ML18153D168: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/10/1992
| issue date = 11/10/1992
| title = Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C
| title = Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C
| author name = STEWART W L
| author name = Stewart W
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 3
| page count = 3
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:-e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 November 10, 1992 United States Nuclear Regulatory Commission Attention:
{{#Wiki_filter:-
Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 e
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE SERVICE WATER SUPPLY LCO Serial No. 92-389 NURPC Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Pursuant to 1 O CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2. The proposed Technical Specification change will allow one of two service water flow paths to the main control and emergency switchgear rooms air conditioning condensers to be removed from service for system maintenance.
November 10, 1992 United States Nuclear Regulatory Commission                       Serial No. 92-389 Attention: Document Control Desk                                 NURPC Washington, D. C. 20555                                           Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
This is accomplished by specifying an Action Statement for operable service water flow paths to the main control and emergency switchgear rooms air conditioning condensers governed by Technical Specification 3.14.C. A Limiting Condition for Operation (LCO) permitting one train to be out of service for 24 hours prior to HOT SHUTDOWN and an additional 48 hours prior to COLD SHUTDOWN will be used in lieu of the requirements of Technical Specification  
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE SERVICE WATER SUPPLY LCO Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2.
The proposed Technical Specification change will allow one of two service water flow paths to the main control and emergency switchgear rooms air conditioning condensers to be removed from service for system maintenance.                 This is accomplished by specifying an Action Statement for operable service water flow paths to the main control and emergency switchgear rooms air conditioning condensers governed by Technical Specification 3.14.C. A Limiting Condition for Operation (LCO) permitting one train to be out of service for 24 hours prior to HOT SHUTDOWN and an additional 48 hours prior to COLD SHUTDOWN will be used in lieu of the requirements of Technical Specification 3.0.1. Attachment 1 identifies the proposed changes which are indicated by revision bars in the right margin.
The proposed change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee. It has been determined that this change does involve an unreviewed safety question as defined in 1o CFR 50.59. However, as shown in Attachment 2, this submittal* involves no significant hazards considerations according to 10 CFR 50.92. Should you have any questions, please do not hesitate to contact us.
Very truly yours, dl~---
: w. L. Stewart          ~
Senior Vice President - Nuclear Attachments
      -1. Proposed Technical Specification Changes                  .
: 2. Discussion and Significant Hazards Consideration Evaluation i 6 0/-    9p 2DRil p
Ii&i!a 6~555gao    PDR
* I


====3.0.1. Attachment====
                                        ~~~~~~~~~~~ -
1 cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219


1 identifies the proposed changes which are indicated by revision bars in the right margin. The proposed change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee.
COMMONWEALTH OF VIRGINIA )
It has been determined that this change does involve an unreviewed safety question as defined in 1 o CFR 50.59. However, as shown in Attachment 2, this submittal*
                                    )
involves no significant hazards considerations according to 1 O CFR 50.92. Should you have any questions, please do not hesitate to contact us. Very truly yours, dl~---w. L. Stewart Senior Vice President
COUNTY OF HENRICO                   )
-Nuclear Attachments
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. L. Stewart who is Senior Vice President -
-1. Proposed Technical Specification Changes . 2. Discussion and Significant Hazards Consideration Evaluation
Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
--. --------------, i 6 0 /-9 p 2 DRil Ii&i!a 6~555gao I PDR
Acknowledged before me this   /!) 7/! day o f ~ W , 19 tr z .
* p cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W. Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219
My Commission Expires:       c!f/a;/ 3/       , 19..1lt'..
----------------
                                                      £. ~ !luu.
1 COMMONWEAL TH OF VIRGINIA ) ) COUNTY OF HENRICO ) The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. L. Stewart who is Senior Vice President  
Notary Public (SEALY}}
-Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief. Acknowledged before me this /!) 7/! day of~ W , 19 tr z . My Commission Expires: c!f/a;/ 3/ , 19..1lt'..  
£. !luu. Notary Public (SEALY}}

Latest revision as of 22:33, 2 February 2020

Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C
ML18153D168
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/10/1992
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18153D169 List:
References
92-389, NUDOCS 9211160382
Download: ML18153D168 (3)


Text

-

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 e

November 10, 1992 United States Nuclear Regulatory Commission Serial No.92-389 Attention: Document Control Desk NURPC Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE SERVICE WATER SUPPLY LCO Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2.

The proposed Technical Specification change will allow one of two service water flow paths to the main control and emergency switchgear rooms air conditioning condensers to be removed from service for system maintenance. This is accomplished by specifying an Action Statement for operable service water flow paths to the main control and emergency switchgear rooms air conditioning condensers governed by Technical Specification 3.14.C. A Limiting Condition for Operation (LCO) permitting one train to be out of service for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to HOT SHUTDOWN and an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to COLD SHUTDOWN will be used in lieu of the requirements of Technical Specification 3.0.1. Attachment 1 identifies the proposed changes which are indicated by revision bars in the right margin.

The proposed change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee. It has been determined that this change does involve an unreviewed safety question as defined in 1o CFR 50.59. However, as shown in Attachment 2, this submittal* involves no significant hazards considerations according to 10 CFR 50.92. Should you have any questions, please do not hesitate to contact us.

Very truly yours, dl~---

w. L. Stewart ~

Senior Vice President - Nuclear Attachments

-1. Proposed Technical Specification Changes .

2. Discussion and Significant Hazards Consideration Evaluation i 6 0/- 9p 2DRil p

Ii&i!a 6~555gao PDR

  • I

~~~~~~~~~~~ -

1 cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219

COMMONWEALTH OF VIRGINIA )

)

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. L. Stewart who is Senior Vice President -

Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this /!) 7/! day o f ~ W , 19 tr z .

My Commission Expires: c!f/a;/ 3/ , 19..1lt'..

£. ~ !luu.

Notary Public (SEALY