ML111040153: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Slides and Viewgraphs, Meeting Briefing Package/Handouts
| document type = Slides and Viewgraphs, Meeting Briefing Package/Handouts
| page count = 20
| page count = 20
| project = TAC:ME6019, TAC:ME6018
| project = TAC:ME6018, TAC:ME6019
| stage = Meeting
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NFPA 805NFPA 805 LICENSE AMENDMENT REQUESTS LICENSE AMENDMENT REQUESTS 1 Pre-Application M eeting with NRC Staff April 13, 2011Arkansas Nuclear One (ANO) 1&2Palisades (PLP)Waterford 3 (WF3)
Agenda Agenda*Introductions*Fleet Project Management Approach
*LAR Submittal Forecast
*805 PRA Peer Review Status
*6850 Alternative Treatments
*Site S p ecific U p dates pp-ANO-1 & 2-PLP
-WF3*Summary 2 2Dial-In:  800-369-3325 with Participant passcode: 56518 followed by #
 
===Introductions===
Introductions*Corporate Team-Licensing -Dave Mannai, Bryan Ford-Engineering Manager -Luis Terrazas
-Fleet Project Management -Andy Thomas,  Doug Kibler-Corporate PRA -Deepak Rao
-NFPA 805 Technical Lead -Jessica Walker*Site Teams-ANO*Engineering Director -Jaime McCoy*Licensing -David Bice
*Fire Protection/PRA -Jessica Walker-PLP*Engineering Manager -Jim Miksa
*Licensing -James Kuemin
*Fire Protection -Tom Swiecicki-WF3*Engineering Manager -Rex Putnam
*Licensing -David Ferris
*Fire Protection -Dennis Kunas 3 3 Fleet Project Management Approach Fleet Project Management Approach*Integrated Fleet (corporate and site) Project Team*Bi-Monthly Executive Stakeholder Briefs
*Weekly Fleet Project Team Meetings
*Active Project Risk Management Program
*Dedicated Fleet and Site Schedulers 4 4 LAR Submittal Forecast LAR Submittal Forecast *ANO 1&2, PLP, and WF3 -June 29, 2011*Submittals will meet acceptance criteria (LIC-109)
*Challenges 5 5 805 PRA Peer Review Status805 PRA Peer Review Status*Conduct Internal Events Peer Review-Complete*Closure / disposition of Internal Events Peer Review -F&Os will be resolved prior to LAR Submittal*Conduct Fire PRA Peer Review-Complete (Palisades Draft Report)Closre/dispositionofFirePRAPeerReie
*Clos u re / disposition of Fire PRA Peer Re v ie w -F&Os will be resolved prior to LAR Submittal 6
6850 Alternative Treatments 6850 Alternative TreatmentsTreatmentANO-1ANO-2PLPWF3Transient combustible HRR. Use a lower HRR for a postulated transient fire. Instead of using the HRR for
'transients' as shown in NUREG/CR-6850, Table E-1, Case 8, the HRR for Case 7 is used. The basis for this is described in the ERIN Fire Factors report submitted to the EPRI/NEI Review Group.
XXXXTransient Combustible Ignition Frequency -Use of a weighting factor applied to transient fires to reflect the reduced probability of a fire impacting critical targets based on procedural controls and the reduced likelihood of transient type fire conditions existing in close proximity to targets of concern (submitted to methodology review committee).
XXXXTreatment of Ventilated Panels for Non-Suppression Probability.
XXCredit for reduction of zone of influence for panels with limited ventilation, used to support Multi-Compartment Analysis.XXHot Short Probability Reduction for Outside of a Panel Configuration (ANO-2 only)
X 7 ANO ANO--1& 2 1& 2 --Current Status Current StatusMilestone ANO-1 Status ANO-2 StatusTable B-1 Fundamental FP ElementsIn ProgressIn ProgressInternal Events PRACOMPLETECOMPLETEFiPRA IP IPMajor Project Milestones 8 8 Fire PRA I n Progress I n ProgressTable B-2 -NSCA MethodologyIn ProgressCOMPLETETable B-3 -NSCA Fire Area ComplianceIn ProgressIn ProgressFire Risk EvaluationsIn ProgressIn ProgressTable F-1 -Non-Power OperationsIn ProgressIn ProgressTable G-1 -Radioactive ReleaseCOMPLETECOMPLETE ANO ANO--1&2 1&2 --Challenges Challenges*Challenges*Gaps
*Technical Issues 9 9 ANO ANO--1&2 1&2 --Items for Approval Items for Approval*3.3.5.2 Metal conduits and cable trays-ANO uses PVC in underground and embedded applications*3.5.16 Firewater dedicated for Fire Protection use -ANO uses the fire water system for other functions 10 10 ANO ANO--1&2 1&2 --Modification Overview Modification Overview*Independent AFW pump/piping/valves/controls*Primary Control Station
*Electrical cable re-route/fire wrap
*RCP trip circuit backup power supply
*Detection system upgrade
*Modifications for Table B-1 Issues 11 11*NFPA 10 fire extinguisher type and location changes*NFPA 15 update non-UL listed modules
*NFPA 30 room ventilation changes
*NFPA 50A hydrogen relief valves & bottle relocation
*NFPA 805 fire barriers/seals/doors/dampers upgrade PLP PLP --Current Status Current StatusMilestoneStatusTable B-1 Fundamental FP ElementsIn ProgressInternal Events PRACOMPLETEMajor Project Milestones 12 12Fire PRAIn ProgressTable B-2 -NSCA MethodologyCOMPLETETable B-3 -NSCA Fire Area ComplianceIn ProgressFire Risk EvaluationsIn ProgressTable F-1 -Non-Power OperationsIn ProgressTable G-1 -Radioactive ReleaseCOMPLETE PLP PLP --Challenges Challenges*Challenges*Gaps
*Technical Issues 13 13 PLP PLP --Items for ApprovalItems for Approval*3.5.16 Firewater dedicated for Fire Protection use -PLP uses the fire water system for other functions*3.11.4. Through Penetration Fire StopsUnsealed conduits 5 feet or longer 14 14 PLP PLP --Modification Overview Modification Overview*Independent AFW pump / piping / valves / controls*Electrical cable re-route / fire wrap
*Independent breakers for 2400 VAC Safeguards & Startup Transformers*Primary Coolant Pump breaker trip pushbuttons
*Detection system upgrade2400VACbktlf 15 15*2400 VAC b rea ker con t ro l power f uses *Bypass switches for AFW & ECCS systems WF3 WF3 --Current Status Current StatusMilestoneStatusTable B-1 Fundamental FP ElementsIn ProgressInternal Events PRACOMPLETEMajor Project Milestones 16 16Fire PRAIn ProgressTable B-2 -NSCA MethodologyIn ProgressTable B-3 -NSCA Fire Area ComplianceIn ProgressFire Risk EvaluationsIn ProgressTable F-1 -Non-Power OperationsIn ProgressTable G-1 -Radioactive ReleaseIn Progress WF3 WF3 --Challenges Challenges*Challenges*Gaps
*Technical Issues 17 17 WF3 WF3 --Items for ApprovalItems for Approval*None 18 18 WF3 WF3 --Modification Overview Modification Overview*Electrical circuit modifications*Suppression system upgrades
*Detection system upgrade 19 19 Summary Summary*All Entergy sites plan to meet June 29, 2011*Action Items
*Closing Remarks 20 20}}

Revision as of 14:38, 8 August 2018

Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2(TAC ME6018 and ME6019)
ML111040153
Person / Time
Site: Palisades, Arkansas Nuclear, Waterford  Entergy icon.png
Issue date: 04/13/2011
From:
Entergy Operations
To:
Plant Licensing Branch IV
Kalyanam N, NRR/DLPM, 415-1480
References
TAC ME6018, TAC ME6019
Download: ML111040153 (20)


Text

NFPA 805NFPA 805 LICENSE AMENDMENT REQUESTS LICENSE AMENDMENT REQUESTS 1 Pre-Application M eeting with NRC Staff April 13, 2011Arkansas Nuclear One (ANO) 1&2Palisades (PLP)Waterford 3 (WF3)

Agenda Agenda*Introductions*Fleet Project Management Approach

  • LAR Submittal Forecast
  • 805 PRA Peer Review Status
  • 6850 Alternative Treatments
  • Site S p ecific U p dates pp-ANO-1 & 2-PLP

-WF3*Summary 2 2Dial-In: 800-369-3325 with Participant passcode: 56518 followed by #

Introductions

Introductions*Corporate Team-Licensing -Dave Mannai, Bryan Ford-Engineering Manager -Luis Terrazas

-Fleet Project Management -Andy Thomas, Doug Kibler-Corporate PRA -Deepak Rao

-NFPA 805 Technical Lead -Jessica Walker*Site Teams-ANO*Engineering Director -Jaime McCoy*Licensing -David Bice

  • Fire Protection/PRA -Jessica Walker-PLP*Engineering Manager -Jim Miksa
  • Licensing -James Kuemin
  • Fire Protection -Tom Swiecicki-WF3*Engineering Manager -Rex Putnam
  • Licensing -David Ferris
  • Fire Protection -Dennis Kunas 3 3 Fleet Project Management Approach Fleet Project Management Approach*Integrated Fleet (corporate and site) Project Team*Bi-Monthly Executive Stakeholder Briefs
  • Weekly Fleet Project Team Meetings
  • Active Project Risk Management Program
  • Dedicated Fleet and Site Schedulers 4 4 LAR Submittal Forecast LAR Submittal Forecast *ANO 1&2, PLP, and WF3 -June 29, 2011*Submittals will meet acceptance criteria (LIC-109)
  • Challenges 5 5 805 PRA Peer Review Status805 PRA Peer Review Status*Conduct Internal Events Peer Review-Complete*Closure / disposition of Internal Events Peer Review -F&Os will be resolved prior to LAR Submittal*Conduct Fire PRA Peer Review-Complete (Palisades Draft Report)Closre/dispositionofFirePRAPeerReie
  • Clos u re / disposition of Fire PRA Peer Re v ie w -F&Os will be resolved prior to LAR Submittal 6

6850 Alternative Treatments 6850 Alternative TreatmentsTreatmentANO-1ANO-2PLPWF3Transient combustible HRR. Use a lower HRR for a postulated transient fire. Instead of using the HRR for

'transients' as shown in NUREG/CR-6850, Table E-1, Case 8, the HRR for Case 7 is used. The basis for this is described in the ERIN Fire Factors report submitted to the EPRI/NEI Review Group.

XXXXTransient Combustible Ignition Frequency -Use of a weighting factor applied to transient fires to reflect the reduced probability of a fire impacting critical targets based on procedural controls and the reduced likelihood of transient type fire conditions existing in close proximity to targets of concern (submitted to methodology review committee).

XXXXTreatment of Ventilated Panels for Non-Suppression Probability.

XXCredit for reduction of zone of influence for panels with limited ventilation, used to support Multi-Compartment Analysis.XXHot Short Probability Reduction for Outside of a Panel Configuration (ANO-2 only)

X 7 ANO ANO--1& 2 1& 2 --Current Status Current StatusMilestone ANO-1 Status ANO-2 StatusTable B-1 Fundamental FP ElementsIn ProgressIn ProgressInternal Events PRACOMPLETECOMPLETEFiPRA IP IPMajor Project Milestones 8 8 Fire PRA I n Progress I n ProgressTable B-2 -NSCA MethodologyIn ProgressCOMPLETETable B-3 -NSCA Fire Area ComplianceIn ProgressIn ProgressFire Risk EvaluationsIn ProgressIn ProgressTable F-1 -Non-Power OperationsIn ProgressIn ProgressTable G-1 -Radioactive ReleaseCOMPLETECOMPLETE ANO ANO--1&2 1&2 --Challenges Challenges*Challenges*Gaps

  • Technical Issues 9 9 ANO ANO--1&2 1&2 --Items for Approval Items for Approval*3.3.5.2 Metal conduits and cable trays-ANO uses PVC in underground and embedded applications*3.5.16 Firewater dedicated for Fire Protection use -ANO uses the fire water system for other functions 10 10 ANO ANO--1&2 1&2 --Modification Overview Modification Overview*Independent AFW pump/piping/valves/controls*Primary Control Station
  • Electrical cable re-route/fire wrap
  • RCP trip circuit backup power supply
  • Detection system upgrade
  • Modifications for Table B-1 Issues 11 11*NFPA 10 fire extinguisher type and location changes*NFPA 15 update non-UL listed modules
  • NFPA 30 room ventilation changes
  • NFPA 50A hydrogen relief valves & bottle relocation
  • NFPA 805 fire barriers/seals/doors/dampers upgrade PLP PLP --Current Status Current StatusMilestoneStatusTable B-1 Fundamental FP ElementsIn ProgressInternal Events PRACOMPLETEMajor Project Milestones 12 12Fire PRAIn ProgressTable B-2 -NSCA MethodologyCOMPLETETable B-3 -NSCA Fire Area ComplianceIn ProgressFire Risk EvaluationsIn ProgressTable F-1 -Non-Power OperationsIn ProgressTable G-1 -Radioactive ReleaseCOMPLETE PLP PLP --Challenges Challenges*Challenges*Gaps
  • Technical Issues 13 13 PLP PLP --Items for ApprovalItems for Approval*3.5.16 Firewater dedicated for Fire Protection use -PLP uses the fire water system for other functions*3.11.4. Through Penetration Fire StopsUnsealed conduits 5 feet or longer 14 14 PLP PLP --Modification Overview Modification Overview*Independent AFW pump / piping / valves / controls*Electrical cable re-route / fire wrap
  • Independent breakers for 2400 VAC Safeguards & Startup Transformers*Primary Coolant Pump breaker trip pushbuttons
  • Detection system upgrade2400VACbktlf 15 15*2400 VAC b rea ker con t ro l power f uses *Bypass switches for AFW & ECCS systems WF3 WF3 --Current Status Current StatusMilestoneStatusTable B-1 Fundamental FP ElementsIn ProgressInternal Events PRACOMPLETEMajor Project Milestones 16 16Fire PRAIn ProgressTable B-2 -NSCA MethodologyIn ProgressTable B-3 -NSCA Fire Area ComplianceIn ProgressFire Risk EvaluationsIn ProgressTable F-1 -Non-Power OperationsIn ProgressTable G-1 -Radioactive ReleaseIn Progress WF3 WF3 --Challenges Challenges*Challenges*Gaps
  • Technical Issues 17 17 WF3 WF3 --Items for ApprovalItems for Approval*None 18 18 WF3 WF3 --Modification Overview Modification Overview*Electrical circuit modifications*Suppression system upgrades
  • Detection system upgrade 19 19 Summary Summary*All Entergy sites plan to meet June 29, 2011*Action Items
  • Closing Remarks 20 20