|
|
(2 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| #REDIRECT [[IR 05000390/2008301]]
| | {{Adams |
| | | number = ML080140037 |
| | | issue date = 01/11/2008 |
| | | title = Reactor and Senior Reactor Operator Initial Examination - Watts Bar Nuclear Plant 05000390/2008301 |
| | | author name = Widmann M |
| | | author affiliation = NRC/RGN-II/DRS |
| | | addressee name = Campbell W |
| | | addressee affiliation = Tennessee Valley Authority |
| | | docket = 05000390 |
| | | license number = NPF-090 |
| | | contact person = |
| | | case reference number = 50-390/08-301 |
| | | document type = Letter, License-Operator, Part 55 Examination Related Material |
| | | page count = 5 |
| | }} |
| | See also: [[see also::IR 05000390/2008301]] |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES |
| | NUCLEAR REGULATORY COMMISSION |
| | REGION II |
| | SAM NUNN ATLANTA FEDERAL CENTER |
| | 61 FORSYTH STREET, SW, SUITE 23T85 |
| | ATLANTA, GEORGIA 30303-8931 |
| | January 11, 2008 |
| | Tennessee Valley Authority |
| | ATTN: Mr. William R. Campbell Jr. |
| | Chief Nuclear Officer and |
| | Executive Vice President |
| | 6A Lookout Place |
| | 1101 Market Street |
| | Chattanooga, TN 37402-2801 |
| | SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION - |
| | WATTS BAR NUCLEAR PLANT 05000390/2008301 |
| | Dear Mr. Campbell: |
| | In a telephone conversation on January 08, 2008, between Mr. Terry Newman, Operations |
| | Training Manager, and Mr. Gerard W. Laska, Senior Operations Examiner, arrangements were |
| | made for the administration of licensing examinations at your Watts Bar Nuclear Plant. |
| | Arrangements were made to administer the written examinations during the week of May 19, |
| | 2008, and the operating tests are scheduled to be administered during the week of May 12, |
| | 2008. The on-site preparatory week is scheduled for the week of April 21, 2008. |
| | As agreed during the telephone conversation, your staff of the will prepare the written |
| | examinations and the operating test based on the guidelines in Revision 9, Supplement 1 of |
| | NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC |
| | regional office will discuss with your staff any changes that might be necessary before the |
| | examinations are administered. |
| | To meet the above schedule, it will be necessary for your staff to furnish the examination |
| | outlines by March 17, 2008. The written examinations, operating tests, and the supporting |
| | reference materials identified in Attachment 2 of ES-201 will be due by March 31, 2008. |
| | Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall |
| | approve the outlines, examinations, and tests before they are submitted to the NRC for review |
| | and approval. All materials shall be complete and ready-to-use. We request that any personal, |
| | proprietary, sensitive unclassified, or safeguards information in your response be contained in a |
| | separate enclosure and appropriately marked. Any delay in receiving the required examination |
| | and reference materials, or the submittal of inadequate or incomplete materials, may cause the |
| | examinations to be rescheduled. |
| | |
| | TVA 2 |
| | In order to conduct the requested written examinations and operating test, it will be necessary |
| | for your staff to provide adequate space and accommodations in accordance with ES-402, and |
| | to make the simulation facility available on the dates noted above. In accordance with ES-302, |
| | your staff should retain the original simulator performance data (e.g., system pressures, |
| | temperatures, and levels) generated during the dynamic operating tests until the examination |
| | results are final. |
| | Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in |
| | effect while the written examinations and operating tests are being administered. |
| | To permit timely NRC review and evaluation, your staff should submit preliminary reactor |
| | operator and senior reactor operator license applications (Office of Management and Budget |
| | (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), |
| | and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first |
| | examination date. If the applications are not received at least 30 days before the examination |
| | date, a postponement may be necessary. Signed applications certifying that all training has |
| | been completed should be submitted at least 14 days before the first examination date. |
| | This letter contains information collections that are subject to the Paperwork Reduction Act of |
| | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of |
| | Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, |
| | 2009. The public reporting burden for this collection of information is estimated to average 500 |
| | hours per response, including the time for reviewing instructions, gathering and maintaining the |
| | data needed, writing the examinations, and completing and reviewing the collection of |
| | information. Send comments on any aspect of this collection of information, including |
| | suggestions for reducing the burden, to the Information and Records Management Branch (T-6 |
| | F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet |
| | electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and |
| | Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, |
| | DC 20503. |
| | The NRC may not conduct or sponsor, and a person is not required to respond to, a collection |
| | of information unless it displays a currently valid OMB control number. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be |
| | available electronically for public inspection in the NRC Public Document Room or from the |
| | Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS |
| | is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html |
| | http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). |
| | |
| | TVA 3 |
| | Thank you for your cooperation in this matter. Mr. Newman has been advised of the policies |
| | and guidelines referenced in this letter. If you have any questions regarding the NRC's |
| | examination procedures and guidelines, please contact Mr. Gerry Laska at (404) 562-4626, |
| | (Internet E-mail: gwl1@nrc.gov), or me at (404) 562-4550, (Internet E-mail: mtw@nrc.gov). |
| | Sincerely, |
| | /RA/ |
| | Malcolm T. Widmann, Chief |
| | Operations Branch |
| | Division of Reactor Safety |
| | Docket No.: 50-390 |
| | License No.: NPF-90 |
| | cc: See Page 4 |
| | |
| | TVA 4 |
| | cc w/encl: Beth A. Wetzel |
| | Ashok S. Bhatnagar Manager |
| | Senior Vice President Corporate Nuclear Licensing and Industry |
| | Nuclear Generation Development and Affairs |
| | Construction Tennessee Valley Authority |
| | Tennessee Valley Authority 4X Blue Ridge |
| | Electronic Mail Distribution 1101 Market Street |
| | Chattanooga, TN 37402-2801 |
| | Walter M. Justice, II |
| | Interim Vice President James D. Smith |
| | Nuclear Engineering & Technical Services Acting Manager |
| | Tennessee Valley Authority Watts Bar Nuclear Plant |
| | Electronic Mail Distribution Tennessee Valley Authority |
| | Electronic Mail Distribution |
| | Michael D. Skaggs |
| | Site Vice President Michael J. Lorek |
| | Watts Bar Nuclear Plant Plant Manager |
| | Tennessee Valley Authority Watts Bar Nuclear Plant |
| | Electronic Mail Distribution Tennessee Valley Authority |
| | Electronic Mail Distribution |
| | General Counsel |
| | Tennessee Valley Authority Masoud Bajestani |
| | Electronic Mail Distribution Vice President |
| | Watts Bar Nulcear Plant |
| | John C. Fornicola Tennessee Valley Authority |
| | General Manager Watts Bar Unit 2 |
| | Nuclear Assurance P.O. Box 2000 |
| | Tennessee Valley Authority Spring City, TN 37381 |
| | Electronic Mail Distribution |
| | Lawrence E. Nanney |
| | Robert H. Bryan, Jr. Director |
| | General Manager TN Dept. of Environment & Conservation |
| | Licensing and Industry Affairs Electronic Mail Distribution |
| | Tennessee Valley Authority |
| | Electronic Mail Distribution James H. Bassham |
| | Director |
| | James R. Douet Tennessee Emergeny Management Agency |
| | Vice President Electronic Mail Distribution |
| | Nuclear Support |
| | Tennessee Valley Authority |
| | 3R Lookout Place |
| | 1101 Market Street |
| | Chattanooga, TN 37402-2801 |
| | |
| | |
| | _________________________ |
| | OFFICE RII:DRS RII;DRS RII:DRS |
| | SIGNATURE /RA/ /RA/ |
| | NAME G. Laska M. Widmann |
| | DATE 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008 |
| | E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO |
| | }} |
|
---|
Category:Letter
MONTHYEARCNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24009A1712024-02-16016 February 2024 Environmental Assessment and Finding of No Significant Impact Related to an Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods (EPID L-2023-LLA-0039) - Letter ML24019A0722024-02-14014 February 2024 Request for Withholding Information from Public Disclosure IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation 2024-09-05
[Table view] Category:License-Operator
MONTHYEARML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) ML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination ML21111A3522021-04-16016 April 2021 March 2021 GFE IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20276A1512020-10-0202 October 2020 RO Exam ML20276A2052020-10-0202 October 2020 SRO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16197A0392016-07-15015 July 2016 NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 2024-03-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) ML22314A0312022-11-10010 November 2022 2B ML22217A0842022-08-0303 August 2022 NRC Operator Licensing Examination Approval 05000390/2022301 and 05000391/2022301 ML22007A1562022-01-0707 January 2022 Notification of Licensed Operator Initial Examination 05000390/2022301 and 05000391/2022301 WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination IR 05000390/20203012021-01-19019 January 2021 Reissue - Watts Bar Nuclear Plant - NRC Operator License Examination Report 05000390/2020301 and 05000391/2020301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20300A5892020-10-26026 October 2020 File 2B - Normal Release - Exam Administrative Items ML20300A5852020-10-26026 October 2020 Wb 2020301 File 2A-3 Exam Administrative Items - Delayed Release ML20300A5842020-10-26026 October 2020 Wb 2020301 Exam Final Items - Delayed Release - File 2A-2 ML20276A2052020-10-0202 October 2020 SRO Exam ML20276A1512020-10-0202 October 2020 RO Exam WBL-20-008, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-03-10010 March 2020 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML20043F0702020-01-23023 January 2020 301, 2B, Exam Administrative Items (Normal Release) ML19256B0322019-09-13013 September 2019 Wb 2019-301, Post Exam Comments (Normal Release) L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations ML19116A1392019-04-26026 April 2019 301 ADAMS-2A Draft Exam Material ML19116A1442019-04-26026 April 2019 301 ADAMS-2C Exam QA Material ML19100A2512019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Watts Bar Nuclear Plant ML19099A3022019-04-0909 April 2019 Confirmation of Requested Initial Operator License Examination for Watts Bar Nuclear Plant, Units 1 and 2 ML19029B1122019-01-29029 January 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2018-02 - Revised Preparation and Scheduling of Operator Licensing Examinations ML19018A2252019-01-18018 January 2019 Notification of Licensed Operator Initial Examination 05000390/2019301, 05000391/2019301 IR 05000390/20183012018-11-0808 November 2018 NRC Operator License Examination Report 05000390/2018301 and 05000391/2018301 ML18298A1632018-10-25025 October 2018 301 Post Exam Comments ML18122A1412018-05-0202 May 2018 Nuclear Regulatory Commission (Nrg) Regulatory Issue Summary (RIS) 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18044A9892018-02-13013 February 2018 Notification of Licensed Operator Initial Examination 05000390/2018301, 05000391/2018301 ML17191B3462017-07-10010 July 2017 Exam Final Items - Delay Release 2 Yrs ML17191B4242017-07-10010 July 2017 Exam Administrative Items - Delay Release 2 Yrs ML17165A4912017-06-14014 June 2017 302 Final Administrative Documents ML17165A4952017-06-14014 June 2017 302 Final Administrative JPMs ML17165A5152017-06-14014 June 2017 302 General Correspondence Redacted ML17165A5372017-06-14014 June 2017 302 Draft RO Written Exam ML17165A4942017-06-14014 June 2017 302 Final Simulator and in Plant JPMs ML17165A4932017-06-14014 June 2017 302 Final Simulator Scenarios ML17165A4852017-06-14014 June 2017 302 Draft Simulator and in Plant JPMs ML17165A4872017-06-14014 June 2017 302 Draft Administrative JPMs ML17165A4832017-06-14014 June 2017 302 Draft Simulator Scenarios ML17165A5412017-06-14014 June 2017 302 Draft SRO Written Exam ML17165A4772017-06-14014 June 2017 302 Draft Administrative Documents ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16257A7232016-09-13013 September 2016 Initial Exam 2016-301 Post Exam Comments ML16257A7142016-09-13013 September 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years ML16257A7212016-09-13013 September 2016 Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years ML16200A1202016-07-15015 July 2016 Operator Licensing Written Examination Approval 05000390/2016301 and 05000391/2016301 ML16054A2772016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000390/2016301, 05000391/2016301 ML15259A2822015-09-16016 September 2015 301 Draft Administrative Documents ML15259A2902015-09-16016 September 2015 301 Draft RO Written Exam ML15259A2922015-09-16016 September 2015 301 Draft SRO Written Exam ML15259A2952015-09-16016 September 2015 301 Draft Simulator Scenarios ML15259A2962015-09-16016 September 2015 301 Draft Simulator and In-Plant JPMs 2024-03-19
[Table view] |
See also: IR 05000390/2008301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
January 11, 2008
Tennessee Valley Authority
ATTN: Mr. William R. Campbell Jr.
Chief Nuclear Officer and
Executive Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION -
WATTS BAR NUCLEAR PLANT 05000390/2008301
Dear Mr. Campbell:
In a telephone conversation on January 08, 2008, between Mr. Terry Newman, Operations
Training Manager, and Mr. Gerard W. Laska, Senior Operations Examiner, arrangements were
made for the administration of licensing examinations at your Watts Bar Nuclear Plant.
Arrangements were made to administer the written examinations during the week of May 19,
2008, and the operating tests are scheduled to be administered during the week of May 12,
2008. The on-site preparatory week is scheduled for the week of April 21, 2008.
As agreed during the telephone conversation, your staff of the will prepare the written
examinations and the operating test based on the guidelines in Revision 9, Supplement 1 of
NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC
regional office will discuss with your staff any changes that might be necessary before the
examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by March 17, 2008. The written examinations, operating tests, and the supporting
reference materials identified in Attachment 2 of ES-201 will be due by March 31, 2008.
Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall
approve the outlines, examinations, and tests before they are submitted to the NRC for review
and approval. All materials shall be complete and ready-to-use. We request that any personal,
proprietary, sensitive unclassified, or safeguards information in your response be contained in a
separate enclosure and appropriately marked. Any delay in receiving the required examination
and reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.
TVA 2
In order to conduct the requested written examinations and operating test, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2009. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington,
DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html
http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
TVA 3
Thank you for your cooperation in this matter. Mr. Newman has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Gerry Laska at (404) 562-4626,
(Internet E-mail: gwl1@nrc.gov), or me at (404) 562-4550, (Internet E-mail: mtw@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 50-390
License No.: NPF-90
cc: See Page 4
TVA 4
cc w/encl: Beth A. Wetzel
Ashok S. Bhatnagar Manager
Senior Vice President Corporate Nuclear Licensing and Industry
Nuclear Generation Development and Affairs
Construction Tennessee Valley Authority
Tennessee Valley Authority 4X Blue Ridge
Electronic Mail Distribution 1101 Market Street
Chattanooga, TN 37402-2801
Walter M. Justice, II
Interim Vice President James D. Smith
Nuclear Engineering & Technical Services Acting Manager
Tennessee Valley Authority Watts Bar Nuclear Plant
Electronic Mail Distribution Tennessee Valley Authority
Electronic Mail Distribution
Michael D. Skaggs
Site Vice President Michael J. Lorek
Watts Bar Nuclear Plant Plant Manager
Tennessee Valley Authority Watts Bar Nuclear Plant
Electronic Mail Distribution Tennessee Valley Authority
Electronic Mail Distribution
General Counsel
Tennessee Valley Authority Masoud Bajestani
Electronic Mail Distribution Vice President
Watts Bar Nulcear Plant
John C. Fornicola Tennessee Valley Authority
General Manager Watts Bar Unit 2
Nuclear Assurance P.O. Box 2000
Tennessee Valley Authority Spring City, TN 37381
Electronic Mail Distribution
Lawrence E. Nanney
Robert H. Bryan, Jr. Director
General Manager TN Dept. of Environment & Conservation
Licensing and Industry Affairs Electronic Mail Distribution
Tennessee Valley Authority
Electronic Mail Distribution James H. Bassham
Director
James R. Douet Tennessee Emergeny Management Agency
Vice President Electronic Mail Distribution
Nuclear Support
Tennessee Valley Authority
3R Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
_________________________
OFFICE RII:DRS RII;DRS RII:DRS
SIGNATURE /RA/ /RA/
NAME G. Laska M. Widmann
DATE 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO