| | {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Mostala, Abbas A. [AAMOS TALA@energy-northwest.com] |
| | Sent: Thursday, May 12, 2011 2:48 PM To: Cunanan, Arthur Cc: Min, Seung; Mostala, Abbas A. |
| | |
| | ==Subject:== |
| | RE: Request for a list of documentation to determine there are no CASS ASME III Class 1 valve less than four inches installed at Columbia Hello Arthur, The documents reviewed to determ ine if there are any CASS va lves less than 4 inches installed at Columbia were: system fl ow diagrams for ASME III Class 1, valve drawings, system design specifications, purchasing requirements, and valve design specifications. This review did not identify any CASS valves less than 4 inches installed at Columbia. |
| | |
| | The original LRA assumed that there were ASME III Class 1 CASS valves less than 4 inches because the valve design specificati on allowed the use of CASS valves as an alternate. |
| | |
| | To determine the number of installed ASM E III Class 1 CASS valves less than 4 inches at Columbia , the system flow diagrams were reviewed for ASME III Class 1 lines that had valves less than 4 inches . Valve drawings or purchasing requirements were reviewed for these valv es to determine the material. No ASME III Class 1 CASS valves less than 4 inches were identified. |
| | |
| | Action Request 234294 Assignment 17 will revise the valve Design Specification to only allow the future use of CASS valves as an alternate at Columbia with certain requirements associated with License R enewal, such as a new Aging Management Program per NUREG 1801 (GALL). Thanks & Regards, Abbas Mostala, , PE License Renewal Project ManagerEnergy NorthwestColumbia Genera ting Station From: Cunanan, Arthur [mailto:Arthur.Cunanan@nrc.gov] |
| | Sent: Wednesday, May 11, 2011 9:54 AM To: Mostala, Abbas A. |
| | Cc: Min, Seung |
| | |
| | ==Subject:== |
| | Request for a list of documentation to determine there are no CASS ASME III Class 1 valve less than four inches installed at Columbia Abbas, 2 By letter dated April 21, 2011 (GO2-11-083) (ADAM accession number: ML11115A098) the applicant stated: |
| | DuringtheconferencecalldiscussedinReference4,EnergyNorthwestagreedtoamendtheLicenseRenewalApplication(LRA)toaddresstheexaminationsofthecastausteniticstainlesssteel(CASS)valvesincludedintheSmallBorePipingProgram(ReferenceRAI3.1.2.3 01).However,duringthereviewofdocumentation,EnergyNorthwestdeterminedthattherearenoCASSASMEIIIclass1valveslessthanfourinchesinstalledatColumbia.Amendment31isprovidedintheEnclosuretoremovethematerialandenvironmentcombinationfromtheLRA. Please provide the staff a list of the documents that the applicant reviewed to determine that there are no |
| | |
| | CASS ASME III Class 1 valve less than four inches installed at Columbia. |
| | |
| | Response via e-mail is acceptable. The response e-mail will be documented in ADAMS. |
| | |
| | Sincerely, Arthur Cunanan Project Manager Division of License Renewal U.S. Nuclear Regulatory Commission 301-415-3897 arthur.cunanan@nrc.gov |
| | |
| | Hearing Identifier: NRR_PMDA Email Number: 30 Mail Envelope Properties (11F5592341C9044B8FD83A755C2DA9F70602229C) |
| | |
| | ==Subject:== |
| | RE: Request for a list of documentat ion to determine there are no CASS ASME III Class 1 valve less than four inches installed at Columbia Sent Date: 5/12/2011 2:47:45 PM Received Date: 5/12/2011 2:48:03 PM From: Mostala, Abbas A. |
| | Created By: AAMOSTALA@energy-northwest.com Recipients: "Min, Seung" <Seung.Min@nrc.gov> Tracking Status: None "Mostala, Abbas A." <AAMOSTALA@energy-northwest.com> Tracking Status: None "Cunanan, Arthur" <Arthur.Cunanan@nrc.gov> Tracking Status: None Post Office: SERVER153.domain1.energy-northwest.com |
| | |
| | Files Size Date & Time MESSAGE 2814 5/12/2011 2:48:03 PM |
| | |
| | Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} |
Revision as of 04:31, 8 August 2018
|
---|
Category:E-Mail
MONTHYEARML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24183A2392024-07-0101 July 2024 NRR E-mail Capture - LIC-109 Acceptance - Columbia Generating Station - Relief Request for the Fourth Ten-Year Interval Inservice Testing - EPID L-2024-LLR-0039 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24060A1022024-02-28028 February 2024 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2023 Biological Monitoring Report ML24053A0092024-02-21021 February 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs L-2024-LLR-0007 Through 00013 ML24008A0022024-01-0505 January 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation - EPID L-2023-LLA-0170 ML23278A0042023-10-0404 October 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID L-2023-LLA-0128 ML23275A0092023-09-29029 September 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Tech Specs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID: L-2023-LLA-0128 ML23150A2502023-05-26026 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - License Amendment Request to Clean-Up Operating License and Appendix a, Technical Specifications - EPID L-2023-LLA-0062 ML23124A2412023-05-0404 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise TS to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position - EPID L-2023-LLA-0063 ML23124A0062023-05-0303 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise Tech Specs to Adopt TSTF-541, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2023-LLA-0063 ML23065A0422023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Biological Monitoring Report ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22312A0042022-11-0707 November 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Fourth 10 Year ISI RR 4ISI-11 - EPID L-2022-LLR-0071 ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22256A2002022-09-13013 September 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22241A0182022-08-26026 August 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22210A0072022-07-28028 July 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22166A4122022-06-15015 June 2022 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise TS to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2022-LLA-0081 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22075A3392022-03-15015 March 2022 NRR E-mail Capture - Columbia Generating Station - Audit Questions - Regulatory Audit of License Amendment Request to Adopt 50.69 - Categorization Process - EPID L-2021-LLA-0207 ML22067A0132022-03-0707 March 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4b - EPID L-2022-LLA-0023 A002515, NRR E-mail Capture - (External Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report2022-01-12012 January 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report ML21348A1852021-12-14014 December 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors - EPID L-2021-LLA-0207 ML21335A0182021-11-30030 November 2021 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Requested Licensing Action - License Amendment Request to Change TS 3.4.11 Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21162A3062021-06-11011 June 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement - EPID L-2021-LLA-0084 ML21137A0012021-05-14014 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21109A2762021-04-0808 April 2021 Email Request for Information for Columbia Generating Station'S PIR Inspection_Redacted ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML21036A2932021-02-0404 February 2021 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2020 Biological Monitoring Report ML20357B1502020-12-22022 December 2020 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request - Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Rev. 2 - EPID L-2020-LLA-0259 ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20314A0452020-11-0606 November 2020 NMFS to Energy Northwest, Entrainment Study Results for Columbia Generating Station ML20297A3032020-10-22022 October 2020 NRR E-mail Capture - LIC-109 Acceptance Review of License Amendment Request for Columbia - Application to Revise Tech Specs to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements - EPID L-2020-LLA-0212 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20265A3242020-09-20020 September 2020 Email 9-20-2020 - Req_ Kick-Off Call Columbia Generating Station RFI Provided for Roll-Back EP Program Inspection (Week of Nov 2 2020) ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20136A0112020-05-14014 May 2020 NRR E-mail Capture - Acceptance Columbia Relief Request ISI Reactor Pressure Vessel Feedwater Nozzles, 4ISI-09 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20090F5532020-03-30030 March 2020 NRR E-mail Capture - Accepted: Columbia Relief Request, EPID: L-2020-LLR-0035 2024-08-01
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Mostala, Abbas A. [AAMOS TALA@energy-northwest.com]
Sent: Thursday, May 12, 2011 2:48 PM To: Cunanan, Arthur Cc: Min, Seung; Mostala, Abbas A.
Subject:
RE: Request for a list of documentation to determine there are no CASS ASME III Class 1 valve less than four inches installed at Columbia Hello Arthur, The documents reviewed to determ ine if there are any CASS va lves less than 4 inches installed at Columbia were: system fl ow diagrams for ASME III Class 1, valve drawings, system design specifications, purchasing requirements, and valve design specifications. This review did not identify any CASS valves less than 4 inches installed at Columbia.
The original LRA assumed that there were ASME III Class 1 CASS valves less than 4 inches because the valve design specificati on allowed the use of CASS valves as an alternate.
To determine the number of installed ASM E III Class 1 CASS valves less than 4 inches at Columbia , the system flow diagrams were reviewed for ASME III Class 1 lines that had valves less than 4 inches . Valve drawings or purchasing requirements were reviewed for these valv es to determine the material. No ASME III Class 1 CASS valves less than 4 inches were identified.
Action Request 234294 Assignment 17 will revise the valve Design Specification to only allow the future use of CASS valves as an alternate at Columbia with certain requirements associated with License R enewal, such as a new Aging Management Program per NUREG 1801 (GALL). Thanks & Regards, Abbas Mostala, , PE License Renewal Project ManagerEnergy NorthwestColumbia Genera ting Station From: Cunanan, Arthur [1]
Sent: Wednesday, May 11, 2011 9:54 AM To: Mostala, Abbas A.
Cc: Min, Seung
Subject:
Request for a list of documentation to determine there are no CASS ASME III Class 1 valve less than four inches installed at Columbia Abbas, 2 By letter dated April 21, 2011 (GO2-11-083) (ADAM accession number: ML11115A098) the applicant stated:
DuringtheconferencecalldiscussedinReference4,EnergyNorthwestagreedtoamendtheLicenseRenewalApplication(LRA)toaddresstheexaminationsofthecastausteniticstainlesssteel(CASS)valvesincludedintheSmallBorePipingProgram(ReferenceRAI3.1.2.3 01).However,duringthereviewofdocumentation,EnergyNorthwestdeterminedthattherearenoCASSASMEIIIclass1valveslessthanfourinchesinstalledatColumbia.Amendment31isprovidedintheEnclosuretoremovethematerialandenvironmentcombinationfromtheLRA. Please provide the staff a list of the documents that the applicant reviewed to determine that there are no
CASS ASME III Class 1 valve less than four inches installed at Columbia.
Response via e-mail is acceptable. The response e-mail will be documented in ADAMS.
Sincerely, Arthur Cunanan Project Manager Division of License Renewal U.S. Nuclear Regulatory Commission 301-415-3897 arthur.cunanan@nrc.gov
Hearing Identifier: NRR_PMDA Email Number: 30 Mail Envelope Properties (11F5592341C9044B8FD83A755C2DA9F70602229C)
Subject:
RE: Request for a list of documentat ion to determine there are no CASS ASME III Class 1 valve less than four inches installed at Columbia Sent Date: 5/12/2011 2:47:45 PM Received Date: 5/12/2011 2:48:03 PM From: Mostala, Abbas A.
Created By: AAMOSTALA@energy-northwest.com Recipients: "Min, Seung" <Seung.Min@nrc.gov> Tracking Status: None "Mostala, Abbas A." <AAMOSTALA@energy-northwest.com> Tracking Status: None "Cunanan, Arthur" <Arthur.Cunanan@nrc.gov> Tracking Status: None Post Office: SERVER153.domain1.energy-northwest.com
Files Size Date & Time MESSAGE 2814 5/12/2011 2:48:03 PM