| issue date = 12/20/2012
| issue date = 12/20/2012
| title = Review of the Spring 2011 Steam Generator Tube Inservice Inspections During Refueling Outage 17
| title = Review of the Spring 2011 Steam Generator Tube Inservice Inspections During Refueling Outage 17
| author name = Kulesa G J
| author name = Kulesa G
| author affiliation = NRC/NRR/DE/ESGB
| author affiliation = NRC/NRR/DE/ESGB
| addressee name = Dudek M I
| addressee name = Dudek M
| addressee affiliation = NRC/NRR/DORL/LPLIII-2
| addressee affiliation = NRC/NRR/DORL/LPLIII-2
| docket = 05000454
| docket = 05000454
| license number =  
| license number =  
| contact person = Obodoako A O, 415-1502
| contact person = Obodoako A, 415-1502
| case reference number = TAC ME9452
| case reference number = TAC ME9452
| document type = Memoranda
| document type = Memoranda
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:December 20, 2012  
{{#Wiki_filter:December 20, 2012 MEMORANDUM TO:             Michael Dudek, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                     Gloria J. Kulesa, Chief     /RA/
 
Steam Generator Tube Integrity and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
MEMORANDUM TO: Michael Dudek, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Gloria J. Kulesa, Chief /RA/ Steam Generator Tube Integrity and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
BYRON NUCLEAR POWER STATION UNIT 1 - REVIEW OF THE SPRING 2011 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 17 (TAC No. ME9452)  
BYRON NUCLEAR POWER STATION UNIT 1 - REVIEW OF THE SPRING 2011 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 17 (TAC No. ME9452)
 
By letter dated July 14, 2011 (Agencywide Documents Access Management System (ADAMS)
By letter dated July 14, 2011 (Agencywide Docu ments Access Management System (ADAMS) Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).  
Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).
 
The staff of the Steam Generator Tube Integrity and Chemical Engineering Branch of the Division of Engineering has completed its review of the report and concludes that the licensee provided the information required by the Byron 1 Technical Specifications. No additional follow up is required at this time. The staffs review is enclosed.
The staff of the Steam Generator Tube Integrity and Chemical Engineering Branch of the Division of Engineering has completed its review of the report and concludes that the licensee  
When you forward the review summary to the licensee, please include Kenneth J. Karwoski and me on distribution for the final document. If you elect to significantly change the enclosed summary prior to sending it to the licensee, please include me on concurrence.
 
Docket No.: 50-454
provided the information required by the Byron 1 Technical Specifications. No additional follow up is required at this time. The staff's review is enclosed.  
 
When you forward the review summary to the licensee, please include Kenneth J. Karwoski and me on distribution for the final document. If you elect to significantly change the enclosed summary prior to sending it to the licensee, please include me on concurrence.  
 
Docket No.: 50-454  


==Enclosure:==
==Enclosure:==


Review of Inspection Summary Report CONTACT: Aloysius O. Obodoako, NRR/DE/ESGB (301) 415-1502 December 20, 2012
Review of Inspection Summary Report CONTACT: Aloysius O. Obodoako, NRR/DE/ESGB (301) 415-1502
 
MEMORANDUM TO: Michael Dudek, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


FROM: Gloria J. Kulesa, Chief /RA/ Steam Generator Tube Integrity and   Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation  
December 20, 2012 MEMORANDUM TO:            Michael Dudek, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                     Gloria J. Kulesa, Chief     /RA/
Steam Generator Tube Integrity and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
BYRON NUCLEAR POWER STATION UNIT 1 - REVIEW OF THE SPRING 2011 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 17 (TAC No. ME9452)  
BYRON NUCLEAR POWER STATION UNIT 1 - REVIEW OF THE SPRING 2011 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 17 (TAC No. ME9452)
By letter dated July 14, 2011 (Agencywide Documents Access Management System (ADAMS)
Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).
The staff of the Steam Generator Tube Integrity and Chemical Engineering Branch of the Division of Engineering has completed its review of the report and concludes that the licensee provided the information required by the Byron 1 Technical Specifications. No additional follow up is required at this time. The staffs review is enclosed.
When you forward the review summary to the licensee, please include Kenneth J. Karwoski and me on distribution for the final document. If you elect to significantly change the enclosed summary prior to sending it to the licensee, please include me on concurrence.
Docket No.: 50-454


By letter dated July 14, 2011 (Agencywide Docu ments Access Management System (ADAMS) Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).
==Enclosure:==
 
The staff of the Steam Generator Tube Integrity and Chemical Engineering Branch of the Division of Engineering has completed its review of the report and concludes that the licensee provided the information required by the Byron 1 Technical Specifications. No additional follow up is required at this time. The staff's review is enclosed.
 
When you forward the review summary to the licensee, please include Kenneth J. Karwoski and me on distribution for the final document. If you elect to significantly change the enclosed summary prior to sending it to the licensee, please include me on concurrence.
 
Docket No.: 50-454


==Enclosure:==
Review of Inspection Summary Report DISTRIBUTION:
Review of Inspection Summary Report  
DE R/F      EMurphy      EWong      AObodoako        CHunt      AJohnson          JWiebe DHills      RidsNrrPMByron ADAMS Accession Number: ML12335A216 OFFICE          NRR/DE/ESGB          NRR/DE            NRR/DE/ESGB NAME            AObodoako            KKarwoski        GKulesa DATE            12 /03 /2012          12 /04 /2012      12 /20 /2012 OFFICIAL RECORD COPY


DISTRIBUTION
BYRON NUCLEAR POWER STATION UNIT 1
: DE R/F EMurphy EWong AObodoako CHunt AJohnson  JWiebe DHills  RidsNrrPMByron ADAMS Accession Number:  ML12335A216 OFFICE NRR/DE/ESGB NRR/DE NRR/DE/ESGB NAME AObodoako KKarwoski GKulesa DATE 12 /03 /2012 12 /04 /2012 12 /20 /2012 OFFICIAL RECORD COPY ENCLOSURE BYRON NUCLEAR POWER STATION UNIT 1


==SUMMARY==
==SUMMARY==
OF THE STAFF'S REVIEW OF THE STEAM GENERATOR TUBE INSERVICE INSPECTIONS FOR REFUELING OUTAGE 17 TAC No. ME9452 DOCKET No. 50-454
OF THE STAFFS REVIEW OF THE STEAM GENERATOR TUBE INSERVICE INSPECTIONS FOR REFUELING OUTAGE 17 TAC No. ME9452 DOCKET No. 50-454 By letter dated July 14, 2011 (Agencywide Documents Access Management System (ADAMS)
 
Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).
By letter dated July 14, 2011 (Agencywide Docu ments Access Management System (ADAMS) Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).  
Byron Nuclear Power Station, Unit 1 has four Babcock & Wilcox SGs. Each SG contains 6,633 thermally treated Alloy 690 tubes. Each tube has a nominal wall thickness of 0.040 inches.
 
The tubes were hydraulically expanded at both ends for the full length of the tubesheet and are supported by a number of stainless steel lattice grid structures and fan bars.
Byron Nuclear Power Station, Unit 1 has four Babcock & Wilcox SGs. Each SG contains 6,633 thermally treated Alloy 690 tubes. Each tube has a nominal wall thickness of 0.040 inches. The tubes were hydraulically expanded at both ends for the full length of the tubesheet and are supported by a number of stainless steel lattice grid structures and fan bars.  
 
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the document referenced above. In addition, the licensee described corrective actions (i.e.,
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the document referenced above. In addition, the licensee described corrective actions (i.e.,
tube plugging) taken in response to the inspection findings. The tubes in all four SGs were inspected this outage.  
tube plugging) taken in response to the inspection findings. The tubes in all four SGs were inspected this outage.
 
After reviewing the information provided by the licensee, the staff has the following comments/observations:
After reviewing the information provided by the licensee, the staff has the following comments/observations:
* The licensee reported that during the steam drum inspection, erosion was found in the steam nozzle venturi area. The localized degradation was observed in the material surrounding the venturi, adjacent to the retaining plate. The licensee stated that it contacted the original equipment manufacturer regarding this degradation and concluded to accept the condition "as-is" and that there are no further actions required. The licensee based their conclusion on the fact that the venturies are held into the head primarily by an interface fit between the venturi and steam nozzle, the retaining plate only provides a secondary retaining function, and localized degradation of the base material will in no way affect the function of the venturies or increase the risk of the venturies loosening during operation.
* The licensee reported that during the steam drum inspection, erosion was found in the steam nozzle venturi area. The localized degradation was observed in the material surrounding the venturi, adjacent to the retaining plate. The licensee stated that it contacted the original equipment manufacturer regarding this degradation and concluded to accept the condition as-is and that there are no further actions required.
Based on a review of the information provided, the staff concludes that the licensee provided the information required by the Byron, Unit 1 Technical Specifications. In addition, the staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.}}
The licensee based their conclusion on the fact that the venturies are held into the head primarily by an interface fit between the venturi and steam nozzle, the retaining plate only provides a secondary retaining function, and localized degradation of the base material will in no way affect the function of the venturies or increase the risk of the venturies loosening during operation.
Based on a review of the information provided, the staff concludes that the licensee provided the information required by the Byron, Unit 1 Technical Specifications. In addition, the staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
ENCLOSURE}}

Latest revision as of 20:21, 11 November 2019

Review of the Spring 2011 Steam Generator Tube Inservice Inspections During Refueling Outage 17
ML12335A216
Person / Time
Site: Byron Constellation icon.png
Issue date: 12/20/2012
From: Kulesa G
Steam Generator Tube Integrity and Chemical Engineering Branch
To: Michael Dudek
Plant Licensing Branch III
Obodoako A, 415-1502
References
TAC ME9452
Download: ML12335A216 (3)


Text

December 20, 2012 MEMORANDUM TO: Michael Dudek, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Gloria J. Kulesa, Chief /RA/

Steam Generator Tube Integrity and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation

SUBJECT:

BYRON NUCLEAR POWER STATION UNIT 1 - REVIEW OF THE SPRING 2011 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 17 (TAC No. ME9452)

By letter dated July 14, 2011 (Agencywide Documents Access Management System (ADAMS)

Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).

The staff of the Steam Generator Tube Integrity and Chemical Engineering Branch of the Division of Engineering has completed its review of the report and concludes that the licensee provided the information required by the Byron 1 Technical Specifications. No additional follow up is required at this time. The staffs review is enclosed.

When you forward the review summary to the licensee, please include Kenneth J. Karwoski and me on distribution for the final document. If you elect to significantly change the enclosed summary prior to sending it to the licensee, please include me on concurrence.

Docket No.: 50-454

Enclosure:

Review of Inspection Summary Report CONTACT: Aloysius O. Obodoako, NRR/DE/ESGB (301) 415-1502

December 20, 2012 MEMORANDUM TO: Michael Dudek, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Gloria J. Kulesa, Chief /RA/

Steam Generator Tube Integrity and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation

SUBJECT:

BYRON NUCLEAR POWER STATION UNIT 1 - REVIEW OF THE SPRING 2011 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 17 (TAC No. ME9452)

By letter dated July 14, 2011 (Agencywide Documents Access Management System (ADAMS)

Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).

The staff of the Steam Generator Tube Integrity and Chemical Engineering Branch of the Division of Engineering has completed its review of the report and concludes that the licensee provided the information required by the Byron 1 Technical Specifications. No additional follow up is required at this time. The staffs review is enclosed.

When you forward the review summary to the licensee, please include Kenneth J. Karwoski and me on distribution for the final document. If you elect to significantly change the enclosed summary prior to sending it to the licensee, please include me on concurrence.

Docket No.: 50-454

Enclosure:

Review of Inspection Summary Report DISTRIBUTION:

DE R/F EMurphy EWong AObodoako CHunt AJohnson JWiebe DHills RidsNrrPMByron ADAMS Accession Number: ML12335A216 OFFICE NRR/DE/ESGB NRR/DE NRR/DE/ESGB NAME AObodoako KKarwoski GKulesa DATE 12 /03 /2012 12 /04 /2012 12 /20 /2012 OFFICIAL RECORD COPY

BYRON NUCLEAR POWER STATION UNIT 1

SUMMARY

OF THE STAFFS REVIEW OF THE STEAM GENERATOR TUBE INSERVICE INSPECTIONS FOR REFUELING OUTAGE 17 TAC No. ME9452 DOCKET No. 50-454 By letter dated July 14, 2011 (Agencywide Documents Access Management System (ADAMS)

Accession No. ML11200A302), Exelon Generation Company, LLC, the licensee, submitted information summarizing the results of their 2011 steam generator (SG) tube inspections performed during refueling outage 17 at Byron Nuclear Power Station, Unit 1 (Byron 1).

Byron Nuclear Power Station, Unit 1 has four Babcock & Wilcox SGs. Each SG contains 6,633 thermally treated Alloy 690 tubes. Each tube has a nominal wall thickness of 0.040 inches.

The tubes were hydraulically expanded at both ends for the full length of the tubesheet and are supported by a number of stainless steel lattice grid structures and fan bars.

The licensee provided the scope, extent, methods, and results of their SG tube inspections in the document referenced above. In addition, the licensee described corrective actions (i.e.,

tube plugging) taken in response to the inspection findings. The tubes in all four SGs were inspected this outage.

After reviewing the information provided by the licensee, the staff has the following comments/observations:

  • The licensee reported that during the steam drum inspection, erosion was found in the steam nozzle venturi area. The localized degradation was observed in the material surrounding the venturi, adjacent to the retaining plate. The licensee stated that it contacted the original equipment manufacturer regarding this degradation and concluded to accept the condition as-is and that there are no further actions required.

The licensee based their conclusion on the fact that the venturies are held into the head primarily by an interface fit between the venturi and steam nozzle, the retaining plate only provides a secondary retaining function, and localized degradation of the base material will in no way affect the function of the venturies or increase the risk of the venturies loosening during operation.

Based on a review of the information provided, the staff concludes that the licensee provided the information required by the Byron, Unit 1 Technical Specifications. In addition, the staff concludes that there are no technical issues that warrant follow-up action at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.

ENCLOSURE