated with inop DG, inoperable (TS 3.5.1 B1 HPCS System inoperable - Verify RCIC operable immediately and restore HPCS within 14 days); AND B.3.1 Determine common cause within 24 hours ; AND B.4.1 -
Appendix D         NRC SCENARIO No. 2                           FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Restore DG to operable status within 72 hours.
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 6 of  21 Restore DG to operable status within 72 hours.  
May protect DG-1 and DG-2 per OI-49.
COMMENTS:
Page 6 of 21


May protect DG-1 and DG-2 per OI-49.
Appendix D                     NRC SCENARIO No. 2                                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 3
 
COMMENTS:   
 
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 7 of  21 Event No. 3  


==
==
Description:==
Description:==
RFW-DPT-4B Failure. This event is initiated when the actions for HPCS-P-2 failure are complete and is initiated by activating TRIGGER 2. Time Position Applicants Actions or Behavior T=20 RO Acknowledges alarms: H13-P603 A8 drop 1-7 and 4-7 (RFW control system trouble and RFW/Turbine RPV level high trip).  
RFW-DPT-4B Failure.
 
This event is initiated when the actions for HPCS-P-2 failure are complete and is initiated by activating TRIGGER 2.
Identifies RFW-LI-606B indicated upscale but RFW-LI-606A and C are reading normal RPV level.  
Time           Position                             Applicants Actions or Behavior T=20               RO         Acknowledges alarms: H13-P603 A8 drop 1-7 and 4-7 (RFW control system trouble and RFW/Turbine RPV level high trip).
 
Identifies RFW-LI-606B indicated upscale but RFW-LI-606A and C are reading normal RPV level.
Identifies that the 'B' Reactor Vessel High Level is sealed in.  
Identifies that the B Reactor Vessel High Level is sealed in.
 
Refers to ARPs.
Refers to ARPs.
SRO Refers to ABN-INSTRUMENTATION.  
SRO       Refers to ABN-INSTRUMENTATION.
 
Refers to Tech Spec 3.3.2.2 and determines action statement 3.3.2.2 Action A applies - place the affected channel in trip within 7 days.
Refers to Tech Spec 3.3.2.2 and determines action statement 3.3.2.2 Action A applies - place the affected channel in trip within 7 days.  
Contacts Work Week Manager.
 
Conducts brief.
Contacts Work Week Manager.  
COMMENTS:
 
Page 7 of 21
Conducts brief.  


COMMENTS: 
Appendix D                     NRC SCENARIO No. 2                                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 4
 
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 8 of  21 Event No. 4  


==
==
Description:==
Description:==
 
High Level Trip of High Pressure Feedwater Heater 6B.
High Level Trip of High Pressure Feedwater Heater 6B. This event is initiated when the actions for RFW-DPT-4B failure are complete and is initiated by activating TRIGGER 3. Time Position Applicants Actions or Behavior T=20 RO Acknowledges HTR 6B High level alarm and refers to ARP.
This event is initiated when the actions for RFW-DPT-4B failure are complete and is initiated by activating TRIGGER 3.
BOP Investigates backpanel and notes controllers for dump and drain valves in AUTO and requiring the valves to be open but level continues to rise. Note:  
Time           Position                           Applicants Actions or Behavior T=20               RO         Acknowledges HTR 6B High level alarm and refers to ARP.
 
BOP       Investigates backpanel and notes controllers for dump and drain valves in AUTO and requiring the valves to be open but level continues to rise. Note:
Nothing the operator does will cause level to stop rising.  
Nothing the operator does will cause level to stop rising.
 
Reports actions (if any) to SRO and that level in FWH 6B cannot be controlled.
Reports actions (if any) to SRO and that level in FWH 6B cannot be controlled.
RO (R) Acknowledges Heater 6B High Level Trip and steam dump valves not fully closed alarms (MSR B heater drain tank alarms may also annunciate).  
RO (R)       Acknowledges Heater 6B High Level Trip and steam dump valves not fully closed alarms (MSR B heater drain tank alarms may also annunciate).
Reports trip of 6B Heater to SRO and entry into ABN-POWER.
Due to the FWH trip, observes feedwater inlet temperature and notes that it has dropped more than 6°F (begin temp is about 411°F and final temp is about 391°F).
Notes Thermal Power has gone up and when GT 3486 MWT, reduces power with RRC flow to maintain LT 3486 per Immediate actions of ABN-POWER.
(Note: SRO may direct power reduction to LE 92Mlbm/hr prior to RO reducing to LT 3486 MWT.)
SRO (C)      Announced entry into ABN-POWER and per step 4.4.1, directs RRC flow be Page 8 of 21


Reports trip of 6B Heater to SRO and entry into ABN-POWER.
Appendix D         NRC SCENARIO No. 2                           FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 lowered to LE 92 Mlbm/hr core flow.
 
COMMENTS:
Due to the FWH trip, observes feedwater inlet temperature and notes that it has dropped more than 6°F (begin temp is about 411°F and final temp is
Page 9 of 21
 
about 391°F).
 
Notes Thermal Power has gone up and when GT 3486 MWT, reduces power with RRC flow to maintain LT 3486 per Immediate actions of ABN-POWER. 
(Note: SRO may direct power reduction to LE 92Mlbm/hr prior to RO reducing to LT 3486 MWT.)
SRO (C) Announced entry into ABN-POWER and per step 4.4.1, directs RRC flow be Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 9 of  21 lowered to LE 92 Mlbm/hr core flow.
COMMENTS:  


Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 10 of  21 Event No. 5  
Appendix D                   NRC SCENARIO No. 2                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 5


==
==
Description:==
Description:==
DEH System Leak requiring a Manual Scram be inserted. This event is initiated when the actions for the trip of FWH 6B are complete and is initiated by activating TRIGGER 4. Time Position Applicants Actions or Behavior Critical Task is to initiate a Manual Reactor Scram when the DEH Low Low Reservoir Level alarm annunciates within 15 minutes of the Low Reservoir level annunciator.
DEH System Leak requiring a Manual Scram be inserted.
T=35 BOP (C) Acknowledges DEH Reservoir Level Low annunciator and refers to ARP.
This event is initiated when the actions for the trip of FWH 6B are complete and is initiated by activating TRIGGER 4.
Directs OPS3 to investigate locally and report level on DEH-LG-17.  
Time         Position                           Applicants Actions or Behavior Critical Task is to initiate a Manual Reactor Scram when the DEH Low Low Reservoir Level alarm annunciates within 15 minutes of the Low Reservoir level annunciator.
T=35             BOP (C)       Acknowledges DEH Reservoir Level Low annunciator and refers to ARP.
Directs OPS3 to investigate locally and report level on DEH-LG-17.
References ABN-DEH-LEAK to SRO.
Announces entry into ABN-DEH-LEAK.
SRO (C)
Directs that OPS1 commence filling the DEH reservoir per SOP-DEH-OPS.
Notes time and starts 15 minute clock for step 4.1.1 of ABN-DEH-LEAK.
BOOTH OPERATOR - Initial tank level will be one minute after request and remainder of reports will be consistent with time since trigger initiation as follows:
Initial report tank level is 16.75; Level report will be 1/2 less each minute after initial level report. It takes 11 minutes to get Low Low Level alarm which required a manual scram BOP        Acknowledges DEH Reservoir Level Low Low annunciator and refers to ARP (It takes 11 minutes from low level alarm to get low-low alarm).
Page 10 of 21


References ABN-DEH-LEAK to SRO.  
Appendix D            NRC SCENARIO No. 2                                    FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO      Directs manual scram; trip of Main Turbine, and trip of Main Generator per step 4.1.1 of ABN-DEH-LEAK.
Announces Listen up for the scram report and places MODE switch to RO shutdown. Announces APRM downscales in, RPV pressure reading and trend, RPV level reading and trend, and EOP entry on low RPV level.
Announces all-rods-in to SRO.
Initiates trip of the Main Turbine (if not automatically completed) by BOP depressing the two Turbine trip pushbuttons.
Initiates trip of the Main Generator (if not automatically complete) by depressing the two red Unit Emergency and Unit Overall Emergency pushbuttons.
Announces entry into EOP 5.1.1, RPV Control, on low RPV level.
SRO COMMENTS:
Page 11 of 21


SRO (C) Announces entry into ABN-DEH-LEAK.
Appendix D                     NRC SCENARIO No. 2                                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 6
 
Directs that OPS1 commence filli ng the DEH reservoir per SOP-DEH-OPS.
Notes time and starts 15 minute clock for step 4.1.1 of ABN-DEH-LEAK. BOOTH OPERATOR - Initial tank level will be one minute after request and remainder of reports will be consistent with time since trigger initiation as follows: Initial report tank level is 16.75"; Level report will be 1/2" less each minute after initial level report. It takes 11 minutes to get Low Low Level alarm which required a manual scram BOP Acknowledges DEH Reservoir Level Low Low annunciator and refers to ARP (It takes 11 minutes from low level alarm to get low-low alarm).
 
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 11 of  21 SRO Directs manual scram; trip of Main Turbine, and trip of Main Generator per step 4.1.1 of ABN-DEH-LEAK.
RO Announces 'Listen up for the scram report' and places MODE switch to shutdown. Announces APRM downscales in, RPV pressure reading and trend, RPV level reading and trend, and EOP entry on low RPV level.
 
Announces all-rods-in to SRO.
 
BOP Initiates trip of the Main Turbine (if not automatically completed) by depressing the two Turbine trip pushbuttons.
 
Initiates trip of the Main Generator (if not automatically complete) by depressing the two red Unit Emergency and Unit Overall Emergency pushbuttons.
SRO Announces entry into EOP 5.1.1, RPV Control, on low RPV level.
COMMENTS:
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 12 of  21 Event No. 6  


==
==
Description:==
Description:==
Lockout of the Startup Transformer. MSIVs close, Initiate RCIC and CRD This event is automatically initiated when CB-S1 breaker closes. Time Position Applicants Actions or Behavior BOP Investigates electrical board status when lights go out after TR-S lockout.
Lockout of the Startup Transformer. MSIVs close, Initiate RCIC and CRD This event is automatically initiated when CB-S1 breaker closes.
 
Time           Position                           Applicants Actions or Behavior Investigates electrical board status when lights go out after TR-S lockout.
Notes no power to SM-1, SM-2, SM-3, SH-5 or SH-6.
BOP Notes no power to SM-1, SM-2, SM-3, SH-5 or SH-6.
 
Notes TR-B is powering SM-7 and SM-8.
Notes TR-B is powering SM-7 and SM-8.
Updates crew on plants electrical board status.
 
Notes that MSIVs have closed and announces pressure control with BOP/RO SRVs at a pressure band of 800 to 1000 psig.
Updates crew on plants electrical board status.  
Working down the level leg of EOP 5.1.1, notes that no high pressure SRO injection sources are running. Directs RCIC and CRD be initiated and injection to RPV at a level band of +13 to +54.
 
Using the quick card, Arms and Depresses RCIC Manual Initiation BOP/RO pushbutton and verifies injection at 600 gpm.
BOP/RO Notes that MSIVs have closed and announces pressure control with SRVs at a pressure band of 800 to 1000 psig.
SRO Working down the level leg of EOP 5.1.1, notes that no high pressure injection sources are running. Directs RCIC and CRD be initiated and injection to RPV at a level band of +13" to +54".
BOP/RO Using the quick card, Arms and Depresses RCIC Manual Initiation pushbutton and verifies injection at 600 gpm.  
 
Starts CRD pump as directed. May direct ABN-CRD-MAXFLOW be performed to facilitate running both CRD pumps.
Starts CRD pump as directed. May direct ABN-CRD-MAXFLOW be performed to facilitate running both CRD pumps.
BOOTH OPERATOR - If requested, wait 5 minutes and then activate TRIGGER 26 to place both CRD suction and discharge filters on line and report completion to control room.
BOOTH OPERATOR - If requested, wait 5 minutes and then activate TRIGGER 26 to place both CRD suction and discharge filters on line and report completion to control room.
BOP/RO Notes that no CAS air compressors are running, contacts OPS3 and directs the reset of CAS compressors.  
Notes that no CAS air compressors are running, contacts OPS3 and BOP/RO directs the reset of CAS compressors.
Page 12 of 21


Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 13 of  21 BOOTH OPERATOR - If requested, wait 2 minutes and then initiate trigger (23) to reset CAS Air Compressors.
Appendix D             NRC SCENARIO No. 2                             FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BOOTH OPERATOR - If requested, wait 2 minutes and then initiate trigger (23) to reset CAS Air Compressors.
COMMENTS:  
COMMENTS:
Page 13 of 21


Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 14 of  21 Event No. 7  
Appendix D                   NRC SCENARIO No. 2                                   FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 7


==
==
Description:==
Description:==
Failure of DG-1 and DG-2 to AUTO start on Undervoltage or when DW/P reaches 1.68 psig. This event is automatically initiated when SM-7 and SM-8 become de-energized or when DW/P rises above 1.68 psig. Time Position Applicants Actions or Behavior BOP/RO (C) When TR-S locks out of when initiations are checked due to DW/P being GT 1.68 psig, notes that neither DG-1 nor DG-2 are running.  
Failure of DG-1 and DG-2 to AUTO start on Undervoltage or when DW/P reaches 1.68 psig.
 
This event is automatically initiated when SM-7 and SM-8 become de-energized or when DW/P rises above 1.68 psig.
Takes control switches for both DG-1 and DG-2 to start and notes that they did start.  
Time       Position                           Applicants Actions or Behavior BOP/RO       When TR-S locks out of when initiations are checked due to DW/P being GT (C)      1.68 psig, notes that neither DG-1 nor DG-2 are running.
 
Takes control switches for both DG-1 and DG-2 to start and notes that they did start.
Informs SRO of failure of DGs to auto start.  
Informs SRO of failure of DGs to auto start.
Directs OPS 3 verify DG operation after auto start.
BOOTH OPERATOR: After requested, wait 5 minutes and report DG 1 and DG2 operating normally.
COMMENTS:
Page 14 of 21


Directs OPS 3 verify DG operation after auto start.
Appendix D                     NRC SCENARIO No. 2                                       FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 8
 
BOOTH OPERATOR: After requested, wait 5 mi nutes and report DG 1 and DG2 operating normally.
COMMENTS: 
 
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 15 of  21 Event No. 8  


==
==
Description:==
Description:==
LOCA (Containment Sprays).
LOCA (Containment Sprays).
This event is initiated automatically one minute after the MSIVs close. Time Position Applicants Actions or Behavior RO/BOP Recognizes rising DW Pressure and reports EOP entry at 1.68 psig.
This event is initiated automatically one minute after the MSIVs close.
Also reports additional primary containment EOP entries as they occur.  
Time           Position Applicants Actions or Behavior RO/BOP       Recognizes rising DW Pressure and reports EOP entry at 1.68 psig.
Also reports additional primary containment EOP entries as they occur.
SRO        Enters EOP 5.2.1, Primary Containment Control and re-enters 5.1.1 due to high DW pressure.
Directs isolations, initiations and DG starts for +13, -50 and 1.68 psig be verified as parameters occur.
RO/BOP        Reports Wetwell pressure when it reaches 2 psig.
SRO        Directs Wetwell sprays with RHR. Directs securing sprays if pressure drops below 1.68 psig.
RO/BOP        Using quick card, initiates wetwell sprays and supplements with wetwell cooling and reports completion to SRO.
SRO        May directs other loop of RHR be placed in suppression pool cooling.
RO/BOP        Utilizing quick card, places RHR loop in SP Cooling.
Page 15 of 21


SRO Enters EOP 5.2.1, Primary Containment Control and re-enters 5.1.1 due to high DW pressure.
Appendix D            NRC SCENARIO No. 2                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 RO/BOP    Reports Wetwell pressure when it reaches 12 psig.
Directs isolations, initiations and DG starts for +13", -50" and 1.68 psig be verified as parameters occur.  
SRO      Directs drywell cooling fans be secured.
 
RO/BOP    Secures drywell cooling fans as directed and reports completion.
RO/BOP Reports Wetwell pressure when it reaches 2 psig.  
SRO      Directs DSIL verification and then drywell sprays be initiated. Directs securing sprays if drywell pressure drops below 1.68 psig.
RO/BOP   Verifies within DSIL and using quick card, initiates drywell sprays as directed.
Reports Drywell pressure drop as expected.
COMMENTS:
Page 16 of 21


SRO Directs Wetwell sprays with RHR. Directs securing sprays if pressure drops below 1.68 psig.
Appendix D                     NRC SCENARIO No. 2                                   FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 9
 
RO/BOP Using quick card, initiates wetwell sprays and supplements with wetwell cooling and reports completion to SRO.
 
SRO May directs other loop of RHR be placed in suppression pool cooling.
RO/BOP Utilizing quick card, places RHR loop in SP Cooling.
 
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 16 of  21 RO/BOP Reports Wetwell pressure when it reaches 12 psig.
SRO Directs drywell cooling fans be secured.
RO/BOP Secures drywell cooling fans as directed and reports completion.
SRO Directs DSIL verification and then drywell sprays be initiated. Directs securing sprays if drywell pressure drops below 1.68 psig.
RO/BOP Verifies within DSIL and using quick card, initiates drywell sprays as directed.
 
Reports Drywell pressure drop as expected.
 
COMMENTS: 
 
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 17 of  21 Event No. 9  


==
==
Description:==
Description:==
LOCA (RPV Level Drop).
LOCA (RPV Level Drop).
This event is initiated automatically one minut e after TR-S lockout and the MSIVs close. Time Position Applicants Actions or Behavior BOP/RO Reports RPV level dropping even with RCIC and CRD running.
This event is initiated automatically one minute after TR-S lockout and the MSIVs close.
Gives RPV level reports as level continues to lower.  
Time           Position                         Applicants Actions or Behavior BOP/RO       Reports RPV level dropping even with RCIC and CRD running.
 
Gives RPV level reports as level continues to lower.
NOTE - From the time -50 " RPV/ Level is reached, it takes about 5 minutes to get to -129" RPV/L and another minute to get to TAF and an additional minute to get to -183" RPV/L.
NOTE - From the time -50 RPV/ Level is reached, it takes about 5 minutes to get to -129 RPV/L and another minute to get to TAF and an additional minute to get to -183 RPV/L.
SRO Directs ADS be inhibited when ADS timers initiate.
SRO       Directs ADS be inhibited when ADS timers initiate.
BOP/RO When RPV/L drops to -129" and the ADS timers intimate, takes both ADS inhibit switches to inhibit and acknowledges BISIs.  
BOP/RO       When RPV/L drops to -129 and the ADS timers intimate, takes both ADS inhibit switches to inhibit and acknowledges BISIs.
 
Reports ADS inhibited to SRO.
Reports ADS inhibited to SRO.
BOP/RO Reports RPV level as it transitions from Wide Range to Fuel Zone indicators.  
BOP/RO       Reports RPV level as it transitions from Wide Range to Fuel Zone indicators.
 
Reports RPV level at TAF and trend continues down slow.
Reports RPV level at TAF and trend continues down slow.
COMMENTS:
COMMENTS:
Page 17 of 21


Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 18 of  21 Event No. 10  
Appendix D                       NRC SCENARIO No. 2                                   FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 10


==
==
Description:==
Description:==
 
Initiate Emergency Depressurization.
Initiate Emergency Depressurization. This is initiated when it is determined that RPV level cannot be restored and maintained GT -183". Critical Task is to initiate an Emergency Depressurization when TAF is reached at -161" and before RPV Level drops to -183".
This is initiated when it is determined that RPV level cannot be restored and maintained GT -183.
Time Position Applicants Actions or Behavior SRO Determines that Emergency Depressurization is required.
Critical Task is to initiate an Emergency Depressurization when TAF is reached at -161 and before RPV Level drops to -183.
Enters PPM 5.1.3, Emergency Depressurization, and determines wetwell level GT 17'.
Time           Position                             Applicants Actions or Behavior SRO           Determines that Emergency Depressurization is required.
Enters PPM 5.1.3, Emergency Depressurization, and determines wetwell level GT 17.
Directs 7 ADS SRVs be opened.
Directs 7 ADS SRVs be opened.
RO/BOP Opens 7 ADS SRVs as directed.
RO/BOP         Opens 7 ADS SRVs as directed.
SRO Directs wetwell and drywell sprays and suppression pool cooling be secured to facilitate RPV injection.
SRO           Directs wetwell and drywell sprays and suppression pool cooling be secured to facilitate RPV injection.
RO/BOP Secures DW and WW sprays and SP cooling as directed.
RO/BOP         Secures DW and WW sprays and SP cooling as directed.
Allows ECCS injection valves to open at 470 psig.
Allows ECCS injection valves to open at 470 psig.
Reports RPV injection as it occurs.
Reports RPV injection as it occurs.
Reports RPV level rising and when GT -161 inches.
Reports RPV level rising and when GT -161 inches.
COMMENTS:
COMMENTS:
Page 18 of 21


Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 19 of  21 Event No. 11  
Appendix D                     NRC SCENARIO No. 2                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 11


==
==
Description:==
Description:==
Re-initiation of Wetwell and Drywell Sprays.
Re-initiation of Wetwell and Drywell Sprays.
This event is initiated by the SRO when RPV level has been raised GT TAF. Time Position Applicants Actions or Behavior SRO Based on rate of RPV level change, injection systems available, and wetwell pressure, directs re-initiation of wetwell and drywell sprays and suppression pool cooling with RHR as appropriate (Wetwell spray initiation if WW/P GT 2 psig and DW Spray initiation if WW/P GT 12  
This event is initiated by the SRO when RPV level has been raised GT TAF.
 
Time           Position                           Applicants Actions or Behavior SRO         Based on rate of RPV level change, injection systems available, and wetwell pressure, directs re-initiation of wetwell and drywell sprays and suppression pool cooling with RHR as appropriate (Wetwell spray initiation if WW/P GT 2 psig and DW Spray initiation if WW/P GT 12 psig.
psig.
RO/BOP         Secures injection systems as directed to return RPV level to +13 to +54 inch band.
RO/BOP Secures injection systems as directed to return RPV level to +13 to +54 inch band.  
Reinitiates wetwell and drywell sprays as appropriate.
 
Reinitiates suppression pool cooling as directed.
Reinitiates wetwell and drywell sprays as appropriate.  
 
Reinitiates suppression pool cooling as directed.  
 
Termination Criteria: The scenario will be terminated when RPV level is being returned to normal and wetwell and drywell sprays have been initiated as appropriate.
Termination Criteria: The scenario will be terminated when RPV level is being returned to normal and wetwell and drywell sprays have been initiated as appropriate.
COMMENTS:
COMMENTS:
 
Page 19 of 21
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 20 of 21 TURNOVER INFORMATION Initial Conditions:  The reactor has been operating at 100% power for the last 131 days. This is a Division 3 work week. OSP-ELEC-M703, DG-3 Monthly Surveillance, is in progress. OPS 2 is standing by in the HPCS DG room. DG-3 is running and SM-2 is being powered from TR-S per OPS-ELEC-M703. PDIS signal X108 (DG3 voltage) is not available.


Appendix D              NRC SCENARIO No. 2                            FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 TURNOVER INFORMATION Initial Conditions:    The reactor has been operating at 100% power for the last 131 days. This is a Division 3 work week. OSP-ELEC-M703, DG-3 Monthly Surveillance, is in progress. OPS 2 is standing by in the HPCS DG room. DG-3 is running and SM-2 is being powered from TR-S per OPS-ELEC-M703. PDIS signal X108 (DG3 voltage) is not available.
Turnover Information: Continue with OSP-ELEC-M703, DG-3 Monthly Surveillance, which has been completed up through step 7.5.49.
Turnover Information: Continue with OSP-ELEC-M703, DG-3 Monthly Surveillance, which has been completed up through step 7.5.49.
SIMULATOR SETUP Reset to IC-180.
SIMULATOR SETUP Reset to IC-180.
Have HPCS DG Surveillance signed off thru step 7.5.49.
Have HPCS DG Surveillance signed off thru step 7.5.49.
Ensure sign at SRO desk indicates a Division 3 work week.  
Ensure sign at SRO desk indicates a Division 3 work week.
 
Page 20 of 21
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 21 of 21 BAT FILE > 2009 NRC Scenario #2
>*************************
>*  Trigger list *
 
>*************************
 
>Trigger 1 HPCS-P-2 Shaft Seizure
>Trigger 2 RFW-DPT-4B Fails


>Trigger 3 Feedwater Heater 6B Trips  
Appendix D                        NRC SCENARIO No. 2                      FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BAT FILE
>Trigger 4 DEH Leak  
> 2009 NRC Scenario #2
>Trigger 10 Conditional for TR-S Lockout and LOCA on CB S1 closure  
>* Trigger list *
 
>Trigger 1 HPCS-P-2 Shaft Seizure
>**********************************************************************
>Trigger 2 RFW-DPT-4B Fails
>The following items setup conditions for the beginning of the scenario
>Trigger 3 Feedwater Heater 6B Trips
 
>Trigger 4 DEH Leak
>**********************************************************************
>Trigger 10 Conditional for TR-S Lockout and LOCA on CB S1 closure
 
>The following items setup conditions for the beginning of the scenario
> DG1 ECCS - FAIL AUTO START IMF MAL-DGN006A TRUE IMF MAL-DGN007A TRUE  
> DG1 ECCS - FAIL AUTO START IMF MAL-DGN006A TRUE IMF MAL-DGN007A TRUE
 
> DG2 ECCS - FAIL AUTO START IMF MAL-DGN006B TRUE IMF MAL-DGN007B TRUE
> DG2 ECCS - FAIL AUTO START IMF MAL-DGN006B TRUE IMF MAL-DGN007B TRUE  
>The following items are triggered in the scenario
 
>TRIGGER 1 - HPCS-P-2 SHAFT SEIZURE IMF PMP-SSW001S (1) TRUE
>**********************************************************************
>TRIGGER 2 - RFW-DPT-4B FAILS UPSCALE IMF XMT-RRS107A (2) 60.000000 0 36.389500
>The following items are triggered in the scenario  
> TRIGGER 3 FWH 6B TRIPS ON HIGH LEVEL
 
> DUMP VALVE LCV-6B2 FAILS CLOSED IMF AOV-FWH050F (3) 1
>**********************************************************************
> DRAIN VALVE LCV-6B1 FAILS CLOSED IMF AOV-FWH049F (3) 1
 
> TRIGGER 4 - DEH COMMON DISCH LEAK
>TRIGGER 1 - HPCS-P-2 SHAFT SEIZURE IMF PMP-SSW001S (1) TRUE  
 
>
>TRIGGER 2 - RFW-DPT-4B   FAILS UPSCALE IMF XMT-RRS107A (2) 60.000000 0 36.389500  
 
>
> TRIGGER 3 FWH 6B TRIPS ON HIGH LEVEL  
> DUMP VALVE LCV-6B2 FAILS CLOSED IMF AOV-FWH050F (3) 1  
 
> DRAIN VALVE LCV-6B1 FAILS CLOSED IMF AOV-FWH049F (3) 1  
 
>
> TRIGGER 4 - DEH COMMON DISCH LEAK  
> DEH RESERVOIR LEVEL LOW ALARM (P820-B1.6-7)
> DEH RESERVOIR LEVEL LOW ALARM (P820-B1.6-7)
IMF ANN-820B1F07 (4) 0  
IMF ANN-820B1F07 (4) 0
> DEH RESERVOIR LEVEL LOW-LOW ALARM (P820-B1.7-7)
> DEH RESERVOIR LEVEL LOW-LOW ALARM (P820-B1.7-7)
IMF ANN-820B1G07 (4 660) 0  
IMF ANN-820B1G07 (4 660) 0
 
>The following are conditionals to initiate triggers
>
>TRIGGER 10 TR-S TRIP/LOCKS OUT ON CLOSURE ON CB-S1 IMF MAL-OED001 (10) TRUE IMF MAL-RRS004B (10 60) 2 600 TRGSET 10 "X8CO230R.GT.0"
>**********************************************************************
>Local Bat file loads generic triggers for local plant actions bat local.txt Page 21 of 21
>The following are conditionals to initiate triggers  
 
>**********************************************************************
 
>TRIGGER 10 TR-S TRIP/LOCKS OUT ON CLOSURE ON CB-S1 IMF MAL-OED001 (10) TRUE IMF MAL-RRS004B (10 60) 2 600 TRGSET 10 "X8CO230R.GT.0"  
>
>Local Bat file loads generic triggers for local plant actions bat local.txt  
 
Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 22 of  21 INSTRUCTIONAL COVER SHEET PROGRAM  OPERATIONS TRAINING COURSE TITLE COLUMBIA GENERATING STATION SIMULATOR EXAMINATION LESSON TITLE Raise Power With Flow, MS-RV-2A Spurious Open, Place RHR in SP Cooling, ARM-RIS-3 Failure, MT Drain Tank Controller Failure Causes MT Trip, Hydraulic ATWS, Reduced SLC, Lower Level, S/R/S Inserts Control Rods, Return Level to Normal LENGTH OF LESSON
 
===1.5 Hours===
 
L S INCLUDED Lesson Plan PQD Code  Rev. No. Simulator Guide PQD Code LO001627 Rev. No.0 JPM PQD Code  Rev. No. Exam PQD Code  Rev. No.
DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY Ron Hayden DATE  6/12/08  REVISED BY DATE    VALIDATED BY DATE    TECHNICAL REVIEW DATE  INSTRUCTIONAL REVIEW DATE  APPROVED  DATE Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 23 of 21 Operations Training Manager    Verify materials current IAW SWP-TQS-01 prior to use.
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 1 of 17 Facility: Columbia                              NRC Scenario No:    3  Examiners:  _______________              Operators: _______________
 
_______________                                _______________


_______________                                 _______________
Appendix D                NRC SCENARIO No. 2                                 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 INSTRUCTIONAL COVER SHEET PROGRAM              OPERATIONS TRAINING COURSE TITLE          COLUMBIA GENERATING STATION SIMULATOR EXAMINATION Raise Power With Flow, MS-RV-2A Spurious Open, Place RHR in SP Cooling, ARM-RIS-3 Failure, MT Drain Tank Controller Failure Causes LESSON TITLE          MT Trip, Hydraulic ATWS, Reduced SLC, Lower Level, S/R/S Inserts Control Rods, Return Level to Normal LENGTH OF LESSON    1.5 Hours LS INCLUDED Lesson Plan PQD Code                                                        Rev. No.
Simulator Guide PQD Code      LO001627                                    Rev. No.      0 JPM PQD Code                                                                Rev. No.
Exam PQD Code                                                              Rev. No.
DIVISION TITLE Nuclear Training DEPARTMENT        Operations Training PREPARED BY        Ron Hayden                                              DATE      6/12/08 REVISED BY                                                                DATE VALIDATED BY                                                              DATE TECHNICAL REVIEW                                                          DATE INSTRUCTIONAL REVIEW                                                      DATE APPROVED                                                                  DATE Page 22 of 21


Initial conditions:  During a plant startup following a refueling outage, Columbia is at approximately 60% with the Main Turbine Generator synchronized. CAS-C-
Appendix D            NRC SCENARIO No. 2                            FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use.
Page 23 of 21


1C is tagged out for repairs.  
Appendix D                          NRC Scenario No. 3                                    FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Facility: Columbia                      NRC Scenario No: 3 Examiners: _______________                Operators: _______________
Initial conditions:            During a plant startup following a refueling outage, Columbia is at approximately 60% with the Main Turbine Generator synchronized. CAS-C-1C is tagged out for repairs.
Turnover:                      Continue with the startup and raise power with flow to 65% power per PPM 3.1.2 step Q-60. The reactivity brief has been given.
Event    Timeline    Event                                    Event Description No.                  Type*
: 1.        T=0        R (RO)      Raise power with flow
: 2.        T=10          C        MS-RV-2A Spurious open - Pull fuses to close (SRO/BOP)
: 3.        T=15          N        Place RHR-B in Suppression Pool Cooling (BOP)
: 4.        T=35          I        ARM-RIS-3 Failure (SRO/BOP)
: 5.        T=40          C        MT Drain Tank Controller Failure - Leads to Manual Scram and (SRO/BOP) Automatic Main Turbine Trip
: 6.        T=45    M (ALL) Hydraulic ATWS. Lower RPV Level to establish LL
: 7.        T=50      C (RO)      Reduced SLC flow
: 8.        T=55                    Perform PPM 5.5.1 (ECCS Inj. Valves) and PPM 5.5.6 (MSIV bypass)
Perform PPM 5.5.10 and PPM 5.5.11 to insert control rods
: 9.        T=65                    Scram/Reset/Scram Inserts All Control Rods Return RPV Level to normal band T=75                    Termination Cue: All rods are in and RPV level is being returned/is returned to normal band
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 17


Turnover:  Continue with the startup and raise power with flow to 65% power per PPM 3.1.2 step Q-60. The reactivity brief has been given.
Appendix D                             NRC Scenario No. 3                                     FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SCENARIO DESCRIPTION The scenario starts with the reactor at approximately 60% power. The turnover information has the crew ready to raise power per PPM 3.1.2 to 65%.
Event No. Timeline Event Type* Event Description 1. T=0 R (RO) Raise power with flow 2. T=10 C (SRO/BOP)
CRO1 will begin raising power with flow to 65% at 10 Mwe per minute.
MS-RV-2A Spurious open - Pull fuses to close 3. T=15 N (BOP) Place RHR-B in Suppression Pool Cooling  4. T=35 I (SRO/BOP)
ARM-RIS-3 Failure 5. T=40 C (SRO/BOP) MT Drain Tank Controller Failure - Leads to Manual Scram and Automatic Main Turbine Trip 6. T=45 M (ALL) Hydraulic ATWS. Lower RPV Level to establish "LL"
: 7. T=50 C (RO) Reduced SLC flow
: 8. T=55  Perform PPM 5.5.1 (ECCS Inj. Valves) and PPM 5.5.6 (MSIV bypass)
 
Perform PPM 5.5.10 and PPM 5.5.11 to insert control rods
: 9. T=65  Scram/Reset/Scram Inserts All Control Rods
 
Return RPV Level to normal band
 
T=75  Termination Cue:  All rods are in and RPV level is being returned/is returned to normal band
 
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 2 of 17 SCENARIO DESCRIPTION The scenario starts with the reactor at approximately 60% power. The turnover information has the crew ready to raise power per PPM 3.1.2 to 65%. CRO1 will begin raising power with flow to 65% at 10 Mwe per minute.
The next event is a spurious opening of MS-RV-2A. ABN-SRV will be entered. When the SRV control switch is taken to close the valve will remain open.
The next event is a spurious opening of MS-RV-2A. ABN-SRV will be entered. When the SRV control switch is taken to close the valve will remain open.
RHR will be placed in Suppression Pool Cooling per SOP-RHR-SPC  
RHR will be placed in Suppression Pool Cooling per SOP-RHR-SPC Fuses BB-F19 and F20, in H13-P628, will be pulled to close the SRV. Tech specs will be referenced but none will apply.
 
The next event is a downscale failure of ARM-RIS-3. The crew will investigate, take actions per ARP and refer to LCS 1.3.7.4.
Fuses BB-F19 and F20, in H13-P628, will be pulled to close the SRV. Tech specs will be referenced but none will apply. The next event is a downscale failure of ARM-RIS-3. The crew will investigate, take actions per ARP and refer to LCS 1.3.7.4.
The next event is a failure of the level control valves associated with the A MSR drain tank. As level rises, a drain tank high level alarm annunciates. Level will continue to rise and a MSR high level alarm will activate.
The next event is a failure of the level control valves associated with the A MSR drain tank. As level rises, a drain tank high level alarm annunciates. Level will continue to rise and a MSR high level alarm will activate.
The crew should scram the plant prior to the 30 second time delay expiring. The MT will trip when the 30 second time delay times out. When the manual scram occurs the crew will recognize that the reactor control rods did not insert due to a hydraulic ATWS. PPM 5.1.1 will be entered, which will direct entry into PPM 5.1.2. Pressure s hould be controlled by MT Bypass valve operation. PPM 5.5.1 and PPM 5.5.6 will be implemented.
The crew should scram the plant prior to the 30 second time delay expiring. The MT will trip when the 30 second time delay times out.
 
When the manual scram occurs the crew will recognize that the reactor control rods did not insert due to a hydraulic ATWS. PPM 5.1.1 will be entered, which will direct entry into PPM 5.1.2. Pressure should be controlled by MT Bypass valve operation.
Reactor water level will be intentionally lowered to -65" to -183" (-80" to -140") to control reactor power.
PPM 5.5.1 and PPM 5.5.6 will be implemented.
When SLC is started the relief valves will lift resulting in reduced SLC flow (18 gpm) to the vessel.  
Reactor water level will be intentionally lowered to -65 to -183 (-80 to -140) to control reactor power.
When SLC is started the relief valves will lift resulting in reduced SLC flow (18 gpm) to the vessel.
The Control Rods will be inserted with the Reactor Manual Control System (driving rods), and the Scram/Reset/Scram method listed in PPM 5.5.11.
The ATWS will clear when RPV level has been lowered and is under control.
When all rods are in, SLC will be secured and PPM 5.1.2 will be exited. RPV level will be returned to normal band per PPM 5.1.1 with feedwater.
The scenario will be terminated when RPV level has been returned to normal band.
Page 2 of 17


The Control Rods will be inserted with the Reactor Manual Control System (driving rods), and the Scram/Reset/Scram method listed in PPM 5.5.11. The ATWS will clear when RPV level has been lowered and is under control.
Appendix D                           NRC Scenario No. 3                                   FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 1
When all rods are in, SLC will be secured and PPM 5.1.2 will be exited. RPV level will be returned to normal band per PPM 5.1.1 with feedwater. The scenario will be terminated when RPV level has been returned to normal band.
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 3 of 17 Event No. 1


==
==
Description:==
Description:==
Raise Reactor Power with Flow.
The event is initiated by turnover information and is started when the crew takes the shift.
Time          Position                          Applicants Actions or Behavior T=0                SRO        Directs RO to raise Reactor Power with flow not to exceed 10 Mwe per minute to a power level of 65%.
RO        With ASD in AUTO, raises reactor power with flow at LE 10 Mwe per minute.
COMMENTS:
Page 3 of 17


Raise Reactor Power with Flow. The event is initiated by turnover information and is started when the crew takes the shift. Time Position Applicants Actions or Behavior T = 0 SRO Directs RO to raise Reactor Power with flow not to exceed 10 Mwe per minute to a power level of 65%.
Appendix D                       NRC Scenario No. 3                                   FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 2
RO With ASD in AUTO, raises reactor power with flow at LE 10 Mwe per minute. COMMENTS:
 
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 4 of 17 Event No. 2


==
==
Description:==
Description:==
MS-RV-2A spurious open - Fuses pulled to close This event occurs when the RO Evaluator has observed the power increase and indicates the is initiated by activating TRIGGER 1 when power has been raised to 75% or when it is determined that the last event has been completed.
Time          Position                        Applicants Actions or Behavior T=10            BOP      Acknowledges SRV Open alarm, observes MS-RV-2A is open and refers to ARP Informs SRO and refers him to ABN-SRV SRO      Directs actions:
Verify SRV open by tail pipe temp rise or SP Temp/level rise or MG output reduction With power LT 90% - directs BOP to place the control switch for MS-RV-2A to OFF BOP      Places the control switch to OFF and observes that the SRV is still open and informs the SRO SRO      Directs placing RHR in Suppression Pool Cooling per SOP-RHR-SPC (Refer to Event 3)
SRO      Directs fuses be pulled per Attachment 7.1 BOP      Takes all watches/rings off, wears safety glasses and using small yellow fuse pullers, removes Fuses BB-F19 and BB-F20 in H13-P628 BOP      Verifies indication on P601 and informs SRO that MS-RV-2A is closed Page 4 of 17


MS-RV-2A spurious open - Fuses pulled to close This event occurs when the RO Evaluator has observed the power increase and indicates the is initiated by activating TRIGGER 1 when power has been raised to 75% or when it is determined that the last event has been completed. Time Position Applicants Actions or Behavior T=10 BOP Acknowledges SRV Open alarm, observes MS-RV-2A is open and refers to ARP Informs SRO and refers him to ABN-SRV  
Appendix D                NRC Scenario No. 3                                  FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO    Refers to Tech Specs and notes that no action statement applies with just this SRV inop Contacts Work Week Manager COMMENTS:
 
Page 5 of 17
SRO Directs actions: Verify SRV open by tail pipe temp rise or SP Temp/level rise or MG output reduction


With power LT 90% - directs BOP to place the control switch for MS-RV-2A to OFF BOP Places the control switch to OFF and observes that the SRV is still open and informs the SRO SRO Directs placing RHR in Suppressi on Pool Cooling per SOP-RHR-SPC (Refer to Event 3)
Appendix D                       NRC Scenario No. 3                               FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 3
SRO Directs fuses be pulled per Attachment 7.1 BOP Takes all watches/rings off, wears safety glasses and using small yellow fuse pullers, removes Fuses BB-F19 and BB-F20 in H13-P628 BOP Verifies indication on P601 and informs SRO that MS-RV-2A is closed Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 5 of 17 SRO Refers to Tech Specs and notes that no action statement applies with just this SRV inop
 
Contacts Work Week Manager
 
COMMENTS:
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 6 of 17 Event No. 3


==
==
Description:==
Description:==
Place RHR B in Suppression Pool Cooling per SOP-RHR-SPC The event is initiated by ABN-SRV performance Time          Position                      Applicants Actions or Behavior T=15            SRO      Directs placing RHR-B in Suppression Pool Cooling per SOP-RHR-SPC BOP      Verify RHR-A operable Verify SW-P-1B running - otherwise N / A Start RHR-P-2B by taking C/S to start Verifies RHR-FCV-64B opens Verifies SW-P-1B running Throttle open RHR-V-24B to between 2500 - 7000 gpm, as determined by the CRS Verify RHR-V-64B closes If maximum cooling is desired, closes RHR-V-48B COMMENTS:
Page 6 of 17


Place RHR B in Suppression Pool Cooling per SOP-RHR-SPC The event is initiated by ABN-SRV performance Time Position Applicants Actions or Behavior T=15 SRO Directs placing RHR-B in Suppressi on Pool Cooling per SOP-RHR-SPC
Appendix D                         NRC Scenario No. 3                                   FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 4
 
BOP Verify RHR-A operable Verify SW-P-1B running - otherwise N / A
 
Start RHR-P-2B by taking C/S to start
 
Verifies RHR-FCV-64B opens Verifies SW-P-1B running Throttle open RHR-V-24B to between 2500 - 7000 gpm, as determined by the CRS Verify RHR-V-64B closes If maximum cooling is desired, closes RHR-V-48B COMMENTS:
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 7 of 17 Event No. 4


==
==
Description:==
Description:==
 
Downscale failure of ARM-RIS-3 The event is initiated by activating TRIGGER 2 after actions for SRV have been completed Time           Position                         Applicants Actions or Behavior T=35             BOP         Acknowledges AREA RAD MONITOR DNSCL alarm and pulls ARP.
Downscale failure of ARM-RIS-3 The event is initiated by activating TRIGGER 2 after actions for SRV have been completed Time Position Applicants Actions or Behavior T=35 BOP Acknowledges AREA RAD MONITOR DNSCL alarm and pulls ARP.
Notes that ARM-RIS-3 is reading downscale.
Notes that ARM-RIS-3 is reading downscale.
SRO Directs actions per ARP: Notify Health Physics  
SRO         Directs actions per ARP:
 
Notify Health Physics Refers to LCS 1.3.7.4 with new fuel in vault. Directs HP to survey area once every 24 hours.
Refers to LCS 1.3.7.4 with new fuel in vault. Directs HP to survey area once every 24 hours.
Directs reset of ARM (not successful).
Directs reset of ARM (not successful).
Stops/confirms stoppage of fuel movement.  
Stops/confirms stoppage of fuel movement.
COMMENTS:
Page 7 of 17


COMMENTS:
Appendix D                         NRC Scenario No. 3                                   FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 5
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 8 of 17 Event No. 5


==
==
Description:==
Description:==
 
Failure of MSR Drain tank 1A level control valves HD-LIC-9A and 9A2 closed The event is initiated by activating TRIGGER 3 after actions for ARM failure have been completed (It takes 6 minutes to get MSR A High Level Alarm after trigger activation)
Failure of MSR Drain tank 1A level control valves HD-LIC-9A and 9A2 closed The event is initiated by activating TRIGGER 3 after actions for ARM failure have been completed (It takes 6 minutes to get MSR A High Level Alarm after trigger activation) Time Position Applicants Actions or Behavior T=40 BOP Acknowledges alarm and reports MSR Drain Tank 1A Level High alarm.
Time         Position                           Applicants Actions or Behavior T=40           BOP         Acknowledges alarm and reports MSR Drain Tank 1A Level High alarm.
Refers to ARP.  
Refers to ARP.
 
Investigates controllers to ensure they are in Auto and recognizes the controllers are not controlling in Auto. Attempts Manual operation.
Investigates controllers to ensure they are in Auto and recognizes the controllers are not controlling in Auto. Attempts Manual operation.
Reports controllers not functioning in Auto or Manual and level indication is off scale high.  
Reports controllers not functioning in Auto or Manual and level indication is off scale high.
 
SRO         Conduct a brief on actions if level continues to rise and MSR Level High alarm is received.
SRO Conduct a brief on actions if level continues to rise and MSR Level High alarm is received.
RO/BOP       Acknowledges and reports MSR A Level High alarm and refers to ARP (Turbine Trip has a 30 second time delay)
RO/BOP Acknowledges and reports MSR A Level High alarm and refers to ARP (Turbine Trip has a 30 second time delay)
SRO         Directs a manual reactor scram prior to automatic scram actuation (SRO may direct a scram prior to MSR A high Level alarm)
SRO Directs a manual reactor scram prior to automatic scram actuation (SRO may direct a scram prior to MSR A high Level alarm)
RO         Scrams the reactor and performs immediate operator actions of PPM 3.3.1:
RO Scrams the reactor and performs immediate operator actions of PPM 3.3.1: mode switch to shutdown monitors/reports Power/Pressure/Level Recognizes failure to scram (ATWS) - (REFER TO EVENT 6)
* mode switch to shutdown
* monitors/reports Power/Pressure/Level Recognizes failure to scram (ATWS) - (REFER TO EVENT 6)
COMMENTS:
COMMENTS:
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 9 of 17 Event No. 6
Page 8 of 17


== Description:==
Appendix D                          NRC Scenario No. 3                                      FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 6
Hydraulic ATWS This event is setup at the beginning of the scenario and occurs automatically when a manual scram is inserted. Critical Task is to lower RPV level and establish an LL (Lowered Level). Time Position Applicants Actions or Behavior T=45 RO Continues with immediate scram actions after recognizing all control rods did not insert:  Depress the manual scram pushbuttons  Initiate ARI and verifies valves opened Insert SRMs and IRMs Announce EOP entry into PPM 5.1.1 on low Reactor Water level and/or Power GT 5% and a scram required


Reports reactor power SRO Enters PPM 5.1.1 and directs/verifies that the Mode Switch has been placed in SHUTDOWN and exits PPM 5.1.1 via the Power leg to PPM 5.1.2 RPV Control ATWS Directs BOP to: Inhibit ADS and take manual control of HPCS  
==
Description:==
Hydraulic ATWS This event is setup at the beginning of the scenario and occurs automatically when a manual scram is inserted.
Critical Task is to lower RPV level and establish an LL (Lowered Level).
Time          Position                          Applicants Actions or Behavior T=45            RO          Continues with immediate scram actions after recognizing all control rods did not insert:
Depress the manual scram pushbuttons Initiate ARI and verifies valves opened Insert SRMs and IRMs Announce EOP entry into PPM 5.1.1 on low Reactor Water level and/or Power GT 5% and a scram required Reports reactor power SRO         Enters PPM 5.1.1 and directs/verifies that the Mode Switch has been placed in SHUTDOWN and exits PPM 5.1.1 via the Power leg to PPM 5.1.2 RPV Control ATWS Directs BOP to:
Inhibit ADS and take manual control of HPCS Verify all appropriate isolations and initiations have occurred Verify pressure is being maintained by the main turbine/bypass valves BOP        Takes both ADS control switches to the INHIBIT position and Page 9 of 17


Verify all appropriate isolations and initiations have occurred
Appendix D                    NRC Scenario No. 3                                                              FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 acknowledges associated BISIs Arms and Depresses the HPCS system initiation P/B while holding the control switch for HPCS-P-1 to STOP Closes HPCS-V-4 when it get fully opened Reports completion to SRO SRO      When Main Turbine trips directs Bypass Valve operation be verified for pressure control RO/BOP    Verifies Bypass valve operation and reports to SRO SRO      Directs bypassing the MSIV isolation interlocks per PPM 5.5.6 Directs performance of PPM 5.5.1 BOP      Performs PPM 5.5.6 and reports completion to Crew Performs PPM 5.5.1 and reports completion to Crew SRO      Direct the RO to:
Stop and prevent all injection into the RPV except by Boron injection systems, RCIC, and CRD (May direct RCIC start be prevented).
Lower level to a band less than -65 inches but greater than -183 inches (preferred band is -80 to -140). Record the upper limit as LL.
Maintain level as directed from LL to -183 inches with systems listed in Table 5 (Band should be
                        -80 to -140).
SRO      Directs SLC initiation when RRC pumps are off (REFER TO EVENT 7).
Page 10 of 17


Verify pressure is being maintained by the main turbine/bypass  valves  BOP Takes both ADS control switches to the INHIBIT position and Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 10 of 17 acknowledges associated BISIs Arms and Depresses the HPCS system initiation P/B while holding the control switch for HPCS-P-1 to STOP Closes HPCS-V-4 when it get fully opened Reports completion to SRO SRO When Main Turbine trips directs Bypass Valve operation be verified for pressure control RO/BOP Verifies Bypass valve operation and reports to SRO SRO Directs bypassing the MSIV isolation interlocks per PPM 5.5.6 Directs performance of PPM 5.5.1 BOP Performs PPM 5.5.6 and reports completion to Crew
Appendix D                 NRC Scenario No. 3                                 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 RO      Stops and prevents condensate and feedwater as directed and lines up on the startup flow control valves Reports EOP entry on low RPV level Reports Reactor Power as it drops due to lowering level When Reactor Power is LT 5%, marks RPV level to establish an LL Maintains RPV level between LL and -183 inches as directed (-80 to -
140)
SRO     Directs PPM 5.5.10 and 5.5.11 (Tabs B, F) performance for a hydraulic ATWS. (REFER TO EVENT 8)
COMMENTS:
Page 11 of 17


Performs PPM 5.5.1 and reports completion to Crew
Appendix D                            NRC Scenario No. 3                                FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 7


SRO Direct the RO to: Stop and prevent all injection into the RPV except by Boron  injection systems, RCIC, and CRD (May direct RCIC start be prevented).
==
Lower level to a band less than -65 inches but greater than -183  inches (preferred band is -80" to -140"). Record the upper limit as LL. Maintain level as directed from LL to -183 inches with systems listed in Table 5 (Band should be -80" to -140").
Description:==
SRO Directs SLC initiation when RRC pumps are off (REFER TO EVENT 7).
Failure of SLC pumps to deliver normal SLC flow to RPV This event is activated at the beginning of the scenario and realized by the crew when SLC control switches are taken to OPER to initiate SLC.
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 11 of 17 RO Stops and prevents condensate and feedwater as directed and lines up on the startup flow control valves
Time          Position                          Applicants Actions or Behavior T=50            SRO         Recognizes RRC Pumps have tripped off and directs SLC initiation before SP temp reaches 110°F RO          Initiates SLC per the quick card:
Swaps keys and places two switches to OPER Verifies squib valves fire Verifies RWCU-V-4 closure Verifies flow and SLC tank level Reports reduced SLC flow (about 18 gpm) and initial tank level SRO          May contact Work Week Manager COMMENTS:
Page 12 of 17


Reports EOP entry on low RPV level
Appendix D                           NRC Scenario No. 3                                 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 8
 
Reports Reactor Power as it drops due to lowering level
 
When Reactor Power is LT 5%, marks RPV level to establish an LL
 
Maintains RPV level between LL and -183 inches as directed (-80" to -
140")  SRO Directs PPM 5.5.10 and 5.5.11 (Tabs B, F) performance for a hydraulic ATWS. (REFER TO EVENT 8)
COMMENTS: 
 
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 12 of 17 Event No. 7
 
== Description:==
Failure of SLC pumps to deliver normal SLC flow to RPV This event is activated at the beginning of the scenario and realized by the crew when SLC control switches are taken to OPER to initiate SLC. Time Position Applicants Actions or Behavior T=50 SRO Recognizes RRC Pumps have tr ipped off and directs SLC initiation before SP temp reaches 110 F  RO Initiates SLC per the quick card:
Swaps keys and places two switches to OPER
 
Verifies squib valves fire
 
Verifies RWCU-V-4 closure
 
Verifies flow and SLC tank level
 
Reports reduced SLC flow (about 18 gpm) and initial tank level
 
SRO May contact Work Week Manager COMMENTS: 
 
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 13 of 17 Event No. 8  
 
== Description:==


==
Description:==
Insert control rods using PPM 5.5.10 and 5.5.11 Tab B.
Insert control rods using PPM 5.5.10 and 5.5.11 Tab B.
This event is initiated by the SRO direction. Time Position Applicants Actions or Behavior Critical Task is to insert Control Rods by performing PPM 5.5.11 Scram/Reset/Scram and then to return RPV level back to normal level band. T=55 SRO Directs PPM 5.5.10 and PPM 5.5.11 be performed to insert control rods BOP Performs, as directed: PPM 5.5.10 - Override ARI Logic - pulls 2 fuses
This event is initiated by the SRO direction.
 
Time           Position                           Applicants Actions or Behavior Critical Task is to insert Control Rods by performing PPM 5.5.11 Scram/Reset/Scram and then to return RPV level back to normal level band.
BOP Performs PPM 5.5.11 Tab B to scram/reset/scram  
T=55             SRO         Directs PPM 5.5.10 and PPM 5.5.11 be performed to insert control rods BOP         Performs, as directed:
 
PPM 5.5.10 - Override ARI Logic - pulls 2 fuses BOP         Performs PPM 5.5.11 Tab B to scram/reset/scram Places SDV HIGH LEVEL TRIP control switch to BYPASS on P603 Determines that scram cannot be reset and overrides RPS per Attachment 6.1:
Places SDV HIGH LEVEL TRIP control switch to BYPASS on P603  
In H13-P611:
 
Determines that scram cannot be reset and overrides RPS per Attachment 6.1: In H13-P611:
Installs jumpers between RPS-RLY-K9B stud 2 and RPS-RLY-K12F stud 4 Installs jumper between RPS-RLY-K9D stud 2 and RPS-RLY-K12H stud 4 In H13-P609:
Installs jumpers between RPS-RLY-K9B stud 2 and RPS-RLY-K12F stud 4 Installs jumper between RPS-RLY-K9D stud 2 and RPS-RLY-K12H stud 4 In H13-P609:
Installs jumpers between RPS-RLY-K9A stud 2 and RPS-RLY-K12E stud 4 Installs jumper between RPS-RLY-K9C stud 2 and RPS-RLY-K12GH stud 4 Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 14 of 17 BOP Resets scram and notes time
Installs jumpers between RPS-RLY-K9A stud 2 and RPS-RLY-K12E stud 4 Installs jumper between RPS-RLY-K9C stud 2 and RPS-RLY-K12GH stud 4 Page 13 of 17


When SDV drain valves have been opened for more than 2 minutes:  
Appendix D                NRC Scenario No. 3                              FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BOP    Resets scram and notes time When SDV drain valves have been opened for more than 2 minutes:
Checks rod density Initiates a manual scram If rods do not insert continues scram/reset/scram Tab B COMMENTS:
Page 14 of 17


Checks rod density
Appendix D                          NRC Scenario No. 3                                  FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 9


Initiates a manual scram
==
 
Description:==
If rods do not insert continues scram/reset/scram Tab B
Control Rods Insert and RPV Level returned to +13 to +54 band.
 
This event is activated when RPV level has been lowered.
COMMENTS: 
Time           Position                         Applicants Actions or Behavior BOOTH OPERATOR: When RPV Level has been lowered and is being controlled in the desired band, and PPM 5.5.11 is being performed (scram/reset/scram) to insert control rods:
 
ACTIVATE TRIGGER 4 T=65             BOP       Checks control rod density Initiates a manual scram Notes Control Rod motion Recognizes and reports All Rods In to the SRO SRO       Directs SLC be stopped RO       Takes control switches out of OPER and observes both SLC pumps stop SRO       Exits PPM 5.1.2 and re-enters PPM 5.1.1 Directs RPV level be raised to +13 to +54 band with available systems RO       Raises RPV level into band as directed TERMINATION POINT - The scenario will be terminated when RPV level has been returned to normal operating band.
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 15 of 17 Event No. 9
COMMENTS:
 
Page 15 of 17
== Description:==
 
Control Rods Insert and RPV Level returned to +13" to +54" band.
This event is activated when RPV level has been lowered. Time Position Applicants Actions or Behavior BOOTH OPERATOR: When RPV Level has been low ered and is being controlled in the desired band, and PPM 5.5.11 is being performed (scram/reset/scram) to insert control rods:
ACTIVATE TRIGGER 4 T=65 BOP Checks control rod density Initiates a manual scram Notes Control Rod motion Recognizes and reports All Rods In to the SRO SRO Directs SLC be stopped RO Takes control switches out of OPER and observes both SLC pumps stop SRO Exits PPM 5.1.2 and re-enters PPM 5.1.1 Directs RPV level be raised to +13" to +54" band with available systems RO Raises RPV level into band as directed TERMINATION POINT - The scenario will be terminated when RPV level has been returned to normal operating band.
COMMENTS:  
 
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 16 of 17 TURNOVER INFORMATION Initial conditions:  During a plant startup following a refueling outage, Columbia is at approximately 60% with the Main Tu rbine Generator synchronized. CAS-C-1C is tagged out for repairs.
 
Turnover:  Continue with the startup and raise power with flow to 65% power per PPM 3.1.2 step Q-60. The reactivity brief has been given.
 
SIMULATOR SETUP INSTRUCTIONS
 
Mark up the startup flowcharts as follows: Up through and including L-33 signed off; Up
 
through and including Q-59 signed off; Up through and including P-13 signed off; Up
 
through and including S-39 signed off; Ensure B43 and B44 are completed; Up through and including A-52 signed off.
Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 17 of 17 BAT FILE > 2009 NRC Scenario #3
>>*************************
 
>*  Trigger list *
 
>*************************
 
>
>Trigger 1 MS-RV-2A spurious opening
 
>Trigger 2 ARM-RIS-3 Fails Downscale
 
>Trigger 3 High Pressure Feedwater Heater 6B High Level Trip
 
>Trigger 4 Run BAT file to Clear ATWS
 
>
>**********************************************************************
 
>The following items set conditions before scenario begins
 
>**********************************************************************
 
> Hydraulic ATWS
 
IMF MAL-CRD007A1  100
 
IMF MAL-CRD007A2  83
 
IMF MAL-CRD007B1  100
 
IMF MAL-CRD007B2  83
 
>
> SLC-P-1A REDUCED FLOW
 
IMF PMP-SLC001F 100
 
>
> SLC-P-1B REDUCED FLOW
 
IMF PMP-SLC002F 50
 
>
>**********************************************************************
 
>The following items are triggered in the scenario
 
>**********************************************************************
 
> TRIGGER 1 - MS-RV-2A SWITCH OFF - SPURIOUS OPENING
 
IOR OVR-RRS010C (1)  OFF
 
> MS-RV-2A SWITCH OPEN
 
IOR OVR-RRS010D (1)  ON
 
>
> TRIGGER 2 - ARM-RIS-3 FAILS DOWNSCALE
 
IOR OVR-RMS027E (2) OFF
 
>
> TRIGGER 3 - HD-LIC-9A2 and HD-LIC-9A Fail
 
IMF AOV-FWH059F (3)  1
 
IMF AOV-FWH060F (3)  1
 
>
>**********************************************************************
 
>The following set up triggers to initiate batch files
 
>**********************************************************************
 
> Local Bat file loads generic triggers for local plant actions
 
bat local.txt
 
>
> TRIGGER 4 - Clear ATWS
 
trg 4 "bat 2009NRCScenario3A.txt"
>
>LO001627A.txt
 
>Ron Hayden
 
>
>This file supplements LO001627 and clears the Hydraulic ATWS
 
>
DMF MAL-CRD007A1


DMF MAL-CRD007A2
Appendix D                    NRC Scenario No. 3                            FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 TURNOVER INFORMATION Initial conditions: During a plant startup following a refueling outage, Columbia is at approximately 60% with the Main Turbine Generator synchronized. CAS-C-1C is tagged out for repairs.
Turnover:          Continue with the startup and raise power with flow to 65% power per PPM 3.1.2 step Q-60. The reactivity brief has been given.
SIMULATOR SETUP INSTRUCTIONS Mark up the startup flowcharts as follows: Up through and including L-33 signed off; Up through and including Q-59 signed off; Up through and including P-13 signed off; Up through and including S-39 signed off; Ensure B43 and B44 are completed; Up through and including A-52 signed off.
Page 16 of 17


DMF MAL-CRD007B1  
Appendix D                  NRC Scenario No. 3                        FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BAT FILE
> 2009 NRC Scenario #3
>* Trigger list *
>Trigger 1 MS-RV-2A spurious opening
>Trigger 2 ARM-RIS-3 Fails Downscale
>Trigger 3 High Pressure Feedwater Heater 6B High Level Trip
>Trigger 4 Run BAT file to Clear ATWS
>The following items set conditions before scenario begins
> Hydraulic ATWS IMF MAL-CRD007A1 100 IMF MAL-CRD007A2 83 IMF MAL-CRD007B1 100 IMF MAL-CRD007B2 83
> SLC-P-1A REDUCED FLOW IMF PMP-SLC001F 100
> SLC-P-1B REDUCED FLOW IMF PMP-SLC002F 50
>The following items are triggered in the scenario
> TRIGGER 1 - MS-RV-2A SWITCH OFF - SPURIOUS OPENING IOR OVR-RRS010C (1) OFF
> MS-RV-2A SWITCH OPEN IOR OVR-RRS010D (1) ON
> TRIGGER 2 - ARM-RIS-3 FAILS DOWNSCALE IOR OVR-RMS027E (2) OFF
> TRIGGER 3 - HD-LIC-9A2 and HD-LIC-9A Fail IMF AOV-FWH059F (3) 1 IMF AOV-FWH060F (3) 1
>The following set up triggers to initiate batch files
> Local Bat file loads generic triggers for local plant actions bat local.txt
> TRIGGER 4 - Clear ATWS trg 4 "bat 2009NRCScenario3A.txt"
>LO001627A.txt
>Ron Hayden
>This file supplements LO001627 and clears the Hydraulic ATWS DMF MAL-CRD007A1 DMF MAL-CRD007A2 DMF MAL-CRD007B1 DMF MAL-CRD007B2 Page 17 of 17


DMF MAL-CRD007B2 Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 18 of 17}}
Appendix D             NRC Scenario No. 3                         FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 18 of 17}}

Latest revision as of 14:49, 12 March 2020

2009-01-Draft Scenarios
ML091060317
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/20/2009
From: Garchow S
NRC Region 4
To:
Energy Northwest
References
50-397/09-301
Download: ML091060317 (62)


Text

INSTRUCTIONAL COVER SHEET PROGRAM TITLE OPERATIONS TRAINING COURSE TITLE COLUMBIA GENERATING STATION SIMULATOR EXAMINATION Raise Power with Flow; Place MT into Gov. Valve Optimization; SLC-V-31 LESSON TITLE indication; HPCS-P-3 Fails; ASD Channel Fails; ASD Loss - Manual Scram; RFW &

RCIC Loss; Lower Pressure For CBP Injection; EQ; SP Rupture: ED on Low SP/L LENGTH OF LESSON 1.5 Hours INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code Rev. No.

Simulator Guide PQD Code LO001625 Rev. No. 0 JPM PQD Code Rev. No.

Exam PQD Code Rev. No.

DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY Ron Hayden DATE 6/12/08 REVISED BY DATE VALIDATED BY DATE TECHNICAL REVIEW DATE INSTRUCTIONAL REVIEW DATE APPROVED DATE Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use.

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Facility: Columbia NRC Scenario No: 1 Examiners: _______________ Operators: _______________

Initial conditions: The plant is operating at approximately 94% power due to economic dispatch.

Turnover Information: Immediately after shift turnover, reactor power is to be raised with RRC Flow until Generator Output reaches 1150 MWe. At that point stop the power increase and place the Main Turbine into Governor Valve Optimization.

When complete, resume power increase to 100%.

A reactivity brief for the power increase has been held. There are no pre-conditioning limits.

Event Timeline Event Type* Event Description No.

1. T=0 R Increase power with flow.

(SRO/RO)

2. T=10 N Place Main Turbine into Governor Valve Optimization.

(BOP)

3. T=12 I SLC-V-31 Indication Failure (Tech Spec).

(SRO/RO)

4. T=20 C HPCS-P-3 Failure (HPCS Keepfill Pump) (Tech Spec).

(SRO/BOP)

5. T=30 C ASD Channel A2 alarm and fault.

(SRO/RO)

6. T=35 C (ALL) ASD UPS trouble simulating both inverters on battery power requiring RRC flow reduction and manual scram.
7. T=40 C (ALL) RCIC shaft coupling breaks on initiation. Both RFW Pumps trip and can not be reset.
8. T=50 M (ALL) OBE and RHR-B Suction Break.
9. T=65 Emergency Depressurization when SP Level cannot be maintained GT 192.
  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 The scenario starts with Columbia at 94% power.

After turnover, the crew is to raise power to 1150 Mwe.

When 1150 MWe has been reached and the MT is to be placed into GV optimization.

The next event is SLC-V-31 losing position indication. This is a non-annunciated failure. If the crew does not discover the malfunction, OPS2 will prompt them from a report from the field. SLC-V-31 failure prevents SLC from auto starting. Tech Specs will be referenced. LCO 3.1.7 is applicable and requires SLC restoration in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

The next event is a failure of the HPCS keepfill pump, HPCS-P-3. The crew will take actions and pull the control power fuses for HPCS-P-1. A problem with re-installation of the fuses later in the scenario will render HPCS not available for the scenario.

The next event is a GTO Freeze alarm on ASD channel 1A/2. RRC-P-1A will run back to 51 Hz. The crew will take action to match loop flows.

When flows are matched the next event is a failure of E-TR-ASD 1. An ASD UPS trouble alarm will be received and the crew will investigate. The transformer failure puts both ASD inverters on battery power. The report from the field will indicate that normal power can not be restored to the inverters. Per ABN-ADS-INV, the crew should reduce RRC flow, scram the reactor and carry out the actions of PPM 3.3.1. PPM 5.1.1 will be entered on low RPV level.

All rods will insert and as RPV level rises above +13, both RFW pumps will trip. When RFW pump resets are attempted they will not reset. RCIC will be initiated and a shaft shear will occur when turbine speed reaches 300 rpm. This effectively is a loss of HP injection sources.

The crew should lower RPV pressure with BPVs to facilitate feeding with condensate booster pumps. RPV level will be returned to +13 to +54 inch band.

After level has been returned to normal band, an OBE will occur. Due to the earthquake the suppression pool will develop a crack in the B RHR pump room. The crew should pull the control power fuses for RHR-P-2B.

ABN-FLOODING will be entered along with EOP PPM 5.2.1 and EOP PPM 5.3.1.

When it is determined that suppression pool level cannot be maintained GT 192 the crew should anticipate Emergency Depressurization is required and per PPM 5.1.1 override, fully open the BPVs. When suppression pool level reaches 192, the crew should exit to PPM 5.1.3 and open 7 ADS SRVs to perform an emergency depressurization.

The scenario will be terminated when the ED is performed and RPV level is being returned to normal band.

Page 2 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 1

==

Description:==

Increase reactor power with flow to 100% power.

This event is initiated by the turnover information.

Time Position Applicants Actions or Behavior T=0 SRO Directs the RO to increase reactor power to 100% power with RRC flow at the rate of 10 Mwe/minute.

RO Increases reactor power with RRC flow as directed at the rate directed.

BOP Monitors plant equipment and peer checks RO.

COMMENTS:

Page 3 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 2

==

Description:==

Place the Main Turbine into Governor Valve Optimization This event is initiated by the turnover information and will take place when output reaches 1150 Mwe Time Position Applicants Actions or Behavior T= 5 SRO Directs BOP operator to place the Main Turbine into Governor Valve Optimization per SOP-MT-GV/OPTIMIZATION BOP Per SOP-MT-GV/OPTIMIZATION performs the following:

Step 5.1.1 Verifies SNE info, TDAS points not inop, DEH in Turbine follow Reactor Mode; MWe GE 1192 and Reactor Power and Pressure stable Step 5.1.2a Verifies LOAD TARGET at 1370 MW Step 5.1.2b Sets VPL demand to 100%

Step 5.1.2c Verifies OK TO SELECT light illuminated Step 5.1.2d Selects OPTIMIZED VALVE MODE Step 5.1.2e Selects yes Step 5.1.2f Verifies valve movement Step 5.1.2g Sets VPL demand 10% GT GV Demand Step 5.1.2h Verifies VPL Demand ramps to target value Step 5.1.2i Verifies VPL demand is 10% above GV Demand BOP Informs SRO that the MT is in Governor Valve Optimization Mode of operation COMMENTS:

Page 4 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 3

==

Description:==

SLC test tank outlet valve, SLC-V-31 loss of position indication.

This event is initiated by activating TRIGGER 1 and should be initiated when the MT is being placed into GV Optimization.

Time Position Applicants Actions or Behavior ROLE-PLAY: If the loss of indication is not observed by the crew (no alarms occur), after 2 minutes call the control room on the phone and report as Ops 2 that, while doing your rounds, you discovered the leads to SLC-V-31 are disconnected from the valves closed limit switch. The cause was due to an NLO trainee stepping on the limit switch while tracing SLC system piping.

SRO If crew detects SLC-V-31 loss of indication prior to the role-play, directs Ops 2 to investigate SLC-V-31 locally.

Cue: As OPS2 - if not already reported - wait two minutes and report that the leads to SLC-V-31 are disconnected from the valves closed limit switch. The cause was due to an NLO trainee stepping on the limit switch while tracing SLC system piping.

SRO/BOP Determines that neither SLC pump will initiate from the Control Room.

(see Comments below).

SRO Declares both SLC pumps inoperable.

- T.S. LCO 3.1.7 B Two SLC subsystems shall be OPERABLE requires restoration of one SLC subsystem to operable status in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

- OR be in MODE 3 in 12 Hrs and MODE 4 in 36 Hrs.

Contacts Work Week Manager to initiate repairs of SLC-V-31.

Conducts brief.

COMMENTS:

SLC logic is such that with V-31 not indicating closed, SLC-V-1A and SLC-V-1B (SLC tank outlets) will not auto open following initiation from the control room. If SLC-V-1A and B do not open, the SLC pumps will not start.

Page 5 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 4

==

Description:==

HPCS System Keepfill pump, HPCS-P-3, failure.

This event is initiated by activating TRIGGER 2 after Technical Specifications have been referenced and a brief has been ..

Time Position Applicants Actions or Behavior T=15 BOP Acknowledges HPCS WATER LEG PUMP DISCH PRESS LOW and HPCS SYSTEM OUT OF SERVICE alarms.

Observes HPCS system pressure and HPCS-P-3 not running.

Refers to ARP and informs SRO of condition.

Directs OPS 2 investigate pump and breaker for HPCS-P-3.

SRO Per ARP, directs HPCS-P-1 start be inhibited by pulling the control power fuses.

Contacts Work Week Manager.

Refers to Tech Spec 3.5.1, condition B which requires RCIC operability verified immediately and restore HPCS within 14 days.

May direct LPCS, RCIC, and ADS be protected per OI-49.

Booth Operator: Three minutes after being sent, report back as OPS 2 that the shaft coupling on HPCS-P-3 is broken.

Booth Operator: Two minutes after request to pull control power fuses on HPCS-P-1 activate TRIGGER 10 and report completion to Control Room.

COMMENTS:

Page 6 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 5

==

Description:==

ASD Channel A2 alarm and fault.

This event is initiated by activating TRIGGER 3 after brief is completed or as directed.

Time Position Applicants Actions or Behavior T=25 RO Acknowledges LOOP A ASD CHANNEL FAILURE LIMIT alarm.

Reports trip of ASD 1A/2 alarm and Fault alarms and RECIRC A OR B HIGH FLOW DELTA alarm.

Verifies trip of channel ASD1 A/2.

Ensures RRC-P-1A has runback to 51 Hz.

Reports power drop due to runback. Reports RPV power/level/pressure.

Checks ASD video Display Unit for source of alarm.

Dispatches OPS1/4 to investigate at the ASD Building.

SRO Directs actions per ARPs.

Cue: Call 2393 and report as OPS4 that there is a GTO freeze alarm on Channel 1A2. Also inform the RO that there is an electrical smell in the building but you see nothing else wrong.

SRO Per ARP for high delta flow (4.602.A6 6-2):

Refers to ABN-POWER for the unplanned power change.

Page 7 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO Refers to Tech Spec 3.4.1, flow mismatch, which is applicable until flows are matched.

Contacts Work Week Manager for ASD Channel fault.

Directs RO to match RRC loop flows by lowering RRC Loop B flow.

RO Reduces RRC-P-1B speed as directed to match flows and clear High Flow Delta alarm.

COMMENTS:

Page 8 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 6

==

Description:==

ASD UPS trouble alarm which simulates the loss of E-PP-ASD1/4.

This event is initiated by activating TRIGGER 4 and should be initiated after RRC loop flows are matched or as directed.

Time Position Applicants Actions or Behavior Critical Task is to initiate a Manual Reactor Scram when it is determined both ASD inverters are on battery power T=30 RO Reports ASD UPS Trouble Alarm (P602.A13 3-5) and refers to ARP.

SRO Refers to ARP and to ABN-ASD-INV.

BOP Sends OPS4 to investigate.

BOOTH OPERATOR: One minute after being sent to investigate, call on the radio and report that there are no lights on in the ASD building, you hear water running (not sure why or where) and are investigating cautiously. One minutes later call 2393 and report that it appears that there is a crack in the roof of the ASD building above transformer E-TR-ASD-1 and water is falling on the transformer. It looks like the main breaker supplying the AC input to E-PP-ASD 1/3 is opened and E-PP-ASD 1/3 is deenergized. You are exiting the building and taking the necessary electrical precautions.

SRO Acknowledges report and refers to Attachment 7.1.

Determines that E-PP-ASD 1/3 is de-energized and that IN-ASD/1A and 1B panels are on battery power.

Determines that normal AC power is not going to be restored to the inverters and that flow reduction and scram are required Page 9 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO Conducts brief.

Directs that RRC flow be reduced to 60 Mlbm/hr.

Directs a manual scram of reactor.

RO Lowers Core Flow to 60 Mlbm/hr as directed.

Announces Listen up for the scram report.

Performs immediate scram actions:

  • Places Reactor Mode Switch in SHUTDOWN
  • Monitors Power, Pressure, and Level
  • Verifies all rods inserted
  • Inserts IRMs and SRMs by depressing INSERT P/B Reports EOP entry on low RPV water level.

COMMENTS:

Page 10 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 7

==

Description:==

RCIC Shaft Coupling breaks when 300 rpm is reached. RFW Pumps trip and can not be reset.

The RCIC event is active from the start of the scenario. RFW pumps auto trip when mode switch is taken to shutdown.

Time Position Applicants Actions or Behavior T=355T SRO Enters (and re-enters) PPM 5.1.1 and directs restoration of RPV level to

+13 inches to +54 inches with RCIC and/or Reactor Feed Pump.

RO Reports both Reactor Feed Pumps tripped.

SRO Directs that the second CRD pump be started.

RO Starts second CRD pump when directed.

May direct ABN-CRD-MAXFLOW be performed.

ROLE-PLAY - three minutes after request for ABN-CRD-MAXFLOW, activate TRIGGER 26 and when valves are finished re-positioning, report completion to control room.

ROLE-PLAY - If sent to RCIC room to investigate, report shaft coupling in pieces on the floor.

RO/BOP When RCIC is initiated, reports that no discharge pressure/flow is observed on RCIC. May report that RPMs did rise but are zero now.

When reset of RFW is attempted, reports they cannot be reset.

Performs actions of PPM 3.3.1.

Page 11 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BOP Reports +13 initiations and isolations sat and monitors pressure.

SRO Directs the BOP to reduce RPV pressure to 500 psig to 600 psig with Bypass Valves to allow injection with the condensate booster pumps.

BOP Reduces pressure as directed with BPVs, using quick card.

RO Sets up feedwater level control for RFW-V-10A/B valve operation.

Injects with condensate booster pumps when pressure has been reduce to 500 psig to 600 psig.

Restores reactor level to +13 inches to + 54 inches.

Comments:

Page 12 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 8

==

Description:==

OBE and RHR-B Suction Break This event is initiated after RPV pressure has been lowered to 500 to 600 psig band and RPV level is being controlled +13 to +54.

BOOTH OPERATOR: During the remainder of the scenario, if asked to re-install the HPCS-P-1 control power fuses, report the fuse block broke and you have contacted the electricians to come help. HPCS-P-1 will NOT be returned to service during the scenario.

BOOTH OPERATOR: Start earthquake machine at low volume working quickly up to full volume and leave on for a 20 seconds total EQ. When full volume is reached, activate TRIGGER 5.

Time Position Applicants Actions or Behavior Booth Operator: When EQ is completed, as OPS1, call the control room on the radio and report that you felt severe shaking and movement in the turbine building.

T=45 BOP Reports OBE annunciator, pulls ARP and refers SRO to ABN-EARTHQUAKE.

Investigates and reports indications on Bd. L.

SRO Directs actions for earthquake per ABN-EARTHQUAKE:

  • Directs plant announcement
  • Directs SAS repeat announcement RO Reports:
  • Reactor Sump R2 level Hi Hi alarm
  • Suppression Pool level Hi/Low Suppression Pool level low alarm
  • Reports lowering trend on Suppression Pool Water Level
  • Reports EOP 5.2.1 entry at -2 when it occurs.
  • Reports RHR B Room level Hi EOP entry into PPM 5.3.1.

Page 13 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 ROLE-PLAY - If asked to investigate RHR room leak, wait two minutes and report water coming from a crack down the side of the suppression pool wall that EXTENDS INTO THE FLOOR. You have exited the room and closed the hatch behind you.

SRO Enters PPM 5.2.1 on low SP level and directs actions per ABN-FLOODING.

Enters PPM 5.3.1 on RHR B room level Hi.

Directs OPS2 to investigate water level in RHR B room.

Determines that RHR B is not operational due to flooding.

May direct the RO to close RHR-V-4B in an attempt to isolate the leak.

May direct pulling of RHR-P-2B control power fuses.

Cue: If directed, wait three minutes, then ACTIVATE TRIGGER 6 to pull RHR-P-2B fuses and report completion.

RO/BOP If directed, closes RHR-V-4B.

Reports continued lowering trend on Suppression Pool level.

Comments:

Page 14 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 9

==

Description:==

Emergency Depressurization due to low Suppression Pool level This event is initiated when SP level cannot be maintained GT 192. SP Level drops about 1 foot every 2 minutes.

Time Position Applicants Actions or Behavior Critical Task is to initiate an Emergency Depressurization when Suppression Pool level cannot be maintained GT 192.

Note: SRO may anticipate the ED on low suppression pool level and direct the bypass valves be opened to rapidly reduce pressure.

BOP Continues to give Suppression Pool level reports as level drops.

T=60 SRO Determines that Suppression Pool level will not be able to be maintained above 192.

May take override in PPM 5.1.1 pressure leg and anticipate Emergency Depressurization.

May direct BPVs be rapidly opened.

RO/BOP If directed, takes manual control of the Bypass Valves and fully opens them.

SRO When Emergency Depressurization is required due to low suppression pool level, (SP Level LE 192) exits pressure leg of PPM 5.1.1.

Enters PPM 5.1.3 and directs 7 ADS SRVs open.

RO/BOP Opens 7 ADS SRVs to depressurize the reactor.

Page 15 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO Directs injection with systems to return RPV level to +13 to +54.

RO/BOP Returns RPV level to band as directed.

This scenario will be terminated when the reactor has been emergency depressurized and RPV level is under control and stable/increasing.

Comments:

Page 16 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO TURNOVER INFORMATION Initial Conditions: The plant is operating at approximately 94% power due to economic dispatch.

Turnover Information: After shift turnover, reactor power is to be raised with RRC Flow until Generator Output reaches 1150 MWe. At that point stop the power increase and place the Main Turbine into Governor Valve Optimization.

When complete, resume power increase to 100%.

A reactivity brief for the power increase has been held and power is to be increased immediately following shift turnover. There are no pre-conditioning limits.

SIMULATOR SETUP INSTRUCTIONS Reset to IC-179 Set Up Earthquake Machine on Low Volume Page 17 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BAT FILE

>* Trigger list *

>Trigger 1 SLC-V-31 position indication loss

>Trigger 2 HPCS-P-3 Shaft break

>Trigger 3 ASD CH A2 alarm/fault

>Trigger 4 ASD UPS Trouble - Simulates loss of E-PP-ASD 1/4

>Trigger 5 EQ, Suppression Pool Leak, RHR B Suction break

>Trigger 6 Pull control power fuses for RHR-P-2B

>Trigger 7 Conditional to Lock in ASD Annunciators

>Trigger 8 Conditional for RCIC Shaft Break (when 300 rpm is reached)

>Trigger 9 Conditional for RFW A/B trip and cant be reset (on MODE SW in SD)

>Trigger 10 Pull Control Power Fuses for HPCS-P-1

>The following items are triggered in the scenario

> TRIGGER 1 - SLC-V-31 Loss of position indication

> SLC-V-31 TEST TANK OUTLET VALVE IRF LOA-SLC002 (1) 1

> SLC-V-31 RED LAMP IOR IND-SLC003B (1) OFF

> SLC-V-31 GREEN LAMP IOR IND-SLC003A (1) OFF

> TRIGGER 2 - HPCS-P-3 Shaft Break & Low Press Alarm IRF LOA-EPS137 (2) DISCONNECT IRF PLP-CSS006 (2) 0.01 0 IRF PLP-CSS002 (2) 2.0 0 IOR STL-HPCS31 (2) ON

> TRIGGER 3 - ASD CH A2 alarm and Fault IMF MAL-RFC002E (3)

IMF MAL-RFC006A (3)

> TRIGGER 4 - ASD UPS Trouble Alarm IMF ANN-602A13C05 (4) 0 Page 18 of 19

Appendix D NRC SCENARIO #1 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009

> TRIGGER 5 - SUPP CHAMBER LEVEL INDICATION

>SLOWLY DROPS TO BOTTOM OF SCALE (8"/MIN)

IMF XMT-PCN003A (5 5) -25 198 IMF XMT-PCN004A (5 5) -24.94 200 IMF XMT-PCN006A (5 5) 3 3000 IMF XMT-PCN007A (5 5) 2 2999

> LINE BREAK AT RHR-P-2B SUCTION IMF MAL-RHR005 (5 10) 8000

> EARTHQUAKE IMF MAL-RWB001 (5) 0.3

> TRIGGER 6 - PULLS CONTROL POWER FUSES FOR RHR-P-2B IRF LOA-EPS397 (6) 1

> TRIGGER 10 - PULLS CONTROL POWER FUSES FOR HPCS-P-1 IMF BKR-CSS001 (10) 5

>The following are conditionals to initiate triggers

> Locks in annunciator window 602.A6 5-1 when both ASD annunciator

> and itself are actuated IMF ANN-602A6E01 (7) 0 TRGSET 7 "JN06E01.AND.JN13D03.GT.0"

>Causes the RCIC pump shaft to seize when speed exceeds 300 rpm.

IMF PMP-RCI001S (8) TRUE TRGSET 8 "X01D066M.GT.300"

>Mode switch to shutdown causes RFW pumps to trip and cannot be reset TRGSET 9 "X03I102S.GT.0" IOR OVR-FPT002B (9) ON IOR OVR-FPT002C (9) OFF IOR OVR-FPT007B (9) ON IOR OVR-FPT007C (9) OFF

>Local Bat file loads generic triggers for local plant actions bat LOCAL.txt Page 19 of 19

INSTRUCTIONAL COVER SHEET PROGRAM OPERATIONS TRAINING COURSE TITLE COLUMBIA GENERATING STATION SIMULATOR EXAMINATION DG-3 Monthly Surveillance, Failure of HPCS-P-2, RFW-DPT-4B Failure, FWH-6B High Level Trip, DEH Leak Requiring Manual Scram, Loss of LESSON TITLE TR-S, DG-1/2 Fails to Auto Start, LOCA, ED on RPV Level LENGTH OF LESSON 1.5 Hours INSTRUCTIONAL MATERIALS INCLUDED Lesson Plan PQD Code Rev. No.

Simulator Guide PQD Code LO001626 Rev. No. 0 JPM PQD Code Rev. No.

Exam PQD Code Rev. No.

DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY Ron Hayden DATE 06/16/08 REVISED BY DATE VALIDATED BY DATE TECHNICAL REVIEW DATE INSTRUCTIONAL REVIEW DATE APPROVED DATE Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use.

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Facility: Columbia NRC Scenario No: 2 Examiners: _______________ Operators: _______________

Initial Conditions: The reactor has been operating at 100% power for the last 131 days. This is a Division 3 work week. OSP-ELEC-M703, DG-3 Monthly Surveillance, is in progress. OPS 2 is standing by in the HPCS DG room. DG-3 is running and SM-2 is being powered from TR-S per OPS-ELEC-M703. PDIS signal X108 (DG3 voltage) is not available.

Turnover Information: Continue with DG-3 monthly surveillance which has been completed through step 7.5.49.

Time Position Applicants Actions or Behavior

1. N (BOP) Synchronize DG-3 per monthly surveillance OSP-ELEC-M703 C (BOP) Failure of HPCS-P-2 requiring manual trip of DG-3 2.

C (SRO) SRO - Tech Spec C Failure of RFW-DPT-4B - Narrow Range on H13-P603 3.

(SRO/RO) SRO - Tech Spec R (RO) High Level Trip of FWH-6B requiring reducing core flow to LE 92 Mlbm/hr 4.

Rod Line GT 100% requiring using Fast Shutdown Sequence to insert rods to lower the rod line Also required core flow be lowered to 75 Mlbm/hr C DEH Leak eventually requires a manual scram and trip of MT and MG 5.

(SRO/BOP)

6. TR-S Lockout; MSIVs close, Initiate RCIC/CRD for level control
7. C (RO) DG-1 and DG-2 Fails to Auto Start
8. M (All) LOCA - Spray Wetwell and Drywell
9. LOCA - RPV level drops to TAF
10. Initiate Emergency Depressurization on low RPV Level and return level to normal with low pressure ECCS pumps
  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SCENARIO DESCRIPTION The scenario begins with power at 100%. DG-3 is running and SM-2 is powered from Startup to support surveillance testing of DG-3.

Turnover information is that OSP-ELEC-M703, DG-3 Monthly Surveillance, is in progress and DG-3 is running and is ready to be synchronized. The BOP operator will continue with this surveillance and sync DG-3.

A short time after the DG-3 is synchronized, HPCS-P-2 will trip and Service Water to DG-3 will be lost.

Per the immediate actions of ABN-SW, DG-3 will be tripped locally. The SRO will review Tech Specs for HPCS DG being INOP.

The next event is RFW-DPT-4B (RFW-LI-606B RPV narrow range indication differential pressure transmitter) will fail and RFW-LI-606B will fail upscale causing a level 8 trip on 1 out of 3 instruments.

The crew will refer to technical specification 3.3.2.2 Action A which will give the crew 7 days to place the affected channel in Trip. The CRS will refer to ABN-INSTRUMENTATION.

The next event is a high level trip of High Pressure Feedwater Heater 6B. Feedwater temperature will drop by GT 6°F requiring entry into ABN-POWER. Reactor Power to rise requiring the RO to lower power with flow and to drive control rods to maintain LT the 100% rod line. When the fast shutdown sequence is used to insert control rods it requires core flow to be lowered to 75 Mlbm/hr.

The next event is a leak in the DEH system. ABN-DEH will be entered and the leak rate will require a reactor scram and trip of the Main Turbine and Main Generator.

When TR-S closes in it will lockout. TR-B will power SM-7 and SM-8.

When TR-S is lost the MSIVs will close causing a LOCA to develop. Manual pressure control on SRV will be required. RCIC will be initiated and CRD restarted to feed the RPV but RPV level will continue to drop.

On the High Drywell Pressure initiation signal, DG-1 and DG-2 will fail to auto start. When initiations are checked the RO will take actions and manually start both Diesel Generators.

RPV level will eventually drop to LT -161 and an Emergency Depressurization will be initiated to facilitate feeding with low pressure ECCS pumps.

Containment pressures will rise requiring the crew to spray the wetwell and the drywell. Sprays will be removed from service to allow RPV injection after the Emergency Depressurization occurs.

The scenario will be terminated when RPV level is being returned to normal band and sprays have been re-initiated as appropriate.

Page 2 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 1

==

Description:==

Synchronize DG-3 for monthly surveillance OSP-ELEC-M703.

This event is initiated by the turnover sheet.

Time Position Applicants Actions or Behavior T=0 SRO Directs the BOP to complete OSP-ELEC-M703 starting at step 7.5.50.

BOP (N) At H13-P601, places the CB-4DG3 Sync Selector Switch to D.

GEN/BUS.

Raises voltage using Diesel Generator Voltage Reg Control switch until incoming voltage is slightly higher than running voltage.

Raises frequency with the Electric Governor control switch until sync scope is running slow in the fast (Clockwise) direction.

When the sync scope is about 5 minutes before the 12 oclock position, places CB-4DG3 control switch in the CLOSE position.

Verifies breaker closes.

Immediately verifies KVARs are zero or slightly positive.

Immediately loads DG-3 to GE 100 KW using the Electric Governor control switch.

Gradually loads DG-3 to 1300KW using the Electric Governor control switch.

Adjust reactive load to approximately 325 KVAR out (to the right) using Diesel Generator Voltage Regulator Control switch.

Page 3 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Places CB-4/DG3 Sync Selector Switch to OFF.

Wait 5 minutes.

COMMENTS:

Page 4 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 2

==

Description:==

Failure of HPCS-P-2 (DG-3 Service Water pump)..

This event is initiated when the 5 minute wait step has been reached (Step 7.5.59) during operability test of DG-3 and is initiated by activating TRIGGER 1.

Time Position Applicants Actions or Behavior T=10 BOP (C) Acknowledges alarms associated with the loss of HPCS-P-2.

Scans panel and notes HPCS-P-2 is not running and SW-V-29 is going closed.

Informs SRO of loss of HPCS-P-2. May give ABN reference to SRO and that a trip of DG-3 is required.

May direct OPS 4 investigate loss of pump.

BOOTH OPERATOR - If requested, three minutes after request inform the Control Room that HPCS-P-2 is hot to the touch and the motor looks scorched.

If required, the breaker is tripped for HPCS-P-2 on MC-4A.

SRO (C) Announces entry into ABN-SW.

Directs BOP to have DG-3 tripped at the local panel (if BOP has not already performed).

BOOTH OPERATOR - 30 seconds after request to trip DG-3, activate TRIGGER 20 and inform the control room when trip has occurred.

SRO Contacts Work Week Manager.

Reviews Technical Specifications: TS 3.8.1B - One required DG inoperable requires: B1 - performance of SR 3.8.1.1 for OPERABLE offsite circuit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; B2 - Declare required features associated with inop DG, inoperable (TS 3.5.1 B1 HPCS System inoperable -

Verify RCIC operable immediately and restore HPCS within 14 days);

AND B.3.1 Determine common cause within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ; AND B.4.1 -

Page 5 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Restore DG to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

May protect DG-1 and DG-2 per OI-49.

COMMENTS:

Page 6 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 3

==

Description:==

RFW-DPT-4B Failure.

This event is initiated when the actions for HPCS-P-2 failure are complete and is initiated by activating TRIGGER 2.

Time Position Applicants Actions or Behavior T=20 RO Acknowledges alarms: H13-P603 A8 drop 1-7 and 4-7 (RFW control system trouble and RFW/Turbine RPV level high trip).

Identifies RFW-LI-606B indicated upscale but RFW-LI-606A and C are reading normal RPV level.

Identifies that the B Reactor Vessel High Level is sealed in.

Refers to ARPs.

SRO Refers to ABN-INSTRUMENTATION.

Refers to Tech Spec 3.3.2.2 and determines action statement 3.3.2.2 Action A applies - place the affected channel in trip within 7 days.

Contacts Work Week Manager.

Conducts brief.

COMMENTS:

Page 7 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 4

==

Description:==

High Level Trip of High Pressure Feedwater Heater 6B.

This event is initiated when the actions for RFW-DPT-4B failure are complete and is initiated by activating TRIGGER 3.

Time Position Applicants Actions or Behavior T=20 RO Acknowledges HTR 6B High level alarm and refers to ARP.

BOP Investigates backpanel and notes controllers for dump and drain valves in AUTO and requiring the valves to be open but level continues to rise. Note:

Nothing the operator does will cause level to stop rising.

Reports actions (if any) to SRO and that level in FWH 6B cannot be controlled.

RO (R) Acknowledges Heater 6B High Level Trip and steam dump valves not fully closed alarms (MSR B heater drain tank alarms may also annunciate).

Reports trip of 6B Heater to SRO and entry into ABN-POWER.

Due to the FWH trip, observes feedwater inlet temperature and notes that it has dropped more than 6°F (begin temp is about 411°F and final temp is about 391°F).

Notes Thermal Power has gone up and when GT 3486 MWT, reduces power with RRC flow to maintain LT 3486 per Immediate actions of ABN-POWER.

(Note: SRO may direct power reduction to LE 92Mlbm/hr prior to RO reducing to LT 3486 MWT.)

SRO (C) Announced entry into ABN-POWER and per step 4.4.1, directs RRC flow be Page 8 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 lowered to LE 92 Mlbm/hr core flow.

COMMENTS:

Page 9 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 5

==

Description:==

DEH System Leak requiring a Manual Scram be inserted.

This event is initiated when the actions for the trip of FWH 6B are complete and is initiated by activating TRIGGER 4.

Time Position Applicants Actions or Behavior Critical Task is to initiate a Manual Reactor Scram when the DEH Low Low Reservoir Level alarm annunciates within 15 minutes of the Low Reservoir level annunciator.

T=35 BOP (C) Acknowledges DEH Reservoir Level Low annunciator and refers to ARP.

Directs OPS3 to investigate locally and report level on DEH-LG-17.

References ABN-DEH-LEAK to SRO.

Announces entry into ABN-DEH-LEAK.

SRO (C)

Directs that OPS1 commence filling the DEH reservoir per SOP-DEH-OPS.

Notes time and starts 15 minute clock for step 4.1.1 of ABN-DEH-LEAK.

BOOTH OPERATOR - Initial tank level will be one minute after request and remainder of reports will be consistent with time since trigger initiation as follows:

Initial report tank level is 16.75; Level report will be 1/2 less each minute after initial level report. It takes 11 minutes to get Low Low Level alarm which required a manual scram BOP Acknowledges DEH Reservoir Level Low Low annunciator and refers to ARP (It takes 11 minutes from low level alarm to get low-low alarm).

Page 10 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO Directs manual scram; trip of Main Turbine, and trip of Main Generator per step 4.1.1 of ABN-DEH-LEAK.

Announces Listen up for the scram report and places MODE switch to RO shutdown. Announces APRM downscales in, RPV pressure reading and trend, RPV level reading and trend, and EOP entry on low RPV level.

Announces all-rods-in to SRO.

Initiates trip of the Main Turbine (if not automatically completed) by BOP depressing the two Turbine trip pushbuttons.

Initiates trip of the Main Generator (if not automatically complete) by depressing the two red Unit Emergency and Unit Overall Emergency pushbuttons.

Announces entry into EOP 5.1.1, RPV Control, on low RPV level.

SRO COMMENTS:

Page 11 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 6

==

Description:==

Lockout of the Startup Transformer. MSIVs close, Initiate RCIC and CRD This event is automatically initiated when CB-S1 breaker closes.

Time Position Applicants Actions or Behavior Investigates electrical board status when lights go out after TR-S lockout.

BOP Notes no power to SM-1, SM-2, SM-3, SH-5 or SH-6.

Notes TR-B is powering SM-7 and SM-8.

Updates crew on plants electrical board status.

Notes that MSIVs have closed and announces pressure control with BOP/RO SRVs at a pressure band of 800 to 1000 psig.

Working down the level leg of EOP 5.1.1, notes that no high pressure SRO injection sources are running. Directs RCIC and CRD be initiated and injection to RPV at a level band of +13 to +54.

Using the quick card, Arms and Depresses RCIC Manual Initiation BOP/RO pushbutton and verifies injection at 600 gpm.

Starts CRD pump as directed. May direct ABN-CRD-MAXFLOW be performed to facilitate running both CRD pumps.

BOOTH OPERATOR - If requested, wait 5 minutes and then activate TRIGGER 26 to place both CRD suction and discharge filters on line and report completion to control room.

Notes that no CAS air compressors are running, contacts OPS3 and BOP/RO directs the reset of CAS compressors.

Page 12 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BOOTH OPERATOR - If requested, wait 2 minutes and then initiate trigger (23) to reset CAS Air Compressors.

COMMENTS:

Page 13 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 7

==

Description:==

Failure of DG-1 and DG-2 to AUTO start on Undervoltage or when DW/P reaches 1.68 psig.

This event is automatically initiated when SM-7 and SM-8 become de-energized or when DW/P rises above 1.68 psig.

Time Position Applicants Actions or Behavior BOP/RO When TR-S locks out of when initiations are checked due to DW/P being GT (C) 1.68 psig, notes that neither DG-1 nor DG-2 are running.

Takes control switches for both DG-1 and DG-2 to start and notes that they did start.

Informs SRO of failure of DGs to auto start.

Directs OPS 3 verify DG operation after auto start.

BOOTH OPERATOR: After requested, wait 5 minutes and report DG 1 and DG2 operating normally.

COMMENTS:

Page 14 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 8

==

Description:==

LOCA (Containment Sprays).

This event is initiated automatically one minute after the MSIVs close.

Time Position Applicants Actions or Behavior RO/BOP Recognizes rising DW Pressure and reports EOP entry at 1.68 psig.

Also reports additional primary containment EOP entries as they occur.

SRO Enters EOP 5.2.1, Primary Containment Control and re-enters 5.1.1 due to high DW pressure.

Directs isolations, initiations and DG starts for +13, -50 and 1.68 psig be verified as parameters occur.

RO/BOP Reports Wetwell pressure when it reaches 2 psig.

SRO Directs Wetwell sprays with RHR. Directs securing sprays if pressure drops below 1.68 psig.

RO/BOP Using quick card, initiates wetwell sprays and supplements with wetwell cooling and reports completion to SRO.

SRO May directs other loop of RHR be placed in suppression pool cooling.

RO/BOP Utilizing quick card, places RHR loop in SP Cooling.

Page 15 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 RO/BOP Reports Wetwell pressure when it reaches 12 psig.

SRO Directs drywell cooling fans be secured.

RO/BOP Secures drywell cooling fans as directed and reports completion.

SRO Directs DSIL verification and then drywell sprays be initiated. Directs securing sprays if drywell pressure drops below 1.68 psig.

RO/BOP Verifies within DSIL and using quick card, initiates drywell sprays as directed.

Reports Drywell pressure drop as expected.

COMMENTS:

Page 16 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 9

==

Description:==

LOCA (RPV Level Drop).

This event is initiated automatically one minute after TR-S lockout and the MSIVs close.

Time Position Applicants Actions or Behavior BOP/RO Reports RPV level dropping even with RCIC and CRD running.

Gives RPV level reports as level continues to lower.

NOTE - From the time -50 RPV/ Level is reached, it takes about 5 minutes to get to -129 RPV/L and another minute to get to TAF and an additional minute to get to -183 RPV/L.

SRO Directs ADS be inhibited when ADS timers initiate.

BOP/RO When RPV/L drops to -129 and the ADS timers intimate, takes both ADS inhibit switches to inhibit and acknowledges BISIs.

Reports ADS inhibited to SRO.

BOP/RO Reports RPV level as it transitions from Wide Range to Fuel Zone indicators.

Reports RPV level at TAF and trend continues down slow.

COMMENTS:

Page 17 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 10

==

Description:==

Initiate Emergency Depressurization.

This is initiated when it is determined that RPV level cannot be restored and maintained GT -183.

Critical Task is to initiate an Emergency Depressurization when TAF is reached at -161 and before RPV Level drops to -183.

Time Position Applicants Actions or Behavior SRO Determines that Emergency Depressurization is required.

Enters PPM 5.1.3, Emergency Depressurization, and determines wetwell level GT 17.

Directs 7 ADS SRVs be opened.

RO/BOP Opens 7 ADS SRVs as directed.

SRO Directs wetwell and drywell sprays and suppression pool cooling be secured to facilitate RPV injection.

RO/BOP Secures DW and WW sprays and SP cooling as directed.

Allows ECCS injection valves to open at 470 psig.

Reports RPV injection as it occurs.

Reports RPV level rising and when GT -161 inches.

COMMENTS:

Page 18 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 11

==

Description:==

Re-initiation of Wetwell and Drywell Sprays.

This event is initiated by the SRO when RPV level has been raised GT TAF.

Time Position Applicants Actions or Behavior SRO Based on rate of RPV level change, injection systems available, and wetwell pressure, directs re-initiation of wetwell and drywell sprays and suppression pool cooling with RHR as appropriate (Wetwell spray initiation if WW/P GT 2 psig and DW Spray initiation if WW/P GT 12 psig.

RO/BOP Secures injection systems as directed to return RPV level to +13 to +54 inch band.

Reinitiates wetwell and drywell sprays as appropriate.

Reinitiates suppression pool cooling as directed.

Termination Criteria: The scenario will be terminated when RPV level is being returned to normal and wetwell and drywell sprays have been initiated as appropriate.

COMMENTS:

Page 19 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 TURNOVER INFORMATION Initial Conditions: The reactor has been operating at 100% power for the last 131 days. This is a Division 3 work week. OSP-ELEC-M703, DG-3 Monthly Surveillance, is in progress. OPS 2 is standing by in the HPCS DG room. DG-3 is running and SM-2 is being powered from TR-S per OPS-ELEC-M703. PDIS signal X108 (DG3 voltage) is not available.

Turnover Information: Continue with OSP-ELEC-M703, DG-3 Monthly Surveillance, which has been completed up through step 7.5.49.

SIMULATOR SETUP Reset to IC-180.

Have HPCS DG Surveillance signed off thru step 7.5.49.

Ensure sign at SRO desk indicates a Division 3 work week.

Page 20 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BAT FILE

> 2009 NRC Scenario #2

>* Trigger list *

>Trigger 1 HPCS-P-2 Shaft Seizure

>Trigger 2 RFW-DPT-4B Fails

>Trigger 3 Feedwater Heater 6B Trips

>Trigger 4 DEH Leak

>Trigger 10 Conditional for TR-S Lockout and LOCA on CB S1 closure

>The following items setup conditions for the beginning of the scenario

> DG1 ECCS - FAIL AUTO START IMF MAL-DGN006A TRUE IMF MAL-DGN007A TRUE

> DG2 ECCS - FAIL AUTO START IMF MAL-DGN006B TRUE IMF MAL-DGN007B TRUE

>The following items are triggered in the scenario

>TRIGGER 1 - HPCS-P-2 SHAFT SEIZURE IMF PMP-SSW001S (1) TRUE

>TRIGGER 2 - RFW-DPT-4B FAILS UPSCALE IMF XMT-RRS107A (2) 60.000000 0 36.389500

> TRIGGER 3 FWH 6B TRIPS ON HIGH LEVEL

> DUMP VALVE LCV-6B2 FAILS CLOSED IMF AOV-FWH050F (3) 1

> DRAIN VALVE LCV-6B1 FAILS CLOSED IMF AOV-FWH049F (3) 1

> TRIGGER 4 - DEH COMMON DISCH LEAK

> DEH RESERVOIR LEVEL LOW ALARM (P820-B1.6-7)

IMF ANN-820B1F07 (4) 0

> DEH RESERVOIR LEVEL LOW-LOW ALARM (P820-B1.7-7)

IMF ANN-820B1G07 (4 660) 0

>The following are conditionals to initiate triggers

>TRIGGER 10 TR-S TRIP/LOCKS OUT ON CLOSURE ON CB-S1 IMF MAL-OED001 (10) TRUE IMF MAL-RRS004B (10 60) 2 600 TRGSET 10 "X8CO230R.GT.0"

>Local Bat file loads generic triggers for local plant actions bat local.txt Page 21 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 INSTRUCTIONAL COVER SHEET PROGRAM OPERATIONS TRAINING COURSE TITLE COLUMBIA GENERATING STATION SIMULATOR EXAMINATION Raise Power With Flow, MS-RV-2A Spurious Open, Place RHR in SP Cooling, ARM-RIS-3 Failure, MT Drain Tank Controller Failure Causes LESSON TITLE MT Trip, Hydraulic ATWS, Reduced SLC, Lower Level, S/R/S Inserts Control Rods, Return Level to Normal LENGTH OF LESSON 1.5 Hours LS INCLUDED Lesson Plan PQD Code Rev. No.

Simulator Guide PQD Code LO001627 Rev. No. 0 JPM PQD Code Rev. No.

Exam PQD Code Rev. No.

DIVISION TITLE Nuclear Training DEPARTMENT Operations Training PREPARED BY Ron Hayden DATE 6/12/08 REVISED BY DATE VALIDATED BY DATE TECHNICAL REVIEW DATE INSTRUCTIONAL REVIEW DATE APPROVED DATE Page 22 of 21

Appendix D NRC SCENARIO No. 2 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Operations Training Manager Verify materials current IAW SWP-TQS-01 prior to use.

Page 23 of 21

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Facility: Columbia NRC Scenario No: 3 Examiners: _______________ Operators: _______________

Initial conditions: During a plant startup following a refueling outage, Columbia is at approximately 60% with the Main Turbine Generator synchronized. CAS-C-1C is tagged out for repairs.

Turnover: Continue with the startup and raise power with flow to 65% power per PPM 3.1.2 step Q-60. The reactivity brief has been given.

Event Timeline Event Event Description No. Type*

1. T=0 R (RO) Raise power with flow
2. T=10 C MS-RV-2A Spurious open - Pull fuses to close (SRO/BOP)
3. T=15 N Place RHR-B in Suppression Pool Cooling (BOP)
4. T=35 I ARM-RIS-3 Failure (SRO/BOP)
5. T=40 C MT Drain Tank Controller Failure - Leads to Manual Scram and (SRO/BOP) Automatic Main Turbine Trip
6. T=45 M (ALL) Hydraulic ATWS. Lower RPV Level to establish LL
7. T=50 C (RO) Reduced SLC flow
8. T=55 Perform PPM 5.5.1 (ECCS Inj. Valves) and PPM 5.5.6 (MSIV bypass)

Perform PPM 5.5.10 and PPM 5.5.11 to insert control rods

9. T=65 Scram/Reset/Scram Inserts All Control Rods Return RPV Level to normal band T=75 Termination Cue: All rods are in and RPV level is being returned/is returned to normal band
  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SCENARIO DESCRIPTION The scenario starts with the reactor at approximately 60% power. The turnover information has the crew ready to raise power per PPM 3.1.2 to 65%.

CRO1 will begin raising power with flow to 65% at 10 Mwe per minute.

The next event is a spurious opening of MS-RV-2A. ABN-SRV will be entered. When the SRV control switch is taken to close the valve will remain open.

RHR will be placed in Suppression Pool Cooling per SOP-RHR-SPC Fuses BB-F19 and F20, in H13-P628, will be pulled to close the SRV. Tech specs will be referenced but none will apply.

The next event is a downscale failure of ARM-RIS-3. The crew will investigate, take actions per ARP and refer to LCS 1.3.7.4.

The next event is a failure of the level control valves associated with the A MSR drain tank. As level rises, a drain tank high level alarm annunciates. Level will continue to rise and a MSR high level alarm will activate.

The crew should scram the plant prior to the 30 second time delay expiring. The MT will trip when the 30 second time delay times out.

When the manual scram occurs the crew will recognize that the reactor control rods did not insert due to a hydraulic ATWS. PPM 5.1.1 will be entered, which will direct entry into PPM 5.1.2. Pressure should be controlled by MT Bypass valve operation.

PPM 5.5.1 and PPM 5.5.6 will be implemented.

Reactor water level will be intentionally lowered to -65 to -183 (-80 to -140) to control reactor power.

When SLC is started the relief valves will lift resulting in reduced SLC flow (18 gpm) to the vessel.

The Control Rods will be inserted with the Reactor Manual Control System (driving rods), and the Scram/Reset/Scram method listed in PPM 5.5.11.

The ATWS will clear when RPV level has been lowered and is under control.

When all rods are in, SLC will be secured and PPM 5.1.2 will be exited. RPV level will be returned to normal band per PPM 5.1.1 with feedwater.

The scenario will be terminated when RPV level has been returned to normal band.

Page 2 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 1

==

Description:==

Raise Reactor Power with Flow.

The event is initiated by turnover information and is started when the crew takes the shift.

Time Position Applicants Actions or Behavior T=0 SRO Directs RO to raise Reactor Power with flow not to exceed 10 Mwe per minute to a power level of 65%.

RO With ASD in AUTO, raises reactor power with flow at LE 10 Mwe per minute.

COMMENTS:

Page 3 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 2

==

Description:==

MS-RV-2A spurious open - Fuses pulled to close This event occurs when the RO Evaluator has observed the power increase and indicates the is initiated by activating TRIGGER 1 when power has been raised to 75% or when it is determined that the last event has been completed.

Time Position Applicants Actions or Behavior T=10 BOP Acknowledges SRV Open alarm, observes MS-RV-2A is open and refers to ARP Informs SRO and refers him to ABN-SRV SRO Directs actions:

Verify SRV open by tail pipe temp rise or SP Temp/level rise or MG output reduction With power LT 90% - directs BOP to place the control switch for MS-RV-2A to OFF BOP Places the control switch to OFF and observes that the SRV is still open and informs the SRO SRO Directs placing RHR in Suppression Pool Cooling per SOP-RHR-SPC (Refer to Event 3)

SRO Directs fuses be pulled per Attachment 7.1 BOP Takes all watches/rings off, wears safety glasses and using small yellow fuse pullers, removes Fuses BB-F19 and BB-F20 in H13-P628 BOP Verifies indication on P601 and informs SRO that MS-RV-2A is closed Page 4 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 SRO Refers to Tech Specs and notes that no action statement applies with just this SRV inop Contacts Work Week Manager COMMENTS:

Page 5 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 3

==

Description:==

Place RHR B in Suppression Pool Cooling per SOP-RHR-SPC The event is initiated by ABN-SRV performance Time Position Applicants Actions or Behavior T=15 SRO Directs placing RHR-B in Suppression Pool Cooling per SOP-RHR-SPC BOP Verify RHR-A operable Verify SW-P-1B running - otherwise N / A Start RHR-P-2B by taking C/S to start Verifies RHR-FCV-64B opens Verifies SW-P-1B running Throttle open RHR-V-24B to between 2500 - 7000 gpm, as determined by the CRS Verify RHR-V-64B closes If maximum cooling is desired, closes RHR-V-48B COMMENTS:

Page 6 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 4

==

Description:==

Downscale failure of ARM-RIS-3 The event is initiated by activating TRIGGER 2 after actions for SRV have been completed Time Position Applicants Actions or Behavior T=35 BOP Acknowledges AREA RAD MONITOR DNSCL alarm and pulls ARP.

Notes that ARM-RIS-3 is reading downscale.

SRO Directs actions per ARP:

Notify Health Physics Refers to LCS 1.3.7.4 with new fuel in vault. Directs HP to survey area once every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Directs reset of ARM (not successful).

Stops/confirms stoppage of fuel movement.

COMMENTS:

Page 7 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 5

==

Description:==

Failure of MSR Drain tank 1A level control valves HD-LIC-9A and 9A2 closed The event is initiated by activating TRIGGER 3 after actions for ARM failure have been completed (It takes 6 minutes to get MSR A High Level Alarm after trigger activation)

Time Position Applicants Actions or Behavior T=40 BOP Acknowledges alarm and reports MSR Drain Tank 1A Level High alarm.

Refers to ARP.

Investigates controllers to ensure they are in Auto and recognizes the controllers are not controlling in Auto. Attempts Manual operation.

Reports controllers not functioning in Auto or Manual and level indication is off scale high.

SRO Conduct a brief on actions if level continues to rise and MSR Level High alarm is received.

RO/BOP Acknowledges and reports MSR A Level High alarm and refers to ARP (Turbine Trip has a 30 second time delay)

SRO Directs a manual reactor scram prior to automatic scram actuation (SRO may direct a scram prior to MSR A high Level alarm)

RO Scrams the reactor and performs immediate operator actions of PPM 3.3.1:

  • mode switch to shutdown

COMMENTS:

Page 8 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 6

==

Description:==

Hydraulic ATWS This event is setup at the beginning of the scenario and occurs automatically when a manual scram is inserted.

Critical Task is to lower RPV level and establish an LL (Lowered Level).

Time Position Applicants Actions or Behavior T=45 RO Continues with immediate scram actions after recognizing all control rods did not insert:

Depress the manual scram pushbuttons Initiate ARI and verifies valves opened Insert SRMs and IRMs Announce EOP entry into PPM 5.1.1 on low Reactor Water level and/or Power GT 5% and a scram required Reports reactor power SRO Enters PPM 5.1.1 and directs/verifies that the Mode Switch has been placed in SHUTDOWN and exits PPM 5.1.1 via the Power leg to PPM 5.1.2 RPV Control ATWS Directs BOP to:

Inhibit ADS and take manual control of HPCS Verify all appropriate isolations and initiations have occurred Verify pressure is being maintained by the main turbine/bypass valves BOP Takes both ADS control switches to the INHIBIT position and Page 9 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 acknowledges associated BISIs Arms and Depresses the HPCS system initiation P/B while holding the control switch for HPCS-P-1 to STOP Closes HPCS-V-4 when it get fully opened Reports completion to SRO SRO When Main Turbine trips directs Bypass Valve operation be verified for pressure control RO/BOP Verifies Bypass valve operation and reports to SRO SRO Directs bypassing the MSIV isolation interlocks per PPM 5.5.6 Directs performance of PPM 5.5.1 BOP Performs PPM 5.5.6 and reports completion to Crew Performs PPM 5.5.1 and reports completion to Crew SRO Direct the RO to:

Stop and prevent all injection into the RPV except by Boron injection systems, RCIC, and CRD (May direct RCIC start be prevented).

Lower level to a band less than -65 inches but greater than -183 inches (preferred band is -80 to -140). Record the upper limit as LL.

Maintain level as directed from LL to -183 inches with systems listed in Table 5 (Band should be

-80 to -140).

SRO Directs SLC initiation when RRC pumps are off (REFER TO EVENT 7).

Page 10 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 RO Stops and prevents condensate and feedwater as directed and lines up on the startup flow control valves Reports EOP entry on low RPV level Reports Reactor Power as it drops due to lowering level When Reactor Power is LT 5%, marks RPV level to establish an LL Maintains RPV level between LL and -183 inches as directed (-80 to -

140)

SRO Directs PPM 5.5.10 and 5.5.11 (Tabs B, F) performance for a hydraulic ATWS. (REFER TO EVENT 8)

COMMENTS:

Page 11 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 7

==

Description:==

Failure of SLC pumps to deliver normal SLC flow to RPV This event is activated at the beginning of the scenario and realized by the crew when SLC control switches are taken to OPER to initiate SLC.

Time Position Applicants Actions or Behavior T=50 SRO Recognizes RRC Pumps have tripped off and directs SLC initiation before SP temp reaches 110°F RO Initiates SLC per the quick card:

Swaps keys and places two switches to OPER Verifies squib valves fire Verifies RWCU-V-4 closure Verifies flow and SLC tank level Reports reduced SLC flow (about 18 gpm) and initial tank level SRO May contact Work Week Manager COMMENTS:

Page 12 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 8

==

Description:==

Insert control rods using PPM 5.5.10 and 5.5.11 Tab B.

This event is initiated by the SRO direction.

Time Position Applicants Actions or Behavior Critical Task is to insert Control Rods by performing PPM 5.5.11 Scram/Reset/Scram and then to return RPV level back to normal level band.

T=55 SRO Directs PPM 5.5.10 and PPM 5.5.11 be performed to insert control rods BOP Performs, as directed:

PPM 5.5.10 - Override ARI Logic - pulls 2 fuses BOP Performs PPM 5.5.11 Tab B to scram/reset/scram Places SDV HIGH LEVEL TRIP control switch to BYPASS on P603 Determines that scram cannot be reset and overrides RPS per Attachment 6.1:

In H13-P611:

Installs jumpers between RPS-RLY-K9B stud 2 and RPS-RLY-K12F stud 4 Installs jumper between RPS-RLY-K9D stud 2 and RPS-RLY-K12H stud 4 In H13-P609:

Installs jumpers between RPS-RLY-K9A stud 2 and RPS-RLY-K12E stud 4 Installs jumper between RPS-RLY-K9C stud 2 and RPS-RLY-K12GH stud 4 Page 13 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BOP Resets scram and notes time When SDV drain valves have been opened for more than 2 minutes:

Checks rod density Initiates a manual scram If rods do not insert continues scram/reset/scram Tab B COMMENTS:

Page 14 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Event No. 9

==

Description:==

Control Rods Insert and RPV Level returned to +13 to +54 band.

This event is activated when RPV level has been lowered.

Time Position Applicants Actions or Behavior BOOTH OPERATOR: When RPV Level has been lowered and is being controlled in the desired band, and PPM 5.5.11 is being performed (scram/reset/scram) to insert control rods:

ACTIVATE TRIGGER 4 T=65 BOP Checks control rod density Initiates a manual scram Notes Control Rod motion Recognizes and reports All Rods In to the SRO SRO Directs SLC be stopped RO Takes control switches out of OPER and observes both SLC pumps stop SRO Exits PPM 5.1.2 and re-enters PPM 5.1.1 Directs RPV level be raised to +13 to +54 band with available systems RO Raises RPV level into band as directed TERMINATION POINT - The scenario will be terminated when RPV level has been returned to normal operating band.

COMMENTS:

Page 15 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 TURNOVER INFORMATION Initial conditions: During a plant startup following a refueling outage, Columbia is at approximately 60% with the Main Turbine Generator synchronized. CAS-C-1C is tagged out for repairs.

Turnover: Continue with the startup and raise power with flow to 65% power per PPM 3.1.2 step Q-60. The reactivity brief has been given.

SIMULATOR SETUP INSTRUCTIONS Mark up the startup flowcharts as follows: Up through and including L-33 signed off; Up through and including Q-59 signed off; Up through and including P-13 signed off; Up through and including S-39 signed off; Ensure B43 and B44 are completed; Up through and including A-52 signed off.

Page 16 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 BAT FILE

> 2009 NRC Scenario #3

>* Trigger list *

>Trigger 1 MS-RV-2A spurious opening

>Trigger 2 ARM-RIS-3 Fails Downscale

>Trigger 3 High Pressure Feedwater Heater 6B High Level Trip

>Trigger 4 Run BAT file to Clear ATWS

>The following items set conditions before scenario begins

> Hydraulic ATWS IMF MAL-CRD007A1 100 IMF MAL-CRD007A2 83 IMF MAL-CRD007B1 100 IMF MAL-CRD007B2 83

> SLC-P-1A REDUCED FLOW IMF PMP-SLC001F 100

> SLC-P-1B REDUCED FLOW IMF PMP-SLC002F 50

>The following items are triggered in the scenario

> TRIGGER 1 - MS-RV-2A SWITCH OFF - SPURIOUS OPENING IOR OVR-RRS010C (1) OFF

> MS-RV-2A SWITCH OPEN IOR OVR-RRS010D (1) ON

> TRIGGER 2 - ARM-RIS-3 FAILS DOWNSCALE IOR OVR-RMS027E (2) OFF

> TRIGGER 3 - HD-LIC-9A2 and HD-LIC-9A Fail IMF AOV-FWH059F (3) 1 IMF AOV-FWH060F (3) 1

>The following set up triggers to initiate batch files

> Local Bat file loads generic triggers for local plant actions bat local.txt

> TRIGGER 4 - Clear ATWS trg 4 "bat 2009NRCScenario3A.txt"

>LO001627A.txt

>Ron Hayden

>This file supplements LO001627 and clears the Hydraulic ATWS DMF MAL-CRD007A1 DMF MAL-CRD007A2 DMF MAL-CRD007B1 DMF MAL-CRD007B2 Page 17 of 17

Appendix D NRC Scenario No. 3 FORM ES-D-1 Columbia Generating Station ILC NRC Exam January, 2009 Page 18 of 17