{{#Wiki_filter:February 24, 2011  Mr. Edward D. Halpin  
{{#Wiki_filter:February 24, 2011  
   Mr. Edward D. Halpin  
President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX  77483  
President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX  77483  
   SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2011006;  
   SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2011006;  
05000499/2011006) AND REQUEST FOR INFORMATION  Dear Mr. Halpin:  The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
05000499/2011006) AND REQUEST FOR INFORMATION  
Region IV staff will conduct a triennial fire protection baseline inspection at your South Texas Project facility beginning in May 2011.  The inspection team will be comprised of reactor inspectors from the NRC Region IV office.  The team will conduct the inspection in accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection- (Triennial)" dated January 1, 2011.   The schedule for the inspection is as follows:  
  Dear Mr. Halpin:  
  * Information gathering visit:  May 24-26, 2011  * Onsite inspection:  June 13 - 17, 2011    June 27 - July 1, 2011  
  The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
Region IV staff will conduct a triennial fire protection baseline inspection at your South Texas Project facility beginning in May 2011.  The inspection team will be comprised of reactor inspectors from the NRC Region IV office.  The team will conduct the inspection in accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection- (Triennial)" dated January 1, 2011.
The schedule for the inspection is as follows:  
 
  * Information gathering visit:  May 24-26, 2011  
  * Onsite inspection:  June 13 - 17, 2011    June 27 - July 1, 2011  
 
  The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the fire protection programs, fire protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, of  
  The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the fire protection programs, fire protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, of  
February 25, 2002/10 CFR 50.54(hh)(2).  Four inspectors will participate in the information gathering visit to select the fire areas for evaluation, identify additional documents needed to support the inspection, obtain unescorted access, and meet with the key personnel who will support the inspection.  The fire area selection will require a walkdown of candidate fire areas accompanied by key personnel from your staff.  The enclosure to this letter provides an initial  
February 25, 2002/10 CFR 50.54(hh)(2).  Four inspectors will participate in the information gathering visit to select the fire areas for evaluation, identify additional documents needed to support the inspection, obtain unescorted access, and meet with the key personnel who will support the inspection.  The fire area selection will require a walkdown of candidate fire areas accompanied by key personnel from your staff.  The enclosure to this letter provides an initial  
list of the documents the team will need for their review.  We request that your staff transmit UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125  
list of the documents the team will need for their review.  We request that your staff transmit UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125  
STP Nuclear Operating Company - 2 -  copies of the documents listed in the enclosure to the NRC Region IV office for team use in preparation for the inspection.  Please send this information so that it will arrive in our office in Arlington, Texas, by the dates listed in the enclosure.   
STP Nuclear Operating Company - 2 -  
  copies of the documents listed in the enclosure to the NRC Region IV office for team use in preparation for the inspection.  Please send this information so that it will arrive in our office in Arlington, Texas, by the dates listed in the enclosure.  
   
During the information gathering visit, the team will also discuss the following inspection support administrative details: office space size and location; specific documents requested to be made available to the team in their office spaces; arrangements for reactor site access; and the availability of knowledgeable plant engineering, operations and licensing organization personnel to serve as points of contact during the inspection.   
During the information gathering visit, the team will also discuss the following inspection support administrative details: office space size and location; specific documents requested to be made available to the team in their office spaces; arrangements for reactor site access; and the availability of knowledgeable plant engineering, operations and licensing organization personnel to serve as points of contact during the inspection.   
  We request that during the onsite inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review.  Of specific interest for the fire protection portion of the inspection are those documents that establish that your fire protection program satisfies the NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance.  For the  
  We request that during the onsite inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review.  Of specific interest for the fire protection portion of the inspection are those documents that establish that your fire protection program satisfies the NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance.  For the  
B.5.b portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest.    Also, please ensure the availability of appropriate personnel knowledgeable of:  (1) plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant  
B.5.b portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest.    Also, please ensure the availability of appropriate personnel knowledgeable of:  (1) plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant  
fire protection systems, and (4) the fire protection program and its implementation.   This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-
fire protection systems, and (4) the fire protection program and its implementation.
0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number."  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).   
0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number."  
Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection or the inspection team's information or logistical needs, please contact Greg Pick, the lead inspector, in the Region IV office at (817) 860-8270, or by email, greg.pick@nrc.gov.        Sincerely,       /RA/         
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
   
Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection or the inspection team's information or logistical needs, please contact Greg Pick, the lead inspector, in the Region IV office at (817) 860-8270, or by email, greg.pick@nrc.gov.        Sincerely,
      /RA/         
       N. O'Keefe, Chief      Engineering Branch 2      Division of Reactor Safety   
       N. O'Keefe, Chief      Engineering Branch 2      Division of Reactor Safety   
STP Nuclear Operating Company - 3 -  Dockets:  50-498; 50-499 Licenses:  NPF-76; NPF-80   
STP Nuclear Operating Company - 3 -  
Enclosure:  Triennial Fire Protection    Inspection Documentation Request List  Kevin Richards, Senior Vice President  STP Nuclear Operating Company  
   Dockets:  50-498; 50-499 Licenses:  NPF-76; NPF-80  
South Texas Project P.O. Box 289 Wadsworth, TX  77483  David W. Rencurrel Senior Vice President Units 1 and 2 STP Nuclear Operating Company  
   
South Texas Project P.O. Box 289 Wadsworth, TX  77483  Louis Peter, Plant General Manager  
Enclosure:  Triennial Fire Protection    Inspection Documentation Request List  
STP Nuclear Operating Company South Texas Project  P.O. Box 289 Wadsworth, TX  77483   
  Kevin Richards, Senior Vice President  STP Nuclear Operating Company  
South Texas Project P.O. Box 289 Wadsworth, TX  77483  
  David W. Rencurrel Senior Vice President Units 1 and 2 STP Nuclear Operating Company  
South Texas Project P.O. Box 289 Wadsworth, TX  77483  
  Louis Peter, Plant General Manager  
STP Nuclear Operating Company South Texas Project  P.O. Box 289 Wadsworth, TX  77483  
   
Tim Powell, Vice President,  Technical Support and Oversight STP Nuclear Operating Company South Texas Project P.O. Box 289  
Tim Powell, Vice President,  Technical Support and Oversight STP Nuclear Operating Company South Texas Project P.O. Box 289  
Wadsworth, TX  77483  A. W. Harrison, Manager, Licensing STP Nuclear Operating Company South Texas Project  
Wadsworth, TX  77483  
P.O. Box 289 Wadsworth, TX  77483  Charles T. Bowman, General Manager,    Nuclear Safety Assurance STP Nuclear Operating Company South Texas Project  
  A. W. Harrison, Manager, Licensing STP Nuclear Operating Company South Texas Project  
P.O. Box 289 Wadsworth, TX  77483  Marilyn Kistler Staff Specialist, Licensing  
P.O. Box 289 Wadsworth, TX  77483  
STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX  77483  Cheryl Mele City of Austin  
  Charles T. Bowman, General Manager,    Nuclear Safety Assurance STP Nuclear Operating Company South Texas Project  
Electric Utility Department 721 Barton Springs Road Austin, TX  78704  J. J. Nesrsta/R. K. Temple  
P.O. Box 289 Wadsworth, TX  77483  
   Ed Alercon/Kevin Pollo City Public Service P.O. Box 1771 San Antonio, TX  78296   
  Marilyn Kistler Staff Specialist, Licensing  
A. H. Gutterman, Esq.. Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC  20004   
STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX  77483  
  Cheryl Mele City of Austin  
Electric Utility Department 721 Barton Springs Road Austin, TX  78704  
  J. J. Nesrsta/R. K. Temple  
   Ed Alercon/Kevin Pollo City Public Service P.O. Box 1771 San Antonio, TX  78296  
   
A. H. Gutterman, Esq.. Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC  20004  
   
Richard A. Ratliff, P.E., L.M.P. Radiation Safety Licensing Branch Manager Division for Regulatory Services Texas Department of State Health Mail Code 2385  
Richard A. Ratliff, P.E., L.M.P. Radiation Safety Licensing Branch Manager Division for Regulatory Services Texas Department of State Health Mail Code 2385  
P.O. Box 149347  Austin, TX  78714-9347  Brian Almon Public Utility Commission of Texas P.O. Box 13326 Austin, TX  78711-3326  
P.O. Box 149347  Austin, TX  78714-9347  
  Brian Almon Public Utility Commission of Texas P.O. Box 13326 Austin, TX  78711-3326  
 
    
    
STP Nuclear Operating Company - 4 -  Environmental and Natural Resources Policy Director, Office of the Governor P.O. Box 12428 Austin, TX  78711-3189  
STP Nuclear Operating Company - 4 -  
  Environmental and Natural Resources Policy Director, Office of the Governor P.O. Box 12428 Austin, TX  78711-3189  
 
  Mr. Nate McDonald Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street  
  Mr. Nate McDonald Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street  
Bay City, TX  77414  Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building  
Bay City, TX  77414  
P.O. Box 12157 Austin, TX  78711  Susan M. Jablonski Office of Permitting, Remediation and  
  Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building  
P.O. Box 12157 Austin, TX  78711  
  Susan M. Jablonski Office of Permitting, Remediation and  
Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087  
Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087  
Austin, TX  78711-3087  Ted Enos 4200 South Hulen, Suite 422 Fort Worth, TX  76109  
Austin, TX  78711-3087  
  Ted Enos 4200 South Hulen, Suite 422 Fort Worth, TX  76109  
 
  Kevin Howell/Catherine Callaway/Jim von Suskil NRG Energy, Inc. 1301 McKinney, Suite 2300  
  Kevin Howell/Catherine Callaway/Jim von Suskil NRG Energy, Inc. 1301 McKinney, Suite 2300  
Houston, TX  77010  Peter G. Nemeth Crain, Caton, & James, P.C. P.O. Box 289  
Houston, TX  77010  
Mail Code:  N5005 Wadsworth, TX 77483  Chief, Technological Hazards    Branch FEMA Region VI 800 North Loop 288  
  Peter G. Nemeth Crain, Caton, & James, P.C. P.O. Box 289  
Federal Regional Center Denton, TX  76201-3698  Chairperson Radiological Assistance Committee  
Mail Code:  N5005 Wadsworth, TX 77483  
FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX  76201-3698   
  Chief, Technological Hazards    Branch FEMA Region VI 800 North Loop 288  
C. Kierksey City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX  78704   
Federal Regional Center Denton, TX  76201-3698  
STP Nuclear Operating Company - 5 -  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)  
  Chairperson Radiological Assistance Committee  
FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX  76201-3698  
   
C. Kierksey City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX  78704  
    
STP Nuclear Operating Company - 5 -  
  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)  
DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Vacant) Senior Resident Inspector (John.Dixon@nrc.gov) Resident Inspector (Binesh.Tharakan@nrc.gov)  
DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Vacant) Senior Resident Inspector (John.Dixon@nrc.gov) Resident Inspector (Binesh.Tharakan@nrc.gov)  
Branch Chief, DRP/A (Wayne.Walker@nrc.gov) Senior Project Engineer, DRP/A (David.Proulx@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov) Project Engineer, DRP/A (Laura.Micewski@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Mohan.Thadani@nrc.gov)  
Branch Chief, DRP/A (Wayne.Walker@nrc.gov) Senior Project Engineer, DRP/A (David.Proulx@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov) Project Engineer, DRP/A (Laura.Micewski@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Mohan.Thadani@nrc.gov)  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource  
  Inspection Reports/MidCycle and EOC Letters to the following: ROPreports  Only inspection reports to the following:  
 
OEDO RIV Coordinator (James.Trapp@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)     
  Inspection Reports/MidCycle and EOC Letters to the following: ROPreports  
   R:\Reactors\STP\STP TFP RFI_GAP.Docx  ADAMS ML ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials:  GAP    Publicly Available  Non-Sensitive    Non-publicly Available  Sensitive SRI/DRS/EB2 C:DRS/EB2  GPick NOKeefe  /RA/ /RA/  02/24/2011 02/24/2011  OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax   
  Only inspection reports to the following:  
OEDO RIV Coordinator (James.Trapp@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)  
    
   R:\Reactors\STP\STP TFP RFI_GAP.Docx  ADAMS ML ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials:  GAP  
   Publicly Available  Non-Sensitive  
   Non-publicly Available  Sensitive SRI/DRS/EB2 C:DRS/EB2  
   GPick NOKeefe  /RA/ /RA/  02/24/2011 02/24/2011  OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax  
   
    
    
   - 1 - Enclosure ENCLOSURE   
   - 1 - Enclosure ENCLOSURE   
  Triennial Fire Protection Inspection Documentation Request   
  Triennial Fire Protection Inspection Documentation Request  
   
Please provide the following documents (items 1 - 4) prior to the onsite information-gathering visit, preferably no later than May 20, 2011.  Where practical, please provide copies electronically.  Please provide an index of the requested documents which includes a brief description of what the document is, and the numerical heading associated with the request  
Please provide the following documents (items 1 - 4) prior to the onsite information-gathering visit, preferably no later than May 20, 2011.  Where practical, please provide copies electronically.  Please provide an index of the requested documents which includes a brief description of what the document is, and the numerical heading associated with the request  
(i.e., where it can be found in the list of documents requested).   1. The current version of your fire protection program and fire hazards analysis.  2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response.   3. Copies of the licensing basis documents for fire protection (safety evaluation reports, pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).  4. The fire probabilistic risk assessment or portions of the plant's individual plant examination for external events report addressing fire events.  Also, include the results of any post-IPEEE reviews, and listings of actions taken/plant modifications conducted in response to IPEEE information.  5. A copy of the documents that support your multiple spurious operation evaluations (i.e., expert panel reports, evaluation packages, et cetera).   Please provide the following documentation (items 5 - 47) during the information-gathering visit in order to support inspection preparation.  Whenever practical, please provide copies electronically.  Drawings should be provided as paper copies of sufficient size such that all details are legible.   6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire zone delineation; and (c) the locations of fire protection equipment, such as detection, suppression, and post-fire emergency lighting units; and (d) fire area boundaries.  The specific documents needed to support inspection preparation will be  
(i.e., where it can be found in the list of documents requested).  
discussed during the site visit.  7. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, fire fighting procedures, etc.).   8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas).  9. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability with or without control room evacuation.   
1. The current version of your fire protection program and fire hazards analysis.  
   - 2 - Enclosure  10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the event of a fire (safe shutdown equipment lists).   
  2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response.
3. Copies of the licensing basis documents for fire protection (safety evaluation reports, pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).  
  4. The fire probabilistic risk assessment or portions of the plant's individual plant examination for external events report addressing fire events.  Also, include the results of any post-IPEEE reviews, and listings of actions taken/plant modifications conducted in response to IPEEE information.  
  5. A copy of the documents that support your multiple spurious operation evaluations (i.e., expert panel reports, evaluation packages, et cetera).  
Please provide the following documentation (items 5 - 47) during the information-gathering visit in order to support inspection preparation.  Whenever practical, please provide copies electronically.  Drawings should be provided as paper copies of sufficient size such that all details are legible.
6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire zone delineation; and (c) the locations of fire protection equipment, such as detection, suppression, and post-fire emergency lighting units; and (d) fire area boundaries.  The specific documents needed to support inspection preparation will be  
discussed during the site visit.  
  7. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, fire fighting procedures, etc.).  
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas).  9. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability with or without control room evacuation.   
   - 2 - Enclosure  
   10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the event of a fire (safe shutdown equipment lists).   
 
  11. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for normal and alternate shutdown.  Please provide one copy of the piping and instrumentation (flow) diagrams for these systems of a size sufficient to read all details.  These should include the systems used for reactor  
  11. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for normal and alternate shutdown.  Please provide one copy of the piping and instrumentation (flow) diagrams for these systems of a size sufficient to read all details.  These should include the systems used for reactor  
coolant system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems.  12. A listing, with descriptions, of design change packages which were determined to impact fire protection and post-fire safe shutdowns, performed since June 1, 2008.   13. Copies of fire protection program change evaluations (Generic Letter 86-10 evaluations) performed since June 1, 2008.  14. A listing of open and closed corrective action documents initiated since June 1, 2008, which relate to the fire protection program or equipment, including corrective actions for fire-induced circuit failures, both single and multiple spurious actuations (for the selected  
coolant system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems.  
fire areas).  Include Corrective Action Process document number, date, and subject.  15. A listing of the applicable codes and standards (with the versions/dates) related to the design of plant fire protection features and evaluations of any code deviations.  Copies of these codes should be available for review.  16. Drawings of the portions of the emergency lighting system that support fire response.   17. Procedures used to remove smoke from safety-related areas and the engineering studies or calculations that support the design basis.  18. Drawings of communication systems credited in the license basis for firefighting and plant operations during fires where control room is occupied and/or evacuated.  19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.  20. A listing of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.  Also, include a list of maintenance and surveillance testing procedures used to verify fuse and breaker coordination in accordance with the post-fire safe shutdown coordination analysis.  21. Maintenance rule performance criteria, and a summary of the performance history for systems or functions monitored within the maintenance rule program that support the fire protection program or involve safe shutdown equipment, over the period since June 1, 2008.   
  12. A listing, with descriptions, of design change packages which were determined to impact fire protection and post-fire safe shutdowns, performed since June 1, 2008.  
   - 3 - Enclosure 22. A copy of fire protection program requirements (e.g., limiting conditions for operation, surveillance test requirements) covered by Technical Specifications, Technical Requirements Manual, Updated Final Safety Analysis Report, or similar documents.  23. Copies of internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program completed since June, 2008.  24. A list of manual actions taken outside the control room which are credited to mitigate the consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should group actions by the initiating fire area or zone and indicate where the action must take place.  25. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design basis documents that describe the purpose/function/operating characteristics of the safe shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and  
13. Copies of fire protection program change evaluations (Generic Letter 86-10 evaluations) performed since June 1, 2008.  
reactivity control, including the essential support systems).  26. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.  These should depict how power gets from the switchyard to the engineered safety feature loads (480V and 4160V).   
  14. A listing of open and closed corrective action documents initiated since June 1, 2008, which relate to the fire protection program or equipment, including corrective actions for fire-induced circuit failures, both single and multiple spurious actuations (for the selected  
  27. A list of automatic and manually initiated gaseous fire suppression systems in the plant, giving location and the key equipment being protected.   28. A list of repairs (and the procedure that controls the actions) needed to:  a) reach and/or maintain hot shutdown and b) reach and/or maintain cold shutdown.  29. A list of high to low pressure interface valves.  30. A copy of procedures governing the training and operation of the fire brigade.  31. Organization charts of site personnel down to the level of fire protection staff personnel.  32. A contact list of key site personnel who will be supporting this inspection, giving location of their office and phone number onsite.  33. The team would like to observe an unannounced fire brigade drill in the plant, if possible, during the week of June 27, 2011.  Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning drills.  34. The team would like to perform a walkthrough of the procedure for control room evacuation due to fire with qualified operators in the plant during the week of June 13,  
fire areas).  Include Corrective Action Process document number, date, and subject.  
2011.  Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning the walkthrough.   
  15. A listing of the applicable codes and standards (with the versions/dates) related to the design of plant fire protection features and evaluations of any code deviations.  Copies of these codes should be available for review.  
   - 4 - Enclosure The following documents (items 35 - 48) involve B.5.b mitigating strategies.  35. A copy of the license condition that incorporated the requirements issued to address the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002,  
  16. Drawings of the portions of the emergency lighting system that support fire response.
and 10 CFR 50.54(hh)(2).  36. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2).  37. A list of procedures/guidelines which were revised or generated to implement the mitigation strategies.  These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.  38. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy.  39. A list of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.  40. Copies of piping and instrumentation diagrams (P&ID) or simplified flow diagrams for systems relied upon in the mitigation strategies.  These could be the type used for training.  41. A list of modification packages and simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.  42. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies.  43. A list of B.5.b strategies, if any, which have implementing details that differ from that documented in the submittals to the NRC and the safety evaluation report.  44. A copy of site general arrangement drawing(s) that show the majority of buildings/areas referenced in B.5.b documents.  45. Training records/ training matrix/ lesson plans related to B.5.b.  46. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies.  47. The team would like to perform a walkthrough of the procedure implementing a sample mitigating strategy (to be selected by the inspector during the information gathering visit) and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies during the week of June 13, 2011.  Please put us in contact with the appropriate personnel for planning the walkthrough during the onsite  
17. Procedures used to remove smoke from safety-related areas and the engineering studies or calculations that support the design basis.  
  18. Drawings of communication systems credited in the license basis for firefighting and plant operations during fires where control room is occupied and/or evacuated.  
  19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.  
  20. A listing of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.  Also, include a list of maintenance and surveillance testing procedures used to verify fuse and breaker coordination in accordance with the post-fire safe shutdown coordination analysis.  
  21. Maintenance rule performance criteria, and a summary of the performance history for systems or functions monitored within the maintenance rule program that support the fire protection program or involve safe shutdown equipment, over the period since June 1, 2008.   
   - 3 - Enclosure 22. A copy of fire protection program requirements (e.g., limiting conditions for operation, surveillance test requirements) covered by Technical Specifications, Technical Requirements Manual, Updated Final Safety Analysis Report, or similar documents.  
  23. Copies of internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program completed since June, 2008.  
  24. A list of manual actions taken outside the control room which are credited to mitigate the consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should group actions by the initiating fire area or zone and indicate where the action must take place.  25. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design basis documents that describe the purpose/function/operating characteristics of the safe shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and  
reactivity control, including the essential support systems).  
  26. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.  These should depict how power gets from the switchyard to the engineered safety feature loads (480V and 4160V).   
 
  27. A list of automatic and manually initiated gaseous fire suppression systems in the plant, giving location and the key equipment being protected.  
28. A list of repairs (and the procedure that controls the actions) needed to:  a) reach and/or maintain hot shutdown and b) reach and/or maintain cold shutdown.  
  29. A list of high to low pressure interface valves.  
  30. A copy of procedures governing the training and operation of the fire brigade.  
  31. Organization charts of site personnel down to the level of fire protection staff personnel.  
  32. A contact list of key site personnel who will be supporting this inspection, giving location of their office and phone number onsite.  
  33. The team would like to observe an unannounced fire brigade drill in the plant, if possible, during the week of June 27, 2011.  Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning drills.  
  34. The team would like to perform a walkthrough of the procedure for control room evacuation due to fire with qualified operators in the plant during the week of June 13,  
2011.  Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning the walkthrough.  
    
   - 4 - Enclosure The following documents (items 35 - 48) involve B.5.b mitigating strategies.  
  35. A copy of the license condition that incorporated the requirements issued to address the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002,  
and 10 CFR 50.54(hh)(2).  
  36. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2).  
  37. A list of procedures/guidelines which were revised or generated to implement the mitigation strategies.  These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.  
  38. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy.  
  39. A list of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.  
  40. Copies of piping and instrumentation diagrams (P&ID) or simplified flow diagrams for systems relied upon in the mitigation strategies.  These could be the type used for training.  
  41. A list of modification packages and simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.  
  42. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies.  
  43. A list of B.5.b strategies, if any, which have implementing details that differ from that documented in the submittals to the NRC and the safety evaluation report.  
  44. A copy of site general arrangement drawing(s) that show the majority of buildings/areas referenced in B.5.b documents.  
  45. Training records/ training matrix/ lesson plans related to B.5.b.  
  46. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies.  
  47. The team would like to perform a walkthrough of the procedure implementing a sample mitigating strategy (to be selected by the inspector during the information gathering visit) and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies during the week of June 13, 2011.  Please put us in contact with the appropriate personnel for planning the walkthrough during the onsite  
information gathering trip   
information gathering trip   
   - 5 - Enclosure  The following documentation needs (items 48 - 50) will be dependent upon sample selections, and will be finalized during discussions with your staff.  Please provide the required documents prior to the week of June 13, 2011.  Whenever practical, please provide copies electronically.  Drawings should be provided as paper copies of sufficient size such that all details are legible.   48. Pre-fire plans for the selected fire areas (areas to be selected by the team during the information-gathering trip).   49. List of identified fire induced circuit failure configurations (for the selected fire areas) that could prevent operation or cause maloperation of equipment credited for safe shutdown in the event of a fire.  Include failure configurations associated with hot shorts, open circuits, or shorts to ground identified as potentially causing spurious or multiple spurious actuations or maloperations of this equipment.  50. Cable routing information for components and equipment, credited for safe shutdown in the selected fire areas.  This information request item will be discussed and finalized with your staff during the information gathering visit.  
   - 5 - Enclosure  
 
  The following documentation needs (items 48 - 50) will be dependent upon sample selections, and will be finalized during discussions with your staff.  Please provide the required documents prior to the week of June 13, 2011.  Whenever practical, please provide copies electronically.  Drawings should be provided as paper copies of sufficient size such that all details are legible.
48. Pre-fire plans for the selected fire areas (areas to be selected by the team during the information-gathering trip).
49. List of identified fire induced circuit failure configurations (for the selected fire areas) that could prevent operation or cause maloperation of equipment credited for safe shutdown in the event of a fire.  Include failure configurations associated with hot shorts, open circuits, or shorts to ground identified as potentially causing spurious or multiple spurious actuations or maloperations of this equipment.  
  50. Cable routing information for components and equipment, credited for safe shutdown in the selected fire areas.  This information request item will be discussed and finalized with your staff during the information gathering visit.
}}
}}

Revision as of 11:04, 13 August 2018

South Texas Project Electric Generating Station, Units 1 and 2 - Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000498-11-006; 05000499-11-006) and Request for Information
ML110550758
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/24/2011
From: O'Keefe N F
NRC/RGN-IV/DRS/EB-2
To: Halpin E D
South Texas
References
IR-11-006
Download: ML110550758 (10)


See also: IR 05000498/2011006

Text

February 24, 2011

Mr. Edward D. Halpin

President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2011006;

05000499/2011006) AND REQUEST FOR INFORMATION

Dear Mr. Halpin:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your South Texas Project facility beginning in May 2011. The inspection team will be comprised of reactor inspectors from the NRC Region IV office. The team will conduct the inspection in accordance with the baseline Inspection Procedure 71111.05T, "Fire Protection- (Triennial)" dated January 1, 2011.

The schedule for the inspection is as follows:

  • Information gathering visit: May 24-26, 2011
  • Onsite inspection: June 13 - 17, 2011 June 27 - July 1, 2011

The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the fire protection programs, fire protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, of

February 25, 2002/10 CFR 50.54(hh)(2). Four inspectors will participate in the information gathering visit to select the fire areas for evaluation, identify additional documents needed to support the inspection, obtain unescorted access, and meet with the key personnel who will support the inspection. The fire area selection will require a walkdown of candidate fire areas accompanied by key personnel from your staff. The enclosure to this letter provides an initial

list of the documents the team will need for their review. We request that your staff transmit UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125

STP Nuclear Operating Company - 2 -

copies of the documents listed in the enclosure to the NRC Region IV office for team use in preparation for the inspection. Please send this information so that it will arrive in our office in Arlington, Texas, by the dates listed in the enclosure.

During the information gathering visit, the team will also discuss the following inspection support administrative details: office space size and location; specific documents requested to be made available to the team in their office spaces; arrangements for reactor site access; and the availability of knowledgeable plant engineering, operations and licensing organization personnel to serve as points of contact during the inspection.

We request that during the onsite inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review. Of specific interest for the fire protection portion of the inspection are those documents that establish that your fire protection program satisfies the NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance. For the

B.5.b portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest. Also, please ensure the availability of appropriate personnel knowledgeable of: (1) plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant

fire protection systems, and (4) the fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number."

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection or the inspection team's information or logistical needs, please contact Greg Pick, the lead inspector, in the Region IV office at (817) 860-8270, or by email, greg.pick@nrc.gov. Sincerely,

/RA/

N. O'Keefe, Chief Engineering Branch 2 Division of Reactor Safety

STP Nuclear Operating Company - 3 -

Dockets: 50-498; 50-499 Licenses: NPF-76; NPF-80

Enclosure: Triennial Fire Protection Inspection Documentation Request List

Kevin Richards, Senior Vice President STP Nuclear Operating Company

South Texas Project P.O. Box 289 Wadsworth, TX 77483

David W. Rencurrel Senior Vice President Units 1 and 2 STP Nuclear Operating Company

South Texas Project P.O. Box 289 Wadsworth, TX 77483

Louis Peter, Plant General Manager

STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

Tim Powell, Vice President, Technical Support and Oversight STP Nuclear Operating Company South Texas Project P.O. Box 289

Wadsworth, TX 77483

A. W. Harrison, Manager, Licensing STP Nuclear Operating Company South Texas Project

P.O. Box 289 Wadsworth, TX 77483

Charles T. Bowman, General Manager, Nuclear Safety Assurance STP Nuclear Operating Company South Texas Project

P.O. Box 289 Wadsworth, TX 77483

Marilyn Kistler Staff Specialist, Licensing

STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483

Cheryl Mele City of Austin

Electric Utility Department 721 Barton Springs Road Austin, TX 78704

J. J. Nesrsta/R. K. Temple

Ed Alercon/Kevin Pollo City Public Service P.O. Box 1771 San Antonio, TX 78296

A. H. Gutterman, Esq.. Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004

Richard A. Ratliff, P.E., L.M.P. Radiation Safety Licensing Branch Manager Division for Regulatory Services Texas Department of State Health Mail Code 2385

P.O. Box 149347 Austin, TX 78714-9347

Brian Almon Public Utility Commission of Texas P.O. Box 13326 Austin, TX 78711-3326

STP Nuclear Operating Company - 4 -

Environmental and Natural Resources Policy Director, Office of the Governor P.O. Box 12428 Austin, TX 78711-3189

Mr. Nate McDonald Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street

Bay City, TX 77414

Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building

P.O. Box 12157 Austin, TX 78711

Susan M. Jablonski Office of Permitting, Remediation and

Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087

Austin, TX 78711-3087

Ted Enos 4200 South Hulen, Suite 422 Fort Worth, TX 76109

Kevin Howell/Catherine Callaway/Jim von Suskil NRG Energy, Inc. 1301 McKinney, Suite 2300

Houston, TX 77010

Peter G. Nemeth Crain, Caton, & James, P.C. P.O. Box 289

Mail Code: N5005 Wadsworth, TX 77483

Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288

Federal Regional Center Denton, TX 76201-3698

Chairperson Radiological Assistance Committee

FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76201-3698

C. Kierksey City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

STP Nuclear Operating Company - 5 -

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Vacant) Senior Resident Inspector (John.Dixon@nrc.gov) Resident Inspector (Binesh.Tharakan@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov) Senior Project Engineer, DRP/A (David.Proulx@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov) Project Engineer, DRP/A (Laura.Micewski@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Mohan.Thadani@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource

Inspection Reports/MidCycle and EOC Letters to the following: ROPreports

Only inspection reports to the following:

OEDO RIV Coordinator (James.Trapp@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)

R:\Reactors\STP\STP TFP RFI_GAP.Docx ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials: GAP

Publicly Available Non-Sensitive

Non-publicly Available Sensitive SRI/DRS/EB2 C:DRS/EB2

GPick NOKeefe /RA/ /RA/ 02/24/2011 02/24/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 - Enclosure ENCLOSURE

Triennial Fire Protection Inspection Documentation Request

Please provide the following documents (items 1 - 4) prior to the onsite information-gathering visit, preferably no later than May 20, 2011. Where practical, please provide copies electronically. Please provide an index of the requested documents which includes a brief description of what the document is, and the numerical heading associated with the request

(i.e., where it can be found in the list of documents requested).

1. The current version of your fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response.

3. Copies of the licensing basis documents for fire protection (safety evaluation reports, pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).

4. The fire probabilistic risk assessment or portions of the plant's individual plant examination for external events report addressing fire events. Also, include the results of any post-IPEEE reviews, and listings of actions taken/plant modifications conducted in response to IPEEE information.

5. A copy of the documents that support your multiple spurious operation evaluations (i.e., expert panel reports, evaluation packages, et cetera).

Please provide the following documentation (items 5 - 47) during the information-gathering visit in order to support inspection preparation. Whenever practical, please provide copies electronically. Drawings should be provided as paper copies of sufficient size such that all details are legible.

6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire zone delineation; and (c) the locations of fire protection equipment, such as detection, suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The specific documents needed to support inspection preparation will be

discussed during the site visit.

7. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, fire fighting procedures, etc.).

8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas). 9. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability with or without control room evacuation.

- 2 - Enclosure

10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the event of a fire (safe shutdown equipment lists).

11. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for normal and alternate shutdown. Please provide one copy of the piping and instrumentation (flow) diagrams for these systems of a size sufficient to read all details. These should include the systems used for reactor

coolant system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems.

12. A listing, with descriptions, of design change packages which were determined to impact fire protection and post-fire safe shutdowns, performed since June 1, 2008.

13. Copies of fire protection program change evaluations (Generic Letter 86-10 evaluations) performed since June 1, 2008.

14. A listing of open and closed corrective action documents initiated since June 1, 2008, which relate to the fire protection program or equipment, including corrective actions for fire-induced circuit failures, both single and multiple spurious actuations (for the selected

fire areas). Include Corrective Action Process document number, date, and subject.

15. A listing of the applicable codes and standards (with the versions/dates) related to the design of plant fire protection features and evaluations of any code deviations. Copies of these codes should be available for review.

16. Drawings of the portions of the emergency lighting system that support fire response.

17. Procedures used to remove smoke from safety-related areas and the engineering studies or calculations that support the design basis.

18. Drawings of communication systems credited in the license basis for firefighting and plant operations during fires where control room is occupied and/or evacuated.

19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

20. A listing of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems. Also, include a list of maintenance and surveillance testing procedures used to verify fuse and breaker coordination in accordance with the post-fire safe shutdown coordination analysis.

21. Maintenance rule performance criteria, and a summary of the performance history for systems or functions monitored within the maintenance rule program that support the fire protection program or involve safe shutdown equipment, over the period since June 1, 2008.

- 3 - Enclosure 22. A copy of fire protection program requirements (e.g., limiting conditions for operation, surveillance test requirements) covered by Technical Specifications, Technical Requirements Manual, Updated Final Safety Analysis Report, or similar documents.

23. Copies of internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program completed since June, 2008.

24. A list of manual actions taken outside the control room which are credited to mitigate the consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should group actions by the initiating fire area or zone and indicate where the action must take place. 25. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design basis documents that describe the purpose/function/operating characteristics of the safe shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and

reactivity control, including the essential support systems).

26. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems. These should depict how power gets from the switchyard to the engineered safety feature loads (480V and 4160V).

27. A list of automatic and manually initiated gaseous fire suppression systems in the plant, giving location and the key equipment being protected.

28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or maintain hot shutdown and b) reach and/or maintain cold shutdown.

29. A list of high to low pressure interface valves.

30. A copy of procedures governing the training and operation of the fire brigade.

31. Organization charts of site personnel down to the level of fire protection staff personnel.

32. A contact list of key site personnel who will be supporting this inspection, giving location of their office and phone number onsite.

33. The team would like to observe an unannounced fire brigade drill in the plant, if possible, during the week of June 27, 2011. Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning drills.

34. The team would like to perform a walkthrough of the procedure for control room evacuation due to fire with qualified operators in the plant during the week of June 13,

2011. Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning the walkthrough.

- 4 - Enclosure The following documents (items 35 - 48) involve B.5.b mitigating strategies.

35. A copy of the license condition that incorporated the requirements issued to address the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002,

and 10 CFR 50.54(hh)(2).

36. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2).

37. A list of procedures/guidelines which were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.

38. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy.

39. A list of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.

40. Copies of piping and instrumentation diagrams (P&ID) or simplified flow diagrams for systems relied upon in the mitigation strategies. These could be the type used for training.

41. A list of modification packages and simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.

42. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies.

43. A list of B.5.b strategies, if any, which have implementing details that differ from that documented in the submittals to the NRC and the safety evaluation report.

44. A copy of site general arrangement drawing(s) that show the majority of buildings/areas referenced in B.5.b documents.

45. Training records/ training matrix/ lesson plans related to B.5.b.

46. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies.

47. The team would like to perform a walkthrough of the procedure implementing a sample mitigating strategy (to be selected by the inspector during the information gathering visit) and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies during the week of June 13, 2011. Please put us in contact with the appropriate personnel for planning the walkthrough during the onsite

information gathering trip

- 5 - Enclosure

The following documentation needs (items 48 - 50) will be dependent upon sample selections, and will be finalized during discussions with your staff. Please provide the required documents prior to the week of June 13, 2011. Whenever practical, please provide copies electronically. Drawings should be provided as paper copies of sufficient size such that all details are legible.

48. Pre-fire plans for the selected fire areas (areas to be selected by the team during the information-gathering trip).

49. List of identified fire induced circuit failure configurations (for the selected fire areas) that could prevent operation or cause maloperation of equipment credited for safe shutdown in the event of a fire. Include failure configurations associated with hot shorts, open circuits, or shorts to ground identified as potentially causing spurious or multiple spurious actuations or maloperations of this equipment.

50. Cable routing information for components and equipment, credited for safe shutdown in the selected fire areas. This information request item will be discussed and finalized with your staff during the information gathering visit.