ML110410160: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:1 DiabloCanyonNPEm Resource From: Sizemore, Brandy [BNSM@pge.com]
Sent: Thursday, January 20, 2011 7:37 PM To: Ferrer, Nathaniel Cc: Grebel, Terence; Sharp, Loren
==Subject:==
RE: Draft Agenda for ACRS Subcomitte Meeting Attachments:
Draft Agenda 02-09 (3).doc Hello,  Attached is the proposed topics of discussion and the list of speakers.
Thanks Brandy Sizemore
From: Grebel, Terence Sent: Thursday, January 20, 2011 4:31 PM To: Sizemore, Brandy
==Subject:==
FW: Draft Agenda for ACRS Subcomitte Meeting From: Ferrer, Nathaniel [mailto:Nathaniel.Ferrer@nrc.gov]
Sent: Friday, January 07, 2011 10:43 AM To: Grebel, Terence Cc: DiabloCanyonNPEm Resource
==Subject:==
Draft Agenda for ACRS Subcomitte Meeting Terry, Attached is the draft of the Agenda for the ACRS Subcommittee Meeting for DCPP License Renwal. Please note the bulleted topics are just examples, being used as placeholders. Please provide feeback regarding you r proposed topics of discussion, and the list of speakers.
Thank you,
NathanielFerrerProjectManagerDivisionofLicenseRenewalOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommission(301)415 1045 Hearing Identifier:  DiabloCanyon_LicenseRenewal_NonPublic Email Number:  2517  Mail Envelope Properties  (D776CF09EA15C644831E2FD16142395602B065B4) 
==Subject:==
RE: Draft Agenda for ACRS Subcomitte Meeting  Sent Date:  1/20/2011 7:36:37 PM  Received Date:  1/20/2011 7:36:40 PM From:    Sizemore, Brandy Created By:  BNSM@pge.com Recipients:    "Grebel, Terence" <TLG1@pge.com>
Tracking Status: None  "Sharp, Loren" <LDSL@PGE.COM>
Tracking Status: None  "Ferrer, Nathaniel" <Nathaniel.Ferrer@nrc.gov>  Tracking Status: None
Post Office:  exchange18.Utility.pge.com Files    Size      Date & Time MESSAGE    1001      1/20/2011 7:36:40 PM  Draft Agenda 02-09 (3).doc    50752 
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:          ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Plant License Renewal Subcommittee Meeting Diablo Canyon Power Plant February 9, 2011 Rockville, MD
- Proposed Agenda -
Cognizant Staff Engineer: Michael Benson, michael.benson@nrc.gov , (301) 415-6396 Topics Presenters Time Opening Remarks Dennis Bley, ACRS 1:30 pm - 1:35 pm Staff Introduction NRR 1:35 pm - 1:40 pm PG&E Company - Diablo Canyon Power Plant  Introductions  Site and Station Description Plant History and Major Improvements License Renewal Application Overview  Open and Confirmatory Items Overview Flux Thimble Tube Inspection Program (Open Item)
Flaw Growth Evaluation for RHR (Open Item)  Scoping and Screening (Open Items)  Buried Piping and Tanks Inspection Program (Open Item)
TLAA Identification (Open Item)  Metal Fatigue (Open Item)
Jim Becker
Loren Sharp Terry Grebel
Mike Wright Dave Gonzalez
Dave Miklush
Michelle Albright 1:40 pm - 3:00 pm Break 3:00 pm - 3:15 pm NRC Staff  SER Overview  Scoping and Screening Results  Onsite Inspection Results  Aging Management Review  Time Limited Aging Analyses Nathaniel Ferrer, NRR Region IV 3:15 am - 4:35 pm Subcommittee Discussion Dennis Bley, ACRS 4:35 pm - 5:00 pm NOTE:  During the meeting, 301-415-7360 should be used to contact anyone in the ACRS Office. Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion. Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting. One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.}}

Revision as of 08:09, 14 August 2018

2011/01/20 Diablo Canyon Lr - Draft Agenda for ACRS Subcomitte Meeting
ML110410160
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/20/2011
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML110410160 (4)


Text

1 DiabloCanyonNPEm Resource From: Sizemore, Brandy [BNSM@pge.com]

Sent: Thursday, January 20, 2011 7:37 PM To: Ferrer, Nathaniel Cc: Grebel, Terence; Sharp, Loren

Subject:

RE: Draft Agenda for ACRS Subcomitte Meeting Attachments:

Draft Agenda 02-09 (3).doc Hello, Attached is the proposed topics of discussion and the list of speakers.

Thanks Brandy Sizemore

From: Grebel, Terence Sent: Thursday, January 20, 2011 4:31 PM To: Sizemore, Brandy

Subject:

FW: Draft Agenda for ACRS Subcomitte Meeting From: Ferrer, Nathaniel [1]

Sent: Friday, January 07, 2011 10:43 AM To: Grebel, Terence Cc: DiabloCanyonNPEm Resource

Subject:

Draft Agenda for ACRS Subcomitte Meeting Terry, Attached is the draft of the Agenda for the ACRS Subcommittee Meeting for DCPP License Renwal. Please note the bulleted topics are just examples, being used as placeholders. Please provide feeback regarding you r proposed topics of discussion, and the list of speakers.

Thank you,

NathanielFerrerProjectManagerDivisionofLicenseRenewalOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommission(301)415 1045 Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2517 Mail Envelope Properties (D776CF09EA15C644831E2FD16142395602B065B4)

Subject:

RE: Draft Agenda for ACRS Subcomitte Meeting Sent Date: 1/20/2011 7:36:37 PM Received Date: 1/20/2011 7:36:40 PM From: Sizemore, Brandy Created By: BNSM@pge.com Recipients: "Grebel, Terence" <TLG1@pge.com>

Tracking Status: None "Sharp, Loren" <LDSL@PGE.COM>

Tracking Status: None "Ferrer, Nathaniel" <Nathaniel.Ferrer@nrc.gov> Tracking Status: None

Post Office: exchange18.Utility.pge.com Files Size Date & Time MESSAGE 1001 1/20/2011 7:36:40 PM Draft Agenda 02-09 (3).doc 50752

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Plant License Renewal Subcommittee Meeting Diablo Canyon Power Plant February 9, 2011 Rockville, MD

- Proposed Agenda -

Cognizant Staff Engineer: Michael Benson, michael.benson@nrc.gov , (301) 415-6396 Topics Presenters Time Opening Remarks Dennis Bley, ACRS 1:30 pm - 1:35 pm Staff Introduction NRR 1:35 pm - 1:40 pm PG&E Company - Diablo Canyon Power Plant Introductions Site and Station Description Plant History and Major Improvements License Renewal Application Overview Open and Confirmatory Items Overview Flux Thimble Tube Inspection Program (Open Item)

Flaw Growth Evaluation for RHR (Open Item) Scoping and Screening (Open Items) Buried Piping and Tanks Inspection Program (Open Item)

TLAA Identification (Open Item) Metal Fatigue (Open Item)

Jim Becker

Loren Sharp Terry Grebel

Mike Wright Dave Gonzalez

Dave Miklush

Michelle Albright 1:40 pm - 3:00 pm Break 3:00 pm - 3:15 pm NRC Staff SER Overview Scoping and Screening Results Onsite Inspection Results Aging Management Review Time Limited Aging Analyses Nathaniel Ferrer, NRR Region IV 3:15 am - 4:35 pm Subcommittee Discussion Dennis Bley, ACRS 4:35 pm - 5:00 pm NOTE: During the meeting, 301-415-7360 should be used to contact anyone in the ACRS Office. Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion. Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting. One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.