Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML120450931 | | | number = ML12108A186 |
| | issue date = 02/14/2012 | | | issue date = 04/16/2012 |
| | title = Special IR 05000285-11-406, Fort Calhoun Station, Preliminary Greater than Green Findings | | | title = EA-11-246 - Fort Calhoun Station - Final Significance Determination for Security-Related Greater than Green Findings, NRC Inspection Report 05000285-11-406 and Notice of Violation |
| | author name = Vegel A | | | author name = Collins E E |
| | author affiliation = NRC/RGN-IV/DRS | | | author affiliation = NRC/RGN-IV/ORA |
| | addressee name = Bannister D J | | | addressee name = Bannister D J |
| | addressee affiliation = Omaha Public Power District | | | addressee affiliation = Omaha Public Power District |
Line 13: |
Line 13: |
| | document report number = IR-11-406 | | | document report number = IR-11-406 |
| | document type = Letter | | | document type = Letter |
| | page count = 5 | | | page count = 2 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:OFFICIAL USE ONLY " " February 14, 2012 | | {{#Wiki_filter:FOR " " |
| | FOR April 16, 2012 EA-11-246 |
|
| |
|
| EA-11-246 David J. Bannister, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550
| | David J. Bannister, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-055 |
|
| |
|
| SUBJECT: FORT CALHOUN STATION - NRC SPECIAL INSPECTION REPORT 05000285/2011406; PRELIMINARY GREATER THAN GREEN FINDINGS | | SUBJECT: FORT CALHOUN STATION - FINAL SIGNIFICANCE DETERMINATION FOR SECURITY-RELATED GREATER THAN GREEN FINDINGS, NRC INSPECTION REPORT 05000285/2011406 AND NOTICE OF VIOLATION |
|
| |
|
| ==Dear Mr. Bannister:== | | ==Dear Mr. Bannister:== |
| On January 18, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a reactive inspection at your Fort Calhoun Station. The enclosed inspection report documents the inspection results, which were discussed on January 18, 2012, with Mr. W. Goodell, Manager, Nuclear Performance Improvement and Support, and other members of your staff.
| | This letter provides you the final results of our significance determination of the preliminary Greater than Green findings identified in our previous communication dated February 14, 2012, which included the subject inspection report. These Greater than Green findings were discussed in detail in Sections 3.0 and 3.1 of the subject inspection report. |
|
| |
|
| The inspection was commenced on September 26, 2011, in accordance with NRC Management Directive 8.3, "NRC Incident Investigation Program," and Inspection Manual Chapter 0309, "Reactive Inspection Decision Basis for Reactors," based on the initial deterministic criteria evaluation made by the NRC on June 8, 2011.
| | On March 15, 2012, you provided additional information regarding the findings. In this letter you stated that Omaha Public Power District agrees with the descriptions of the apparent violations, the significance of the violations, and the assigned crosscutting aspects. In addition, you declined your opportunity to discuss this issue in a Regulatory Conference. |
|
| |
|
| The inspection reviewed the circumstances surrounding an issue which occurred on May 24, 2011, and examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The attached report documents one or more findings that have preliminarily been determined to be Greater than Green (i.e., findings of greater than very low security significance) that may result in the need for further evaluation to determine the significance, and therefore the need for additional NRC action. Each finding was assessed based on the best available information, using the Physical Protection Significance Determination Process (PPSDP). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector's left the area.
| | After considering the information developed during the inspection, and the information you provided in your March 15 letter, the NRC has concluded that the inspection findings are appropriately characterized as Greater than Green, a finding having more than very low security significance. Fort Calhoun Station is currently shutdown and in the oversight process described by Inspection Manual Chapter 0350, "Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns." Therefore, follow up inspection activities related to these findings will be incorporated into the Inspection Manual Chapter 0350 restart and inspection process. FOR FOR You have 30 calendar days from the date of this letter to appeal the staff's determination of significance for the identified Greater than Green findings. Such appeals will be considered to have merit only if they meet the criteria given in NRC Inspection Manual Chapter 0609, Attachment 2. |
|
| |
|
| One or more findings are also apparent violations of NRC requirements and are being considered for escalated enforcement action in accordance with the Enforcement Policy, which can be found on the NRC's Web site at http://www.nrc.gov/reading-rm/doc-collections/enforcement. In accordance with NRC Inspection Manual Chapter (IMC) 0609, we intend to complete our evaluation using the best available information and issue our final determination of security significance within 90 days of the date of this letter. The significance determination process encourages an open dialogue between the NRC staff and the licensee; however, the dialogue should not impact the timeliness of the staff's final determination.
| | The NRC has also determined that the conditions discussed are violations of 10 CFR 73.21(a), and 10 CFR 73.55(b)(10), as cited in the attached Notice of Violation (Notice). The circumstances surrounding the violations are described in detail in the subject inspection report. In accordance with the NRC Enforcement Policy, the Notice of Violation is considered escalated enforcement action because it is associated with Greater than Green findings. |
|
| |
|
| Before we make our final significance determination, we are providing you with an opportunity to (1) attend a Regulatory Conference where you can present to the NRC your perspective on the facts and assumptions the NRC used to arrive at the finding and assess its significance; or (2) submit your position of the finding to the NRC in writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of this letter and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective. If a Regulatory Conference is held, it will not be open for public observation. If you decide to submit only a written response, such submittal should be sent to the NRC within 30 days of your receipt of this letter. If you decline to request a Regulatory Conference or submit a written response, you relinquish your right to appeal the final SDP determination, in that by not doing either, you fail to meet the appeal requirements stated in the Prerequisite and Limitation sections of Attachment 2 of IMC 0609.
| | You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. |
|
| |
|
| Please contact Mr. Michael C. Hay, Chief, Plant Support Branch 1, Division of Reactor Safety, at (817) 200-1527 and in writing within 10 days from the issue date of this letter to notify the NRC of your intentions. If we have not heard from you within 10 business days, we will continue with our significance determination and enforcement decision. The final resolution of this matter will be conveyed in separate correspondence.
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents and Access Management System (ADAMS). ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from ADAMS. If Security-Related Information is necessary to provide an acceptable response, please follow the instructions for withholding in 10 CFR 2.390(b)(1). |
|
| |
|
| Because the NRC has not made a final determination in this matter, no Notice of Violation is being issued for these inspection findings at this time. In addition, please be advised that the number and characterization of the apparent violations described in the enclosed inspection report may change as a result of further NRC review.
| | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. You may contact Michael Hay of my staff at 817-200-1215 with any questions. |
|
| |
|
| One crosscutting aspect was assigned to each finding. The crosscutting aspects were both related to problem identification and resolution. The first involved the failure to thoroughly evaluate problems such that resolutions effectively addressed the causes and extent of conditions and the second involved the failure to implement effective corrective actions such that deficiencies are effectively resolved, [P.1.(c)] and [P.1.(d)], respectively. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV, and the NRC Resident Inspector at the Fort Calhoun Station.
| | Sincerely,/RA/ |
| | Elmo E. Collins Regional Administrator Docket: 50-285 License: DPR-40 |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," once separated from the enclosure, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. However, the material enclosed within contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
| | ===Enclosures:=== |
| . Because this issue involves Security-Related Information, if you chose to respond, your response will not be made available for public inspection in the NRC Public Document Room or from the NRC's ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
| | 1. Notice of Violation 2. NRC Evaluations and Conclusions cc w/o enclosures: Electronic Distribution |
| | |
| Sincerely,/RA/ Anton Vegel, Director Division of Reactor Safety
| |
| | |
| Docket: 50-285 License: DPR-40 Nonpublic
| |
| | |
| ===Enclosure:=== | |
| NRC Inspection Report 05000285/2011406 | |
| | |
| ===w/Attachments:===
| |
| 1. Supplemental Information 2. Fort Calhoun Special Inspection Team Charter 3. Chronology of Events at Fort Calhoun
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1262022-08-0303 August 2022 Letter to Roger Trudell, Chairman, Santee Sioux Nation, Nebraska, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1292022-08-0303 August 2022 Letter to Tiauna Carnes, Chairperson, Sac and Fox Nation of Missouri in Kansas, Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1282022-08-0303 August 2022 Letter to Victoria Kitcheyan, Chairwoman, Winnebago Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1232022-08-0303 August 2022 Letter to Mr. Leander Merrick, Chairperson, Omaha Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1272022-08-0303 August 2022 Letter to Vern Jefferson, Chairman, Sac and Fox Tribe of the Mississippi in Iowa, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22159A2152022-06-28028 June 2022 Letter Forwarding FRN on Public Meeting and Request for Comment on License Termination Plan LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information IR 05000285/20220032022-06-15015 June 2022 NRC Inspection Report 05000285/2022003 ML22119A2472022-05-0303 May 2022 Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental Review IR 05000285/20220022022-04-28028 April 2022 NRC Inspection Report 050-00285/2022-002 LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report 2024-01-31
[Table view] |
Text
FOR " "
FOR April 16, 2012 EA-11-246
David J. Bannister, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-055
SUBJECT: FORT CALHOUN STATION - FINAL SIGNIFICANCE DETERMINATION FOR SECURITY-RELATED GREATER THAN GREEN FINDINGS, NRC INSPECTION REPORT 05000285/2011406 AND NOTICE OF VIOLATION
Dear Mr. Bannister:
This letter provides you the final results of our significance determination of the preliminary Greater than Green findings identified in our previous communication dated February 14, 2012, which included the subject inspection report. These Greater than Green findings were discussed in detail in Sections 3.0 and 3.1 of the subject inspection report.
On March 15, 2012, you provided additional information regarding the findings. In this letter you stated that Omaha Public Power District agrees with the descriptions of the apparent violations, the significance of the violations, and the assigned crosscutting aspects. In addition, you declined your opportunity to discuss this issue in a Regulatory Conference.
After considering the information developed during the inspection, and the information you provided in your March 15 letter, the NRC has concluded that the inspection findings are appropriately characterized as Greater than Green, a finding having more than very low security significance. Fort Calhoun Station is currently shutdown and in the oversight process described by Inspection Manual Chapter 0350, "Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns." Therefore, follow up inspection activities related to these findings will be incorporated into the Inspection Manual Chapter 0350 restart and inspection process. FOR FOR You have 30 calendar days from the date of this letter to appeal the staff's determination of significance for the identified Greater than Green findings. Such appeals will be considered to have merit only if they meet the criteria given in NRC Inspection Manual Chapter 0609, Attachment 2.
The NRC has also determined that the conditions discussed are violations of 10 CFR 73.21(a), and 10 CFR 73.55(b)(10), as cited in the attached Notice of Violation (Notice). The circumstances surrounding the violations are described in detail in the subject inspection report. In accordance with the NRC Enforcement Policy, the Notice of Violation is considered escalated enforcement action because it is associated with Greater than Green findings.
You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents and Access Management System (ADAMS). ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from ADAMS. If Security-Related Information is necessary to provide an acceptable response, please follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. You may contact Michael Hay of my staff at 817-200-1215 with any questions.
Sincerely,/RA/
Elmo E. Collins Regional Administrator Docket: 50-285 License: DPR-40
Enclosures:
1. Notice of Violation 2. NRC Evaluations and Conclusions cc w/o enclosures: Electronic Distribution