ML100620277: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML100620277
| number = ML100620277
| issue date = 03/03/2010
| issue date = 03/03/2010
| title = North Anna Inspection/Activity Plan Report 22 2010001
| title = Inspection/Activity Plan Report 22 2010001
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 03/03/2010 07:06:35 Report 22 03/01/2010
{{#Wiki_filter:Page 1 of 2                                                                               North Anna 03/03/2010     07:06:35                                                         Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit         Planned Dates                                                                                                   No. of Staff Number        Start     End     Inspection Activity                                                             Title         on Site EB3ISI       - UNIT 2 ISI                                                                           1 1         03/22/2010   03/26/2010   IP 7111108P            Inservice Inspection Activities - PWR EB3TI172     - EB3 RCS DM BUTT WELDS                                                               1 1, 2       03/22/2010   03/26/2010   IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGISI     - UNIT 2 SGISI                                                                         1 2       03/29/2010   04/02/2010   IP 7111108P            Inservice Inspection Activities - PWR OL EXAM       - INITIAL EXAM PREP                                                                   5 1         05/17/2010   05/21/2010     V23333              NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 1                                                               5 1         06/07/2010   06/11/2010     V23333              NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 2                                                               5 1         06/21/2010   07/02/2010     V23333              NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES PSB1EP       - EMERGENCY PREPAREDNESS EXERCISE                                                     3 1, 2       07/19/2010  07/23/2010   IP 7111401              Exercise Evaluation 1, 2      07/19/2010   07/23/2010  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2      07/19/2010   07/23/2010  IP 71151                Performance Indicator Verification PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK1                                                       2 1, 2       09/13/2010  09/17/2010   IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2      09/13/2010   09/17/2010  IP 71124.02            Occupational ALARA Planning and Controls 1, 2      09/13/2010   09/17/2010  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1, 2      09/13/2010   09/17/2010  IP 71124.05            Radiation Monitoring Instrumentation 1, 2      09/13/2010   09/17/2010  IP 71151                Performance Indicator Verification EB3ISI       - UNIT 1 INSERVICE INSPECTION                                                         1 1         09/20/2010   09/24/2010   IP 7111108P            Inservice Inspection Activities - PWR EB3TI172     - EB3 RX COOLANT SYS DM BUTT WELDS                                                     1 2       09/20/2010   09/24/2010   IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK2                                                       2 1, 2       09/27/2010  10/01/2010   IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2      09/27/2010   10/01/2010  IP 71124.02            Occupational ALARA Planning and Controls 1, 2      09/27/2010   10/01/2010  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1, 2      09/27/2010   10/01/2010  IP 71124.05            Radiation Monitoring Instrumentation 1, 2      09/27/2010   10/01/2010  IP 71151                Performance Indicator Verification EB3HS         - HEAT SINK                                                                           1 1, 2       02/14/2011   02/18/2011   IP 7111107T            Heat Sink Performance This report does not include INPO and OUTAGE activities.
-06/30/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site North Anna EB3ISI-UNIT 2 ISI 1 1     IP Inservice Inspection Activities - PWR 7111108P 03/22/2010 03/26/2010 EB3TI172-EB3 RCS DM BUTT WELDS 1 1, 2   IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 03/22/2010 03/26/2010 EB3SGISI-UNIT 2 SGISI 1 2   IP Inservice Inspection Activities - PWR 7111108P 03/29/2010 04/02/2010 OL EXAM-INITIAL EXAM PREP 5 1     NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES V23333 05/17/2010 05/21/2010 OL EXAM-INITIAL EXAM - WEEK 1 5 1     NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES V23333 06/07/2010 06/11/2010 OL EXAM-INITIAL EXAM - WEEK 2 5 1     NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES V23333 06/21/2010 07/02/2010 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1, 2  IP Exercise Evaluation 7111401 07/19/2010 07/23/2010 1, 2   IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/19/2010 07/23/2010 1, 2   IP Performance Indicator Verification 71151 07/19/2010 07/23/2010 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 2 1, 2  IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/13/2010 09/17/2010 1, 2   IP Occupational ALARA Planning and Controls 71124.02 09/13/2010 09/17/2010 1, 2   IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/13/2010 09/17/2010 1, 2   IP Radiation Monitoring Instrumentation 71124.05 09/13/2010 09/17/2010 1, 2   IP Performance Indicator Verification 71151 09/13/2010 09/17/2010 EB3ISI-UNIT 1 INSERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR 7111108P 09/20/2010 09/24/2010 EB3TI172-EB3 RX COOLANT SYS DM BUTT WELDS 1 2   IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 09/20/2010 09/24/2010 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK2 2 1, 2  IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/27/2010 10/01/2010 1, 2   IP Occupational ALARA Planning and Controls 71124.02 09/27/2010 10/01/2010 1, 2   IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/27/2010 10/01/2010 1, 2   IP Radiation Monitoring Instrumentation 71124.05 09/27/2010 10/01/2010 1, 2   IP Performance Indicator Verification 71151 09/27/2010 10/01/2010 EB3HS-HEAT SINK 1 1, 2   IP Heat Sink Performance 7111107T 02/14/2011 02/18/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.           Enclosure
This report shows only on-site and announced inspection procedures.
 
Inspection / Activity Plan Page 2 of 2 03/03/2010 07:06:35 Report 22 03/01/2010
Page 2 of 2                                                                             North Anna 03/03/2010     07:06:35                                                         Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit         Planned Dates                                                                                                                 No. of Staff Number        Start     End     Inspection Activity                                                           Title                           on Site PI&R         - PROBLEM IDENTIFICATION AND RESOLUTION                                                               4 1, 2       04/11/2011   04/15/2011  IP 71152B              Identification and Resolution of Problems 1, 2      04/25/2011   04/29/2011   IP 71152B              Identification and Resolution of Problems MODS         - MODIFICATION/50.59 INSPECTION                                                                       3 1, 2       05/09/2011  05/13/2011   IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2      05/23/2011   05/27/2011  IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
-06/30/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site North Anna PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2   IP Identification and Resolution of Problems 71152B 04/11/2011 04/15/2011 1, 2   IP Identification and Resolution of Problems 71152B 04/25/2011 04/29/2011 MODS-MODIFICATION/50.59 INSPECTION 3 1, 2  IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/09/2011 05/13/2011 1, 2   IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/23/2011 05/27/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                           Enclosure}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 22:20, 13 November 2019

Inspection/Activity Plan Report 22 2010001
ML100620277
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/03/2010
From:
NRC/RGN-II/DRP/RPB5
To:
Virginia Electric & Power Co (VEPCO)
Shared Package
ML100620268 List:
References
IR-10-001
Download: ML100620277 (2)


Text

Page 1 of 2 North Anna 03/03/2010 07:06:35 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB3ISI - UNIT 2 ISI 1 1 03/22/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RCS DM BUTT WELDS 1 1, 2 03/22/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGISI - UNIT 2 SGISI 1 2 03/29/2010 04/02/2010 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM PREP 5 1 05/17/2010 05/21/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 5 1 06/07/2010 06/11/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 5 1 06/21/2010 07/02/2010 V23333 NORTH ANNA/JUNE 2010 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 07/19/2010 07/23/2010 IP 7111401 Exercise Evaluation 1, 2 07/19/2010 07/23/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/19/2010 07/23/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 2 1, 2 09/13/2010 09/17/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/13/2010 09/17/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/13/2010 09/17/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/13/2010 09/17/2010 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/13/2010 09/17/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 09/20/2010 09/24/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT SYS DM BUTT WELDS 1 2 09/20/2010 09/24/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP OCCUPATIONAL BASELINE WEEK2 2 1, 2 09/27/2010 10/01/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/27/2010 10/01/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/27/2010 10/01/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/27/2010 10/01/2010 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/27/2010 10/01/2010 IP 71151 Performance Indicator Verification EB3HS - HEAT SINK 1 1, 2 02/14/2011 02/18/2011 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 North Anna 03/03/2010 07:06:35 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 04/11/2011 04/15/2011 IP 71152B Identification and Resolution of Problems 1, 2 04/25/2011 04/29/2011 IP 71152B Identification and Resolution of Problems MODS - MODIFICATION/50.59 INSPECTION 3 1, 2 05/09/2011 05/13/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 05/23/2011 05/27/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure