ML17089A576: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17089A576
| number = ML17089A576
| issue date = 03/30/2017
| issue date = 03/30/2017
| title = 2017/03/30 NRR E-mail Capture - Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 Through MF9390)
| title = NRR E-mail Capture - Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 Through MF9390)
| author name = Singal B K
| author name = Singal B
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name = Richardson M
| addressee name = Richardson M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Singal, Balwant Sent: Thursday, March 30, 2017 1:43 PM To: Richardson, Michael
{{#Wiki_filter:NRR-PMDAPEm Resource From:                             Singal, Balwant Sent:                             Thursday, March 30, 2017 1:43 PM To:                               Richardson, Michael


==Subject:==
==Subject:==
Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-
Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 through MF9390)
 
By letter dated March 8, 2017 (Agencywide Access and management System (ADAMS) Accession No. ML17068A082), Pacific Gas and Electric Company (the licensee) submitted relief requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, for relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI full examination volume coverage requirements for reactor pressure vessel welds. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 through MF9390)
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
By letter dated March 8, 2017 (Agencywide Acce ss and management System (ADAMS) Accession No. ML17068A082), Pacific Gas and Electric Company (the licensee) submitted relief requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, for relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI full examination volume coverage requirements for reactor pressure vessel welds. The purpose of this e-mail is to provide the results of the U.S. Nuclear  
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::350 hours]] to complete ([[estimated NRC review hours::70 hours]] for each relief request). The NRC staff expects to complete this review by January 31, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
 
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient te chnical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
If you have any questions, please contact me.
 
The NRC staff has reviewed your application and concluded that it does provide technical information in  
 
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that  
 
impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 350 hours to complete (70 hours for each relief request). The NRC staff expects to complete this review by January 31, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.  
 
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advanc e or in parallel with industry program initiatives or pilot applications.  
 
If you have any questions, please contact me.  
 
Balwant K. Singal Senior Project Manager (Diablo Canyon and Wolf Creek)
Balwant K. Singal Senior Project Manager (Diablo Canyon and Wolf Creek)
Nuclear Regulatory Commission  
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1
 
Division of Operating Reactor Licensing  


Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 2
2 Hearing Identifier:   NRR_PMDA Email Number:         3423 Mail Envelope Properties   (Balwant.Singal@nrc.gov20170330134200)
Hearing Identifier: NRR_PMDA Email Number: 3423   Mail Envelope Properties   (Balwant.Singal@nrc.gov20170330134200)


==Subject:==
==Subject:==
Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 through MF9390)
Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 through MF9390)
Sent Date:   3/30/2017 1:42:49 PM Received Date: 3/30/2017 1:42:00 PM From:   Singal, Balwant Created By:   Balwant.Singal@nrc.gov  
Sent Date:             3/30/2017 1:42:49 PM Received Date:         3/30/2017 1:42:00 PM From:                 Singal, Balwant Created By:           Balwant.Singal@nrc.gov Recipients:
 
"Richardson, Michael" <MJRm@pge.com>
Recipients:     "Richardson, Michael" <MJRm@pge.com> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   3048     3/30/2017 1:42:00 PM
Tracking Status: None Post Office:
 
Files                         Size                   Date & Time MESSAGE                       3048                   3/30/2017 1:42:00 PM Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Recipients Received:}}

Latest revision as of 00:17, 9 March 2020

NRR E-mail Capture - Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 Through MF9390)
ML17089A576
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/30/2017
From: Balwant Singal
Plant Licensing Branch IV
To: Richardson M
Pacific Gas & Electric Co
References
MF9386, MF9387, MF9388, MF9389, MF9390
Download: ML17089A576 (3)


Text

NRR-PMDAPEm Resource From: Singal, Balwant Sent: Thursday, March 30, 2017 1:43 PM To: Richardson, Michael

Subject:

Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 through MF9390)

By letter dated March 8, 2017 (Agencywide Access and management System (ADAMS) Accession No. ML17068A082), Pacific Gas and Electric Company (the licensee) submitted relief requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, for relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI full examination volume coverage requirements for reactor pressure vessel welds. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 350 hours14.583 days <br />2.083 weeks <br />0.479 months <br /> to complete (70 hours2.917 days <br />0.417 weeks <br />0.0959 months <br /> for each relief request). The NRC staff expects to complete this review by January 31, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Diablo Canyon and Wolf Creek)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1

2 Hearing Identifier: NRR_PMDA Email Number: 3423 Mail Envelope Properties (Balwant.Singal@nrc.gov20170330134200)

Subject:

Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 through MF9390)

Sent Date: 3/30/2017 1:42:49 PM Received Date: 3/30/2017 1:42:00 PM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:

"Richardson, Michael" <MJRm@pge.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3048 3/30/2017 1:42:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: